Samjin Pharmaceutical Research Center
Science + Workplace
2018 · 2021 | CD
Size : 144,000 sq ft
Status : Completed
Location : Seoul, South Korea
Team of 3~6; Junglim Architecture(DA+AOR) + THE_ SYSTEM LAB(DA)
Role : AOR
Software : Revit · AutoCAD · Sketchup · Lumion
The research center offers flexible workspaces with an 43-foot-tall indoor vertical farm, gym, client room, and an outdoor terrace to 150 research scientists.
Detail Elevation & Plans
4 Professional Works
Chkd. Chkd. 검토 검토 Chkd. 담당 Approved 설계 Architect 승인 No. Project 설계명 Date Revision Description Scale 축척 도면명 Title Drawn 협력설계 Consultant Sheet No. No. Project No. 도면번호 Drawing No. 일련번호 프로젝트번호 Rev. PC1642 삼진제약 연구소 설계변경 임 진 우 안 성 우 이 정 훈 A1=1/50, A3=1/100 상세도-6(남측면 화장실) A-806 외벽 평·입·단면 입면상세도 4 옥탑 평면상세도 2 8층 평면상세도 1 (EL+44.00) (EL+39.50) (EL+54.80) 옥 탑 (EL+48.95) X4 8 층 7 층 옥탑지붕 X5 8400 4950 5850 4500 6 7 (EL+44.00) (EL+39.50) (EL+54.80) 옥 탑 (EL+48.95) 8 층 7 층 옥탑지붕 4950 5850 4500 Y2a 700 700 화장실(여) VAR. 900 600 900 VAR. THK3 세라믹 패널 단열(D-W1c) THK28 칼라로이복층유리 VAR. 900 700 1300 1600 1200 1700 550 1600 THK28 칼라로이복층유리 THK10.76 투명접합유리 VAR. 800 VAR. 단열(D-W1c) THK28 칼라로이복층유리 750 상부입면선 외부용 수성페인트 [옥탑 KEY MAP] 옥탑지붕 평면상세도 3 옥탑 캣워크 설치 : THK4.5 EX.메탈(스틸/ 파우더코팅) 200 THK3 알루미늄 시트 Y2b 1000 Y2a 750 Y2b 1000 Y2a 750 Y2b 1000 2 A854 /ㅁ-75X45X3.2 STEEL PIPE @500 (방청페인트 / 우레탄페인트) 이 정 훈 900 700 1300 1600 2600 400 3000 2800 900 600 900 THK50 고강도 콘크리트패널 THK30 남미흑 버너구이 VAR. 900 700 VAR. VAR. 900 700 VAR. THK50 고강도 콘크리트패널 THK100 고강도 콘크리트패널 1 04 17 2020 800 (SGP 필름) THK17.52 저철분접합유리 THK50 고강도 콘크리트패널 VAR. THK50 고강도 콘크리트패널 750 400 350 THK100 고강도 콘크리트패널 (두겁석,W=620) 450 1600 550 700 450 2 05 15 2020 2차 설계변경 1차 설계변경 2 난간설치(TYPE"G") 1 A853 2 3000 VAR. VAR. THK30 남미흑 버너구이 THK30 남미흑 버너구이
5 Samjin Pharmaceutical Research Center
Completed Exterior
6 Professional Works
Design in 2018
Ceiling Plan in 2018
Outsourced Rendering
7
Pharmaceutical Research
X2 Y5 X3 X4 X5 Y4 Y3 Y2a Y1 G3 G3 G4 G4 G3 G3(보 절곡 G1 G3 G3A G1A G9A G9 G3 G5 G5 G2 G2 WG1 WG1 WG1 WG1 WG1 CG2 G11 G11 CG2 DS1A S1 S1 EDS1 EDS1 DS1 EDS1 EDS4 DS4 DS4 DS3 DS4 S1 EDS3 EDS5 EDS5A DS5A EDS5 EDS5 B2 B2 B2 B2 G4 B1A B1A G1B CG1 CG1 G3( 보 절곡 CG1 CG1 B4( 보 절곡 G9A B4 B4 B4 B4 150 450 100 200 150 350 350 250 200 400 300 200 400 B11 B11 B4 B4 4000 13500 18099 650 12000 8400 8400 1700 9000 8700 12000 4000 4000 4200 4200 4200 4200 350 4820 4180 4350 4350 4000 4000 4000 31150 1000 12000 750 7650 5850 2550 350 B1 SL -30 B2C B2C S1 SL -680 3200 WG1 G10 38050 6000 6000 4260 3740 400 7500 1000 8000 8700 12000 450 3750 3750 DS3 DS3 DS1A OPNG 6600 249 450 30050 7500 2850 2950 DS3 SL -60 SL -30 200 300 650 CS1 CS1 부 호 내 용 개 구 부 수 벽 방 수 턱 OPNG 슬래브 OPEN 구간 범 례 축척= 1 100 3층 구조평면도 1 200 Y5 Y4 Y3 Y2a Y2b Y1 X2 X3 Y2 X3a X4 X5 X4a 측부 덧침구간 보 측부 덧침구간 SL -80 1140X2950 1380 940 560 4580 100 190 580 1410 4350 4350 350 190 OPNG OPNG 350 250 650 3층 C5A 기둥 (700 x3150)은 G3A 보 하단 레벨까지 시공 150 300 300 300 300 100 400 200 300 600 190 2760 410 350 150 70 170 70 70 300 300 170 300 210 2605 50 840 520 기둥 덧침 50 B1 DS1A B5 300 2110 300 100 100 480 슬래브 꺽임선 S1 1640 DS2 DS2 DS2 DS2 DS2 DS2 DS2 DS2 DS2 SL -30 보 측부 덧침구간 SL -80) 측부 덧침구간 SL -80) 지상3층 SL±0 =EL+21.50 슬래브 덧침구간 상부 덧침구간 측부 덧침구간 SL ±0 SL-60 SL-100 SL-250 SL-380 SL+800 SL-80 8. SLAB LEVEL 2. 코어 벽체를 제외한 4. WALL GIRDER를 제외한 치수 표기없는 및 벽체는 중심선에서 좌 우 대칭임 주근방향 6. AD, PS, EPS 등의 SLAB Opening 및 벽체 Opening은 해당 설비도면을 참조하여 RC 슬래브 주근방향 슬래브 보강근 2-D16(T&B) 표기없는 벽체의 부호는 W0(THK200) 임 3. 코어 관련 부재는 코어 확대도면 참조 Shop drawing 작성 후 원 구조 기술사 승인 및 공사 감독관 확인을 거쳐 시공한다 3층 구조평면도 S-209 A1=1/100, A3=1/200 NOTES 214,Yulgok-ro,Jongno-gu Seoul, 110-460, Korea Telephone Http://www.junglim.com Chkd. 2 Chkd. 1 Approved 설계 승인 Project 축척 Title 협력설계 Sheet No. No. 도면번호 프로젝트번호 PC1642 삼진제약 연구소 설계변경 임 진 우 안 성 우 이 정 훈 S301 S302 2 S404 300 DS3 B3 CS1 CS1 CS1 S304 350 DS3 콘크리트 턱 50 450 50 450 380 8290 2290 285 4010 250 350 50 940 585 930 501 100 430 2B 4B 2A 2A 1B 6 7 11 400 100 400 100 7 S434 8 SS1 SS1 1100 165 1365 1470 1485 3885 1100 2700 3000 EDS5 EDS5 CS2 b1 EDS4A 1450 600 5700 1200 1 1 1 940XH(VAR.) 940XH(VAR.) 이 정 훈 1 0417 2020 1차 설계변경 45m/Min NOTES 검토 검토 담당 Approved 설계 설계명 축척 도면명 Consultant Project No. 도면번호 일련번호 삼진제약 4층 A1=1/100, 4층 평면도 축척 1/100 1 진탕/세척/암실 403 2700 샘플보관실 404 2700 칭량실 405 2700 기기실2 407 2700 A.D FL±0 창고 A.V TPS PS EPS 공조실 4N01 FL±0 회의실 ELEV. 홀/복도 4P01 2700 계단실-2 화장실(남) 4T01 2400 화장실(여) 청소창고 4T03 2400 FL±0 SL-60 용출/이화학실험실 401SL-30,-60 FL±0 FL±0 SL-60 SL-60 FL±0 SL-60 SL±0 SL±0 SL±0 SL±0 계단실-1 4ST01 1300 12000 8400 8400 2100 32200 800 9000 8700 12000 900 31400 1000 8000 Y5 Y3 Y4 Y2a Y2a Y2b Y3 X2 X3 X4 X5 1. 4층 FL±0 분석연구실 409 2700 (실험가구배치도) (실험가구배치도) 안정성실 402 2700 기기실1 406 2700 FL±0 SL±0 FL±0 SL±0 FL±0 SL±0 FL±0 SL±0 4F 전기, 기기실2 실험가스 1차 증류수 급수, 급수, 칭량실 실험가스 UPS 콘센트 FL±0 SL±0 FL±0 SL-100 탕비실 FL±0 SL-60 1 0417 2020 Completed Research & Testing Lab Level 4 Furniture Layout Plan Level 3 Structural Plan
Samjin
Center
Acute Respiratory Infections Treatment Center
Healthcare + Renovation
2018 ~ 2022 | All Phases (Competition ~ CA)
Size : 238,000 sq ft
Status : Completed
Location : Seoul, South Korea
Team of 13; Junglim Architecture(DA+AOR)
Role : DA+AOR
Software : Revit · AutoCAD · Sketchup · Lumion
As one of three additions to Hyundai Asan Medical Center campus, the new 57-bed Acute Respiratory Infections Treatment Center is constructed on top of the renovated existing basement and features the fritted glass façade, which is designed to reflect the greenery of the central park, and a negative pressure system.
8 Professional Works
9 Hyundai Asan Medical Center Expansion
Completed Façade
Façade Design Development
10 Professional Works
통경축 서관 동관 아산중앙공원 I동 호흡기센터 Mirror Screen 성내천 신관
Fritted Glass Façade Pattern
Outsourced Rendering
Façade Details
Detail Elevation
11 Hyundai Asan Medical Center Expansion
12 Professional Works Completed Waiting Room Waiting Room Interior Elevation & Render 눌 러 세 요 4'-11" 9'-9" 1'-6" 8'-2" 8'-9" Wood Texture Interior Film Eco-Friendly Gloss Paint Cove Lighting Cove Lighting Rubber Sheet Baseboard Rubber Sheet Baseboard 8" 8'-10" 8'-10" 12'-3" 13'-7" 8'-9" 12'-3" 8'-10" 2' 3'-10" 2' 3'-5" 2' 7 3/4" 4 3/4" 2" 4 3/4" 1" 4 3/4" X 4 3/4" Recessed Linear Light Fixture
13
Hyundai Asan Medical Center Expansion
Completed Interior Furniture Details & Interior Render
Automated Material Handling System Options
14 Professional Works
HVAC Zonings for Negative Pressure System
Accessible Design
15 Hyundai Asan Medical Center Expansion
3 Usergroup Meeting
Sterile Supply Layout Adjustments
Level
Central
Cardiovascular Center
Healthcare + Higher Education + Retail
2018 ~ 2021 | Competition ~ CD
Size : 909,000 sq ft
Status : On Hold
Location : Seoul, South Korea
Team of 13; Junglim Architecture(DA+AOR)
Role : DA+AOR
Software : AutoCAD · Sketchup · Lumion · Twinmotion
Hyundai Asan Medical Center’s Cardiovascular Center will provide 300 beds, faculty offices in which the existing facilities lacks, atriums for natural light, and underground connections to existing facilities and newly built parking garage.
16 Professional Works
17 Hyundai Asan Medical Center Expansion
Northside Exterior
Outsourced Rendering
18 Professional Works Detail Section of the Main Entrance Y9 28'-10" 31'-5" Y8 2'-8" 19'-8" 8'-3" 2'-4" Vestibule#1 6" Concrete Driveway Slab Waterproofing Membrane Civil Engineering Works w/ Textile Reinforcement 2" Anti Vibration Pad 2'-8" Transition Strip Colored Stainless Steel Sheet 11'-2" Aluminum Louver Fiberglass Insulation UPS Room 1" Double-Glazed Low-E Glass Lobby Level 3 Level 2 Level 1 2'-8" 17'-8" 9'-5" 2'-6" 2'-8" 8'-6" Motorized Roller Shades Pocket Headbox A-3 1'-2" 1'-9" Medicine Preparation Room Corridor Meeting Room Training Room
19 Hyundai Asan Medical Center Expansion
Material & Lighting Design for the Main Entrance
20 Professional Works
Vestibule Entry Design Options
21 Hyundai Asan Medical Center Expansion
W
Ceiling Height
22 Professional Works
1.4m 1.4m 4600 2,620 3,000 2,850 650 900 x 600 170 820 Conference Hall Interior
Accessible Design
다원제안
다원제안
위로 100이동 및 오른쪽으로 확장
위로 100이동 및 오른쪽으로 확장
위로 100이동 및 오른쪽으로 확장
가구오염 방지를 위한 벽체 내밈(벽체 보호를 위한 벽지 필수)
가구오염 방지를 위한 벽체 내밈(벽체 보호를 위한 벽지 필수)
가구(인테리어)로 커튼 숨김
가구오염 방지를 위한 벽체 내밈(벽체 보호를 위한 벽지 필수)
가구(인테리어)로 커튼 숨김
가구(인테리어)로 커튼 숨김
오른쪽으로 150이동
오른쪽으로 150이동
오른쪽으로 150이동
세면기의 도기형 사용으로 깊이 축소
세면기의 도기형 사용으로 깊이 축소
세면기의 도기형 사용으로 깊이 축소
커튼박스 조성 시, 미니냉장고 배치 예정이므로 빌트인 가구 조성시 500mm는 다소 비좁을 것으로 판단됩니다. 커튼 노출형 일 시, 빌트인 가구 600mm depth 확보되며 청소 유지관리면에서 합리적이라고 판단됩니다.
커튼박스 조성 시, 미니냉장고 배치 예정이므로 빌트인 조성시 500mm는 다소 비좁을 것으로 판단됩니다.
커튼 노출형 일 시, 빌트인 가구 600mm depth 확보되며 유지관리면에서 합리적이라고 판단됩니다.
다원제안 커튼박스 조성 시, 미니냉장고 배치 조성시 500mm는 다소 비좁을 커튼 노출형 일 시, 빌트인 가구 유지관리면에서 합리적이라고 판단됩니다.
23 Hyundai Asan Medical Center Expansion M M
원 안 정림제안
100 150
500 M M 원 안 정림제안
100 150
500 600 M 650 M M 안 정림제안
150
100
500 600 M 650 Inpatient Unit Options
Office Floor Plan
Faculty
Parking Garage
Infrastructure
2018 ~ 2022 | DD ~ CA
Size : 370,000 sq ft
Status : Completed
Location : Seoul, South Korea
Team of 13; Junglim Architecture(DA+AOR)
Role : AOR
Software : AutoCAD · Rhinoceros 3D · Sketchup · Lumion
In design of the new 1,296-stall parking garage for Hyundai Asan Medical Center, expanded metal panels and aluminum louver are applied on the façade for the green wall to be created.
24 Professional Works
25 Hyundai Asan Medical Center Expansion
Completed Exterior
26 Professional Works Expanded Metal Façade Design Development Overall Development Aluminum Expanded Metal Aluminum Transom M12, Hex Head Machine Bolt W/ Lock Washer & Nut Galvanized Steel Anchor Clip Aluminum Expanded Metal Aluminum Transom M12, Hex Head Machine Bolt W/ Lock Washer & Nut Aluminum Angle Aluminum Extruded Louver Aluminum Mullion Galvanized Steel Beam Galvanized Steel Anchor Clip Set-Anchor M16, Hex Head Machine Bolt W/ Flat Washers W/ Lock Washer & Nut Galvanized Steel Anchor Plate Level 1 Exterior Finish Aluminum Expanded Metal Aluminum Angle Aluminum Extruded Louver Aluminum Mullion Aluminum Transom M12, Hex Head Machine Bolt W/ Flat Washers W/ Lock Washer & Nut Galvanized Steel Anchor Clip Set Anchor Ground Level 25' 2' 54'-5" A 2' 25' OUT Parking 24'-7" 13'-9" 24'-7" A15 A16 A17 A18 A19 24'-7" 24'-7" 24'-7" A13 A14 420'-6" 24'-7" A1 13'-9" A2 A3 A4 A5 24'-7" 24'-7" 24'-7" 24'-7" 24'-7" 24'-7" 24'-7" 24'-7" 24'-7" 24'-7" A6 A7 A8 A9 A10 A11 A12 IN Restroom Restroom 54'-5" B5 2' 25' B4 54'-8" 218'-9" 54'-8" 54'-8" B2 B3 54'-8" B1 25' 2' 54'-5" A Parking
27 Hyundai Asan Medical Center Expansion Façade Detail Elevation & Section A10 A11 24'-7" 24'-7" 11'-2" 11'-2" 11'-2" 11'-2" 3'-3" 3'-3" 3'-3" 3'-3" 3'-3" 3'-3" 3'-3" 3'-11" 0'-8" Expanded Metal Panel A Type (Powder Coating) A12 A9 3'-5" 3'-3" 3'-3" 3'-3" 3'-3" 3'-3" 3'-3" 3'-3" 7'-2" 3'-11" 1'-0" 6'-3" 3'-11" 7'-2" 3'-11" 1'-0" 6'-3" 3'-5" 2'-2" 11'-2" 11'-2" 11'-2" 11'-2" 0'-8" B1 Aluminum Expanded Metal Panel 3'-5" 2'-2" Guardrail Continuous Steel Channel (Powder Coating) 48'-8" Aluminum Handrail Stainless Steel (Hairline Finished) Safety Handrail Steel Beam EL16.40 Level 1 Level 2 Level 3 Level 4 Rooftop EL16.40 Level 1 Level 2 Level 3 Level 4 Rooftop 3'-3" 3'-3" Stainless Steel (Hairline Finished) x Aluminum Extruded Louver 24'-7" Steel Beam 2'-0" 1'-7" Side Gutter A10 A11 24'-7" 24'-7" 11'-2" 11'-2" 11'-2" 11'-2" 3'-3" 3'-3" 3'-3" 3'-3" 3'-3" 3'-3" 3'-3" 3'-11" 0'-8" Expanded Metal Panel A Type (Powder Coating) A12 A9 3'-5" 3'-3" 3'-3" 3'-3" 3'-3" 3'-3" 3'-3" 3'-3" 7'-2" 3'-11" 1'-0" 6'-3" 3'-11" 7'-2" 3'-11" 1'-0" 6'-3" 3'-5" 2'-2" 11'-2" 11'-2" 11'-2" 11'-2" 0'-8" Aluminum Expanded Metal Panel 3'-5" 2'-2" Continuous Steel Channel (Powder Coating) 48'-8" Aluminum Handrail Stainless Steel (Hairline Finished) Safety Steel Beam EL16.40 Level 1 Level 2 Level 3 Level 4 Rooftop EL16.40 Level 1 Level 2 Level 3 Level 4 Rooftop 3'-3" 3'-3" Stainless Steel (Hairline Finished) Aluminum Extruded Louver 24'-7" Steel Beam Side Gutter A11 24'-7" 3'-3" 3'-3" 3'-3" 3'-3" 3'-3" 3'-3" 3'-11" Expanded Metal Panel A Type (Powder Coating) A12 3'-3" 3'-3" 3'-3" 3'-3" 3'-3" 3'-3" 7'-2" 3'-11" 1'-0" 6'-3" 3'-11" 7'-2" 3'-11" 1'-0" 6'-3" 3'-5" 2'-2" 11'-2" 11'-2" 11'-2" 11'-2" 0'-8" B1 54'-9" B2 Parking Aluminum Expanded Metal Panel 3'-5" 2'-2" Parking 8'-10" 8'-10" Parking 8'-10" Parking 8'-10" Guardrail Continuous Steel Channel (Powder Coating) 48'-8" Aluminum Handrail Waterproof Membrane Protection Layer Landscape 3" ~ 9" Topping Concrete (W.M#4-100X100) Stainless Steel (Hairline Finished) Safety Handrail Steel Beam EL16.40 Level 1 Level 2 Level 3 Level 4 Rooftop Polyethylene Vapor Barrier Civil Engineering Works 40" Concrete Ground Slab Steel (Hairline Finished) x x x x x x x x x x Aluminum Extruded Louver 24'-7" Steel Beam 2'-0" 1'-7" Side Gutter A11 24'-7" 3'-3" 3'-3" 3'-3" 3'-3" 3'-3" 3'-11" Expanded Metal Panel A Type (Powder Coating) A12 3'-3" 3'-3" 3'-3" 3'-3" 3'-3" 7'-2" 3'-11" 1'-0" 6'-3" 3'-11" 7'-2" 3'-11" 1'-0" 6'-3" 3'-5" 2'-2" 11'-2" 11'-2" 11'-2" 11'-2" 0'-8" B1 54'-9" B2 Parking Aluminum Expanded Metal Panel 3'-5" 2'-2" Parking 8'-10" 8'-10" Parking 8'-10" Parking 8'-10" Guardrail Continuous Steel Channel (Powder Coating) 48'-8" Aluminum Handrail Waterproof Membrane Protection Layer Landscape 3" ~ 9" Topping Concrete (W.M#4-100X100) Stainless Steel (Hairline Finished) Safety Handrail Steel Beam EL16.40 Level 1 Level 2 Level 3 Level 4 Rooftop Polyethylene Vapor Barrier Civil Engineering Works 40" Concrete Ground Slab Finished) x x x x x x x x x Aluminum Extruded Louver 24'-7" 2'-0" 1'-7" Side Gutter
Hyundai Asan Medical Center Campus
Master Plan
2018 ~ 2021 | Competition ~ DD
Size : 1,517,000 sq ft
Status : Partially Completed
Location : Seoul, South Korea
Team of 13; Junglim Architecture(DA+AOR)
Role : DA+AOR
Software : AutoCAD · Sketchup · Lumion
Hyundai Asan Medical Center campus expansion is planned to be executed, while the existing facilities operate, in two phases: first, Acute Respiratory Infections Treatment Center and parking garage gets constructed while improving the in-campus traffics and landscaped land usage. And second, Cardiovascular Center will be built considering traffic rerouting.
28 Professional Works
29 Hyundai Asan Medical Center Expansion Medical Center Campus
Outsourced Rendering
30 Professional Works N
Acute Respiratory Infections Treatment Center 2. Cardiovascular Center 3. Parking Garage
Central Park
Existing Buildings 1 2 3 4 5 5 5 5 5 5 Site Plan
1.
4.
5.
31 Hyundai Asan Medical Center Expansion
Ecosystem Assessment
Traffic Management Plan
Bongcheon Apartment
Residential
2018 ~ 2021 | SD + CA + Signage
Size : 7,000 sq ft
Status : Completed
Location : Seoul, South Korea
Team of 4; R.A.K Architects & Associates(DA+AOR)
Role :
Software : AutoCAD · Sketchup · Vray
This six-story apartment with 15 units features brick façade, where thinned head joints and raked bed joints create the horizontal texture, and signage consisting of powder coated galvanized steel sheet and steel spacer.
32 Professional Works
Signage Design
Façade in Costruction
33 Bongcheon Apartment
Completed Exterior
Translational Research Hospital
Healthcare + Science + Master Plan
2021 ~ 2022 | Competition ~ SD
Size : 1,119,000 sq ft
Status : In Design
Location : Baegot, South Korea
Team of 6; Junglim Architecture(DA+AOR)
Role : DA
Software : AutoCAD · Rhinoceros 3D · Sketchup · Enscape
Designed in coordination with usergroup, consultants, and HDR, this 800-bed Seoul National University’s Translational Research Hospital in Baegot will function as a Brain Cognitive Science Bio-Specialty Center, featuring both vertically and horizontally integrated treatment-clinical-researcheducation healthcare model and a massing extending to the second phase site.
Outsourced Rendering
34 Professional Works
35 Translational Research Hospital
2nd Phase Master Plan
36 Professional Works N Massing Options 2nd Phase Master Plan
Space Programming in collaboration with HDR
Block Plan Options
37 Translational Research Hospital
2nd Phase Elevation
Osiria Wellness-Focused Senior Housing
Residential + Retail + Hospitality
2018 | Competition
Size : 1,768,000 sq ft
Status : On Hold
Location : Busan, South Korea
Team of 7; Junglim Architecture(DA)
Role : DA
Software : AutoCAD · Rhinoceros 3D · Sketchup · Lumion
The senior housing consists of five towers for 600 residential units and 90 inpatient units of senior medical center, along with the amenities, such as learning center, daycare center, dining lounge, art studio, wellness facilities, and outdoor trail, bridging connections between the towers on a second and rooftop levels.
38 Professional Works
39 Osiria Wellness-Focused Senior Housing
Rooftop Common Area
Outsourced Rendering
Concept Sketches
Façade Variations
40 Professional Works
Outsourced Rendering
Outsourced Rendering
8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 N N 1. Swimming Pool 2. Neighbor Lounge 3. Art Studio 4. Library, Movie Theatre 5. Spa 6. Senior Medical Center 7. Guest House for Families 8. Bridge 9. Learning & Mentoring Center 10. Dining Room 1. Lobby & Amenities 2. Neighbor Lounge 3. F&B Service 4. Preschool & Daycare Center 5. Gallery 6. Dining Room 7. Fitness Center 8. Guest House for Families 9. Senior Medical Center 10. Park 2 3 4 5 6 7 8 9 10 1 1 2 3 3 3 4 5 10 6 7 8 9 Level 2 Floor Plan Ground Floor Plan
Marina City Harbor Front Retail Space
Retail + Hospitality + Culture
2015 | SD
Size : 2,135,000 sq ft
Status : On Hold
Location : Tokyo, Japan
Team of 4; Kengo Kuma And Associates(DA)
Role : DA
Software : Rhinoceros 3D · Lumion
Located on the harbor front, Marina City seeks to create a new destination on the harbor front by introducing an indoor and outdoor retail space with a landscaped roof forming a linear elevated park. On the ground level, the promenade along the harbor connects the retail space, a rooftop observatory, Marina yacht club with a yacht showroom, an immigration office, and a 17-story hotel.
Elevated Park Scale Model
42 Professional Works
Drop-off Hotel Hotel Pool and terrace Hotel guest rooms (level 5th > 16th) Hotel reception Drop-off Convention Water brake wall Drop-off Convention Buses Hotel roof gardens Convention reception Outdoor car-parking Two level indoor car-parking 25 m swimming Pool pond storage Terrace 6.00 FLOOR 3 3.80 01 02 03 05 06 07 09 10 11 13 02 03 04 X X 07 08 09 X 10 X 12 01 NOTE: Schematic Design Part DRAWN APPROVED PROJ. TITLE: Haeundae Marina City Hotel X10 X11 X12 Section A-A' _1:500 Infinite edge pool facing the marina Hotel drop-off porch DROP-OFF FLOOR (3rd floor) Kiss and Ride , Pool and Terrace Bar. Reference images KENGO Haeundae 25 m swimming Pool Pool Panoramic Pool jacuzzi HOTEL LOUNGE Refl. pond storage Pool Terrace drop-off hotel FLOOR 3 Recept. counter 01 02 03 04 05 06 07 08 09 10 11 12 13 X 02 X 03 04 X 05 06 X 07 X 08 09 X 10 11 X 12 X 01 +81 3 3401 7721 F. +81 3401 7778 Date Revision Description By Approved Checked Date These drawings are not for construction STATE: Schematic Design _ Part 1 DRAWN Drawing Title: Haeundae Marina City Hotel Plan floor 1F 14F 5.00 3.80 3.80 3.50 3.50 3.80 3.80 3.80 3.80 3.80 3.80 3.80 3.80 3.80 3.80 3.80 3.80 3.80 3.80 3.80 X01 X02 X03 X04 X05 X06 X07 X08 X09 X10 X11 X12 2.90 PARKING PARKING RESTAURANT PARKING POOL TERRACE 7.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 4.10 2.90 2.50 2.30 2.00 2.90 2.40 PARKING MEETING ROOM CONV. REC. T. +81 3 3401 7721 F. +81 3 3401 7778 2-24-8 minamiaoyama minato-ku Tokyo 107-0062 Revision Description By Approved NOTE: These drawings are not for construction STATE: Schematic Design _ Part 1 2015.06.25 01 first submission KKAA Cars flows 3rd floor Section A-A' _1:500 Cars flows _ first floor Cars flows _ second floor 2015.07.07 02 2nd submission KKAA Infinite edge pool facing the marina Hotel drop-off porch DROP-OFF FLOOR
floor) Kiss and Ride , Pool and Terrace
Hotel description: main entrance KENGO KUMA & ASSOCIATES 15th.July.2015 Concept Design Haeundae Marina City Project 20
(3rd
Bar. Reference images
Hotel Floor Plan & Section
43 Marina City Harbor Front Retail Space
Neowa Dome Pavilion
Culture
2015 | SD ~ CD
Size : 300 sq ft
Status : Completed
Location : Gwangju, South Korea
Team of 2; Kengo Kuma And Associates(DA+AOR)
Role : DA
Software : Rhinoceros 3D · Lumion
Designed for Asia Culture Center as part of its permanent exhibition, the pavilion consists of birch plywood boards meticulously connected vertically with stainless steel dowel pins.
44 Professional Works
Scale Model
Connections
Construction Details
Elevation
45 Neowa Dome Pavilion !"#$%&'('' )*%+ ,-./0'1 ,-./0'( ,-./0'2 345/
Completed Pavilion
YOUNGMIN KANG