Williams Field High School | Weight Room Addition

KEY PERSONNEL
Matt Waltz President Matt Waltz President Ghian Snyman Project Director Bill Bressler Client Services Marc Roberts Director of Preconstruction Kevin Bunn Project Manager Chris Werder Project Superintendent Pre-Construction Construction Ghian Snyman Project Director Kevin Bunn Project Manager Chris Werder Project Superintendent Bill Bressler Client Services

IMAGINE DESERT WEST

CHRIST CHURCH LUTHERAN PHOENIX

WESTERN SCHOOL OF SCIENCE & TECH

BASIS NORTH PHOENIX

OVER

45,000

STUDENTS

BASIS MEDICAL CENTER

K8 ACTIVE
CAMPUSES

Identification Badges

Each Person is identified by a number

Each Person is identified by a number

Vehicle Identification

We even identify vehicles.

7 Chris Werder Waltz 5/14/19 5:00 AM SAFETY Chris Werder WILLIAMS
FIELD HIGH SCHOOL
7 7 7 7
Sign In Sheet
SIGNAGE IDENTIFICATION

Construction Site

Fencing

Trade Partner Parking

Storage | Laydown

Office Trailer

Bike Storage Relocation

Parent Drop Off/Pick up

Student Traffic

Landscape Valve Boxes

Man Hole

Backflow Preventer

LOGISTICS PLAN

SCHEDULE

COST AND SCHEDULE

IMAGINE DESERT WEST

WESTERN SCHOOL OF SCIENCE & TECH

PIONEER PREPARATORY GLENVIEW COLLEGE PREP
PER COST DURATION $7.1M
4 MONTHS PER COST DURATION $7.2M $160 4 MONTHS PER COST DURATION $6.7M $167 4 MONTHS PER COST DURATION $6.3M $150 5 MONTHS
$169

STAKEHOLDER ENGAGEMENT

Student Saftey Audits

Opportunities to work with Highley’s STEM Ahead (see email below)

OCCUPIED CAMPUSES

At WALTZ the most important part of what we do is keep your students, staff and visitors safe throughout the entire duration of the project. In addition, we believe disruptions should be very minimal in an educational setting.

1. NO INJURIES

2. NO DISRUPTIONS NO EXCUSES

Our approach and philosophy regarding working on an occupied campus with students and staff is very straight forward.

1. WE WILL STUDY AND MEMORIZE YOUR SCHOOLS SCHEDULE

(illustrated to the right)

2. WE WILL OVER COMMUNICATE to the District and School Principal to understand all activities and requirements for the campus

3. BE INVISIBLE, MAKE AN IMPACT

We will be as invisible to the campus, yet make an impact.

WALTZ has years of experience working on active campuses. We understand the importance of open communication, and comprehensive scheduling when working on a site with students and staff. We have identified a few key components for providing safe and smart working conditions on active sites.

Noise Control - Construction is far from being a quite process, we will work proactivly with the team and present a three-week look-ahead schedule at each team meeting to compare with the academic calendar, testing schedules, and other campus activities. This will allow us to identify the best time to the hour to perform louder activities, and schedule delivery times.

Identification - Identification is critical, we mandate all workers wear Identification and they are required to obtain and maintain a Public Safety Level One Fingerprint Clearance Card before any work is initiated.

Directional Signage and

90% of Project Completed on Occupied Campuses

HIGLEY UNIFIED SCHOOL DISTRICT | 2020-2021 CALENDAR

Separation

Barriers- We will implement barrier’s and establish signage and perimeter fencing around the work areas. Fire lane access will be maintained and accessible throughout the entire duration.

Disruption of UtilitiesDuring Pre-Construction

we will perform an in-depth investigation of the campus utilities. We must understand completely of all underground infrastructure, shut-off valves and disconnect breakers to eliminate unplanned outages.

HIGLEY UNIFIED SCHOOL DISTRICT | 2019-2020 CALENDAR JULY 2019 S M T W Th F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 4 Independence Day 22 Students first day ** All Wednesdays are early release for elementary schools. JANUARY 2020 S M T W Th S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1-3 Winter Break – No School 6 School Resumes for Students 20 Martin Luther King Jr. DayNo School 29 Professional Development K-12 Early Release AUGUST 2019 S M T W Th F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 28 Professional Development K-12 Early Release 28-29 Middle School Parent Conferences – Early Release FEBRUARY 2020 S M T W Th S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 12-13 Middle School Parent Conferences – Early Release 17 President’s Day No School 26 Professional Development K-12 Early Release SEPTEMBER 2019 S M W Th F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 2 Labor Day – No School 25 Professional Development K-12 Early Release 26-27 K-6 Parent Conferences Early Release 30 Fall Break – No School MARCH 2020 S M T W Th S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 5-6 K-6 Parent Conferences Early Release 9- 20 Spring Break – No School 23 School Resumes for Students OCTOBER 2019 S M T W Th S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1-11 Fall Break – No School 14 School Resumes for Students 30 Professional Development K-8 Early Release APRIL 2020 S M T W Th S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 10 Spring Holiday No School NOVEMBER 2019 S M T W Th F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 11 Veterans Day - No School 27 Thanksgiving HolidayK-12 Early Release 28-29 Thanksgiving HolidayNo School MAY 2020 S M T W Th S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 18-19 High School Finals Early Release 20 Last Day for Students Early Release 22 Professional Development Last Day for Teachers 25 Memorial Day DECEMBER 2019 S M T W Th S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 4 Professional Development K-8 Early Release 18-19 High School Finals Early Release 19 K-12 Early Release 20-31 Winter Break - No School JUNE 2020 S M T W Th S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Instructional Days First Semester Total 95 Second Semester Total 85 Total Instructional Days 180 Legend: Early Release Holiday/Break Students Return
JULY 2020 S M T W Th F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 4 Independence Day 27 Students first day ** All Wednesdays are early release for elementary schools. JANUARY 2021 S M W Th F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 Winter Break – No School 4 School Resumes for Students 18 Martin Luther King Jr. DayNo School 27 Professional Development K-12 Early Release AUGUST 2020 S M T W Th S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 26 Professional Development K-12 Early Release 26-27 Middle School Parent Conferences – Early Release FEBRUARY 2021 S M W Th F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 10-11 Middle School Parent Conferences – Early Release 15 Presidents’ Day No School 24 Professional Development K-12 Early Release SEPTEMBER 2020 S M W Th F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 7 Labor Day – No School 23 Professional Development K-12 Early Release 24-25 K-6 Parent Conferences Early Release 28-30 Fall Break – No School MARCH 2021 S M W Th F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 11-12 K-6 Parent Conferences Early Release 15- 26 Spring Break – No School 29 School Resumes for Students OCTOBER 2020 S M W Th F 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1-9 Fall Break – No School 12 School Resumes for Students 28 Professional Development K-8 Early Release APRIL 2021 S M W Th F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 2 Spring Holiday No School NOVEMBER 2020 S M W Th F 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 11 Veterans Day - No School 25 Thanksgiving HolidayK-12 Early Release 26-27 Thanksgiving HolidayNo School MAY 2021 S M W Th F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 25-26 High School Finals Early Release 26 Last Day for Students Early Release 27 Professional Development For Teachers 28 Last Day for Teachers 31 Memorial Day DECEMBER 2020 S M W Th F 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 2 Professional Development K-8 Early Release 16-17 High School Finals Early Release 17 K-12 Early Release 18-31 Winter Break - No School JUNE 2021 S M W Th F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Instructional Days First Semester Total 90 Second Semester Total 90 Total Instructional Days 180 Legend: Early Release Holiday/Break Students Return
SCHEDULE IS OUR SCHEDULE !
KNOW OCCUPIED CAMPUSES.
YOUR
WE

SAFETY PLAN

Safety is WALTZ’s TOP priority.

The safety of your students, staff, community, our team and our trade partners is the most important part of any work we perform. We have implemented a Safety Management Program. This program exceeds the industry standards

Our team will create a site-specific safety plan for the William Field High School Weight Room Addition. Through our dedication to safety we have implemented a few items that best illustrates our commitment to Safety practices.

CHRIS WHEELER | Safety Director

Chris is responsible for the safety on every ongoing project. He ensures all policies and procedures are being followed. Chris will visit the William Field High School Weight Room Addition project weekly and implement safety meetings with key trade partners.

HOW CHRIS WILL KEEP YOUR SITE SAFE:

Over Communicate - Chris communicates safety through policies that are detailed in our Safety Manual and Mettings. These policies are continually updated to comply with changes in the law, and to highlight accident and hazards prevention. Our policies implemented exceed Arizona State and Federal, Safety, and Health Administration standards.

Training - We train EVERY employee including office staff, each of us undergo continuous safety training programs ensuring we are all aware of safe construction practices. In addition Chris assists our Trade Partners and identifies on-site safety meetings for the entire team.

Monitoring -

Project Manager

Kevin Bunn and Safety Director

Chris Wheeler will monitor safety by reviewing monthly inspections (monthly); and Daily reports (Daily).

Motivation - Project Superintendent will conduct a daily site safety assembly. This assembly communicates activities in the workforce so everyone is on the same page and understands daily safety hazards.

PROJECTS THAT HIT 100 DAYS OF SAFETY ARE PROVIDED LUNCH. We show our Trade partner, how much we appreciate their dedication to our clients.

LEAN CONSTRUCTION

In addition to Project Safety we will implement Lean Construction on the William Field High School Weight Room Addition project. Implementing these practice will improve the site cleanliness and add additional safety.

Pull Plan Meeting (Last Planner)

Nothing Hits the Floor Cords Hanging from Ceiling Materials Stacked on Pallets for Mobility

Early Release of Material Procurement

DAILY ACTIVITY SAFETY MEETINGS