Mumbai Metro Gold Line To Airport Route Map For Line

8 Of The Mumbai Metro
Line8oftheMumbaimetrowillalsobereferredtoastheGoldLine.Theproposed NaviMumbaiInternationalAirport(NMIA)andChhatrapatiShivajiInternational Airport(CSIA)willbeconnectedbythemetroline.Comparedtotheotherplanned linesinthenetwork,metroline8willbeanoutlierontheroutechartforthe Mumbaimetro.
Are you searching for new projects in Santacruz?
Regarding Mumbai 8th Metro Line
TheSantacruzairportinMumbaiandtheprojectedNaviMumbaiairportwouldbe betterconnectedthankstotheMumbaimetroline8.Anestimated40kilometres willbecoveredbythemetroline.Ontheline,therewillbeaboutsevenmetro stationstoensurefasterconnectivity.
TheNMIAisexpectedtobeginoperationsinearly2024or2024.Asaresult,it's possiblethatline8oftheMumbaimetromaybereadyaroundthattime.TheDPR finalizationisnowunderway.Withseveralstopsandfastspeed,theGoldlinetothe airportwillresembletheDelhiAirportmetrolineincertainways.Theairportline willrunlessfrequentlythantheordinarymetro.Thislinewillrunapproximately every15minutes.
TheGoldLine'smetrowillmoveataquickerpacethantheothers.Fortheairport corridor,themetro'sfixedspeedisroughly90km/h.TheMumbaimetroline8 routeplanwouldhavefewerstationstoensurespeedierandhigh-speedtransit. Around5LakhpeopleareanticipatedtousetheMumbaimetro'sGoldlineor airportlineeachday.ItisexpectedthattheGoldlinetotheairportwillcostroughly Rs.15000crorestocomplete.
Map of the Mumbai Metro Line 8
ThefollowingisamapoftheMumbaimetroline8route:

An overview of Mumbai Metro Line 8
HerearesomeimportantdetailsabouttheMumbaimetro'sGoldline:
Fact Details
Lengthoftheline8 Approximately35to40km
Numberofstations
Typeofmetroi.e.undergroundor elevated
8(proposed)
Partiallyundergroundandpartially elevated
Estimatedridership 9Lakhsdaily
OwneroftheMumbaimetroline8
MumbaiMetropolitanRegion DevelopmentAuthority(MMRDA)
Speed 90km/hr
Estimatedcost
Rs15,000Crores
Building Plan for Line 8 of the Mumbai Metro
MumbaiMetropolitanRegionDevelopmentAuthority(MMRDA)&City&Industrial DevelopmentCorporation(CIDCO)willworktogethertocreatethemetroline.The buildingofthemetrolineintheMumbairegionwillbehandledbyMMRDA,while CIDCOwillhandletheworkintheNaviMumbaiarea.
TheGoldLinewillbepartiallyelevatedandpartiallyunderground,accordingtothe plannedplan.FromAndheritoGhatkopar,specificallyclosetotheEastern Motorwayroute,willhaveanundergroundstretch.Itwillbeanelevatedcorridor, ortheGharkopartoMankhurdLinkRoad,fromGhatkopartoMankhurd.
Theline8oftheMumbaiMetrocontainsafullprojectreportthatwascreatedby CIDCO.TheMMRDAaskedCIDCOtoprepareitbyOctober2022.TheMetroline1A inNaviMumbai,whichrunsfromMankhurdtoSagarSangam,andthesectionfrom BelapurtoNaviMumbaiarecoveredbytheDPRforMumbaiAirportLineroute chart.
Major Cities Near the Mumbai Metro Line 8
ThedevelopmentofMumbaiMetroLine8wouldhavethegreatestimpactonthe maincommunitiesofVashi,Gharkopar,CheddhaNagarJn,&MankhurdLinkRoad, amongothers.
Locality Features
Vashi
Completelybuilt-outresidentialand businessneighbourhoodwithtop-notch infrastructure.
ResidentialPropertyPricesPerSqFt
Buy:Rs11,500-Rs20,500
Rent:Rs27-Rs43
CommercialHubsNearVashi
InternationalInfotechPark
TheCorporatePark
SatraPlaza
MahaMumbaiReality
IntelligentiaBusinessParkVashiBy HawareProperties
G-SquareBusinessPark
EducationalInstitutesNearby
FatherAgnelMultipurposeSchool& JuniorCollege
St.LawrenceHighSchool
AvalonHeightsInternationalSchool
AnchorwalaEducationAcademy
IESNaviMumbaiHighSchool
GoldcrestHighSchool
Ghatkopar
Acentrallylocatedresidentialsuburbin EasternMumbaiwithexcellent connectivity
ResidentialPropertyPricesPerSqFt
BuyRs11,100-Rs19,400
RentRs32-RS53
EntertainmentHubsNearGhatkopar
RCity
ROdeon
PhoenixMarketcityMall
EducationalInstitutesNearby
KJSomaiyaCollegeofEngineering
SomaiyaVidyaviha
GarodiaInternationalCentreFor Learning
Conclusion the Mumbai Metro Line 8
Inordertosumup,themetroline8wasprojectedin2022.MMRDAinstructed CIDCOtodeveloptheDPRfortheMumbaimetroline8routemap&construction workinOctober2022.Theline,whichwouldconnectthetwointernationalairports inMumbai&theNaviMumbairegion,willbeanoutlier.MMRDAandCIDCOwill startworkingonthemetroline8projectassoonastheDPRisapproved.Around sevenstationsarenowbeingconsideredfortheline,whichwillbe40kilometres long.
You’re looking for Projects in Mahim we have the Best Properties In Mumbai Like Ready to Move:https://navimumbaihouses.com/properties/search/mahim/
If you want daily property update details please follow us on Facebook Page / YouTube Channel / Twitter