WDP Energy & Sustainability
The story so far...
“we aim to be at the forefront of the global combat against climate change by becoming net-zero across our entire value chain”
- Joost Uwents, CEO WDP
SUSTAINABLE TRUCK CHARGING
of road transport, WDP will provide green power charging service for trucks loading, unloading or parking on premises, servicing both long distance and last mile travel.
RENEWABLE HEATING & COOLING
Maximising electrical heating and cooling by our own low carbon solar installation. Excess of electrical energy will be captured and stored maximally for thermal on-site optimisation and integration the self-consumption energy ratio.
Energy & Sustainability: supplying the future of logistics
ENERGY EFFICIENCY SERVICES
WDP provides clients with expertise, methodologies and tools to reduce local energy demand and achieve their company’s ambition on
NEXT GEN WAREHOUSE
WDP’s next generation warehouses are designed to be highly autonomous, energy positive buildings with an as a focal point. They will act as energy plants that maximise green energy production and will actively support the main grid.
SUSTAINABLE CAR CHARGING
Green power charging service for cars on premises. Energy as a service which includes status reports, monitoring and invoicing.
WAREHOUSE AS SOLAR POWER STATION
By making use of all suitable roof space and the facades, combined with micro grid development, solar energy will be used in the most systems can be implemented for storage of excess generation.
It is now over 15 years since we kicked off our solar panel project. Since then, we have intensified our investment in green energy and developed a portfolio of solutions that place our clients at the forefront of the energy transition. The advances we have made in sustainable energy production capacity are driving progress in our industry. They enable our clients to reduce energy consumption in their warehouses and operate more efficiently. At the same time, we are expanding the potential of our properties to become the energy plants of the future.
In January 2022, we introduced our Climate Action Plan, a comprehensive roadmap to net zero in all emission scopes by 2050. Fully aligned with the global target of limiting temperature rise to 1.5 °C by the end of this century and the goals set by the EU Green Deal, the Climate Action Plan sets out clear, actionable steps towards our objectives.
In 2023, we launched WDP Energy, an integral part of the Climate Action Plan. This ambitious project aims to accelerate the energy transition by leading the logistics sector towards more renewable energy production and reduced consumption.
Our vision for green Warehouses with Brains
A closer look at our targets
The targets set in the WDP Climate Action Plan involve our entire value chain. Clear and science-based, they are organised in three tracks:
Becoming your energy service provider
Reducing our environmental footprint
Making WDP sustainable and future-proof
The recent energy crisis led to an accelerated roll-out of the WDP ENERGY track in particular. There was an urgent need to respond to our clients’ evolving energy needs by enabling sites and transport to become more self-sufficient and decarbonised. We had already identified an important opportunity for our clients, business and the environment: the untapped rooftop capacity of our warehouses. By intensifying our utilisation of this space, we recognised the potential to boost our solar installation capacity to 250 MWp by 2025. Achieving this figure became the leading priority for WDP ENERGY.
WDP ENERGY goals and KPIs
By leveraging existing knowhow and business model with innovative solutions, WDP ENERGY continues to work on:
• On-site renewable energy production
• Untapped capacity of buildings
• Becoming the client’s energy service provider
• Rolling out an energy monitoring system
• Decarbonising energy consumption
• Electrification of warehouse sites
• Battery systems for storage of excess generation
• Investment in energy proptech company
WDP ELECTRICITY PROCUREMENT GREEN1
100 %
BY 2023
CURRENT RESULT 56%
ENERGY MONITORING SYSTEM COVERAGE2
100 %
BY 2025 CURRENT RESULT 73%
(1) Being the electricity procured by WDP and consumed by the client. We proactively strive for more green energy procurement together with our clients.
(2) Coverage for relevant properties
(3) Ambition to fully match clients’ consumption profile in the long term with renewable energy production on an aggregate level.
RENEWABLE ENERGY CAPACITY3
250 MWp
BY 2025
CURRENT RESULT 95 MWp
LED LIGHTING IN OUR ENTIRE PORTFOLIO2
100 %
BY 2030
CURRENT RESULT 40%
Together, we’re making
making it happen
The WDP Energy & Sustainability team was founded on strong ambitions. Recognising the growing urgency of the energy transition, we did not waste time. We saw significant challenges and faced them head-on with a well-defined strategy and a focused mindset.
I am proud to report that, in our first year, we achieved our interim goal of 100 MWp of solar capacity installed on our warehouse roofs. As a result of your determination and dedication, we are well on the way to reaching our pivotal target of 250 MWp by 2025.
Thank you!
Getting the message across
Marketing & Communication initiatives
A communication toolkit for Energy & Sustainability
To achieve our goals, we need to show the world that we are serious about our climate promises. This means raising awareness among the logistics sector and the wider public and convincing our clients (current and future) to take a closer look at our energy solutions.
We approached this by creating a WDP Energy ‘brand’, a concept that fits within the broader WDP identity while also being instantly recognisable. With its own logo and tagline – which have been successfully used on totems, drink bottles, packaging, beach flags and other tools – we can take every opportunity to promote WDP Energy’s solutions along with their underlying ethos and ambitions.
Direct and frequent communication with clients is vital, especially as PV installation work progresses on their sites. We developed additional communication tools for these purposes, ensuring that our image remains consistent and professional in every contact. These include a PowerPoint presentation for PV training and a template for PV project status reports. These tools are designed to offer clients a ‘friendly face’ and inspire confidence in our approach and communications.
doluptiunt
poreptur
et alis cuptasped quidem ese evenim aribus
andiore cturiati volorion ni samet, ni resto et quia quod mi, optatin testibus mi, ommolorerum ium endissinciam fugit, veliatem alictat iligend andicipsa dis ut quae plignihilit, sus mo beriberum as velectate core rerati adiati adit la comnitatur, odicimod molupta temporem renetus qui ut lab idelit harunt lab ius porit archillorum, ipsum et aut la vendit liquisquodi alitibe arunt. Tassequ iaturis estiostias sum sedia que eatiaes est exerroreicti commoluptis dolum ra necabor eperuptur?
Nem voloren deleste laborib uscitia ium que nobis aperia dolorerae numquos nonempor min et aut hil es sus millam voles quia sequia dolupienest, quas et venis ea aliquiasi officae odit quatiss umquas et volum hicta de nonsequi omnimusa quaeribus, eneceptas que pa solorem cumquam dolupta veliquost, quasintint que quis dolupie nienimo distiorepel et int aut inihil magnat peraero dolentur autem doluptati alibus, quibearum nulparcias molupta volor atus sus asimus acepe ipsam quos evel maximus natur, sae sim et apicture pla sum ilit quam quatiis maximusae. Bisquos dolorum fugit et ere molorum impores cus qui con re molorep ernatio. Me et parum quia volum eaquide cullab ipsanim fugias modictem apit volore volum elit id quatem quid esto bla quia qui rem fuga. Et voluptatia nihil enimusa nihilit, sed que eos aut dolupti inciusc ipsanditio. Ugia necatin plitint.
Ga. Sum denis sum illa eos mo eum ium quo magnam entecae ctecullia quuntiatas volum num as preped qui optium illam ari sedignimus pa veliquo beate labo. Ut reperovid et mo temporem. Iquae cor re nobit estiora tiorenis dolorit atecab intiorest, ipitia dicillu ptatur, sum elitia di nimusda et eatibus ciasped ut vel mo eiuntiani aut fuga. Nam, conestium quatis evendel molupta cum rerum cus, occabor autet, quatem
The dream becomes reality
PV projects in pictures
Dyna Amsterdam
LOCATION: Amsterdam (NL)
LOCATION: Ștefăneștii de Jos (RO)
Stefanesti 1
Leen Menken
LOCATION: Zoetermeer (NL)
CEVA Heerlen Phase 3
LOCATION: Heerlen (NL)
Helmer
LOCATION: Heerlen (NL)
LOCATION: Ștefăneștii de Jos (RO)
Kivits Ridderkerk
LOCATION: Barendrecht (NL)
AH Barendrecht
AH BarendrechtBerder
LOCATION: Kerkrade (NL)
LOCATION: Courcelles (BE)
Dudelange 1 2 3 4
LOCATION: Dudelange (LU)
Celebrating milestones
Inauguration events in 2023
Berner
LOCATION: Kerkrade (NL)
LOCATION: Heerlen (NL)
Helmer
LOCATION: Breda (NL)
Leen Menken
LOCATION: Zoetermeer (NL)
LOCATION: Anderlecht (BE)
RSCA Anderlecht – FC Bruges
“De samenwerking met WDP ervaar ik als zeer prettig, door de gezamenlijke duurzaamheidsambitie maken we het verschil”
- Joost de Vogel I Manager Realisatie
“De afgelopen 2 jaar die ik met het WDPteam heb mogen samenwerken heb ik als zeer prettig ervaren. De omgang met elkaar is, naast het zakelijke, ook informeel waardoor ik echt het gevoel heb dat we partners zijn”.
- Jurrie Post I Projectontwikkelaar Grootzakelijke Zonnestroom systemen
“Met de klantgerichte en kwaliteit gedreven aanpak van WDP en KiesZon, bundelen we onze logistieke expertise en diepgaande kennis van zonnestroom om de daken van WDP om te vormen tot hoogwaardige, duurzame energiecentrales, waarmee we een belangrijke stap zetten naar een duurzamere toekomst, Let’s get Super Charged”
- Carlo van Doormalen I Projectleider
“Fijne en begripvolle opdrachtgever om voor te werken”
- Danny Berkelmans I Projectleider
“De trein dendert door op weg naar een duurzame toekomst, onderweg daarnaartoe is het soms hobbelig maar we blijven op het goede spoor waardoor de bestemming met de dag dichterbij komt. Wij zijn trots om als (samenwerking) partner van WDP mee te reizen naar jullie bestemming”
- Fabio Pisano | Commercieel Manager
Beste WDP, Jullie gedrevenheid, inzet en enthousiasme maken onze samenwerking tot en gezamenlijk succes. Ik kijk ernaar uit om samen nog veel mooie projecten te mogen realiseren. Bedankt voor het vertrouwen en de plezierige samenwerking. Let’s get Super Charged!
- Niels Timmermans | Projectleider B2B
“From the start it was clear that the WDP team had a hands-on mentality, which matches with our own team. During the installation of the PV panel project in Stefanestii de Jos we could rely on the clear communication with WDP project manager Mihai Budurca. He guided the collaboration with all parties in a professional manner and always had a constructive attitude throughout the whole project. I am confident we delivered an outstanding PV panel project that is the result of a positive collaboration between the WDP-team and our office in Belgium, Romania and the team on site.”
- Sekander Khan I Engineering Manager Solar
“Binnen het WDP Energy Team worden EPC bedrijven voor het bouwen van zonnepaneleninstallaties echt als partners gezien om samen mooie groene energieprojecten te realiseren. Als leverancier is het bijzonder leuk om binnen een duidelijk kader van wensen en eisen met veel respect behandeld te worden om zo tot het gewenste resultaat te komen. Het zorgt voor een vibe bij al onze medewerkers om pareltjes af te leveren waar zowel wij als WDP bijzonder trots mogen op zijn. We kijken uit naar nog veel fijne samenwerkingen in de toekomst.”
- Sekander Khan I Engineering Manager Solar
WDP NV/SA
Blakebergen 15, B-1861 Wolvertem
T. +32 (0)52 338 400 info@wdp.eu | www.wdp.eu
www.facebook.com/WDPwarehouses @WDP_EU linkedin.com/company/wdp
Company number: BE 0417.199.869
(Register of legal entities of Brussels, Dutch section)