Pu_Yan Portfolio

Page 1


Pu Yan

University College London

Major: Architectural Design

Email: zczqpya@ucl.ac.uk

Tel: 44-7826244033

PROLOGUE

Is architecture deemed a language? The development of linguistics in the 21st century has aroused my interest in taking a fresh look at architecture. According to linguistic semiotics theory, even if language is not a visible, audible, or tangible instrument, it is a component of human physical existence and a mark that exists only in our minds. I concur that architectural design is the rearrangement and structuralization of signs, the interpretation of which is governed by their contexts. My own experiences have led me to conclude that architecture is a fluid language with semiotics.

Civic Safe Zone —Urban renewal based on refugees

Individual Academic Work March 2022

Site:Poland,Kraków Supervisor:Lin Li Feng

Email:lin@lin.archi

In 2022, with the outbreak of war between Russia and Ukraine, a large number of Ukrainian refugees began to seek refuge in Europe. This design is based on the Ukrainian refugee problem, based on the old urban space node in Krakow, Poland.

Urban Content of Krakow City

Three Shelters

Dworzec Kolejowy

Kraków Główny PKP

0 0.9km

Completion time: 2014 Flow of people: 32,200 (per day)

TAURON Arena Krakow

0 0.9km

Completion time: 2014

Capacity: 22,000 (Max)

Barbakan Krakowski

0 0.9km

At least 7.72 million Ukrainian refugees have entered Poland since the outbreak of hostilities between Russia and Ukraine. Although some have since left for other countries, more than 1 million people remain in Poland. How to help the displaced refugees is a problem facing the whole society.

Established: 1498

Capacity: 3,600 (per day)

In this design, three building nodes are selected as the transformation design, among which the stadium is mainly used as guidance to solve the short-term accommodation and employment problems of refugees. As the first entrance for refugees to enter a city, the railway station mainly plays the role of guiding the crowd evacuation. The choice of Wengcheng is a city node, the focus is to provide a space for people in the city to communicate and understand each other.

Public buildings along the Mogilska"road

Kraków Główny PKP

Kraków Główny, is the largest and the most centrally located railway station in Kraków, Poland. The railway station was situated in a historical building, constructed between 1844 and 1847 by Rosenbaum, which lies parallel to the tracks. The design was chosen to allow for future line expansion.

TAURON Arena

Tauron Arena Krakow (Tauron Arena Krakow ) is an indoor stadium located in Krakow, Poland. It can accommodate 15,030 people for sporting events . The 2014 Men's World Volleyball Championships and the 2015 World Ice Hockey Championships Division I were held here.

Kraków Barbican Original Building

The is a barbican – a fortified outpost once connected to the city walls. It is a historic gateway leading into the Old Town of Kraków, Poland. It currently serves as a tourist attraction and venue for a variety of exhibitions.

Ground Floor Plan

Through the temporary platform to help more refugees safely to the shelter.

The temporary stopover area helps refugees acclimate better to the foreign environment.

The transformation of small public Spaces in cities, small Spaces can also have a big effect.

TAURON Arena Kraków
Kraków Barbican
Dworzec Kolejowy Kraków Główny PKP

Site:Shanghai,China

Supervisor:Chen Shi Yuan

Email:shiyuan_chen@berkeley.edu

Surrounding Site Analysis

Surrounding Site Elements Development Process

The design hopes to complete the connection of the surrounding urban space while updating the site. On the premise of meeting the site function update, the design takes the surrounding architectural materials as the carrier for further discovery and combination, and understands the possibility between different functional blocks through different attempts

The stairs of Sports Hall Mall
The Basketball court Ferris wheel is the landmark symbol of the amusement park around the site. The vertical movement makes the visitors have a good visual experience. The rotation of the Ferris wheel also adds dynamic feeling to the whole space.
The stairs of Sports Hall is a place where young people love activities. All kinds of street activities are held here.
The
better. The membrane structure on the roof of the swimming pool provides excellent shading effect and helps people better adapt to the external environment in summer.
Of The Football Field

Recombination Of Architectural Elements

The vertical garden combines the high space of the shopping mall, the green space of the park, and the shopping and consumption area, hoping to introduce the crowd into the new urban complex by rotating, so that the building space can be better combined with the outdoor environment.

The combination of membrane structure with basketball court and bleachers not only provides more superior sports and fitness environment for urban residents, but also adds a sense of movement and interest to urban space.

The commercial street combines recreational facilities around the venue, small shopping street and large supermarket, hoping to provide excellent experience for people of different consumption levels through a three-dimensional community system.

Combine the basketball court stand with the commercial pedestrian street, make full use of the height difference of the stand and the combination of the commercial area, so that the commercial area can create convenience stores and other businesses. So that shoppers can watch interesting games while shopping.

The combination of commercial space and urban parks enables shoppers to have a better shopping experience. Break the boundary between building and outdoor space through green plants. The combination of ramps, trusses, urban green plants and small shops makes the takeaway riders in the urban space more convenient to pick up and take away the takeaway. Ramps can also reduce the pressure of some elderly people.

Axonometric Location Map

Improve the integration of the station and surrounding space through the combination of the above elements.

Vertical garden
Commercial street
Basketball business
Basketball stand
Garden commerce
Convenient take-out
Baskeetball Park

platform

Through the new station, people once again see the historical and cultural symbols of Hongkou District in the station.

Street perspective

The dynamic facade beneath the platform brings a longlost vitality to the urban space.

Subway

03

Under The Mountains

— Medium-sized gymnasium design on campus

Academic Team Work

February, 2022

Site:Chongqin,China

Supervisor:Wang Xue Song

Email:wangxuesong@cqu.edu.cn

Team Work : Ran Da Lin Huang Yi Qian Yan Pu

Chen Qiu Xu , Wan Li Xin

ROLE IN TEAM:Modeling: 30% Design: 30% Drawing: 30%

This topic is the design of 5000 medium-sized gymnasiums. As a sports competition and training venue, the shape of the gymnasium should convey the flavor of the times and display the new modern style; The structure must be combined with the building, and the technology must be integrated to display the technical beauty; The architectural design should consider the versatility of the sports building combined with the match, so that the sports ground and auxiliary rooms have a certain degree of adaptability and flexibility.

The site is located on the campus of Chongqing University Zone B, adjacent to the residential area in the north and the campus teaching area in the south. It is the area that teachers, students and surrounding residents often pass by. As an urban space, it is an important place to connect the surrounding areas.

Most of the surrounding people are campus students, residents and classrooms, and the peak hours are in the morning (6:009:00) and evening (18:00-21:00) around the site.

In order to adapt to the site, this design has carried out space concession at the primary and secondary entrances to meet the space hint for the main passage of the crowd.

Conforming to the distant landscape, the building retains the sight corridor in the middle of the gymnasium, and establishes an aerial walkway to meet the crowd's experience of viewing the scenery.

Action Palimpsest
SITE
Drainage trench
Simulate roof weight under external force
Material tension and compression utilization rate
Structural displacement diagram Reinforced Parts
In order to reduce the lateral displacement between trusses, a lateral connection is added between trusses
Metal aluminum sheet skin
Inverted trapezoidal door truss
Glass curtain wall

Evacuation Section

Indoor
Detail-diagonal skylight drain
Detail-audience seats
Playground view of the mountain
Aerial view of the stadium

Site:Hamburg,Germany

Supervisor:

Email:meiziannie@gmail.com

Hamburg energy crisis

Germany is heavily dependent on Russian natural gas. Before 2022, about 55% of Germany's natural gas is from Russia. Natural gas accounted for 27% of all energy consumption in Germany in the first half of 2021, most of which was used for heating and industrial use, and a small part (15%) was used for power plants.

Renewable natural gas station (A new energy generation methods) Elements Flow Subjects

Energy Station Discretization

Cost of Natural Gas transportation(source: BGR Energierohstoffe 2009) It can be learned from the survey that natural gas is often accompanied by energy loss in the process of transportation. This design hopes to try to separate the urban energy stations and combine the characteristics of renewable natural gas to generate raw materials from biological waste. Help cities alleviate energy problems.

Before energy dispersion

After energy dispersion

FO1:M inimum Distance for Production

(Residents/offices/Commerce)

FitnessValue1:1418.46647

FitnessRank :182/999

FO2:Minimum Distance for Consumption

FitnessValue2:1275.525748

FitnessRank :458/999

FO3:(Minimum Value)Evenly distribution

FitnessValue3:2215.562866

FitnessRank :945/999

Algorithm Optimization

Natural Gas Station Analysis

1.LARGE SCALE

The main functions include natural gas self-production, waste material recycling and natural gas tank transportation.

2.MEDIUM SCALE

Main functions include natural gas self-production, recycling of waste and used products, and supplementary distribution of surrounding commercial natural gas.

3.SMALL SCALE

Main functions include natural gas self-production and supporting other small natural gas filling stations

Natural Gas Production Plant

Garbage recovery

At the natural gas processing plant, everything is in order, and new ways of producing energy have led to a greener life.

In medium sized natural gas production plants, due to the organic combination of energy and surrounding building space. A new industrial ecology has been formed.

In small sized natural gas production plants, By providing natural gas for basic transportation, people can use energy more cheaply

SITE 2 City street and natural gas business
SITE 1 Natural gas loading plant
SITE 3 Clean energy for the people

OtherWorks A

HuanGui Graden

Location:Hangzhou

Team Work with partner: Minqi Long

November 2021

Contribution: Design, Drawing, Modeling

OtherWorks

Urban design of Science Oasis Location:Chongqing

B May 2022

Team Work with partner: Xinxin Zeng, Chengyi Wu

Contribution: Concept Design Modeling

Ground floor plan of garden

The project is located in Hangzhou, combined with traditional Chinese stories, to create the open garden of Jiangnan in the Ming and Qing dynasties. Aerial view

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Pu_Yan Portfolio by PU_YAN - Issuu