2
PROFESSIONAL WORKS
3
Chengdu Luxelake Commercial Community
Employment Information
Company: MVRDV
Project Information
Location: Chengdu, China
GFA: 22,200m2
Type: Commercial Status: In Later Schematic Design Stage
Chengdu Luxelake Commercial Community is a transformative lifestyle shopping mall that seamlessly blends the urban spirit with the deep-rooted connection to nature, which is essential to the city’s ethos. This innovative mall transcends conventional shopping experiences to become an embodiment of Chengdu’s unique attitude, celebrating the harmony between modern living and the lush greenery that defines the region.
My responsibilities involve ensuring the seamless integration of various elements to bring the mall’s vision to life - this includes guiding the project’s progress, balancing functional design, client objectives, and sustainable principles.
I was involved in the Concept Design and Schematic Design phase. I collaborate closely with MEP engineers to integrate essential building services like lighting, ventilation, and plumbing. I also worked with fire safety consultants to ensure compliance with fire codes and regulations. Strategically placing fire escapes, implementing fire-resistant materials, and integrating fire suppression systems are essential aspects to prioritize the safety of mall occupants.
As a part of the design team, I was also responsible for the drawing package production as well as renderings and diagrams. The project is progressing smoothly in its final Schematic Design stage now.
4
5
Masterplan color 彩色总平面
Design concept 设计概念 从传统商场到麓湖
Chengwan Road 橙湾路
Bay Drop-off 落客港湾 Fire Truck Entrance 消防车入口 Parking Entrance 地下车库出入口 Commercial Entrance 商业入口 Commercial Entrance 商业入口 Commercial Entrance 商业入口 Vehicle Entrance 机动车出入口 Non-Vehicle Entrance 非机动车出入口 Commercial Entrance 商业入口 Commercial Entrance 商业入口 10.70 99.20 16.00 16.00 5.60 10.80 21.20 26.40 88.80 94.00 4F 3F 2F 4F 19F 3F 6F 18F 5F 4F 3F 2F 1F 3F 2F Site Boundary 用地红线 Podium Setback Line 裙房用地退线 B1 Boundary 地下室边界线 Tower 塔楼 19F H=99.2m ±0.000=485.820 Podium 裙房 4F H=22.3m ±0.000=485.820 Podium 裙房 4F H=20.9m ±0.000=485.820 485.720 Commercial Entrance 商业入口 56005000 3 0 0 0 0 15000 15000 19400 32000 127800 160800 39000
Waterfront Park 环水公园 3381 480.820 479.720 485.720 485.720 485.470 485.720 483.020 485.079 485.411 485.639 485.762 485.822 485.882 485.942 486.002 486.062 486.100486.122 484.703 484.518 484.743 484.995 485.332 2F Tower Setback Line 塔楼用地退线 NumberDescription 150% 2100%
Concept diagram Masterplan 6
Park-front view
立面_不允许改动 change allowed
I engaged in close communication with Client’s various departments, including marketing and operations.The iterative approach involves constant refinement of the design to meet their demands. Feedback from different stakeholders were use it to improve the layout, aesthetics, and functionality of the mall.
Meanwhile, we decided to utilize a modular grid system ensure precision in alignment and construction, resulting in a cohesive and polished appearance. The grid allows for easy customization while maintaining an overall sense of unity.
Facade types 立面类型
Facing Park 面向公园
Facing Corridor 面向内庭院
Facing North 面向北侧
Facade types 立面类型
MEP, Fire wall 设备,防火墙
Facing Park 面向公园
Facing Corridor 面向内庭院 Facing North 面向北侧
Fire wall
88 Density 0.5m 密度 0.5m 密度1m 密度1.5m 密度1.5m 密度2m 密度2m 密度3m Density 1m Density 1.5m Density 2m Density 2m Density 1.5m Density 3m Depth 300mm Depth 150mm 进深 150mm 进深 300mm Facing park Facing corridor Facing North MEP, Fire wall 设备,防火墙 Facing Park 面向公园 Facing Corridor 面向内庭院 Facing North 面向北侧 MEP, Fire wall 设备,防火墙
MEP floor 设备层 四层 三层 二层 一层 F4 F3 F2 F1 Public corridor view Facade types Facade types
Density 0.5m 密度 0.5m 密度1m 密度1.5m 密度1.5m 密度2m 密度2m 密度3m Density 1m Density 1.5m Density 2m Density 2m Density 1.5m Density 3m Depth 300mm Depth 150mm 进深 150mm 进深 300mm Facing park Facing corridor Facing North MEP, Fire wall 设备,防火墙
MEP,
7
设备,防火墙
L1 Floor plan
LEVEL 01_P LEVEL 01_P LEVEL -01_P -6000 LEVEL 02_P 5600 LEVEL 02_P 5600 LEVEL 03 10800 LEVEL 04 16000 LEVEL 05 21200 LEVEL 06 26400 LEVEL 07 31600 LEVEL 08 36800 LEVEL 09 42000 LEVEL 10 47200 LEVEL 11 52400 LEVEL 12 57600 LEVEL 13 62800 LEVEL 14 68000 LEVEL 15 73200 LEVEL 16 78400 LEVEL 17 83600 LEVEL 18 88800 LEVEL 19 94000 TOWER MEP 99200 LEVEL 03_P 10700 LEVEL 03_P 10700 LEVEL 04_P 15800 LEVEL 04_P 15800 LEVEL P ROOF_W 20900 T-A T-B T-C PODIUM ROOF_W 25000 B-D P-A P-B P-C P-D P-E P-F P-G P-H P-I LEVEL -01 -4900 LEVEL -02 -9700 B-C B-B T-D P-J P-K P-L P-M P-N TOWER ROOF 104400 LEVEL P MEP_E 22300 LEVEL ROOF_E 27400 7400 8400 6300 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 10800 4900 4800 6150 8450 6150 6900 6750 8400 8400 6000 8400 6000 8400 6000 8400 6000 8500 8400 4100 5100 5100 5100 5600 5100 6500 5100 5100 5600 6000 3700 RETAIL 商业 RETAIL 商业 LOBBY 大堂 LOBBY 大堂 商业 RETAIL 商业 商业 RETAIL 商业 RETAIL 商业 RETAIL 商业 商业 RETAIL 商业 RETAIL 商业 RETAIL 商业 RETAIL 商业 RETAIL 商业 RETAIL 商业 RETAIL 商业 MEP 设备屋面 商业 商业 RETAIL 商业 商业 商业 RETAIL 商业 MEP 消防控制室 CORE 核心筒 设备屋面 RETAIL 商业 商业 RETAIL 商业 CARPARK 停车场 2299 m² CARPARK 停车场 +31 (0) 477 2860 drawing number subject format client location scale A1 比比 主 图图 日日 标标 图图 项目目目 As indicated SD -A-202 SECTIONS 剖面二 2023/07/07 成都万华新城投资股份有限公司 四川省成都市双流区澄湾路与嘉州路交叉口 成都麓湖 A17 社区商业 SD Chengdu Luxe Lake A17 1 250 SECTION 4 剖面图 1 Revision Schedule 2100% Schematic Design07/07/23 LEVEL 01_P 0 LEVEL -01_P -6000 LEVEL 02_P 5600 LEVEL 03_P 10700 LEVEL 04_P 15800 LEVEL P MEP_E 22300 5100 6500 5100 5100 5600 6000 3700 RETAIL 商业 RETAIL 商业 RETAIL 商业 RETAIL 商业 CORE 核心筒 RETAIL 商业 Achterklooster 7 3011 RA Rotterdam +31 (0) 10 477 2860 www.mvrdv.com drawing number subject date format client location scale A1 比比 业主 图图 日日 标标 图图号 项目目目 As indicated SD -A-202 SECTIONS 剖面二 2023/07/07 Chengdu Wide Horizon Investment Group 成都万华新城投资股份有限公司 四川省成都市双流区澄湾路与嘉州路交叉口 成都麓湖 A17 社区商业 SD Chengdu Luxe Lake A17 Sections 剖面图 163 UP T-A T-B T-C T-1 T-2 T-3 T-4 P-A P-B P-C P-D P-E P-F P-G P-H P-I P-1 P-2 P-4 P-3 P-5 T-D P-J 6300 8400 7400 8400 6000 8400 6000 8400 6000 8400 8400 6750 6900 6150 8450 615 0.00 124 m² RETAIL 商业 133 m² RETAIL 商业 113 m² RETAIL 商业 商业 190 m² RETAIL 商业 P-K P-L P-M P-N P-6 P-7 P-8 P-9 P-10 664 m² 商业 大堂 37 m² LOBBY 大堂 商业 28900 7700 7700 7700 1:5 0.00 3000 5000 4000 KITCHEN 厨房 厨房 厨房 KITCHEN 厨房 404 m² RETAIL 商业 -0.100 -0.100 -0.100 -0.100 4000 160 m² RETAIL 商业 317 m² RETAIL 商业 KITCHEN 3000 -0.100 0.00 0.00 0.00 0.00 0.00 25000 13000 19000 drawing number subject date format client location scale A1 比比 业主 图图 日日 标标 图图号 项目目目 SD -A-101 一层平面图 2023/07/07 Chengdu Wide Horizon Investment Group 成都万华新城投资股份有限公司 四川省成都市双流区澄湾路与嘉州路交叉口 成都麓湖 A17 社区商业 SD Chengdu Luxe Lake A17 1 250 LEVEL 01 一层平面图 1 NumberDescription Date 150% Schematic Design10/05/23 2100% Schematic Design07/07/23
一层平面 146 Section Front view L1 Floorplan 8
Podium facade types 裙房立面类型
Based on the grid system, the facade is carefully designed to enhance the functionality of the mall. It takes into account factors like natural lighting, ventilation, and climate control. The placement of windows, louvers, and shading devices is strategically determined to optimize energy efficiency while creating a comfortable indoor environment.
Within this grid, a careful selection of materials, textures, and colors is employed to create a dynamic visual experience. I was responsible in coordination with facade and MEP consultant to constantly optimize the design and construction details, in order to deliver a building with harmonious balance between practicality, visual appeal, and seamless integration within its environment.
Glass Door 玻璃衬板 Open
格栅(20%) 玻璃 门 门+雨蓬 开启 通透面 Door + Canopy Opening Louvres (20%) Glass Door Shadow box 玻璃衬板 Open Closed 96 格栅(20%) 玻璃 门 门+雨蓬 开启 通透面 实体面 Door + Canopy Opening Louvres (20%) P-4 LEVEL 01_P 0 LEVEL 02_P 5600 LEVEL 03_P 10700 LEVEL 04_P 15800 LEVEL P ROOF_W 20900 P-4 P-3 P-5 7800 5400 5100 5100 5100 5600 1100 1000 3000 1100 1000 4100 1000 3500 1100 1 D-503 1 D-504 1 D-505 1 D-506 1 D-507 1 D-508 1000 3000 1 100 DETAIL SECTION 剖面大样图 3 Revision Schedule NumberDescription Date 150% Schematic Design10/05/23 2100% Schematic Design07/07/23 indoor 室内 6HS+1.52PVB+6HS+12A+10FT 超白半钢+1.52PVB+6 超白半钢+12A+10 超白钢 concrete slab 混凝土楼板 20mm screed 20 厚 水泥砂浆找平 double waterproofing layer 厚双层防水卷材 screed slop 细石混凝土找坡,最薄处 Floor support 地板支撑器 terrazzo floor 成品水磨石地板 80mm EPS insullation 80 厚EPS挤塑聚苯板 outdoor 室外 100x100mm spacing metal grille 100x100mm 金属格栅 concrete finishing 清水混凝土完成面 250 项目地址 成都麓湖 社区商业 SD Podium Detail 裙房细部节点 concrete slab 混凝土楼板 20 : 水泥砂浆找平 double waterproofing layer 厚双层防水卷材 3mm PVDF Aluminum panel 铝单板 concrete finishing 清水混凝土完成面 screed slop 细石混凝土找坡,最薄处 50x50 aluminum profile shadow gap 50X50 铝型材阴影缝 aluminum profile fin 铝型材 80mm EPS insullation 挤塑聚苯板 indoor 室内 超白半钢 超白半钢 超白钢 450 50 150 drawing number A1 图纸号 成都麓湖 社区商业 SD Chengdu Luxe Lake A17 Podium Detail 裙房细部节点
121
Podium facade detailed section 裙房立面细部剖面图
Section details
9
Facade module types
Pujiang Viewing Platform
Employment Information
Company: MVRDV
Project Information
Location: Chengdu, China
GFA: 400m2
Type: Public
Status: Design Development completed. Construction to commence soon
The project is a viewing platform situated in the mountain region of Chengdu, China. The architecture is a fusion of contemporary aesthetics and organic forms, resulting in an iconic and instantly recognizable silhouette against the mountain backdrop. Its curvilinear lines mimic the rising moon, creating a seamless transition between the built environment and nature. Timber is used as main structure of the building, in order to minimize carbon footprint while adding a touch of authenticity that resonates with the area’s history and culture.
I participated in this project from its initial Concept Design phase, to the completion of Design Development, and was involved in all aspects of the design and coordination given its relatively small scale (despite a few challenges in its functional and design-related intricacies).
I also communicated with the Client closely to understand their ambitions for the project and implement those into the design in optimal ways. It was important to deliver the building with minimal impact to its untouched natural context and local neighbourhood, while creating a pioneering innovative landmark that fulfil multiple functions such as meeting, public lecturing, catering.
The project is now being assessed for cost estimation and planning approval. Construction is scheduled to commence towards the end of the year.
10
升降平台 投影仪区域 Projection screen area 吧台 Bar +0.00 +0.90 下B1楼梯 Stairs to B1 -0.02 2621150 2100 8400 2100 1150 262 用地红线 Site Boundary 172 m² 平台室内 Interior 窗帘 Curtain +4.50 10494 14880 121 m² 露台 Terrace 自动平移门需接消防用电 Auto sliding door to be connectedd to EPS 无障碍升降平台 Accessible Platform 6011 2402 1598 839 4030 15424 L1 plan 1层平面 Level 1 0 投影仪 Projector 露台 Terrace 后勤走廊 BOH Corridor 公共区域 Lobby 1132 5743 300 4500 4000 5540 1800 4000 11675 4000 700 1850 3000 1800 3200 观景平台室内 Viewing platform interior 9734 760 1565 100 2100 2100 2100 2100 2100 2100 100 515 865 865 14880 760 9734 空调出风口 AC Fresh air outlet 空调出风口 AC Fresh air outlet Long section 长剖面 existing farmland 现状农地 natural forest 自然森林 natural forest 自然森林 reconstructed forest 重建自然森林 rock landscape 岩石景观 entrance plaza 入口广场 forestry path 森林步道 dry stream 旱溪 rest space 休息平台 flowery meadow 缀花草坪 restaurant 餐厅 viewing platform 观景平台 viewing boardwalk 观景栈道 water pond 水池 micro wetland 小微湿地
L1 Plan Masterplan Section 11
Masterplan 总平面
Furniture configurations
Even though the building’s physical size might be compact, its functional and design-related intricacies pose a significant challenge. One such complexity arises from the building’s high ceiling and limited space for mechanical ventilation. Close coordination with Fire Safety consultant were undertaken in order to maintain air quality and ensure smoke is effectively removed in the event of a fire, while not compromising on the original design intent with the dynamic geometry.
Overcoming these challenges required thinking outside the box. For instance, integrating fire-resistant materials into the design in a visually appealing way, devising creative ventilation solutions that fit the limited space, and implementing advanced fire detection system that are both effective and unobtrusive.
Interior view of Pujiang pavilion (lecture setting)
从观景露台回望
View from deck of Pujiang pavilion
家具布局 scenario
场景二 会议 - 圆桌 场景三 会议 - 长方桌 场景四 讲座 Pujiang viewing platform 蒲江县长秋山雪山观景平台建筑及景观概念设计 97
1 cafe scenario 2 meeting - round table scenario 3 meeting - rectangular table scenario 4 lecture
场景一 餐饮
Terrace view
Interior view
12
Furniture type and layout
wooden beam, same as interior 木梁,与室内梁材料相同 aluminium windows 铝框窗 curtain 窗帘
While timber is an environmentally friendly choice, it does pose challenges when it comes to water-proofing, especially with a large green roof above. To address this challenge, specialized membranes, drainage systems, and sealing techniques need to be employed to create a watertight barrier that protects the timber structure.
Expansive use of glass also led to increased wind loads and potential thermal expansion issues, which needed to be managed to ensure the structural stability of the timber frame.
Integrating MEP systems in a timber-based building also requires meticulous planning. With the assistant of multiple MEP consultants, we carefully coordinated the arrangement and placement of the systems to maximize spatial efficiency and minimize the impact on the uninterrupted interior design.
Roof 屋面 - planting, type & height tbd. 植被,种类和高度待定 - 300mm soil in anti-erosion mat 300mm土壤和耐根穿刺层 - 50mm drainage mat 50mm 排水层 - waterproofing layer 防水层 - 2x wooden panels 两层木板 - 100mm insullation 100mm保温层 - 600mm wooden structural beams, finish treatment tbc 600mm 木结构梁,完成面处理待定 - 30mm substructure, finish treatment tbc 30mm 次结构,完成面处理待定 - wood veneer on substructure 木皮饰面和结构背板
acoustic insullation 吸音棉
air duct 风管 lighting 灯光
Roof detail 1
1.Use of natural materials
Sustainability strategy
Sustainable strategies 可持续策略
1. 天然材料的使用
2. Natural building physics
Solar
Sustainability 05-06-2023
format
scale A3
date
Subject
drawing number
1:10 Principle details TP1292-SD-404V
Pujiang viewing platform Achterklooster 3011 RA Rotterdam +31 (0) 10 477 2860 www.mvrdv.com
lighting 灯光
Curtain on entrance as airlock/buffer 入口处的窗帘作为缓冲区
Trees for natural shade of glass facade
Insulating / thermal mass roof green
acoustic insullation 隔音棉 lighting 灯光
3. Collecting natural resources
Landscape lighting and building energy supply
Rainwater collection and absorption
Greywater Collection
Collected water as irrgration
scale A3
format
date
1:10 projector integrated in the ceiling 投影仪与吊顶结合安装 curtain 窗帘
05-06-2023
Subject
Roof 屋面 - planting, type & height tbd. 植被,种类和高度待定 - 300mm soil in anti-erosion mat 300mm土壤和耐根穿刺层 - 50mm drainage mat 50mm 排水层 - waterproofing layer 防水层 - 2x wooden panels 两层木板 - 100mm insullation 100mm保温层 - 600mm wooden structural beams, finish treatment tbc 600mm 木结构梁,完成面处理待定 - 30mm substructure, finish treatment tbc 30mm 次结构,完成面处理待定 - wood veneer on substructure 木皮饰面和结构背板Principle details TP1292-SD-406V
Pujiang platform Achterklooster 3011 RA Rotterdam +31 (0) 10 477 2860 www.mvrdv.com
drawing number
13
主结构及饰面使用木材
Main structure + cladding in timber structure + cladding in timber
南边太阳辐射
ventilation 自然通风
阻热/隔热屋面
radiation from the south
Natural
能源收集
用于景观照明及建筑能源供应
Energy storage
中水收集系统
中水灌溉
雨水收集及下渗
CO2
利用树荫提供玻璃立面的自然遮阳
2. 建筑自然物理策略 3. 收集天然资源 可持续发展 Pujiang viewing platform 蒲江县长秋山雪山观景平台建筑及景观概念设计 64
Roof detail 2
Tencent Superbay Dormitory + Kindergarten
Employment Information
Company: MVRDV
Project Information
Location: Shenzhen, China
GFA: 198,500m2
Type: Residential + Commercial Status: In Construction
Located on a prominent bay location in Qianhai, Shenzhen, the project brief called for more than 4,000 dormitory units to be occupied by the Tencent employees, together with public amenities and a kindergarten on the site.
Beyond its scale, the brief is also technologically ambitious. Expanding on their mission statement, which foregrounds the “user value” of technology and the benefits it can bring to everyday life, they requested that their new campus be an exemplary smart city district, demonstrating the city-altering potential of the latest urban technologies.
The project was the final winning entry from a design competition held by the Tencent company. I participated in the project after the project was commissioned and during the Schematic Design phase.
My responsibilities include producing architecture documentation whilst constantly coordinate with various consultants and responding to client’s feedbacks from weekly meetings and comments from government presentations. There were also a lot of coordination works internally as the team was comprised of designers from both the Rotterdam and the Shanghai office working within the same BIM file, which required us to always be highly precise and organised with our workflows.
14
15
I was responsible for the Masterplan to ensure various standards and regulations were satisfied, for example, overall building and basement setback distances, fire operation zone provisions, overall heights, building terrace setback distance in relation to fire-fighting requirements, car-park entry locations etc. A large amount of coordination with various consultants were required, and we faced quite a lot challenges due to the high density of the site whilst ensuring a compliant design.
Masterplan
Elevation
16
Kindergarten interior view
I was also involved in coordinating unit layouts to ensure service alignment, code compliance, optimised accessibility and privacy etc. Meanwhile, to minimise construction cost as well as reducing material waste, studies were done to standardise unit types while still allowing for certain variation in the unit configurations. The unit types were also carefully designed to create standardised facade modules which can be pre-fabricated.
Unit interior views 17
Typical floorplan
Unit Types Programs 18
The main programs are comprised of more than 4,000 dormitory units, public amenities on the ground floor of the dormitory buildings, sky-gardens, and a kindergarten that is independent to the dormitory buildings. The goal is to provide the Tencent employees the convenience of technology as well as the pleasure of being surrounded by nature, with the serpentine park always within a short walking distance, and green terraces all around them
The structural design adopts a hybrid of column and shear wall systems. This allows for maximised spatial efficiency while still providing the required structural integrity. The shear walls divide the ground floor spaces into multiple pockets which were designed as public amenities such as shared kitchen, gym, library, delivery room, study lounges, etc. I was responsible to coordinate the structural design with the floor layout. It was also critical to take into account the fire operation area and fire truck route design, to ensure it is compliant while maintaining the design/aethetic intent.
Shared kitchen view
19
Ground floorplan
Shenzhen Bihailou Art Village
Employment Information
Company: MVRDV
Project Information
Location: Shenzhen, China
GFA: 6,500m2
Type: Commercial + Culture
Status: In Schematic Design Stage
Nestled on the border between Hong Kong and Shenzhen, the architecture draws inspiration from the rich historical tapestry of both Hong Kong and Shenzhen. Designed to rejuvenate the area after a prolonged closure due to the COVID-19 pandemic, this vibrant mall seamlessly blends commercial activities with cultural elements, paying homage to the region’s history and diverse traditions.
I worked on the project from its Concept Design stage to Schematic Design stage. My role encompassed a multifaceted approach to client engagement and project realization. This includes comprehending and interpreting clients’ needs, offering insightful suggestions based on past project experiences that enhance their initial brief, and proposing innovative and functional design solutions. At the same time, I collaborated with diverse consultants and integrated their inputs to align with the project’s budget constraints while maintaining design integrity.
20
21
L1L2L3L4L5L6L7TOTAL 200SeatHall+RehearsalHall650650 400SeatTheatre690690 Culture79336169584 Commercial4407281017173292353732923 CoveredTerrace24832282654250413 Core+Services121141162121186161103995 TOTALperoo8099011060864297576456255 ToaCuureGFA1924 ToaCommeciaGFA3336 ToaCoe+Sevces995 ToaGFA6255 www.mvrdv.nl +31104772860 10 20m 1:200 N U Retail 198 m2 Retail 105 m2 Retail 96 m2 Retail 41 m2 Core Service 121 m2 GFA 805 m2 L1 Retail: 440 m2 Terrace: 248 m2 U www.mvrdv.nl +31104772860 1:200 N UP DN UP Retail 198 m2 Retail 105 m2 Retail 63 m2 Retail 41 m2 Core Service 121 m2 GFA 528 m2 L1 Retail: 407 m2 Terrace: 244 m2 DN UP 10 20m 1:200 N UP DN P P Retail 198 m2 Retail 105 m2 Retail 63 m2 Retail 41 m2 Core + Service 121 m2 GFA 528 m2 L1 Retail: 407 m2 Terrace: 244 m2 Retail 55 m2 Retail 135 m2 Retail 77 m2 Retail 76 m2 L1 Retail: 343 m2 GFA 505 m2 Core + Service 162 m2 10 20m 1:200 N UP DN UP Covered space (non accountable) Covered space (50% GFA accountable) Retail 100-250m / unit Core Retail 55 m2 Retail 135 m2 Retail 77 m2 Retail 76 m2 L1 Retail: 343 m2 GFA 505 m2 Core + Service 162 m2 www.mvrdv.nl +31104772860 10 20m 1:200 N DN UP UP DN U U
Plans 一层平面 200 400 Culture Commercial Covered Core+Services TO Tot Tot Tot Tot 200SeatHall+RehearsalHall 400SeatTheatre Culture Commercial CoveredTerrace Core+Services TOTALpeoor ToaCuueGFA ToaCommercaGFA ToaCore+Servces ToaGFA DN UP Retail 357 m2 Retail 71 m2 Retail 289 m2 10 20m 1:200 N L4 Retail: 717 m2 Core Service: Terrace: 26 m2 GFA 864 Retail 55 m2 Retail 135 m2 Retail 77 m2 Retail 76 m2 10 20m 1:200 DN UP P DN UP 10 20m 1:200 UP DN U U Retail 198 m2 Retail 105 m2 Retail 63 Retail 41 m2 1:200 UP DN UP Retail 198 m2 Retail 105 m2 Retail 63 m2 Retail 41 m2 Retail 55 m2 Retail 135 m2 Retail 77 m2 Retail 76 m2 10 20m 1:200 DN UP UP DN P P Principle plan L4 Plans 四层平面 200 400 Culture Commercial Covered Core+Services TO Tot Tot Tot Tot 200SeatHall 400SeatTheatre Culture Commercial CoveredTerrace Core+Services TOTALpeo TotaCuue TotaComm TotaCoe+S TotaGFA DN UP UP DN www.mvrdv.nl +31104772860 10 20m N UP Retail 188 m2 Retail 52 m2 Retail 208 m2 Retail 143 m2 L2 Core + Service Retail: 728m2 Terrace: 32 m2 GFA 895 Retail 137 m2 Retail 55 m2 Retail 135 m2 Retail 77 m2 Retail 76 m2 10 20m 1:200 DN UP UP DN UP P 10 20m 1:200 U U Retail 198 m2 Retail 105 m2 Retail 63 Retail 41 m2 DN UP 10 20m 1:200 UP Retail 198 m2 Retail 105 m2 Retail 63 m2 Retail 41 m2 Retail 55 m2 Retail 135 m2 Retail 77 m2 Retail 76 m2 1:200 P P Principle plan L2 Plans 二层平面 L1L2L3L4L5L6L7TOTAL 200SeatHall+RehearsalHall650650 400SeatTheatre690690 Culture79336169584 Commercial4407281017173292353732923 CoveredTerrace24832282654250413 Core+Services121141162121186161103995 TOTALperoo8099010608641297576456255 ToaCutureGFA1924 ToaCommecaGFA3336 ToaCore+Sevces995 ToaGFA6255 L1L2L3L4L5L6L7TOTAL 200SeatHall+RehearsalHall650650 400SeatTheatre690690 Culture79336169584 Commercial4407281017173292353732923 CoveredTerrace24832282654250413 Core+Services121141162121186161103995 TOTALpeoor80990110608642 576 56255 ToaCuueGFA924 ToaCommercaGFA3336 ToaCore+Servces995 ToaGFA6255 89 DN UP www.mvrdv.nl +31104772860 10 20m 1:200 N Retail 263 m2 Retail 66 m2 Retail: 329 m2 L5 200-Seat Hall: 650m2 Core + Service: 186 m2 Terrace: 54 m2 GFA 1209 m2 200-Seat Multifunctional Hall 321 m2 Prefunction 57 m2 Rehearsal Hall 272 m2 Retail 55 m2 Retail 135 m2 Retail 77 m2 Retail 76 m2 L1 Retail: 343 m2 GFA 505 m2 Core Service 162 m2 www.mvrdv.nl +31104772860 10 1:200 N DN UP UP DN U P Terrace (open to sky) Covered terrace (non accountable) Covered terrace (50% GFA accountable) 200 seat Multi functional hall/support Rehearsal hall Other cultural program Core UP N UP DN U Retail 198 m2 Retail 105 m2 Retail 63 m2 Retail 41 m2 Core Service 121 m2 GFA 528 m2 L1 Retail: 407 m2 Terrace: 244 m2 N UP DN P P Retail 198 m2 Retail 105 m2 Retail 63 m2 Retail 41 m2 Core Service 121 m2 GFA 528 m2 L1 Retail: 407 m2 Terrace: 244 m2 Retail 55 m2 Retail 135 m2 Retail 77 m2 Retail 76 m2 L1 Retail: 343 m2 GFA 505 m2 Core Service 162 m2 10 20m N DN UP UP U Principle plan L5 (200 seat multi hall) Plans 五层平面(200
L1L2L3L4L5L6L7TOTAL 200SeatHall+RehearsalHall650650 400SeatTheatre690690 Culture79336169584 Commercial4407281017173292353732923 CoveredTerrace24832282654250413 Core+Services121141162121186161103995 TOTALperoo8099010608641297576456255 ToaCutureGFA1924 ToaCommecaGFA3336 ToaCore+Sevces995 ToaGFA6255 L1L2L3L4L5L6L7TOTAL 200SeatHall+RehearsalHall650650 400SeatTheatre690690 Culture79336169584 Commercial4407281017173292353732923 CoveredTerrace24832282654250413 Core+Services121141162121186161103995 TOTALperfoor8099010 086412975764562 5 ToaCutureGFA924 ToaCommercaGFA3336 ToaCore+Sevces995 ToaGFA6255 UP DN Back of House 64 m2 Prefunction 84 m2 Prefunction 78m2 Retail 101 m2 Culture 79 m2 D 10 20m 1:200 N P L3 400-Seat Hall: 690 m2 Culture: 79m2 Core + Service: 162 m2 Retail: 101 m2 Terrace: 28 m2 GFA 1053 m2 25 1 7 6 400-Seat Multifunctional Hall 456 m2 Retail 55 m2 Retail 135 m2 Retail 77 m2 Retail 76 m2 L1 Retail: 343 m2 GFA 505 m2 Core Service 162 m2 www.mvrdv.nl +31104772860 10 20m 1:200 N DN U P Terrace (open to sky) Covered terrace (non accountable) Covered terrace (50% GFA accountable) 400 seat Theatre Other cultural program Retail 100-250m unit Core DN UP www.mvrdv.nl +31104772860 10 20m N UP DN U Retail 198 m2 Retail 105 m2 Retail 63 m2 Retail 41 m2 Core Service 121 m2 GFA 528 m2 L1 Retail: 407 m2 Terrace: 244 m2 DN UP www.mvrdv.nl +31104772860 20m 1:200 N UP DN P P Retail 198 m2 Retail 105 m2 Retail 63 m2 Retail 41 m2 Core Service 121 m2 GFA 528 m2 L1 Retail: 407 m2 Terrace: 244 m2 Retail 55 m2 Retail 135 m2 Retail 77 m2 Retail 76 m2 L1 Retail: 343 m2 GFA 505 m2 Core Service 162 m2 www.mvrdv.nl +31104772860 10 20m 1:200 N DN UP UP DN UP U Principle plan L3: (Theatre) Plans 三层平面(剧场) 200 400 Culture Commercial Covered Core+Services TO Tot Tot Tot Tot L1L2L3L4L5L6L7TOTAL 200SeatHall+RehearsalHall 400SeatTheatre Culture Commercial4407281017173292353732923 CoveredTerrace24832282654250413 Core+Services121141162121186161103995 TOTALperoo80990 TotaCuureGFA1924 TotaCommecaGFA3336 TotaCoe+Servces995 TotaGFA6255 www.mvrdv.nl +31104772860 10 20m N DN UP Retail 179 m2 Retail 73 m2 L6 Culture: 335 m2 Retail: 235 m2 GFA :756 Terrace: 25 m2 Core Service: Cu ure 74 m2 Culture 131 m2 Culture 130 m2 Retail 55 m2 Retail 135 m2 Retail 77 m2 Retail 76 m2 10 20m 1:200 DN UP UP DN UP P DN UP UP DN U U Retail 198 m2 Retail 105 m2 Retail 63 Retail 41 m2 Retail 55 m2 Retail 135 m2 Retail 77 m2 Retail 76 m2 10 20m DN UP P P Principle plan L6 Plans 六层平面 Section L5 Plan L3 Plan L1 Plan L6 Plan L4 Plan L2 Plan 22
Principle plan L1
座多功能厅)
The project aims to be not just a mall but a cultural crossroads, where visitors from all sides can easily access and engage with the vibrant offerings.
One primary hurdle of this design intent lies in the challenges of the structural design, stemming from the irregular mass distribution featuring numerous cantilevered volumes. Our design vision revolves around achieving seamless, column-free spaces, which necessitated large amount of collaboration with the structural consultant. Balancing this intent with the client’s financial constraints demanded careful study and optimization of the structural framework, while keeping a keen eye on ensuring efficient integration of essential services.
Structure option 4 all stacking & use of columns in the walls 1 7 standing box standing box and/or stacking box stacking box stacking box stacking box stacking box stacking box *principle sketch (this not representable section) Structure option 3 all stacking & use of columns in internal spaces 1 standing box standing box and/or stacking box stacking box stacking box stacking box stacking box stacking box *principle sketch (this not representable section) Structure option 2 main structural (concrete?) floors on which things can stand or hang on. 1 standing box standing box stacking box stacking box *principle sketch (this not representable section) and/or hanging box and/or hanging box standing box standing box standing box Structure option 1 all stacking & use of columns in walls 1 standing box standing box and/or stacking box stacking box stacking box stacking box stacking box stacking box *principle sketch (this not representable section)
Summary
1. Straight columns hidden in walls
2. Main transfer layers on L3 & L5
3. Straight columns in internal spaces 4. Continuous columns
Structure studies
23
Public walkway view Public walkway view
24
Shanghai Sky Wonderland
Employment Information
Company: MVRDV
Project Information
Location: Shanghai, China
GFA: 177,000m2
Type: Commercial mixed-use
Status: Competition Completed | 3rd Prize
Shanghai is one of the most unique cities in China. The project is located in the heart of this unique city which is the birthplace of Shanghai’s urban map. The plot has its own unique historical context and personality, it is important to thoroughly understand this uniqueness, in order to provide a comprehensive design solution that could adapt to the local characters, condense the urban texture, forge an iconic architectural language, and realise its vision and value as a city within a city.
Covering an area of nearly 2 hectares, Yu Garden is a garden built in the Ming Dynasty. “Yu” is the same as “pleasure”, which means peace and smoothness. The plot is adjacent to Yu Garden and will also become an extension of Yu Garden, realising the transition from history to contemporary. The design aims to create a paradise here that condenses the past and present of Shanghai, reshape the Shanghai style, and bring the people of this city back to the heart of the city to experience its powerful vitality.
As one of the design team members, I participated in the design from its initial concept generation to final production. Due to the tight deadlines given by the client, the team was working in a highly intense schedule while maintaining an efficient workflow.
25
The massing and facade design is inspired by Jiangnan architecture and landscape, such as the arched roofline, the garden rockeries, and the flower windows, to pay tribute to the precious Jiangnan heritage, as well as to create a contemporary “Jiangnan garden” with a dynamic commercial atmosphere. The Jiangnan form were applied in two approaches as the flying roof and the stacked boxes in reference to the garden rockeries. Other elements including bamboo, foliage, and flower windows were referenced to generate the facade pattern with different variations.
street view
Main
26
The “Jiangnan” inspirations
Design parameters
The design aims to create a dymanic commercial complex with many added natural and social values such as abundent access to nature, generous panaromic views, pedestrian friendly walkways, 24h active spaces etc. It will become a contemporary name card of Shanghai while presenting itself as an elegant and traditional Chinese garden with full of Jiangnan elements that calls for the nostalgic souls.
Groundfloor plan Masterplan
27
Selected historic buildings in the so called second ring of the new development will get a special treatment. For example leaving only a structural framework to create more open space for the surrounding temple and at the same time a special entrance into the new development. Another example is the renovation of the wall of the historcial building, to create a welcoming entrance for the site to attract and guide the flow of people.
catalogue 28
Historical building renovation
Exterior view
Exterior view
29
Exterior view
Pujiang New Town Civic Center
Employment Information
Company: MVRDV
Project Information
Location: Pujiang, Chengdu, China
GFA: 74,000m2
Type: Public
Status: Competition Completed | Wining Scheme
Pujiang, a new iconic city near Chengdu, China, with a carefully designed new Masterplan is envisaged to be the beacon for all Sichuan province. The future driven identity merges with a deep natural background to become the new paradigm for sustainable development.
The brief calls for a Civic Center, a Conference Center, a 5-star Hotel and six Office buildings as part of the new masterplan, to accommodate large international conferences and serve as the new city hub for Pujiang.
As part of the design team, I participated in the project from its initial concept generation to final deliverable production. The team member are based both in Rotterdam and Shanghai, and we worked around the clock to ensure a smooth delivery of the project. We have also engaged sustainability and structural consultants to optimise the design to achieve a near zero carbon design in response to the design brief as well as China’s carbon neutral goal for 2060.
The project was selected as the Winning Scheme in December 2021.
Exterior view 30
31
North plot building exploded diagram South plot building exploded diagram
The water, valleys and mountain peaks are the important character that form the local identity.
The design intends to preserve the precious natural resources here, while paying tribute to it by creating architecture that draws inspirations from these elements and blends itself within the surroundings.
I was responsible to configure the internal layout of the Civic Center, the Conference Center, and the Hotel as per the design brief and produce the technical drawings as well as the area schedules.
The Civic Center is a gigantic urban tribune. The public 24h hall is distributed across the open steps, making use of all the top surfaces of the closed programs beneath, such as the data center, offices and admin spaces.
The Conference Center is arranged in a spiral-like configuration around the main hall. The stepping layout connects the two main lobbies placed on both sides, spaces beneath the rooftops and stairs can be used as meeting rooms and public theatres, to maximise the spatial efficiencies.
The Hotel volume is composed of functional blocks juxtaposed on each other creating a stacking of public and private programs. All the hotel rooms have direct access to the spectacular view of the surrounding.
Site image and conceptural inspiration
Masterplan
32
Civic center interior view
Civic center section
Civic center plan
Conference center interior view
Conference center section
Conference center section
Hote interior view
Hotel section
33
Hotel plan
We worked closely with both the sustainability and structural consultant to arrive at numerous sustainable design strategies such as maximising biodiversity to create an urban ecosystem, and provision of rainwater re-use system, natural ventilation, and green roof etc. to reduce cooling load and mitigate urban heat island effect.
From a social aspect, the design is also highly sustainable by re-using local building materials, adopting regional crops and species for the landscape design, creating car-free pedestrian environment for user safety, various outdoor activity space to cater for different communities in the neighbourhood. The overall urban strategy is focused on people, defining a pedestrian oriented development.
Biodiversity analysis
Natural ventilation analysis
Carbon sequestration analysis
External heat load analysis
34
Sponge city analysis
Landscape/pavilion design catalogue
Birdeye view
Walkability analysis
Site section 35
University of Newcastle BioResources Facility
Employment Information
Company: Denton Corker Marshall
Project Information
Location: Newcastle, Australia
GFA: 3,705m2
Cost (AUD): $25,000,000
Type: Laboratory
Status: Built
The project requires the development of a new bioresources facility at the University of Newcastle to support current animal based researches and cater for future expansion in capacity and capability.
The combination of architecture and engineering design ensures the building to perform consistently at a very high level, provides a platform of excellency supporting best practice animal husbandry, care and well-being whilst also addressing limitations resulting from outsourced animal breeding and deficiencies in existing infrastructure. The building, with its construction due to completion in November 2020, seeks to establish an environment for students and staff that will support the University’s approach to problem-based learning, and attract the world’s best researchers and global innovation leaders.
I was involved in the project from Conceptual Design, Design Development, Tender, and to Construction which was completed in early October, 2020. Working on this project has given me the opportunity to work in an independent role as the primary point of contact between the design team and various parties including project managers, contractors, consultants etc., to ensure the design intents are followed through with all relevant requirements/compliance achieved, while ensuring a smooth delivery of the project.
36
37
Level 01 reflected ceiling plan
Level 01 floor plan
A key element of the design is to achieve maximum flexibility within the constraints of the budget. The internal layout has been carefully designed to allow for built-in flexibility and provision for expandability of specific zones of biological operational activities.
The building contains sensitive research animals and equipment across various barrier levels and for this reason there are a number of key issues to be resolved in the design, such as acoustic and vibration requirements, objectionable exhaust air management, barrier retention to ensure a highly clean environment, circulation and flexibility, and human amenity (with consideration to natural light while specialised artificial lights were utilised for majority of the building due to animal facility requirement).
The combination of architecture and engineering design ensures the building to perform consistently at a very high level, reflecting the valuable nature of science and research undertaken within.
1 3 4 6 9 10 11 12 B E CLEAN PREP 120 RECEIVING QUARANTINE PROC ROOM CLEAN STORE 133 DIRTY WASH 104 A/R 102 ISOLATION ANTE ROOM 172 SPECIAL TECH 105 NEOCROPSY/SURGERY 107 HOLDING (FLEX) 108 PROCEDURES 109 HOLDING 110 PROCEDURES 111 CLEANER 112 NECROPSY /SURGERY 128 GERM FREE HOLDING 140 BREEDING 139 SPECIAL TECH 127 BREEDING (FLEX) 138 PROCEDURES (FLEX) 137 PROCEDURES 136 BREEDING 135 PROCEDURES 122 PROCEDURES 121 HOLDING 132 SECURE BREEDING CORRIDOR 05 179 BREEDERS OVERGOWN 180 CORRIDOR 01 170 RESEARCHER GOWN 176 CORRIDOR A/R 119 CORRIDOR 06 181 6855 6700 5470 3890 4310 4040 4360 4050 4350 4200 6115 RY A12_0001 A12_0000 A12_0002 ISOLATION AREA GOWN 174 A11_0000 A11_0001 A11_0002 A11_0003 C A D HOLDING (FLEX) 124 HOLDING 123 CLEANER 134 PROCEDURES 125 STORE 101 ENTRY AIRLOCK 182 AUTOMATED CANOPY ABOVE LIFT LIFT L02 SPECIAL TECH 106 HOLDING 131 DELIVERY 118 QUARANTINE PROC ROOM 130 5670 2700 7400 5990 ISOLATION CORRIDOR 173 178 A12_0003 STORE 100 FEMALE CHANGE 114 MALE CHANGE 116 UNISEX ACCESS 115 A12_0004 VOID VOID LIFT LOBBY 171 A/R 177 FFL 27.565 ACL A35_0040 R10 2 R102 R100 RACK WASH ACL VOID SPILL KIT WS-C WS-A WS-C WS-B WS-C WS-B WS-B WS-B WS-C WS-B WS-B WS-C WS-C FU10A SA15A FU10A FU10A SA15 FM06 WS-B GA NOTES: REFER A04 SITEWORKS DRAWING PACKAGE FOR LANDSCAPE DETAILS. REFER CIVIL AND SERVICES ENGINEERS REQUIRMENTS AND DETAIL. REFER TO A35, A36, A37 DRAWING PACKAGES FOR AMENITY/WET AREAS, CIRCULATION/LIFT LOBBY AND TYPICAL SPECIALIST ROOM PLANS AND ELEVATIONS FOR FURTHER INTERIOR DETAILS. EQUIPMENT NOT INCLUDED FOR PROJECT START-UP SHOWN DASHED.REFER FF+E SCHEDULE FOR START UP PROVISIONS. LEGEND START UP EQUIPMENT Drawing Status Project Number Project File Drawing Number Revision not scale from drawing. Use marked dimensions. be read conjunction with other Consultant The Architect be immediately notified any dis Copyright this drawing retained Architect Electronic files subject the terms Denton Corker Marshall Electronic Data Disclaimer. General Notes Issue Date Denton Corker Marshall Melbourne Victoria 3000 +61 9012 3600 melb@dentoncorkermarshall.com dentoncorkermarshall.com 123 1:100 1:200 Drawn Checked ISSUED FOR TENDER FOR INFORMATION T1 25/10/2018 D0136 -UON BIORESOURCES LEVEL 01 -OVERALL PLAN D0136 A10_0100 D0136 UoN BioResources_R18 UNIVERSITY OF NEWCASTLE University Dr, Callaghan NSW 2308 Telephone +61 4921 5000 Facsimile +61 4985 Email Mark.D.Taylor@newcastle.edu.au PA T125/10/2018PAIssued Tender AP AP AP AP AP AP AP AP AP AP AP AP AP AP EX EX EX EX EX EX EX EX AP EX EX AP AP EX AP AP AP AP EX A 1 4 5 7 8 10 11 12 B E 113 124 127 102 137 135 C A D 125 128 117 110 110 116 124a REFER TO FACADE PACKAGE FOR EXTERIOR SOFFIT FINISH CD02 T1B T1A T1A T1A T1A T1A T1A T1A T1A T1A S2 T1A S2 S1 T1A T1A FCL 2100 ABOVE LOCKERS FCL 1300 BULKHEAD ABOVE LOCKERS D2 D2 S1B D2D2 FCL 4230 FCL 4160 FCL 4190 CL02 BC01 52565018501850650 T1A EQEQ EQEQ T1A T1A T1A T1A T1A T1AT1A T1A T1A T1A T1A 8008001262 1098800800 350 350 350 30012501250 800800 800800 EQ EQ 230 EQEQ 245 650 3700 650 300450450450 1097 PA02A T1AT1A T1A T1A 122a 123a 123 122 110 120 121 119 118 L02 ST01 L01 116 116 103 109 129 141 130 131 132 133 140 139 134 147 138 144145 108 107 142 143 105 106 T1AT1A T1AT1A CL01 CL01 CL01 T1A T1A CL01 CL01 CL01 T1A T1A T1A T1AT1A CL01 960 2200 5586501850 1850650 CL01 CL01 104 CL01 CL01 115 126 126 T1A T1A T1A T1A T1A T1A T1A T1A T1A T1A 690 650 2300 650 700700650 EQEQ PA02A CL01 CL01 CL01 1049 CL01 PA02B CL02 CL03 CL01 D1 D1 1200 PA02C PA02C PA02C CL01 CL01 CL01 PA02B CL01 1150700650 3700 CL03 CL03 SETOUT SETOUT 450450450 CL05 PA02B EQEQEQEQ EQEQ 14501050 EQEQ EQEQ EQEQ EQEQ ALL CEILING MOUNTED FIXTURES TO BE SETOUT TO MEET SERVICES REQUIREMENTS BY OTHERS. EQ EQ 350 EQ 800800 EQ 350 EQ EQ EQEQ EQ EQ EQ22 EQ22 EQ22 1655 16551263 12481655 750 650 3700 650 EQEQ 650 3700 650 1350650 18501850650 6006501850 1850650 650130024006501000750500 EQEQ 12501250 1675650 3700 650 450650 3700 650750 1500650 3700 650750 350 STAIR SERVICES SET OUT IN ABEYANCE PENDING REVIEW BY SERVICE CONSULTANTS 489 500 450450600450317 EQEQ CL02 CL02 CL02 700 EQEQEQ NOTES: ALL FINISH CEILING LEVEL (FCL) AT 2700 UNLESS INDICATED OTHERWISE REFER TO A25_0300 FOR THE REFLECTED CEILING PLAN LEGEND. CONTRACTOR TO ALLOW FOR ALL ACCESS PANELS AS REQURED. MECHANICAL ELECTRICAL FIXTURESSHOWN ARE FOR COORDINATION PURPOSES ONLY. REFER TO SERVICE CONSULTANTS DOCUMENTATION. PERFORATED FOIL FACED INSULATION BENEATH RF01. REFER TO ELECTRICAL SERVICES DRAWING E-02-001 FOR LIGHTING TO PARAPET. ALL SET OUTS FROM FACE OF WALL TO CENTRELINE OF ELEMENT UNLESS DIMENSION IS ALIGNED WITH EDGE OF ELEMENT -REFER TYPICAL DETAIL FOR CLARIFICATION. DASHED LINE USED TO INDICATE CENTRE OR EDGE ALIGNMENT. ALL DIMENSIONS TO FACE OF PLASTER WALL. BIOSAFETY CABINETS CAN BE RELOCATED THROUGHOUT THE FACILITY AND IN SOME INSTANCES MAY CLASH WITH LIGHTING TRUNKING. OPERATIONAL CONTROL MEASURES REQUIRED. BULKHEAD FACE OF WALL OVER FUME CUPBOARD CYTOTOXIC CABINET TO ALIGN WITH FACE OF EQUIPMENT BELOW. CONJUNCTION WITH ASC_0000 MATERIAL AND FINISHES SCHEDULE. PAINT ALL PLASTERBOARD PRIOR TO MAKING ANY FIXINGS TO MAINTAIN ROOM SEAL BARRIER. FLANGE AND CAULK ALL PENETRATIONS, RECTANGULAR AND CIRCULAR. APPLY CF02 TO ALL EXPOSED CONCRETE SURFACES UNO. No. DateApp Revision reason issue Project Title Client Drawing Title Drawing Status Project Number Scale North Point Project File Drawing Number be read conjunction with other Consultant drawings. The Architect be immediately notified any crepancies. Electronic files are subject the terms the Denton Corker Marshall Electronic Data Disclaimer. Architect Denton Corker Marshall Level Collins Street Australia +61 9012 3600 UoN@dentoncorkermarshall.com Drawn Checked FOR CONSTRUCTION D0136 -UON BIORESOURCES REFLECTED CEILING LEVEL 01 PLAN D0136 A25_0100 D0136 UoN BioResources_R18 UNIVERSITY OF NEWCASTLE CALLAGHAN CAMPUS University Dr, Callaghan NSW 2308 Telephone +61 4921 5000 Facsimile +61 4985 4200 Email Mark.D.Taylor@newcastle.edu.au MC
UP UP 1 2 4 5 7 8 10 11 12 B E C A D 6855 6700 5470 3890 4310 4040 4360 4050 4350 4200 6115 W L E SSL 22.815 SSL 23.015 A53_0100 A53_0200 SSL 23.065 SSL 23.065 SSL 23.015 13561558 985 100 5 26981060729 215 SSL 21.665 SSL 21.665 1855 1842 3196 910 470 485 83232 540 118 961930 C 100 284 2698 50 50 15 8 LEVEL 01 OVER SHOWN DASHED LIFT PIT LIFT PIT RW1 SETOUT SLAB SETOUT 333295 2 A52_0000 PILING, EDGE BEAM AND CAPPING BEAM BEYOND SHOWN DASHED. REFER STRUCTURAL ENGINEER'S DOCUMENTATION FOR WAFFLE SLAB DETAIL 50 ⌀100 100 ⌀100 100 ⌀100 ⌀100 ⌀100 100 100 100 ⌀100 100 ⌀ ⌀100 ⌀100 ⌀ 100 50 ⌀100 ⌀150 ⌀150 50 150 ⌀150 ⌀100 80 150 FB 100 100 150 1890 ⌀150 ⌀100 ⌀100 150 100 ⌀150 ⌀100 150 A52_0000 A52_0000 A52_0000 150 150 ⌀50 CONSTRUCTION JOINT REFER TO STRUCTURAL ENGINEER'S DOCUMENTATION 1 1 14845 SPOON DRAIN TO BASE OF WALL REFER TO CIVIL CONSULTANTS DOCUMENTATION 2755 2 0 7 330 930 0 510540 7931030 230 3069 150 1020 675 2580 430 1520 240 418 285 1 5 1330 200 2450 100 SLAB SETDOWN SETOUT SLAB SETDOWN ALONG PERIMETER TO ALLOW FOR PAVEMENT SLAB OVER. REFER TO CIVIL ENGINEER'S DOCUMENTATION SLAB SETDOWN CIVIL ENGINEER'S 2 5 TRANSITION FROM RW1 TO SW1 SPOON DRAIN TO BASE OF WALL REFER TO CIVIL ENGINNER'S DOCUMENTATION C 777781 2415 3095 25 10 1 ⌀ 678 C 9 841 210 210 235 235 ⌀150 1550 L C 230 7 ⌀100 100 850 2436 C 581 2001 1601068 150150 100 C 235 187 C 171 69 3034 100 L 0 0 5 2 50 50 100 ⌀ ⌀ 50 1756 ⌀ 1234 ⌀ C 370 260 417 100 1433 9 919592 7 7 1227 2 50 300 630 300 161 C 200 50 470 745 561577 883930 100 100 0 300 630 300 630 300 161 260 230 9 5 50 3000 910950 L SSL 23.085 SSL 23.015 203 150 150 150 100 ⌀ STRUCTURAL ENGINEER'S 1106 C 2816300 250 300 9 787402 1985586 35 100 290 340 100 16201717 0 3 4 100 ⌀ SSL 22.765 SETOUT C COORDINATE HYDRANT REBATE BETWEEN PILES COMPLIANT HYDRANT ACCESS WIDTH HEIGHT TO BE MAINTAINED 00 ANGLED WALL 18592342 0 420 WALL FACE 2151190510 2 REFER A53 SERIES FOR CORE SETOUTS 230 CURVED WALL R 22 782 CURVED WALL 1282 1092 100 766 0 100 6 1871586 515 2004 1047 100 NOTE TO BE READ CONJUNCTION WITH: -A50_0000 -PILE SET OUT -A53 DRAWING SERIES -DETAILE CORE SET OUT -CIVIL + STRUCTURAL ENGINEER'S DOCUMENTATION -SERVICES DOCUMENTATION -CONTRACTOR'S SHOP DRAWINGS -CONCRETE SLAB EDGE TO BE COORDINATED WITH FACADE SETOUT AND INSTALLATION. -DIMENSIONS HAVE BEEN PROVIDED TO CENTRE OF PENETRATIONS, HOBS, PLINTHS AND CONCRETE ELEMENTS UNO. -REFER TO STRUCTURAL ENGINEER'S DRAWINGS FOR STRUCTURAL SIZING, SLAB THICKNESSES, STRUCTURAL DETAIL, CONSTRUCTION JOINT LOCATION DETAILS. -REFER TO STRUCTURAL ENGINEER'S DETAILS FOR CORE FILLED BLOCKWORK WALLS. -CONTRACTOR TO ADVISE ARCHITECT IN WRITING GEOTECHNICAL CONDITIONS REQUIRE SPECIFIC TOLERANCES FOR PILE SET OUT -FIRE COLLAR TO BE PROVIDED TO ALL CONCRETE PENETRATIONS CROSSING FIRE COMPARTMENT ZONES. -REFER TO SERVICES DRAWINGS FOR SIZING AND DETAILS FOR ALL PENETRATIONS -PENETRATIONS TO BE COORDINATED WITH LOCATION OF STRUCTURAL TENDONS REINFORCEMENT WITHIN SLAB. -CAST INS REQUIRED FOR PENETRATIONS TO FOUNDATION RAFT, SLABS AND PILE CAPS. REFER TO STRUCTURAL ENGINEERING FOR DETAIL. -SERVICES PROVISION REQUIRES DETAIL INPUT PROFILE REQUIREMENTS ARE TO BE VERIFIED DRAWINGS. THE ARCHITECTURAL PROFILE DRAWINGS INDICATE THE SERVICES SCOPE INFORMATION ONLY AND SERVICES SUBCONTRACTORS MAY HAVE ADDITIONAL REQUIREMENTS NOT INDICATED ON THE ARCHITECTURAL DRAWINGS WHICH REQUIRE ONGOING COORDINATION. -ALL CONCRETE COLUMN SIZES & DISTINCTION REFER PRECAST INSITU ARE TO BE CONFIRMED AGAINST THE STRUCTURAL ENGINEERS COLUMN SCHEDULE. ANY DISCREPANCIES BETWEEN THE ARCHITECTURAL DRAWINGS AND THE STRUCTURAL ENGINEERS SCHEDULE ARE TO BE REFERRED TO THE ARCHITECT FOR CLARIFICATION PRIOR TO PROCEEDING WITH ANY WORKS. -COLUMNS ARE NOT NECESSARILY ALIGNED OR CONCENTRIC THROUGH SUBSEQUENT FLOORS. -CONTRACTOR TO DISPLACE CLASHING REINFORCEMENT BARS IN PILE CAPS TO ACCOMODATE PENETRATIONS WITH REINFORCING BAR TO BE PROVIDED BETWEEN ALL PENETRATIONS ACCORDANCE WITH STRUCTURAL ENGINEER'S REQUIREMENT. -PENETRATIONS ≤20mm ARE NOT SHOWN AND TO BE COORDINATED BY CONTRACTOR ON SITE. -CONTRACTOR TO ENSURE ALL PENETRATIONS OTHER THAN FLOOR WASTES ARE CONCEALED WITHIN WALL CAVITIES OR DESIGNATED RISERS U.N.O. -ALL PENETRATIONS EXCLUDING FLOOR WASTES ON LEVEL TO INCLUDE HOB -CONTRACTOR TO CONFIRM CONCRETE PLINTH COORDINATED WITH EQUIPMENT/PLANT DIMENSION AND SPECIFICATION. 8 E 8 SSL 23.045 SSL 23.045 SSL 23.065 543520480520 FB FLOOR BOX FLOOR BOX SIZE REFER TO ELECTRICAL ENGINEER'S DOCUMENTATION AND TO BE IN ACCORDANCE WITH UON STANDARD SERVICE PENETRATION CONTRACTOR TO COORDINATE ANY REQUIRED CHANGE IN DIAMETER ON SITE PRIOR TO INSTALLATION DIA LEVEL AHD 23065 2 3 5 6 7 9 10 11 12 AHD 24.658 AHD 26.634 NOMINAL GROUND PLANE. ALLOW FOR 75mm MULCH BUILD UP BEHIND PILE CAP. CF05 B E C A D CF05 CF03 AHD 24.356 AHD 26.634 NOMINAL GROUND PLANE. ALLOW FOR 75mm MULCH BUILD UP BEHIND PILE CAP. CF05 FIRE HYDRANT RECESS LEVEL 00 AHD 23065 11 12 NOMINAL GROUND PLANE. ALLOW FOR 75mm MULCH BUILD UP BEHIND PILE CAP. CF03 Drawing Status not scale from drawing. Use marked dimensions. be read conjunction with other Consultant drawings. The Architect be immediately notified any discrepancies. Copyright drawing retained Architect Electronic files subject the terms 246 10 1:200 1:400 FOR INFORMATION AS BUILT A52_0000 SCALE 50 CONCRETE PROFILE DETAIL PLAN SCALE 100 RETAINING WALL SOUTH ELEVATION SCALE 100 RETAINING WALL EAST ELEVATION SCALE 100 RETAINING WALL NORTH ELEVATION
38
Groundfloor concrete profile drawing
Exterior view (during construction)
The architectural massing is derived from site constraints, internal functional requirements and the ambition to create a simple and elegant form that nestles into the sloping topography amongst more prominent buildings rather than dominating.
The façade is both a result of the secure functional role of the BRF and a response to the flexible, evolving and progressive nature of the activity within and around. This is realised through the expression of a rigid, ‘raw’ metal cladding to both the Ground and Roof Levels, juxtaposed with a simple, calm, flowing expression of refined materiality wrapping Level 01.
Exterior view
A 900 50150 SECONDARY STEEL SUPPORT CD05 FLASHING FIXED OFF SECONDARY STEEL SUPPORT + FLASHED OVER CONCRETE HOB HOOK-ON BRACKET FIXED OFF UNITISED ALUMINIUM FRAME TOP + BOTTOM OF MODULES 6mm ALUMINIUM PLATE POWDERCOAT TO MATCH TRANSOM COLOUR 50 50 BC02 MX02 CD01 SKIRTING+FLOOR FINISH REFER A34 SERIES FOR FINISHES PLANS UNI-STRUT CAST INTO SLAB EDGE FOR FIXING OFF HOOK ON BRACKET SUPPORT WITH FC BACKING FIXED OFF TOP HATS FM03 WT03 WT03 MDF TO CONCEALED BLIND PELMET RONDO PS17 INTERNAL CORNER BEAD ALLOW FOR RECESSED CONTINUOUS STRIP LED LIGHTING 6 MAX. 25 MIN. ALLOW FOR RECESSED CONTINUOUS STRIP LED LIGHTING CONTINUOUS ALUMINIUM ANGLE TO WIDTH OF WINDOW CAULKED JOINT BETWEEN PLATE + BACK OF TRANSOM 150 50 900 CD05 50 50 MX02 CD01 SKIRTING+FLOOR FINISH REFER A34 SERIES FOR FINISHES PLANS FLASHING FIXED OFF SECONDARY STEEL SUPPORT + FLASHED OVER CONCRETE HOB WITH FC BACKING FIXED OFF TOP HATS COLORBOND FLASHING. COLOR TO MATCH SPEED PANEL FM03 WT03 COLORBOND FLASHING. COLOR TO MATCH SPEED PANEL REFER A39 JOINERY SERIES FOR JOINERY DETAIL RONDO PS17 INTERNAL CORNER BEAD ALLOW FOR RECESSED CONTINUOUS STRIP LED LIGHTING HOOK-ON BRACKET FIXED OFF UNITISED ALUMINIUM FRAME TOP + BOTTOM OF MODULES UNI-STRUT CAST INTO SLAB EDGE FOR FIXING OFF HOOK ON BRACKET SUPPORT SECONDARY STEEL SUPPORT ALLOW FOR RECESSED CONTINUOUS STRIP LED LIGHTING 6 MAX. 25 MIN. ALLOW FOR RECESSED CONTINUOUS STRIP LED LIGHTING No. DateApp Revision or reason for issue SCALE 1 5 2 LEVEL 1 FT05 DETAIL SECTION SCALE 1 5 1 LEVEL 1 FT04 DETAIL SECTION 4 T125/10/2018PAIssued for Tender Facade detail drawings
39
builtdrawingisbasedonthefinal'issueforcons incorporatesalldirectionsissuedtoDentonCorker phase.Thedrawingdoesnotincludeamendmentsinst thecontentshouldbeverifiedbyon-siteinspection/surveypriortoundertakingany
11 B C SPECIAL TECH 148 A37_0040 2 3 5 EQ25 EQ25 EQ06 JU05A JU05D JU05 FU09 FU09 FU09 EQ38 EQ38 EQ66 CL G A S O U T L E T 3765 CL GAS OUTLET 3930 CL CL CL CL 700 150 900 150 C C 150107 CL CL C 560150 107 WS-B CL 1501464 NOM.150 EQ73 EQ71 WORKSTATION CL CL CL CL CL150 530 530 150 CL CL CL CL CL 150530530150 JU06A EQ71 EQ73 WORKSTATION JU05 CL CL 650 500 CL CL 1310 150 11 PA01 PA01B RE01A PA01B PA01 JU05D RE01A 1500 1200 PA02C 11 PA01 PA01B RE01A PA01B RE01A PA01 1200 1500 B C PA01 PA01B RE01A PA01 PA01B RE01A PA01 PA01B RE01A MODULINE: -4 x DGPO -3 x DDATA -1 X 15A GAS OUTLET: -CA -CO2 -N2 -O2 -VAC JU05D PA02C JU06A MODULINE: -1 x DGPO -1 x DDATA 1200 1500 EQ66 307 1200 ALIGN BAGTANK B GAS OUTLET: -CA -CO2 -N2 -O2 -VAC PA01B PA01 RE01A MODULINE: -5 x DGPO -3 x DDATA FUTURE PROVISION EQUIPMENT -TO INCLUDE ALL SERVICE PROVISIONS IN ACCORDANCE WITH SERVICE CONSULTANT DOCUMENTATION. CONTRACTOR TO CONFIRM SERVICE PROVISIONS WITH MANUFACTURER. TAG TYPE KEY FE Do not scale from drawing. Use marked dimensions. To be read in conjunction with all other Consultant's drawings. The Architect to be immediately notified of any discrepancies. Copyright on this drawing retained by the Architect Electronic files are subject to the terms of the General Notes Architect Denton Corker Marshall Pty Ltd Level 19, 55 Collins Street Melbourne Victoria 3000 Australia T +61 9012 3600 F +61 9012 3601 E UoN@dentoncorkermarshall.com dentoncorkermarshall.com
SCALE 1 50 1 FLOOR PLAN SCALE 1 50 2 NORTH ELEVATION SCALE 1 50 3 SOUTH ELEVATION SCALE 50 4 EAST ELEVATION SCALE 1 50 5 WEST ELEVATION 6 AXONOMETRIC Number Comments Area 148 30 m² FCL FFL Lab interior view Lab interior view Interior corridor view 40 Room layout drawing Junction details
Exterior view
working file 41
Exterior view
Revit
Monash BioMedical Teaching + Learning Building
Employment Information
Company: Denton Corker Marshall
Project Information
Location: Melbourne, Australia
GFA: 11,360m2
Cost (AUD): $94,000,000
Type: Research + Education
Status: Built Monash University associates itself with best practice and setting global benchmarks in both Academia and Research. Smart use of technology, design for change, flexibility and adaptability are critical properties.
The University seeks to establish an environment for its students of Biomedical Sciences that will support the University’s innovative approach to pedagogy. Flexibility, multidisciplinary interaction, and achieving a superior student experience are important considerations.
I was involved in the project from Design Development through to Construction stage. While a significant amount of communication with various parties was required due to the high performing nature of the building, the tasks required continual coordination and integration of information and project material from project consultants, specialists and suppliers, and documentation productions in accordance with the project contract and project procurement procedure.
42
43
The building is consist of interlocking L shaped Labs with flexible breakout teaching spaces at one end and prep and service pods at the other end come together to form the Flexi Lab.
The laboratories are configured in an ‘L shape’ and wrap around a central glazed satellite preparation area providing smaller-scale more intimate laboratory environments for 60 to 120 students. Alternatively, the four laboratories can be combined to provide a space for up to 240 students.
The innovative new Biomedical Learning and Teaching Building also features a 1,200 square metre informal learning hub that can accommodate 400 students, averaging 90 informal learning seats per floor.
UP A10-203 A10-201 A10-202 A10-204 A B C D 1 2 3 4 5 6 7 8 9 A10-301 A A10-301 A A10-302 B A10-302 B A10-303 C A10-303 C A10-304 D A10-304 D AHU 2-PL03 MOLECULAR BIOSCIENCES 209 210 WARM ROOM 211 PC2 DECON 212 CIRCULATION 2-PS02 CIRCULATION 2-PS04 SERVICES 2-RS08 2-PL02 2-ST02 ELEC DB 2-PL01 SERVICES 2-RS06 EXHAUST RISERS 2-RS04 SERVICE RISER 2-RS05 2-LF04 CIRCULATION 2-PS03 PC2 HUB 207A WET LAB HUB 208A FLEXIBLE TEACHING SPACE FLEXIBLE TEACHING SPACE 206 BAG STORE 205 HAND WASH 205A 203 FHR 2-PL05 DDA 2-TL01 MALE 2-TL02 FEMALE 2-TL03 DB ROOM 2-PL06 2-ST03 SERVICES 2-RS01 2-LF01 CIRCULATION 2-PS01 ADMINISTRATION 202 2-ST01 INFORMAL LEARNING 201 8700 8600 8700 FFL 100.100 MOLECULAR BIOSCIENCES 213 AHU 2-PL04 6800 6500 9800 8300 9800 5300 11700 4160 HAND WASH 205B FFL 100.100 SERVICES 2-RS03 SERVICES 2-RS02 A10-305 E A10-305 E 2-LF02 2-LF03 2-LF05 SERVICES 2-RS07 FOUNTAIN PC2 WET LAB 207 WET LAB 208 FE FE 1 1 A50-216 A50-230 1 A50-245 A50-247 1 A50-262 A50-306 1 A50-307 1 A50-403 A50-404 1 A50-318 1 A50-507 A50-511 4 A55-201 4 A31-202 4 A31-203 4 A31-204 A31-201 LCD LCD LCD LCD LCD LCD LCD LCD LCD LCD LCD UTILITY 203A OFFICE 203C OFFICE 203B MEETING POD 201A CD-01A CLEAN 2-CL01 RACK JOINERY UNIT FE CABINET BIOHAZARD BIOHAZARD CABINET CABINET No.DateAppRevision reason issue Project Title Client Drawing Title Drawing Status Project Number Project File Print Date Drawing Number Do not scale from drawing. Use marked dimensions. To be read conjunction with all other Consultants' drawings. The Architect be immediatel notified of any discrepancies. Copyright on this drawing retained by the Architect. Electronic files are subject the terms the Denton Corker Marshall Electronic Data Disclaimer. Issue Date Denton Corker Marshall Pty Ltd Level 19, 55 Collins Street Melbourne Victoria 3000 Australia +61 9012 3600 +61 9012 3601 melb@dentoncorkermarshall.com dentoncorkermarshall.com 1235 1:100 @ Drawn By Checked D4 100 30/03/2017 3:57:56 PM BIOMEDICAL LEARNING + TEACHING BUILDING LEVEL 2 FLOOR PLAN 7512 A10-104 7512_BLTB_Building 30/03/17 DESIGN DEVELOPMENT PRELIMINARY MONASH UNIVERSITY Research Way, Wellington Road, Clayton 3800 Telephone +61 9902 0290 Facsimile +61 9902 0290 Email cindy.deayton@monash.edu BG SY D103/02/17SYCONSULTANT ISSUE D203/03/17SYCONSULTANT ISSUE D317/03/17SYCONSULTANT ISSUE D430/03/17SYDESIGN DEVELOPMENT ISSUE
Level 01 Floorplan Lab
44
interior view
The facade frit pattern is inspired by the biomedical reference imagery. Optimisation of the frit locations and coverage has been developed to meet the energy reduction, daylight and comfort targets. It also assists in disguising the floor slabs and suspended ceiling voids when viewed from outside, and strengthens the singular reading of the projecting forms.
NOTE: AIRTIGHTNESS LINE AIRTIGHTNESS TO BE ACHIEVED IN ACCORDANCE WITH FACADE CONSULTANT'S SPECIFICATION LEVEL 1 95650 LEVEL 3 104550 LEVEL 4 109000 THERMAL INSULATION SHADOW GAP STOPPING BEAD CONTINUOUS SMOKE SEAL EXTERIOR INTERIOR ADDITIONAL CLADDING TO SIDE REVEAL 1100 1260 740 CL CL 1065 1335 2050 SECONDARY STEEL IS SHOWN INDICATIVELY ONLY AND IS REQUIRED TO BE DESIGNED AND DOCUMENTED BY THE CONTRACTOR CONTINUOUS SMOKE SEAL SECONDARY STEEL IS SHOWN INDICATIVELY ONLY AND IS REQUIRED TO BE DESIGNED AND DOCUMENTED BY THE CONTRACTOR SYPHONIC DRAIN. REFER TO HYDRAULIC ENGINEER'S DETAILS CLADDING OVER STACK JOINT TO BE SITE FIXED WITH MOVEMENT CONNECTION TO ONE SIDE CLADDING OVER STACK JOINT TO BE SITE FIXED WITH MOVEMENT CONNECTION TO ONE SIDE EXTRUDED ALUMINIUM SILL PROFILE. POWDERCOAT TO MATCH TRANSOM COLOUR FLASHING TO COLOUR MATCH FT01 CLADDING CLADDING OVER STACK JOINT TO BE SITE FIXED WITH MOVEMENT CONNECTION TO ONE SIDE CD-07 TO COLOUR MATCH CURTAIN WALL MULLION 1495 RL 94.210 595 WALL LINING TO CONTINUE TO REVEAL FCL 3100 AFFL FT-05 FT-04 SITE FIXED CLADDING TO MATCH FT07 FINISH SITE FIXED CLADDING TO MATCH FT01 FINISH CD-08 CD-04 LEVEL 1 95650 LEVEL 3 104550 LEVEL 4 109000 2050 CL CL TYPICAL 445 CURTAINPANEL CURTAINPANEL CURTAINPANEL CURTAINPANEL 1495 CURTAINPANEL CURTAINPANEL RL 110.495 TOP OF PARAPET STACK JOINT 30 NOM Project Title Client Drawing Title Drawing Status Project Number Scale North Point Project File Print Date Drawing Number Revision Issue Date Architect Denton Corker Marshall Pty Ltd Level 19, 55 Collins Street Melbourne Victoria 3000 Australia +61 3 9012 3600 +61 3 9012 3601 melb@dentoncorkermarshall.com dentoncorkermarshall.com 0.20.40.6 1:20 @ A1 M 1:40 @ A3 Drawn By Checked By FOR CONSTRUCTION C1 As indicated 20/11/2017 9:34:46 AM BIOMEDICAL LEARNING + TEACHING BUILDING FT01 NORTH-SOUTH C. WALL SHEET 01 7512 A43-201 7512_BLTB_Building 20/11/2017 MONASH UNIVERSITY 26 Research Way, Wellington Road, Clayton 3800 Telephone +61 3 9902 0290 Facsimile +61 3 9902 0290 Email cindy.deayton@monash.edu FW SY A43-201SCALE 1 20 2 FT01 SECTION SOUTH TAG DESCRIPTION (READ IN CONJUNCTION WITH MATERIAL SCHEDULE) CD-04ALUMINIUM SOLID SLATE GREY TO MATCH FT01 CD-07ALUMINIUM "MONUMENT" TO MATCH MULLION CD-08FC SHEET PAINTED TO MATCH FT-01 FT-01REFER TO A43-200 SERIES FT-04REFER TO A43-400 SERIES FT-05REFER TO A43-500 SERIES LOWER GROUND 87000 GROUND 91200 LEVEL 95650 LEVEL 100100 LEVEL 104550 LEVEL 109000 ROOF 113450 A B C D A10-304 D CIRCULATION 1-PS01 WATER TANK LG-PL03 INFORMAL LEARNING LG03 CIRCULATION LG-PS01 CIRCULATION G-PS01 INFORMAL LEARNING G02 ADMINISTRATION 102 INFORMAL LEARNING 104 INFORMAL LEARNING 201 CIRCULATION 2-PS01 ADMINISTRATION 203 CIRCULATION 3-PS01 STAFF LOUNGE KITCHEN 301 STAIR 01 LG-ST01 RL 108.645 8700 8600 8700 SITE BOUNDARY A10-305 E STAIR G-ST01 STAIR 1-ST01 2-ST01 STAIR 3-ST01 RL 108.645 RL 110.505 CORRIDOR LG-PS02 CIRCULATION LG-PS01 LEARNING RESOURCES CENTRE LG15 MEETING POD 201A INFORMAL LEARNING 201 ADMINISTRATION 304 INFORMAL LEARNING 302 RL 114.950 RL 111.618 No.DateAppRevision reason for issue Project Title Drawing Title Scale North Point Do not scale from drawing. Use marked dimensions. To be read in conjunction with all other Consultants' drawings. The Architect be immediatel notified any discrepancies. Copyright on this drawing retained by the Architect. Electronic files are subject to the terms of the General Notes Architect Denton Corker Marshall Pty Ltd Level 19, 55 Collins Street Melbourne Victoria 3000 Australia 1:100 A1 1:200 A3 BIOMEDICAL LEARNING TEACHING BUILDING SECTION AA BG SY D103/03/17SYCONSULTANT ISSUE D217/03/17SYCONSULTANT ISSUE D330/03/17SYDESIGN DEVELOPMENT ISSUE
Section Facade detail drawing
Exterior view
Exterior view
45
Exterior view (during construction)
The biomedical pattern that is integrated into the East and Western façade of the building is also reflected in the pattern design of the atrium ceiling. The generation of the ceiling pattern involves extensive coordination with services within the ceiling space, to ensure acoustic and service requirements are achieved, while creating a flowing expression with standardised modules.
Ceiling detail drawing 46
Ground level reflected ceiling plan
A A A A A A C D 2 3 A50-241 6 A50-241 4 A50-241 SYSTEMS BIOLOGY 111 COLD ROOM 112 SYST BIO WASH 113 STORE ROOM 114 A50-242 8 9 10 11 A50-242 12 13 14 15 7 EQ-140 EQ-290 EQ-156 EQ-145 EQ-350 EQ-336 EQ-370 JU-34 JU-34 JU-34 EQ-145 EQ-265 EQ-265 FM-03 FM-03 FM-03 FM-03 FM-03 FM-03 FM-03 1 A50-253 FU.CH.03 JU-33 JU-31 JU-85A SA-15 JU-35 SA-16 FE JU-82A FU.CH.07 FU.CH.04 JU-32 CL EQ EQ 1500 CL EQ EQ CL 3121 C 570 PLUMBING FIXTURE JU-31 SETOUT FUME SETOUT JU-34 SETOUT R3000 JI-02 JL-01 CONTINUOUS BENCHTOP MINIMAL JOINTS JL-01 CONTINUOS BENCHTOP MINIMAL JOINTS CL 404 FC-01 EQ-256 70 TU-04 LCD EL-C EL-E EL-D EL-D EL-D EL-D EL-D EL-B EL-D EL-D x2 C CL 1360 725 CL 245 CL 636 CL 635 CL 1121 CL CL 461 486 AV-L 4x CL 1210 CL 200 CL CL 200 CL 200 EL-C CL 205 CL 300 C 400 CL 800 CL CL 200 CL 200 500 EL-F C CL CL CL 1125 1125 950425 CL 365 1100 C CL CL CL CL 640640640640365 EQ-231 EQ-231 EQ-231 EQ-230 EQ-305 6x AV-H EL-F CL 320 CL 4761 EQ-145 TU-04 TU-04 CL 410 CL 605 CL C CL C 68045155200 LOCAL EQUIPMENT CONTROLLER @1600AFL CENTERED ON THIS SIDE OF THE WALL C D 2 3 FCL 2700 FCL 2700 CL-02 CL-02 1500 993 140 2040140971 3300 160 JU-32 SETOUT JU-32 SETOUT SETOUT CL 1226 C CL CL EQ1000 1000 EQ CF-01 BC-02 STORE ROOM 114 SYSTEMS BIOLOGY 111 SYST BIO WASH 113 460 SETOUT D CABLE DUCT WL-04 PA-01 PA-01 WL-03C WL-03C PA-01 JU-34 EQ-140 EQ-290 FU.CH.07 JU-33 WL-03+PA-01 SETOUT CABLE DUCT SETOUT PA-01 1530 1070 100 150 1170 450 720 WL-03C DESK SETOUT FG FG CO2 JU-82A EQEQ 2 3 FFL 95.650 FCL 98.350 OPEN PA-01 WL-04 LCD EQ-145 JU-34 FU.CH.07 2700 100 2600 WL-04+PA-01 SETOUT LCD SETOUT 1600 LCD SETOUT CL 820 AV-L EL-D x4 AV-H PA-01 TO THESE SIDES OF THE WALL EQEQ C D 2700 CABLE DUCT CABLE DUCT PLASTERBOARD BULKHEAD OVER FUME CUPBOARD TO BE MOUNTED FLUSH WITH EXTENT OF HOOD WL-04 WL-03C WL-03C WL-03C PA-01 PA-01 FCL 98.350 FFL 95.650 JU-34 JU-34 JU-34 JU-34 JU-85A FU.CH.07 EQ-145 EQ-350 100 2600 WL-04+PA-01 SETOUT CABLE DUCT SETOUT 371 FE 150 1170 1170 WL-03C SETOUT FC-01 EQ-256 1400 CO2 OUTLET EL-C FUTURE MILLI-Q ON WALL EL-F EL-C 2x JU-82A PA-01 2 3 FFL 95.650 2700 PLASTERBOARD BULKHEAD OVER FUME CUPBOARD TO BE MOUNTED FLUSH WITH EXTENT OF HOOD WL-03C WL-04 PA-01 JU-34 JU-33 JU-32 JU-31 EQ-140 JU-82A FU.CH.07 FU.CH.03 FU.CH.03 FCL 98.350 1480 300 920 WL-04+PA-01 SETOUT JU-31+JU-32 SETOUT WL-03C WL-03C SETOUT 70 180 920 TU-04 C D 2700 FFL 95.650 OPEN PA-01 PA-01 PA-01 PA-01 REFER TO DRAWING A50-253 TYPICAL -4 C COLD ROOM JU-32 JU-31 FU.CH.03 FU.CH.03 LCD 2700 9203001480 PA-01 SETOUT JU-31+JU-32 SETOUT 1600 LCD SETOUT 955 JU-32 SETOUT FCL 98.350 EL-B EL-E JU-82A AH LEGEND SMOKE DETECTOR EWIS SPEAKER MOTION SENSOR RETURN AIR GRILLE 600X600 SUSPENDED LED PANEL 600X600 SPRINKLER HEAD SQUARE SWIRL DIFFUSER 600X600 LIGHTING POWER + COMMUNICATION MECHANICAL FIRE NOTE: ALL CEILING FIXTURES LOCATED AT TILE CENTRES U.N.O. EMERGENCY LIGHT RECESSED DOWNLIGHT SURFACE MOUNTED LUMINAIRE SURFACE MOUNTED EMERGENCY LUMINAIRE WI-FI HEAT DETECTOR SMOKE DETECTOR (CONCEALED) SURFACE MOUNTED EWIS SPEAKER RETURN AIR GRILLE 300X300 NOTE: SERVICES SHOWN TO CEILING PLANS HAVE BEEN UPDATED T SUIT CONSULTANT'S DRAWINGS SINCE LAST ISSUE. AV OUTLETS POWER (DGPO) DATA (2X F/RJ45 WALL PLATE) DATA (1X M/RJ45 CABLE IN CEILING CAVITY) DATA (1X F/RJ45 WALL PLATE) IP PHONE CLIPSAL C10PL (SINGLE OUTLET) BULLNOSE WALLPLATE (AV) DATA (SINGLE CABLE IN WALL RETICULATED VIA CUT-OUT) M/RJ45 KP/TP/VC CAMERA BULLNOSE WALLPLATE (DATA) N DENOTES QTY OF DATA CABLES N NOTE LEGEND T H CP AH C CO TEMPERATURE SENSOR HUMIDITY SENSOR LOCAL ON/OFF CONTROL PANEL AFTER HOURS PUSH BUTTON LOCAL EQUIPMENT CONTROLLER CARBON MONOXIDE SENSOR CO2CARBON DIOXIDE SENSOR O2OXYGEN SENSOR FGFLAMMABLE/COMBUSTIBLE SENSOR IVBISOLATION VALVE BOX GAPGAS ALARM PANEL GSAPGAS SENSOR ALARM PANEL BMSBUILDING MANAGEMENT SYSTEM 0 No.DateAppRevision or reason for issue Project Title Client Drawing Title Drawing Status Project Number Scale North Point Project File Print Date Drawing Number Revision Do not scale from drawing. Use marked dimensions. To be read in conjunction with all other Consultants' drawings. The Architect to be immediately notified of any discrepancies. Copyright on this drawing retained by the Architect Electronic files are subject to the terms of the Denton Corker Marshall Electronic Data Disclaimer. General Notes Issue Date Architect Denton Corker Marshall Pty Ltd Level 19, 55 Collins Street Melbourne Victoria 3000 Australia T +61 3 9012 3600 F +61 3 9012 3601 E melb@dentoncorkermarshall.com dentoncorkermarshall.com 0.511.5 2.5 1:50 @ A1 M 1:100 @ A3 Drawn By Checked By FOR CONSTRUCTION C9 As indicated 20/04/2018 5:39:00 PM BIOMEDICAL LEARNING + TEACHING BUILDING SYSTEMS BIOLOGY L1 SHEET 1 7512 A50-241 7512_BLTB_Building 23/03/2018 MONASH UNIVERSITY 26 Research Way, Wellington Road, Clayton 3800 Telephone +61 3 9902 0290 Facsimile +61 9902 0290 Email cindy.deayton@monash.edu CG SY A10-103SCALE 1 50 1 LEVEL 01, PREP - SYSTEMS BIOLOGY, PLAN SCALE 1 50 A53-103 2 LEVEL 01, PREP - SYSTEMS BIOLOGY, REFLECTED CEILING PLAN A50-241SCALE 1 50 4 PREP - SYSTEMS BIOLOGY, ELEVATION A50-241SCALE 1 50 5 PREP - SYSTEMS BIOLOGY, ELEVATION A50-241SCALE 1 50 6 PREP - SYSTEMS BIOLOGY, ELEVATION A50-241SCALE 1 50 3 PREP - SYSTEMS BIOLOGY, ELEVATION A50-241SCALE 1 50 7 PREP - SYSTEMS BIOLOGY, ELEVATION 3m GPO EXCLUSION ZONE C101/11/17SYRCP ISSUED FOR CONSTRUCTION C201/12/17SYINTERNAL ELEVATIONS IFC C306/12/17SYTURRET SERVICES CLARIFICATION C427/02/18SYINTERNAL ELEVATIONS IFC C505/03/18SYINTERNAL ELEVATIONS UPDATE C609/03/18SYSERVICES AND JOINERY UPDATE C723/03/18SYSERVICES+EQUIPMENT UPDATE C813/04/18SYSERVICES+EQUIPMENT UPDATE C920/04/18SYSERVICES UPDATE Room layout drawing 47
Melbourne Grammar School Bromby Science and Technology Centre
Employment Information
Company: Denton Corker Marshall
Project Information
Location: Melbourne, Australia
GFA: 5,000m2
Cost (AUD): $30,000,000
Type: Education
Status: Built
The project is a five-storey building accommodating new and emerging pedagogies by providing highly flexible formal and informal learning spaces.
The building is sympathetic to the campus heritage and identity, contributing to the ‘Bluestone Campus’ character in both form and colour. It also engages with the wider campus landscape; the singular sculptural form creates a clear and direct response to the main oval.
I was in involved in preparing the Construction drawing package, integrating and coordinating information and project materials from consultants and contractors, to ensure timely delivery of accurate documentation and smooth running of the construction.
48
49
Entering the building, the common atrium is revealed with the sweeping staircase encouraging movement and participation. The interiors is seen as an extension of the external concept whereby the striking external envelope is continuously visible throughout the interiors. In this way the building acts as an education tool to engage students and encourage exploration with what is occurring in the learning and teaching spaces. While the elongated windows allow for amazing outlooks and daylight into every space, they also act as sun-shading devices for the ESD initiatives.
1 2 3 4 ENTRY LOBBY IT LAB TEACHING SPACE HEAD OF HOUSE STAFF HUB INDUSTRY HUB PROJECT ROOM 5 6 7 8 10M 9 LOCKER ROOM HANDBURY SCIENCE AND TECHNLOGY HUB MELBOURNE GRAMMAR SCHOOL 1 2 8 5 4 7 5 6 3 1 4 9 Level 02
Floorplan
50
Exterior view
Interior view
Rooftop view 51
Interior view
The building is intended to act as education tool itself whereby selected structural and service elements are visible, but done in a refined and sophisticated way. In the classrooms and laboratories, multi-service active beams are hung from exposed soffit to explain the environmental and servicing requirements of the Greenstar building with drop panels for acoustics.
The internal laboratory concept is taken from current trends in medical research institutes whereby long benches promote a collaborative learning environment.
Finishes are a combination of natural materials such as exposed concrete and blackened metal and glass, punctuated with bright colours and textures with a consideration for the environment with all selections.
Workshop enlarged floorplan Interior view F E 3 4 5 6 WORKSHOP 116.1.012 JU.19 JU.18 JU.20 JU.17 FX.SI.04 FX.EW.01 FX.EW.01 STAFF TECHNICIANS 116.1.011 LOBBY 116.1.002 PROJECT ROOM 3 116.1.014 PROJECT STORAGE 116.1.010 PROJECT ROOM 2 116.1.015 PROJECT ROOM 1 116.1.016 WORKSHOP STORE 116.1.013 JU.01 JU.01 FB.08 FX.SG.01 FX.SG.01 FX.WLC.01 2931 4500 2398 1492 2625 2225 4775 1400 FX.FW.01 FX.FW.01 650250100900 EQ.GN.01 EQ.GN.01 EQ.GN.01 CONTROL PANEL LOCATION A50.258 A50.201 A50.200 A50.200 SK-590 ASSEMBLY CODE TAG ASSEMBLY TYPE TYPE NUMBER A.AA.00.00 CLASSIFICATION MATERIAL CODE COLOUR CODE MATERIAL CODE TAG FIXTURES, FITTINGS EQUIPMENT CODE TAG AA.AA.00 AA.00A TAG LEGEND CLASSIFICATION TYPE CODE TYPE NUMBER UNIQUE TYPE DOOR TAG DT.01 1.011A DOOR TYPEREFER DRAWING SERIES A45 FOR DOOR TYPE SCHEDULE DETAILS REFER: A50.570: FURNITURE SCHEDULES A57.900: EQUIPMENT SCHEDULES A57.910: FIXTURES SCHEDULES ASSEMBLIES, MATERIALS, FINISHES COLOUR CODES INDEX ASSEMBLIES, MATERIALS, FINISHES COLOUR CODES INDEX E E JOINERY NOTE: REFER TO A55 DRAWING SERIES FOR JOINERY DETAILS No.DateAppRevision or reason for issue Do not scale from drawing. Use marked dimensions. To be read conjunction with other Consultant's drawings. The Architect to be immediatel notified any discrepancies. Copyright on this drawing retained by the Architect. Electronic files are subject the terms of the Denton Corker Marshall Electronic Data Disclaimer. General Notes Architect Denton Corker Marshall Pty Ltd Level 19, 55 Collins Street Melbourne Victoria 3000 Australia T +61 9012 3600 SCALE PLAN 1 WORKSHOP INTERIOR C212/04/2017NTAMENDMENTS/ CONFIRMATION OF MATERIALS + COLOURS C101/08/2016NTCONSTRUCTION ISSUE 52
2 3 3 4 5 6 7 8 1 Section 53
Interior view (during construction)
Shepparton Art Museum
Employment Information
Company: Denton Corker Marshall
Project Information
Location: Shepparton, Australia
GFA: 5,000m2
Cost (AUD): $39,900,000
Type: Museum
Status: Built
The project is a five-storey building housing the current Shepparton Art Museum, visitor centre and another local gallery. It is a significant development in the region due to its potential to become a key pedestrian route and to provide connection to the indigenous culture. The building presents itself as a singular, powerful composition of abstract sculptural elements placed in the landscape.
My tasks on the project involved gaining understanding of client objectives and requirements as well as knowledge of precedents, environments, history and culture influencing the architectural design, and participating in producing conceptual design responses and articulating ideas with architectural drawings and 3D visualisations.
54
55
The park is SAM’s greatest asset and the design capitalises on this and conceives a sculptural building-in-the-park. The building service and loading dock areas are buried under a mound creating an Art Hill above them. Not only are they completely screened but it has the added benefit of creating two ground levels to the park – a standard ground level, and an upper ground level.
Street verandahs characterise regional and country towns. They provide shade, shelter, identity, gathering and meeting places. The design creates a contemporary interpretation of the street verandah on each of the four facade responding to different use and orientation.
Rather than having designated galleries displaying art and artefacts the building is conceived as an art container - not one gallery but every space and every moment in and on SAM is a gallery display opportunity, be it stairs, lobby walls, lift wells, facades, external toilet block roofs. Every surface presents an opportunity for display, event or installation.
Lower Ground Floorplan
A10-302 1 C B D E 1 2 3 4 AGT G.13 VIC STORAGE G.14 SAM SHOP G.28 AGT G.19 CLEANER'S ROOM G.29 KITCHEN G.08 VIC OFFICE G.07 SAM STORAGE G.12 VISITOR INFORMATION CENTRE G.05 CENTRE ENTRY G.01 CORRIDOR G.CR4 AT G.20 DISPLAY G.04 KAIELA ARTS G.16 STUDIO G.18 CAFE STORAGE G.30 BATH G.26 ARTIST IN RESIDENCE G.25 OFFICE G.17 AT G.10 CORRIDOR G.CR3 KITCHEN LIFT GOODS LIFT FIRE STAIR G.ST1 FIRE STAIR G.ST2 MEETING ROOM G.09 RL 112.900 RL 112.900 RL 112.900 RL 112.900 LOADING DOCK G.39 KAIELA STORAGE G.21 STORAGE G.11 DISPLAY FIP G.03 1 A50-501 REFER TO DRAWING A10-111 FOR CONTINUATION 9300 9300 9300 CORRIDOR G.CR1 CORRIDOR G.CR2 A10-301 A10-300 CLOAKS G.27 FHR G.02 UNDER STAIR VOID LINE OF CANOPY ABOVE CF02 CF02 CF02 MX01 TL03 CP01A CP01A RE01 RE01 CF02 CF02 CF02 CF02 CP01A SAM STORAGE G.31 MX01 CF02 A10-101 POTTERY WHEELS LOUNGE CF02 FHR A10-201 A10-203 A10-202 A10-200 DB G.23 CP01A CP01A G.06 m² DB G.15 CF02 HOT WATER UNITS RE01 RE01 RE01 RE01 STORAGE G.22 FHR G.24 AV SCREEN RL 112.900 4 A34-053 LINE OF BULKHEAD ABOVE LINE OF FLOOR ABOVE VOID CP04 CP04 CP04 CP04 CANOPY DRAINAGE, CONCEALED IN TIMBER BILLET 4 A34-052 A24-060 TIMBER BENCH TIMBER BENCH CP04 FM03 FM03 DISPLAY CABINET FM07 FM03 1:40 1:102 1:41 1:41 CF03 CF02 CF02 AV SCREEN FUTURE AV SCREEN CF02 RL 112.900 CF03 FM03A FM03C FM03 FM03C MX09 MX09 PV01 PV01 PV01 DP DP FM12A FM12A FM12A OVERFLOW HATCH, REFER TO FACADE DETAIL B 4 BEDROOM GM.01 RL 115.340 CP01B VOID TOB 116.370 Drawing Title Drawing Status Project Number Scale North Point Project File Print Date Drawing Number Do not scale from drawing. Use marked dimensions. To be read in conjunction with other Consultant drawings. The Architect to be immediately notified any discrepancies. Copyright this drawing retained by the Architect Electronic files are subject the terms of the Denton Corker Marshall Electronic Data Disclaimer. General Notes Issue Date 123 1:100 @ A1 1:200 @ A3 Drawn Checked Project Title Architect Denton Corker Marshall Pty Ltd Level 19, 55 Collins Street Melbourne Victoria 3000 Australia +61 9012 3600 +61 9012 3601 melb@dentoncorkermarshall.com dentoncorkermarshall.com No. DateApp Revision reason issue T2 14/08/2018 4:53:33 PM GROUND LEVEL PLAN 7521 A10-101 FOR TENDER GG SY SHEPPARTON ART MUSEUM GREATER SHEPPARTON CITY COUNCIL LOCKED BAG 1000 SHEPPARTON VIC 3632 A10-101 SCALE 100 2 GROUND LEVEL PLAN MEZZANINE T103/08/2018For Tender T214/08/2018For Tender GROUND LEVEL RL 112.90 LEVEL RL 117.90 LEVEL RL 128.90 LEVEL RL 133.60 ROOF RL 139.85 1 2 3 4 LEVEL MEZZANINE RL 136.50 5500 5500 4700 2900 3350 TERRACE GALLERIA CENTRAL PLANT CRATE CENTRAL GALLERIA CENTRAL GALLERIA LAKE VIEW ATRIUM WEST STAIR KAIELA ARTS ENTRY A43-400 3800 1200 4050 1450 4050 1450 360011003600 2650 2 A50-101 5000 CEILING LEVEL CEILING LEVEL CEILING LEVEL CEILING LEVEL CEILING LEVEL FCL 121.95 FCL 127.45 FCL 132.50 FCL 137.20Drawing Title Scale North Point Do not scale from drawing. Use marked dimensions. To be read in conjunction with other Consultant drawings. The Architect to be immediately notified any discrepancies. Copyright this drawing retained by the Architect Electronic files are subject the terms of the Denton Corker Marshall Electronic Data Disclaimer. General Notes 123 1:100 @ A1 1:200 @ A3 Architect Denton Corker Marshall Pty Ltd Level 19, 55 Collins Street Melbourne Victoria 3000 Australia +61 9012 3601 melb@dentoncorkermarshall.com dentoncorkermarshall.com No. DateApp Revision reason issue SECTION AA FOR TENDER SHEPPARTON ART MUSEUM GREATER SHEPPARTON CITY COUNCIL LOCKED BAG 1000 SHEPPARTON VIC 3632 T103/08/2018For Tender T214/08/2018For Tender 56
Section Exterior view (during construction)
The building is an outstanding work of architecture in both appearance and performance with simplicity, clarity and memorable identity. It makes an outstanding contribution to Shepparton and Victoria Park Lake by substantially expanding the park including a dramatic Art Hill screening all building services and surrounding SAM in parkland.
The final project provides a highly legible, highly transparent and highly accessible art museum focused around an open, generous circulation, with maximised curatorial freedom.
Exterior view
Exterior view
57
ACADEMIC WORKS
The W Towers [Social Housing]
Group Work (2)
Berlin, 2016
The recent waves of migration has directly lead to a rapidly growing population and a severe housing shortage in Berlin. A new, digital turning point in building would have to become an incubator of rational urban development – producing modular buildings without monotony, with social integration as potential, with flexibility and a subsequent increase in density as prerequisites for an urban future.
The project focuses on this theme based on a real scenario in Berlin. The design approach adopts the tower typology with prefabricated construction method and low construction area to consolidate the area sustainably, and minimise the impact on existing green spaces.
The final outcome is four twenty-one level towers each with 22 different apartment layouts, ranging from 1 bedroom studios to 3 bedroom apartments, in which can be arranged and combined differently according to specific needs. The apartment layouts differentiate from the conventional social housing plans with relatively long depth and inflexible rooms squeezed in rectangular plans, but offers modern and unique life styles, with its more open and efficient living spaces. Together with the use of advanced engineering,
01
60
it offers a changeable prototype in the sense of a case study for a house of the 21st century.
The whole scheme allows a big variety of flat sizes and configurations, which are all thought in a modular system. By shifting and intersecting the walls, the scheme avoids rectangular plans with relatively long depths, but rather creates unconventional social housing types with more luxury and flexible options. Every single square metre has been adapted to its maximum use, meanwhile, the majority of the flats will receive South light.
The ground floor keeps it’s space open to the public. It offers services like small shops, some bike storages and garbage storages. As the building gets taller some public programs are offered including a kindergarten and a meeting space.
15th Alternative Floor Plan- Kindergarten 19th Alternative Floor Plan - Meeting Space 19 20th Floor Plan 1 - 10th Floor Plan 11 - 14th Floor Plan 15 - 16th Floor Plan 17 - 18th Floor Plan
1. Entrance hall
2.Commercial Function
3. Bike Room
4. Garbage Room
61
The prototypical building articulates itself in shape of a high-rise typology. In this way the impact to its surrounding is as little as possible and at the same time it can inhabit a large amount of people.
According to the German Building Law, the planning of building should always consider the setback area to prevent over-shade (setback distance from building edge = building height x 0.4). The setback distance of each building must be respected and cannot be overlapped. This is also one of the critical factors that determine the shifting outline of the architecture.
The site already has a quite dense population and the majority of the residents tend to be elderly people who have been living there for more than 10 years. The proposal tries to minimise the impact on the local residents and improve the urban condition, by articulating the buildings in high rise typology and maintaining 90% of the vegetation on site. The landscape design differentiates from the rigid form of the building and forms a dynamic pattern that is developed as free as possible. This provides a light yet energetic background for the high rise towers, and marks out two gardens between the building with distinct atmosphere: a ‘paradise’ and a ‘secret backyard’. More importantly, the proposal requires minimum maintenance and allows the current residents to appreciate the existing condition.
Typical Floorplan
Massing Diagram
Opening up the basement and creat a sunken plaza
Mirroring the volume / satisfying the setback law Adjusting the outline to reinforce the green gardens
Applying the modular grid Cutting the volume to allow for natural light
grid Cutting the volume to allow for natural light
Opening up the basement and creat a sunken plaza
Mirroring the volume / satisfying the setback law Adjusting the outline to reinforce the green gardens
Applying the modular grid Cutting the volume to allow for natural light Setback Plan
62
By choosing industrial standardised materials the building cost can be reduced and at the same time it allows for a light and contemporary modular appearance. The facade elements can be prefabricated and transported on site by trucks. The three main materials are concrete shear walls, glasses, and metal meshes.
In response to the unique configuration of the plans, the building structure adopts a shear wall and beam system. The length of the shear walls are calculated based on the maximum span of the beams. Each component is also standardised based on the construction grid.
Facade Section Building Construction
Facade Diagram
Exploded Structural Diagram 63
Present [Bathhouse] Individual Work
Melbourne, 2015
Men’s changing room/bathroom
Women’s changing room/bathroom
Located at the Daylesford Lake, Melbourne, the project intends to become a stretch of the eye to the landscape, a continuity that defines a journey shifting from the outer world to inner world. The architecture awaits fulfilment and reception, complete only when the observer enters. It begins with a collaboration with the natural world to set the stage.
The program is inspired by the concept of monastery, which were not built for contemplation alone, but also as apparatuses aiming to regulate life in all its physical and mental aspects.
“Every order defined a form of life clearly prescribed according to a rule, that is to say a precise program. The goal was not to replace life with abstract standards or schedules (such as our daily routines) but rather, to make the rules so consistent to life that the rule
SUN PATH Cells
Entry to bath
Rooftop Bar
Sauna & Massage rooms
Indoor bath
Outdoor bath
02 64
Order to life and rule as reflected by landscape and in the rhythm to the landscape. A stretch of the eye to the landscape. A continuity that defines a journey. A shift from the outer world to inner world. The architecture awaits fulfilment and reception, completes only when the observer enters. It begins with a collaboration with the natural world to set the stage.
A living space that houses an individual and a tree simultaneously, telling the pass of time and season.
“Light moments” in the gloominess, at the same time to let people relish the power and foreboding our land can exert.
Creating freedom and healing within the limitation of architecture, a constant interplay between inner world and outer world.
65
Gift to the City
[Galleries and Museum]
Individual Work Melbourne, 2014
Accommodating five individual galleries which each exhibits an artwork from a different artist via different media, including video work, sculpture, objects, etc., the the art and the built form into one, and allows the public and the art to complement each other.
The independent galleries are clustered together in a simple yet dynamic language - there is no interruption of the overall impression by any secondary elements, which has nothing to do with the artists’ statements. No visual boundaries or threshold were added to the structure - the act of approaching and participating it through the forest of columns on the concrete podiums complete the architecture and transform the architecture to a progression of experience.
The museum is here to serve the exhibition of artworks while adding layers of information onto them and providing overlapping perspectives that allow the users to form their distinct ‘whole’.
03
GALLERY 1 GALLERY 2 GALLERY 3 GALLERY 4 GALLERY 5 Ground level plan 66
“Often you won’t need to heavily direct people towards the appropriate space, because there is no appropriate space.”
“Introducing this sense of doubt into things...when sometimes you see something, you kind of step back a little bit and think about what it is before”
Artwork
“..sensorial, experience based installation, in which the viewer is always the centre piece; installation will actually become alive whenever viewer was inside an experience seeing the installation,
...transgender as a symbol of resistance, transformation fader finding the status quo.
Gillick Liam Gallery Mark Titchner Gallery avaf Gallery section videos projected on each of the intersecting planes split into vertical/ horizontal stripes to intersect wih each other the industrial city profile was taken and abstracted to be the steel frames that hang the screens and the artworks become the movable structure in this space to delivery messages.
DEVELOPMENT
CONCEPT
floor plan a
1.inner glass lining 2.steel structure
1 2 3 4
3.outer plasterboard skin 4. entry
...two identities into one body of work.” Type: Paintings and Installations Artwork Type: Video Artwork Type: Video 1. Opposition 2. Transformation 3. Combination 4. Reformation 5. Opposition 6. Transformation 7. Refomration 8. Merging 9. Wraping 6. Combination 67
The Blend Lab [Maker Lab]
Individual Work
Melbourne, 2014
Maker Typology
A contemporary maker lab that accommodates diverse makers/communities in Collingwood (Melbourne)and integrate different elements that exist in the suburb.
By introducing a diverse range of programs and blend them through the visitor’s journey, it re-activates the community and encourage social interaction. Spaces are defined in multiple ways to allow for both private, semiprivate, and public activities.
Makers separated from public Making process exhibited for public Public part of making
Spatial Relationship
To introduce diverse elements that exist in the community and integrate them in the project in order to encourage not only connections between makers and public but also among different communities in the neighbourhood.
04
Independent Intersecting Blending
68
The concept of the blend lab is to provide a space for people with creative minds to share their knowledge and allow different activities in the community to happen at the same time while still allowing for private, semi - private, and public preferences. It encourages people to interact with each other and participate in the making through a series of ‘distractions’ within the circulation. The spatial relationships between the makers and public are constantly challenged to reinforce the concept and injecting playfulness to the project.
PROGRAMS ENVELOPE disperse concentrate disperse disperse concentrate concentrate circulation intersect programs ENVELOPE ENVELOPE PROGRAMS ENVELOPE disperse concentrate PROGRAMS ENVELOPE disperse concentrate disperse disperse concentrate concentrate 3rd floorplan workshop 3 workshop 4 workshop 5 workshop 6 bathrooms workshop 2 exhibition workshop public lecture rock climbing centre machine&storage footpath to townhall footpath to railway station restaurant/cafe bathrooms teaching space exhibition teaching space teaching space teaching space 2 teaching space teaching space teaching space teaching space 4 teaching space 4 foldable curtain (for public event) machine&storage exhibition exhibition exhibition footpath to townhall footpath to townhall
69
Exploded Diagram
Form Development
The Neudaflat [High Rise Timber Construction]
Individual Work Utrecht, 2015
Facade exploded diagram
Timber Frame Structure
The 15 storey office building in Utrecht will be renovated using the structure of wood, incorporated with a sustainable facade, that minimizes energy use and requires the minimal structural support. The vertical load bearing elements will use the diagrid system as they are structurally efficient as well as architecturally significant assemblies for tall buildings.
In summer, the intermediate layer of the ETFE cushion will be pushed outwards to block heat. The middle cushion on the North facade will be opened to allow the Northern breeze to come in, and heat will be exhausted through the chimney on the South facade.
In winter, the intermediate layer of the ETFE cushion will be pushed inwards to allow heat to come in. The middle cushion on the South facade will be opened, and air will be pre-heated/ sent to the AHU system to heat the internal space.
Climate Facade 68°
Diagram FLOOR FINISH FLOOR FINISH PREFABRICATED FLOOR ELEMENT PREFABRICATED FLOOR ELEMENT EDGE BEAM AND MAINTAINENCE CATWALK EDGE BEAM AND MAINTAINENCE CATWALK VERTICAL LOAD BEARING ELEMENTS VERTICAL LOAD BEARING ELEMENTS 50mm MAINTAINENCE CATWALK CURTAIN WALL SUPPORT FRAME FOR ETFE CUSHION ETFE CUSHION
Building Structure Exploded
05
500mm MAINTAINENCE CATWALK FIXED ONTO EDGE BEAM TIMBER FRAME FIXED ONTO METAL JOINT ROTATEBLE EFTE CUSHION TO ALLOW FRESH AIR IN ETFE CUSHIONS CLAMPING PROFILES TIMBER TUBULAR TERTIARY SUPPORT FRAME SECONDARY STRUCTURE FRAME WITH METAL GRILLE CURTAIN WALL SYSTEM BUILDING STRUCTURE Outer air chamber Inner air chamber OUTER LAYER (TRANSLUCENT FRITTED PATTERN) EQUINOX SUMMER SOLSTICE WINTER SOLSTICE INTERMEDIATE LAYER (TRANSLUCENT FRITTED PATTERN) INNER LAYER (NO FRITTING) 300mm 500mm MAINTAINENCE CATWALK FIXED ONTO EDGE BEAM TIMBER FRAME FIXED ONTO METAL JOINT ROTATEBLE EFTE CUSHION TO ALLOW FRESH AIR IN ETFE CUSHIONS CLAMPING PROFILES TIMBER TUBULAR TERTIARY SUPPORT FRAME SECONDARY STRUCTURE FRAME WITH METAL GRILLE CURTAIN WALL SYSTEM BUILDING STRUCTURE Outer air chamber Inner air chamber OUTER LAYER (TRANSLUCENT FRITTED PATTERN) EQUINOX SUMMER SOLSTICE WINTER SOLSTICE INTERMEDIATE LAYER (TRANSLUCENT FRITTED PATTERN) INNER LAYER (NO FRITTING) 300mm 500mm MAINTAINENCE CATWALK FIXED ONTO EDGE BEAM TIMBER FRAME FIXED ONTO METAL JOINT ROTATEBLE EFTE CUSHION TO ALLOW FRESH AIR IN ETFE CUSHIONS CLAMPING PROFILES TIMBER TUBULAR TERTIARY SUPPORT FRAME SECONDARY STRUCTURE FRAME WITH METAL GRILLE CURTAIN WAL SYSTEM BUILDING STRUCTURE Outer air chamber Inner air chamber OUTER LAYER (TRANSLUCENT FRITTED PATTERN) EQUINOX SUMMER SOLSTICE WINTER SOLSTICE INTERMEDIATE LAYER (TRANSLUCENT FRITTED PATTERN) INNER LAYER (NO FRITTING) 300mm 500mm MAINTAINENCE CATWALK FIXED ONTO EDGE BEAM TIMBER FRAME FIXED ONTO METAL JOINT ROTATEBLE EFTE CUSHION TO ALLOW FRESH AIR IN ETFE CUSHIONS CLAMPING PROFILES TIMBER TUBULAR TERTIARY SUPPORT FRAME SECONDARY STRUCTURE FRAME WITH METAL GRILLE CURTAIN WALL SYSTEM BUILDING STRUCTURE Outer air chamber Inner air chamber OUTER LAYER (TRANSLUCENT FRITTED PATTERN) EQUINOX SUMMER SOLSTICE WINTER SOLSTICE INTERMEDIATE LAYER (TRANSLUCENT FRITTED PATTERN) INNER LAYER (NO FRITTING) 300mm 70
Timber Joint
Forest on the Sea [Pier Design]
Group Work (4) Melbourne, 2020
St Kilda as a suburb has gone through major transformations since the 2000s, however one element that has seen little change is the St Kilda foreshore. The site of the former Brookes Jetty is a perfect opportunity for an urban intervention that will not only reshape this part of the foreshore above the water line but provide an opportunity to rehabilitate and reimagine the sea life below.
‘Forest On The Sea’ is a destination and reimagination of the previous Brookes Jetty and a reflection of its surroundings. It consists of three key elements; The Rock Pools, The Canopies, and The Walkways that will be linked to its surrounding programs such as Luna Park and Acland Street through the future promenade along Shakespeare grove.
The Rock Pools serve as the focal point of the project where a symbiotic relationship between people, built form, flora and fauna occur. The 17 rock pools that are made to mimic rocky shorelines will help to significantly increase biodiversity in St Kilda. These rock pools will also provide intimate areas where the public can relax and interact with the local sea life. A series of canopies rise up from the rock pools to provide shading, jumping platforms and viewing platforms at different heights for the public to interact with. An elevated Walkway links several of the canopies back to the existing stormwater outlet forming a bridge from the foreshore to the rock pools linking land and the people, with the water and sea life of Port Phillip Bay. The walkway acts as a point of reflection on this once prominent and popular spot whilst also serving the programs expected of the jetty in Port Phillip Bay.
‘GeorgeRobinsonalsorelatedaKulinstorythatBunjil,theancestralcreatorplacedrocksatStKildatostopthewatersofthegreatflood...’ YALUKIT WILLAM The River PeopleofPortPhillip,MeyerEidelson
06
71
Thank you. 72