Portfolio & Resume of Vivian Maldonado-Freytes

Page 1

VIVIANMALDONADO

PORTFOLIO

Vivian M. Maldonado-Freytes

Architect IT and active NCARB

SUMMARY OF QUALIFICATIONS

phone: (202) 795 - 0615

e-mail: vivian.m.f.88@gmail.com

13113 Bluhill Rd

Silver Spring, MD, 20906

Architect working towards license, with a Master Degree in Landscape Architecture. Ten years of experience in project design and development of construction drawings for varied typologies of projects like; hospitality, multi-family, office, retail, education and healthcare. Total proficiency in Revit for graphic production in all building phases, including construction administration. Participated in a total of 7 building cycles and 28 projects in different stages.

REVIT

CAD

SKETCH UP PRO

ADOBE CS

ENSCAPE 2.6

BLUEBEAM REVU

EXCEL + WORD

ENGLISH + SPANISH KEYBOARDING

(-) (+)

DESIGN

PHILOSOPHY

PROFESSIONAL EDUCATION

MAJOR ACCOLADES

A resilient attitude contributes to an interdisciplinary view of design, I search to grow in a constant reshaping of ideas inside a field of understanding the environment, architecture and it’s immediate (natural or built) interactions.

Polytechnic University of Puerto Rico

LAAB Accredited Master’s degree in Landscape Architecture

Polytechnic University of Puerto Rico

NAAB Accredited Bachelor’s degree in Architecture

............................................

• First place for 2016 best LA thesis design competition of the CAAPPR

• AIA/PR Honor Awards 2015, Honorable Mention for the LA thesis

• Completed MA thesis design of an ecological and touristic program (Ecolodges)

• Completed BA thesis design of a dance conservatory as institutional program

• Participated in 9 theatrical dance productions and 16 consecutive years of education as a professional Spanish dancer.

May 2015

May 2013

PROFESSIONAL EXPERIENCE

Hickok Cole, Inc.

February 2022 – To present Project Architect I

Collaborated in multiple deliverables for 4 distinct residential projects with varying scales and construction typologies, from podium over wood construction type to a 20 story all concrete structure conversion project from office to residential. Including, managing simultaneously 3 different walkups prototype buildings, and assisting on a mass timber project. Assisted in phases such as DD until IFC, in addition to participating in smaller studies. Project locations included Alexandria, DC, Richmond, and Utah. Had ownership and collaborated with other team members in unit development, including checking accessibility compliance. Took part in coordination efforts with consultants (MEP, ID, Code and Accessibility), in addition to architecture coordination with floor & wall assemblies. Experience with FAR calculations and repositioning studies. Presently involved in CD phase for a walk-up project, that required site coordination for a total of 15 buildings.

Hord Coplan Macht, Inc.

September 2019 – February 2022 Designer

Participated in 8 different projects during my time at the firm, from residential redevelopments, high-end residential with mixed-used and master plan for various buildings. Worked with lead designers for initial housing and retail conceptual package, developed building total gross area calculations and assisted in Revit skin modeling, rendering design options, precedent research, and parking layouts. Involved in projects located in DC and VA. Assisted in GMP and Bid Addendum delivery. In charge of developing building exterior elevations, development of unit RCP’s, ADA building compliance list and UL assembly sheets. Participated in DD submission by creating and developing life safety plans, cartooning unit data, and assisting in unit matrix. Collaborated in a simultaneous delivery of 2 buildings that are part of a master plan in the Potomac Avenue future metro station. Involved in concept, SD and city approvals. Responsible for producing building’s unit matrix, including unit layouts. Participated in master plan development with 3 building designs in Alexandria location.

Stantec Architecture, Inc.

July 2016 – September 2019 Designer

I participated in the design and documentation of a 351,850 sf Ion Medical Center located in China from concept design to DD. I was tasked with creating Revit drawing documents, graphics and a design booklet for its 498,778 sf phase 1 master plan. In addition to developing diagrams for phase 2, assisting in Revit design adjustments and palette selection. I also worked in the building cycle for medium scale proton therapy projects in Alabama and Miami where I was responsible for creating the drawing documents for the public spaces, lobbies, and clinical areas. I was also part of the CA efforts by reviewing submittals, RFI’s, specifications, ASI, addendums, and foundation permits. I worked directly with the retail Principal and Senior Designer in developing a proposal for a competition to design the lobby, penthouse and fitness center of a DC office building that has since been awarded to the firm. I also participated in a DC high school competition by taking ownership of the Revit modeling and graphic diagrams. Assisted with the process of exterior revisions and consultant drawing coordination for a DD delivery for an MDA project in Texas.

WDG Architecture, PLLC

December 2015 – July 2016 Staff Architect

Assisted in the creation of feasibility studies and site analysis as a preamble to SD. This process allowed me to get familiarized with VA and DC’s zoning requirements for residential, office and commercial developments. I was also part of the process for design competitions, RFP and client presentations for which I developed CAD drawings, Revit renderings and graphics that clearly communicated the design’s objective. In addition, I got exposure to BOMA standards and CDP submissions.

Graduate Design Studio

August 2014 – October 2014 with Professional Practice

Two trimesters of direct communication with clients (government department of Puerto Rico Land of Administration) with weekly meetings for schematic land layout supervision and final design development. Proposed solutions had to consider owner’s objectives (develop expertise in Permaculture & Ecolodges) and specific economic factors.

Freelance CAD Drafter (Self-Employed)

February 2014 – June 2014

Development of construction drawings for an affordable housing project.

Torre Almenada Engineering

Architect In Training, Drafter

August 2013 – November 2013

Fast paced drafting of structural drawings, site grading and design development for diverse types of projects such as transportation terminals, commerce, and retail spaces, among others. Assisted on presentations for clients and construction permits coordination.

2016 – 2015

Participations

-Exhibit the LA thesis in the 20th ARQPOLI Anniversary with the presence of ACSA (American Collegiate Schools of Architecture)

-Contributed to the first Carta de Paisaje de Puerto Rico as the first Caribbean Landscape approach to form future part of the LALI (Iniciativa Latinoamericana del Paisaje)

-Ex-students design EXPO for the inauguration of the ARQPOLI new school

Summer Architectural Courses

-Enhanced cultural knowledge by exploring different world designs views

-Participated in graphic expositions at the Centro de Ballajá

Universities Presidential Inaugural & National Youth Leadership Conference

Painting & freehand drawing courses at Liga de Arte, Old San Juan, Puerto Rico

Cuba – 2012 & Barcelona – 2011

2009 & 2005

8 years

............................................
ACADEMIC ACHIEVEMENTS
A Work
Background in 06 - 31
Experience

BANNEKER HIGH SCHOOL COMPETITION SHAW, DC

DESCRIPTION:

The project would be located in Shaw’s district, adjacent to its library, the Cardozo playground, a dog and skate park. Even though the main program responds to education it also adds a park as a buffer to the near avenues and invites for community activities.

DESIGN INTENT:

In a bigger scale, the project importance relies on providing urban connections by taking advantage of its position and support its growing neighborhood by integrating its design in multiple aspects (social and natural). By organizing program in a distributed planning, it enhances the students educational experience towards a dynamic manner. The multiple openings and not straight facades bring opportunities of recreational spaces on its surrounding as well of diverse views of the context. The spread programs within the school are connected by a feature stair that works as an activated spine of experiences between common and private spaces.

CONCEPTUAL PROCESS B01 L01 L02 L03 L04
INTERIOR VIEW SECTION
SITE PLAN & EXTERIOR VIEW
MAIN ENTRANCE VIEW
06
LIBRARY & THEATER INTERIOR STUDIES 07
MAIN STAIR INTERIOR STUDY

UAB PROTON THERAPY CENTER

BIRMINGHAM, ALABAMA

DESCRIPTION:

Particle Therapy Center project, which consists of an advanced radiation treatment that uses a beam of protons to treat the cancerous tumors. It is located in the UAB Campus surrounded by existing healthcare buildings.

DESIGN INTENT:

The site was to be balanced between softscape and hardscape and expose a main corner drop-off condition adjacent to the ambulance entrance. The predominant south and east facades feature openings that frame the views and filter the interior and exterior with a dynamic greenery screen. The main structure is a 2-story building cladded in brick. Its interior spaces are composed of technical support, treatment, pre-treatment, a clinic, offices and a bunker in the pit level. The entrance vestibule has a double height lobby that leads to the front desk.

DETAIL SECTION RENDERED ELEVATIONS
SITE PLAN LOBBY ENLARGED PLANS PLAN & SECTION DETAIL LOBBY INTERIOR & EXTERIOR VIEWS
ARCHITECTURAL
08
MASTER PLAN 09

DESCRIPTION:

Heavy Ion international project consisting of 2 buildings to be developed in separate phases. The program required a more complex bunker and additional support and cancer research spaces since it is more advanced than proton treatments and uses a linear accelerator of heavy ions to treat tumors.

DESIGN INTENT:

The selected site was defined by 2 main streets, power lines and a river. The overall design was based on the tangram Chinese puzzle, which was applied to the program layout producing multiple interior courtyards which served as a system to organize the 46 patient rooms. Phase 1 and 2 was to share a main drop-off that offered pedestrian access. Vehicular traffic was to be kept separate between staff, patients and back of house. The interior circulation had to consider regular and VIP patients separately. Other interior spaces were administration, doctor rooms, and amenities such as a cafeteria and a fitness center.

MAIN ENTRANCE VIEWS PROGRAMMATIC PLANS FINISH FLOOR PLANS LOBBY INTERIOR VIEWS
2 PHASE MASTER PLAN
HEFEI ION MEDICAL CENTER HEFEI, CHINA
10
11
PATIENT ROOM VIEW TREATMENT VIEW STAFF OFFICE VIEW
2
PHASE MASTER RENDERING

DESCRIPTION:

This site is part of master plan revitalization plan, with retail and residential (mixed use). A 7story building with 390 units and 107,845 sf in the lot, its construction type is concrete podium over wood.

DESIGN INTENT:

The concept was to show the sunrise and sunset from different pedestrian angles of the building, inset of balconies, including amenity and common indoor areas. At the 2nd level, bioretention at the courtyard landscape was added to handle water overflows, plus an underground vault area with stair access. The open front courtyard was meant to visually interact with the exterior pathway and streetscape, keeping in consideration the rest of 10 buildings at the master plan scale.

LEVEL 06 256'-6 5/8" LEVEL 07 266'-9 1/4" B.O. ROOF 275'-5 7/8" 174'-2" 5'-1" 8'-8 5/8" 10'-2 3/4" 10'-2 3/4" UNIT UNIT UNIT RF-01 EWS-5Wa EWS-4Wa GR-1 WOOD FRAMED CORNER POST CLADDED WITH WD-1 AT ALL SIDES INSULATED SOFFIT TO BE PAINTED OPEN BEYOND PERFORATED PANEL GUARDRAIL TO WRAP BALCONY, TYP PRP-1 OPEN BEYOND OPEN BEYOND A-511 C1 TYP A-511 C5 TYP T.O. ROOF 277'-10" A-511 D5 SIM A-511 C4 BLINDSIDE WATERPROOFING LEVEL 03 11 1/2" LEVEL 04 1 1/8" LEVEL 05 3 7/8" LEVEL 06 256'-6 5/8" LEVEL 07 266'-9 1/4" B.O. ROOF 275'-5 7/8" LOWER LEVEL 174'-2" UNIT UNIT 1'-2" RF-01 FL-01 A-511 C1 TYP EWS-5Wa EWS-5Wa FL-01 FL-01 T.O. ROOF 277'-10" A-512 C2 BLINDSIDE WATERPROOFING C D 3 4 5 M 3 O-ROAD 3 5 7 8 10 12 13 14 15 M 11 GENERAL NOTES -FLOOR PLAN B 12345 12345 FLOOR PLAN BLOCK EYE FOULGER-PRATT A1 FLOOR PLAN -LEVEL 01---LOWER LEVEL A-221 RESIDENTIAL LEVEL RESIDENTIAL LEVEL RESIDENTIAL LEVEL RESIDENTIAL LEVEL RESIDENTIAL LEVEL RETAIL LEVEL PASEO EXISTING PARKING STRUCTURE RESIDENTIAL LEVEL RESIDENTIAL LEVEL RESIDENTIAL LEVEL RESIDENTIAL LEVEL RESIDENTIAL LEVEL RESIDENTIAL LEVEL RESIDENTIAL COURTYARD POOL RESIDENTIAL COURTYARD AVG. GRADE FITNESS 3HR RATED PODIUM SLAB RESIDENTIAL LEVEL RETAIL STORAGE BIO RETENTION STORM VAILT REGRADE EXISTING PAVEMENT TO MEET NEW ENTRANCE C D 5 0 1/16" = 1'-0" B4 16' 8' 32' BUILDING SECTION -NORTH/SOUTH A4B4 B4 A-220 A-221 A4 A-221 A4 A-222 A-222 A-223 A-201 A-201 B4 -202 A4B4A5 B3 B5 A3 A-203 A5a A-203 A3 A-204 A5a - C5 -205 C3 -205 A5 A-205 A2A4 -206 A2A4 - A5 ROAD ROAD A5 A-124A A3A-124C A5 A-124A A2 A-124B A2 A-124B A2A-124D A3A-124C A2A-124D SF-400 2B-7U405U4092B-3b B-U468BD-1c S2BU414-1.2 2B-3a.2 -BD-1b.3U417BD-1b U436S-S-2 2BD-1A SBD-1aBBU449-9 B-9 B-9B-9 B-9 B3BU418S-1 B- B-1 B- BD-1dELEC/TDE CORRIDOR STORAGE- 2B-3aELEC/TDE C410 RES 04 ELEC/TDE ELEC/TDE MECH2B-22B2B294'-0" 3'-10" 67'-8" 6'-0" 176'-7 1/2" 5'-10 1/2" 34'-0" 6 104 6 294'-0" U419B-1.3 - B- B- B- 2B-3a 900 490 90 1 2 3 4 5 6 7 8 12 13 14 15 A B C D E F G H I J K L M N O P A4 301'-6" 3'-8" 164'-9 5/8" 87'-4 1/4" 45'-8 1/4" 63'-8 1/2" 71'-3 5/8" 65'-0 1/8" 60'-11 1/8" 8'-0" 23'-4 1/4" 9'-1 1/4" 35'-1" 467'-6 1/2"1 88 634 8 92'-8 3/4" 26'-9 1/4" 119'-6" 10'-0 3/4" 4'-0 1/4" 4'-0" 5'-0" 5'-0" 15'-11 5/8" 121'-5 1/8" 336'-10" 1'-5 7/8" 48'-0" 20'-0" 144'-8" 20'-0" 102'-8 1/8" 7 -0 67'-6" 71'-2 5/8" 150'-7 3/4" 72'-2 1/8" CONCRETE FLOOR ASSEMBLY 3-HR HORIZONTAL SEPARATION 72-10 6-0 64 81 2'-1 7/8" 2'-1 7/8" 4-71 4 6-112 A-531 A2a C401 1. OVERALL BUILDING DIMENSIONS TO FACE 2. DEMISING WALL DIMENSIONS TO CENTER 3. ALL ELEVATION MARKERS ARE TO TOP OF 5. ALL UNIT DEMISING WALLS TO BE WALL TYPE REFER TO A-902 AND A-903 6. ALL CORRIDOR WALLS TO BE WALL TYPE REFER TO A-902 AND A-903 7. DOORS TO BE 4" FROM ADJACENT PARTITION, 8. REFER TO A-120A TO A126D FOR ENLARGED 10. REFER TO A-341 TO A-452 FOR ALL VERTICAL 11. REFER TO A-357 FOR ALL VERTICAL SHAFT 12. REFER TO A-530 FOR ALL MECHANICAL SHAFT 14. REFER TO A-600 SERIES FOR ENLARGED 15. REFER TO A-700 SERIES FOR ID SPACES 16. REFER TO A-900 SERIES FOR INTERIOR FINISHES INSTALLED FLOOR TO CEILING GENERAL NOTES A B C D 12345 1 2 3 2 5 M B M 6 0W E S N B O K 1 0W E T E N B O K YC R E A N H EA C HR 1 1/16" 1'-0" A1 FLOOR PLAN LEVEL 01(196) 196'-0" LEVEL 02 214'-5 1/2" LEVEL 03 225'-11 1/2" LEVEL 04 236'-1 1/8" LEVEL 05 246'-3 7/8" LEVEL 06 256'-6 5/8" LEVEL 07 266'-9 1/4" B.O. ROOF 275'-5 7/8" A-203 A5 8'-8 5/8" 10'-2 3/4" 10'-2 3/4" 10'-2 3/4" 10'-1 3/4" 11'-6" 18'-5 1/2" A B C D E F G H I J K L M N O P T.O. ROOF 277'-10" C5 LEVEL 02 214'-5 1/2" LEVEL 03 225'-11 1/2" LEVEL 04 236'-1 1/8" LEVEL 05 246'-3 7/8" LEVEL 06 256'-6 5/8" LEVEL 07 266'-9 1/4" B.O. ROOF 275'-5 7/8" LEVEL 01(193) 193'-0" A-204 A5 A-204 C5 8'-8 5/8" 10'-2 3/4" 10'-2 3/4" 10'-2 3/4" 10'-1 3/4" 11'-6" 21'-5 1/2" 1 2 3 4 5 6 7 8 9 10 12 13 14 15 T.O. ROOF 277'-10" 11 A B C D 1 2 3 4 5 1 2 3 4 5 1 0 3 3 6 2 P M B M 0 1 7W E T E D B O C K 1 7W E S T E N D B L O C E YC O R E A N D H E LR C HR 1 v 1/16" = 1'-0" A4 16' 8' 32' OVERALL ELEVATION -WEST 0 1/16" = 1'-0" B4 OVERALL ELEVATION -SOUTH PASEO ROAD ROAD PARKING B4 A4-------ROAD----------------------- - ------8 12 C D G H M O-11GENERAL NOTES -FLOOR PLAN B A 12345 12345 FLOOR PLAN A-102 BLOCK EYE FOULGER-PRATT A1 FLOOR PLAN -LEVEL 02---TYPICAL PLAN WEST ELEVATION EXTERIOR RENDERINGS COURTYARD SECTION COURTYARD LEVEL GROUND LEVEL WEST ENDBLOCK EYE ALEXANDRIA,
VIRGINIA
12

POTOMAC YARD-BLD 15/19 MIXED-USE

ALEXANDRIA, VIRGINIA

DESCRIPTION:

The project consist of two 9 story mixed-use buildings which are part of a master plan for the Potomac Yard new metro station. The site location is adjacent to the metro and river. Each building consists approximately of 3,000,000 GSF and 250 units, with a total of 450 parkings.

DESIGN INTENT:

The overall design approach is to create an access and open view towards the metro area and its green space, in addition of having courtyards in the building facades creating views between each other. The retail and townhouses at ground level provide immediate access to metro station and promotes pedestrian activity. On both buildings the amenity is brought to the corner to take advantage of the views to the metro and the buildings courtyards.

SITE PLAN - BLD 15 & 19 BLD 19 - EAST ELEVATION BLD 15 - EAST ELEVATION BLD 15 - SECTION BLD 19 - SECTION BLD 15TYPICAL & AMENITY LEVEL BLD 19TYPICAL & AMENITY LEVEL
14
BLD 15 - EXTERIOR EAST VIEW BLD 19 - EXTERIOR EAST VIEW 15

1100 NY AVENUE RFP WASHINGTON, DC

DESCRIPTION:

This was a 2-week commercial RFP to show the client for the first time our approach to the building. The main objective was linking the neighborhoods in order to achieve an urban and energized space.

DESIGN INTENT:

Due to historical character of the lobby the main challenge was to renovate the look and feel of the lobby without altering the architecture. The monumental space gave the opportunity to play with the interior possibilities. For the fitness center the idea was to call attention to its access point and promote the sharing zone of the foyer, in addition of making a more interactive studio. At the rooftop the architectural elements were already enclosing half of the space limiting lights and views. The idea then was to take advantage of that condition of being partially enclosed to add more intimate seating areas and use the exterior areas as a kind of amphitheater that promoted social encounters.

What If we infuse the vibe of the neighborhood

Empowering a new workforce

As workers gravitate toward social settings, owners that focus on providing a foundation, a sense of place and of belonging will have an edge in attracting them.

CONCEPT DIAGRAM - 1ST FLOOR PLAN

LIVE WORK PLAY
LIVE, WORK & PLAY ENVIRONMENT STUDY
16

CEILING

GRAPHIC

ROOFTOP TERRACE VIEW
SOCIAL BREAK-OUT OF FOYER STUDY LOBBY CEILING STUDY USE OF FURNITURE & RUGS TO CREATE ZONES TO DEFINE SPACES & LIGHTING TO TIE TO GUIDE INTO AN INTERACTIVE STUDIO
ZONES & A SOCIAL AMPHITHEATER 17
CANOPY TO DEFINE

UHEALTH TOWER ENTRANCE COMPETITION MIAMI, FLORIDA

DESCRIPTION:

A 2 weeks renovation competition which included the lobby, main entrance drop-off, public spaces, conference room and a kids-playroom.

DESIGN INTENT:

The building entrance was to integrate the existing UM Hospital with the site in a monumental approach. The purpose of the design was to create a statement in its corner street condition and within the health district, where its located. After taking in consideration the vehicular and pedestrian first impression, the branding was to become part of the design process in order to promote an improve a safer patient/staff experience. The dynamic greenery wall becomes the billboard moment, in addition of presenting a sculptor gesture. The renovation was to unite the adjacent parking building with the new glass box that oversee the front metro line and pedestrian activity.

MAIN ELEVATION EXTERIOR RENDERINGS
2ND FLOOR PLAN
SECTION THROUGH PUBLIC AREAS SECTION THROUGH ENTRANCE
1ST FLOOR PLAN
18
19
AXON RENDERED VIEW

THE OTIS MIXED-USE RICHMOND, VIRGINIA

DESCRIPTION:

The site is part of a revitalization plan of an industrial area. It is a 350-unit mixed-use building with approximately 482,500 GSF total. The project consists of 4 wood stories above 1 concrete podium.

DESIGN INTENT:

The exterior and interior were designed to evoke the industrial aspect of the area. A double height space was given to the retail and amenities which opened the view to the adjacent pedestrian walkway. The ground level has 2 story units with parking at podium and 2 upper landscaped courtyards that are wrapped by more typical units.

TYPICAL PLAN WEST ELEVATION EXTERIOR RENDERINGS COURTYARD SECTION COURTYARD LEVEL GROUND LEVEL
20
ENLARGED WEST ELEVATION & WALL SECTION ENLARGED 1 - BEDROOM UNIT
21
EXTERIOR WEST VIEW

136 ES TEMPLE ST

SALT LAKE CITY, UTAH

DESCRIPTION:

This is a conversion project with a change of occupancy from office to residential. All concrete high story with parking from ground level to level 6. A total of 25 stories with 204 units from level 8 to level 24 and an amenity rooftop. Unit layouts are divided into 14 levels for typical and 2 levels of penthouse layouts.

DESIGN INTENT:

The idea for this building was to keep all existing openings at the envelope in favor of the views at the units. Another consideration was to keep amenities at rooftop level to take advantage of the highest view toward the mountains and downtown. The general earth tone finish palette was meant to complement the natural landscape around the site.

UPUP UPUP ALIGN ALIGN ALIGN ALIGN ALIGN ALIGN ALIGN ALIGN EXTERIOR DIMENSIONS ARE TO FACE OF DIMENSIONS INTERIOR PARTITIONS ARE DIMENSIONS OF UNIT DEMISING WALL ARE REFER TO A6000 SERIES SHEETS FOR ALL 12. AT ALL LEVELS, WHERE NO NEW OVERBUILD PARTITION -LEGEND NEW PARTITION NEW DOOR (NOTED WITH "E" IN DOOR NUMBER) PARTITION -SHEET EGRESS CORRIDOR WITH FIRE RATED PARTITIONS BOLLARDS AT PEDESTRIAN WALK WAY WIRE MESH STORAGE LOCKERS, ALL DOORS BIKE RACKS BIKE FIX-IT STAND 13 OTHERWISE. 14 EXISTING EXTERIOR GLAZING TO REMAIN, 15 SEE LANDSCAPE FOR 7TH FLOOR EXTERIOR 19 EXISTING DOOR TO REMAIN, HARDWARE 20 RESTROOMS. SEE SHEET A4000 FOR MORE 21 EXTERIOR GENERATOR LOCATION. SEE 25 NEW MAIN ELECTRICAL ROOM. PROVIDE 26 FIRE RATED PARTITION 27 NEW GAS METER LOCATION. SEE MEP FOR 31 FIRE RATED PARTITION, SEE STRUCTURAL 32 NEW EXTERIOR ROOFING ASSEMBLY. SEE TRENCH DRAIN AT DOOR THRESHOLD 37 GLASS AND METAL GUARD RAIL 38 NEW EXTERIOR DOOR NEW EXTERIOR ROOFING ASSEMBLY WITH INFORMATION 42 POOL AND POOL SUPPORT STRUCTURE PROVIDE NEW ELEVATOR DOOR AND FRAME 45 PROVIDE UPLIGHT AT INTERIOR OF EXISTING 46 TRAFFIC COATING TO REMAIN. 48 REMOVE EXISTING RAILING AS REQUIRED 49 LOW OVERHEAD BEAM 53 FINISH LAYER OF PARTITION ASSEMBLY 54 WIRE MESH BIKE STORAGE NEW CONCRETE CURB UNDER WALL PARTITION EXISTING CONCRETE SLAB ABOVE TO REMAIN 59 NEW AREA WELL 60 OVERHEAD SECTIONAL STEEL DOOR. SEE INTERIOR GLAZING SYSTEM. SEE A5605 64 LOCATE THE TWO GWB LAYERS OF THE TYPICAL TUB SHOWER DETAIL PROVIDE REQUIRED SIGNAGE, APPROVED 68 EXISTING TO REMAIN ADA PARKING AND 69 EV PARKING ONLY SIGNAGE AT LEVEL 03 A4 A2003 2 4 6 A4 A2507 A4 A2501 A4 A2502 A2505 A4 A2506 ELEV C ELEV A STAIR S2-1 STAIR 1 13 TYP 13 LOADING STAGING TRASH EGRESS 104 EGRESS 103 RETAIL RECEPTION LOBBY 105 ELECTRICAL PARKING 001 PARKING 002 27 153'-4" VIF 156'-1" VIF A5001 A5 S1-1 116 E108A E108B E108C E108D E105A E105B E105C E103 001A 109 105 BB ELEV B ELEV D E105D BB E108E BB W R02.3 R02.6 M12.8 R02.3 R02.3 R02.3 R01.6 ELEC 115 110 AA BIKE STORAGE 117 124 A YS1.3 5'-0" 5'-0" 2'-10 1/2" 7'-0 3/4" 5'-0" 1'-0" 1'-7 5/8"9'-0" S01.6 EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ C A2103 A2 C2 C4 A5001 S81.8 RETAIL 5'-0" 4'-6" M12.8 120 PACKAGE ROOM 119 ADA RESTROOM 121 MAILROOM 118 122 LEASING OFFICE LOBBY HATCH B2 YS1.3 YS1.3 YS1.3 YS1.3 12'-4" VIF 12'-4" VIF 1'-0" 1'-0" YS1.3 S81.8 S81.8 S81.8 S05.6E S05.6E 13 13 13 53 7'-0 3/8" 7'-0 1/8" 12'-1 3/8" Sim 2'-0 1/4" A5 7'-11 1/8" 7/8"8'-8" 5'-10 1/8" 5'-10 1/8" 6'-3 7/8" 13'-2 3/8" 2'-0" 2'-0" 6'-6" 1'-7 1/4" 58 203 SF FIRE COMMAND CENTER 124 29 67 S08.0N S05.2N S05.6 S05.6 S05.2 S05.2N S05.2N R02.3 S01.6 S01.6 YS1.3 S01.6 S01.6 S05.2N S05.2N 6'-6" YS1.3 YC00.6 YS1.3 S05.2N S05.2N ELEVATOR LOBBY 101 24 31 10'-6" 117 7-2 3'-0" A B C D 12345 10/9/2023 9:10:25 AMAutodesk Docs://22045 EAST SO UTH TEMPLE/22045-136 ES TEMPLE-ARCH-R23.rvt A5 PARTITION PLAN -LEVEL 01 UP UP FLOOR PLAN -GENERAL NEW PARTITIONS BUILT CONTIGUOUS TO REFER TO A3400 SERIES AND A3500 SERIES EXTERIOR DIMENSIONS ARE TO FACE OF UNIT TO UNIT DEMISING WALL SHALL BE R23.1 UNIT TO CORRIDOR DEMISING WALL SHALL 11. ALL EXISTING AND NEW STEEL STRUCTURE PARTITION -LEGEND EXISTING PARTITION TO REMAIN MILLWORK EXISTING DOOR TO REMAIN (NOTED WITH "E" IN DOOR NUMBER) PARTITION -SHEET ACCESSIBLE RESTROOM. SEE SHEET A4000 TRASH RECYCLING CHUTES WIRE MESH STORAGE LOCKERS, ALL DOORS EXISTING ELEVATOR SHAFT TO BE REPURPOSED FOR MORE INFORMATION 10 COLD DARK SHELL FOR FUTURE RESTAURANT AND OTHER CONNECTIONS CAPPED WITHIN EXISTING ELEVATOR SHAFT TO BE REPURPOSED 12 NE CORNER GUARDS SEE INTERIORS FOR AMENITY AREAS. ALL REQUIRED. REFER TO STRUCTURAL 17 EXISTING EXTERIOR GLAZING TO REMAIN 18 FABRIC AWNINGS WITH METAL FRAME. EXISTING DOOR TO REMAIN, HARDWARE 23 TRASH CHUTE VENT CAP 24 EXISTING CHASE TO BE REUSED BY PLUMBING. 28 NEW TGCC LOCATION. SEE MEP FOR MORE 29 KNOX BOX LOCATION. PROVIDE ALL BUILDING 30 EXISTING MECHANICAL CHASE TO BE REUSED 34 EXISTING CONCRETE RAMP AND ASSOCIATED 35 EXISTING STAIR TO BE EXTENDED TO ELEVATOR 36 EXISTING CONCRETE PERIMETER BEAM FOR LAYOUT 40 TPO ROOFING WITH ASSOCIATED FLASHING 41 NEW CONCRETE ON METAL DECK SLAB OUTLINED IN SPECIFICATIONS 44 FLOOR ELEVATION AT DOORS TO BE LEVEL WIRE MESH STORAGE LOCKERS 51 EXISTING ELEVATOR CONTROLS TO REMAIN 52 EXISTING ELEVATOR MOTORS TO REMAIN 56 EXISTING BRACED FRAME STRUCTURE 57 EXISTING CONCRETE SLAB ABOVE TO REMAIN 58 REPAIR EXISTING SLAB ON GRADE 62 RE-LEVEL THE EXISTING FLOORING PATCHING. 63 PROVIDE LOCKING MUD IN ACCESS PANEL. LOCATE THE TWO GWB LAYERS OF THE 65 FIRE PIT LOCATION. SEE LANDSCAPE FOR 66 GAS GRILL LOCATION. SEE LANDSCAPE 67 PROVIDE REQUIRED SIGNAGE, APPROVED A2004 A2001 A4 A4 A4 1 3 7 8 STUDIO U812 2 BED U811 2 BED 1 BED BED JR BED DEN 1 BED JR BED 2 BED 2 BED U803 STUDIO 1 BED U813 ELEV LOBBY TRASH ROOM CORRIDOR ELEV C EC-8 ELEV D ELEV A EA-8 STAIR STAIR A2 ES1-8A AA AU1 U01 U01 AU1 U01 U01 AU1 U01 AU1 U01 AU1 U01 AU1 U01 U01 A5002 R02.3 R02.3 R23.1 TELE 804 ELEC 152'-8" VIF 87'-8" VIF R23.6 R23.6 R23.6 R23.6 R23.6 R23.6 R23.6 R02.3 S05.2N ANSI TYPE 'A' 21'-1 3/8" 1'-4 1/4" 1/2" 3/8" 2'-2" 10'-0" 13'-8 7/8" 7'-8" 1'-3" 2'-2" 5'-5 1/4" 21'-1 3/8" 1'-0 1/8" 3'-4 1/4" 6'-4 1/4" 6'-5 1/2" 1'-5 7/8" 5'-9 1/8" 4'-0 5/8" 11'-1 1/4" 12'-4 1/4" A5002 A5604 A3 A2101 D5 5'-6" 7'-0 1/8" 7'-6 1/8" 6'-5 1/2" 6'-3 3/4" 10 1/4" 4'-11 7/8" 1'-0 1/8" 3'-3 5/8" 13'-11 3/8" 3'-3 7/8" 9'-3 3/8" 12'-0 7/8" 11'-5" 1'-5 7/8" 5'-5 1/4" 1'-1 3/4" 13'-8 7/8" 7'-0 1/8" 7'-6 1/8" 1'-0 1/8" 1'-0 1/8" 2'-6 1/8" 1'-3 1/8" 7'-0 1/8" 13'-8 3/8" 1'-0 1/8" 2'-2" 3'-6 3/4" 9" 2'-11 1/8" 8'-6 5/8" 3'-4 1/8" 8'-6 3/8" 13'-8 7/8" 10'-11 5/8" 13'-8 7/8" 3'-4"2'-11 1/8" 8'-6 1/4" 4'-9" 2'-11 7/8" 9'-8 1/8"2'-11 1/8" 64 64 64 PROPERTY LINE 15'-8 1/2" W.O. 15'-8 1/2" W.O. 15'-8 1/2" W.O. 15'-8 1/2" W.O. 15'-8 1/2" W.O. 15'-8 1/2" W.O. 15'-8 1/2" W.O. 5'-0" W.O. 5'-0" W.O. 5'-0" W.O. 5'-0" W.O. 5'-0" W.O. 5'-0" W.O. 5'-0" W.O. 5'-0" W.O. 11 TYP EQ EQ S05.2N A B C D 12345 12345 10/9/2023 9:10:50 AMAutodesk Docs://22045 EAST SO UTH TEMPLE/22045-136 ES TEMPLE-ARCH-R23.rvt 0 1/8" 1'-0" A5 8'4' 16' PARTITION PLAN -TYPICAL LEVEL 08 THRU 22 (LEVEL 08 SHOWN) LEVEL 4346.78 LEVEL 4358.78 LEVEL 4367.78 LEVEL 4376.78 LEVEL 4385.78 LEVEL 4394.78 LEVEL 4403.78 LEVEL 4414.78 LEVEL 4425.78 LEVEL 10 4436.78 LEVEL 11 4447.78 LEVEL 12 4458.78 LEVEL 13 4469.78 LEVEL 14 4480.78 LEVEL 15 4491.78 LEVEL 16 4502.78 LEVEL 17 4513.78 LEVEL 18 4524.78 LEVEL 19 4535.78 LEVEL 20 4546.78 LEVEL 21 4557.78 LEVEL 22 4568.78 LEVEL 23 4579.78 LEVEL 24 4591.78 LEVEL 25 4603.78 LEVEL 26 4626.90 12'-0" 9'-0" 9'-0" 9'-0" 9'-0" 9'-0" 11'-0" 11'-0" 11'-0" 11'-0" 11'-0" 11'-0" 11'-0" 11'-0" 11'-0" 11'-0" 11'-0" 11'-0" 11'-0" 11'-0" 11'-0" 11'-0" 12'-0" 12'-0" 23'-2" 5 14 15 A2 A3003 ELEV. MACHINE 4616.28 MP-1 MP-2 MP-1 MP-2 MP-1 MP-2 MP-1 MP-2 MP-2 MP-2 MP-2 MP-2 MP-2 MP-2 MP-2 MP-2 MP-2 MP-2 MP-2 MP-2 MP-2 MP-2 MP-2 MP-2 MP-2 MP-2 MP-2 MP-2 MP-2 MP-2 MP-2 MP-2 MP-1 MP-1 MP-1 MP-1 MP-1 MP-1 MP-1 MP-1 MP-1 MP-1 MP-1 MP-1 MP-1 MP-1 MP-1 MP-1 MP-1 MP-1 MP-1 MP-1 MP-1 MP-1 MP-1 MP-1 MP-4 MP-4 MP-4 MP-4 MP-4 MP-4 MP-4 RL-1 280'-2" A5303 14 11 RL-1 ELEVATION -GENERAL NOTES 1. REFER TO LANDSCAPE LAYOUT FOR AMENITY AND POOL ERRACES (FUTURE). 3. EXTERIOR WALL INFILL SHALL MATCH ADJACENT WALL U.O.N. 5. ALL EXISTING MASONRY WALLS TO BE REFINISHED AND COATED, COLOR TBD. INFILLED WITH WALL MATCHING ADJACENT ASSEMBLY AND FINISH UON. 7. ALL DIMENSIONS TO BE VERIFIED IN FIELD. ELEVATION -SHEET NOTES EXISTING BASE BUILDING EXTERIOR FINISHES TO REMAIN. GC TO PROTECT ALL FINISHES AT GROUND LEVEL. EXISTING GARAGE EXHAUST NEW OVERHEAD ROLL-UP DOOR SEALANT JOINTS TO BE REMOVED AND REPLACED TYP. ELEVATION BEYOND, SEE ENLARGED ELEVATIONS FOR MORE INFORMATION 10 EXISTING STOREFORNT TO REMAIN 14 EXTERIOR GUARD RAIL TO BE LOCATED BEHIND EXISTING ONCRETE PARAPET 15 TOP OF EXISTING CONCRETE PARAPET CLAD IN METAL PANE 17 SCUPPERS 18 NOT IN USE 12 NEW ELEVATOR OVERRUN 21 PLANTERS, SEE LANDSCAPE FOR MORE INFORMATION 23 NOT IN USE 24 EXISTING CONCRETE STRUCTURE TO REMAIN 25 EIFS EXPANSION JOINT 26 NEW LOUVER, REUSE EXISTING OPENING. SEE MECHANICAL FOR INFORMATION. B A 12345 PROJECT DETAILS STAMP DRAWN BY C 12345 2021 Hickok Cole Architects, Inc. CLIENT NAME D Hickok Cole Architects, Inc. 301 N Street NE, Suite 300 Washington, DC 20002 202.667.9776 As indicated 136 E. SOUTH TEMPLE ST, SALT LAKE CITY, UT 84111 22045 Author BUILDING ELEVATIONSNORTH A2001 136 E. SOUTH TEMPLE STREET HINES 0 -NORTH 10'-8" 5'-4" 21'-4" #DATEDESCRIPTION 2022-09-23SCHEMATIC DESIGN SET 2022-11-04SCHEMATIC DESIGN SET ADDENDUM #01 2022-12-09100% DESIGN DEVELOPMENT 2023-03-31PERMIT SET 2023-05-0395% CONSTRUCTION DOCUMENTS/FGMP 2023-10-06ISSUED FOR CONSTRUCTION B C B C MAIN FRONT ELEVATION UNIT VIEWS GROUND LEVEL
TYPICAL PLAN
22
UNIT FINISHES - LOWER LEVELS Kitchen Finishes Conceptual Kitchen Elevation COUNTERTOP DALTILE ONE QUARTZ FREEDOM CALACATTA PAINT SHERWIN PURE WHITE 7005 FLOORING SHAW CONTRACT CANOE PLUMBING FIXTURES SYMMONS SATIN NICKEL CABINETS UNIBOARD LAMINATE DOLOMITE FINISH BACKSPLASH DALTILE ELIXIR RD20 HARDWARE EMTEK-JASPER 136 E. SOUTH TEMPLE | HINES UNIT FINISH PENTHOUSE PALETTE JULY 28, 2023 2 COUNTERTOP DALTILE ONE QUARTZ FREEDOM CALACATTA SHERWIN WILLIAMS PURE WHITE 7005 HARDWARE EMTEK-JASPER FLOORING ATLAS CONCORDE SILVER BATH FIXTURES SYMMONS SATIN NICKEL CABINETS UNIBOARD LAMINATE UNIT FINISHES Bath Finishes & Hardware 136 E. SOUTH TEMPLE | HINES UNIT FINISH PENTHOUSE PALETTE JULY 28, 2023 8 ALIGN GENERAL NOTES -UNIT SHEET NOTES -UNIT--5'-6 3/4" 1'-1 1/4"5'-6" (1'-6" REQ) 8'-6"EQ) 3'-EQ) 3'-6EQ) 8" (1'-6" REQ) (1'-6" REQ) 10'-4 (3'-0" REQ) 5'-5 3/4" 4'-0"(3'-0" REQ) 0" 4'(5'-0" REQ) (OPH) (OPH) B C 1 23 45 SALT LAKE CITY, UT UNIT PLANS -LEVEL 08 THRU 22 A6008A 136 E. SOUTH TEMPLE A5 ENLARGED UNIT PLANS -TYP LEVEL 08 -WEST 2023-10-06ISSUED FOR CONSTRUCTION ALIGN REFLECTED CEILING PLAN -GENERAL NOTES REFLECTED CEILING PLAN -LEGEND REFLECTED CEILING PLAN -SHEET NOTES EQEQ 6'-5" 9'-8" EQEQ EQEQ 2'-2" EQ EQ 3'-6" 2'-2" LEVEL 22 B 1 23 45 C 1 23 45 SALT LAKE CITY, UT UNIT RCP -LEVEL 08 A6208A 136 E. SOUTH TEMPLE 2023-10-06ISSUED FOR CONSTRUCTION A5 ENLARGED UNIT RCP -TYP LEVEL 08 -WESTENLARGED TYP UNIT PLANS & RCP’S UNIT PALETTE PRESENTATION ROOFTOP VIEW EXTERIOR VIEW 23

HERITAGE

DESCRIPTION:

This is a 3 building with 2 plaza design on a historic district. Spreading across 2 blocks this project consist of 2 underground parking levels and 7 to 8 levels above with a total of 750 units.

DESIGN INTENT:

One of the main challenges was to integrate all 3 buildings withing the scale of the context. Each design considers a stepping on each upper level with the intention of softening the overall volume on the streetscape experience. Another important consideration was the pedestrian activity around and within each ground level. A mews was created to provide a connection across the whole block, which also starts to recognize the lower scale within the project.

WESTFIELDS RESIDENTIAL FAIRFAX, VIRGINIA

DESCRIPTION:

This site is part of a commonwealth center and has a total of 402,000 GSF. The building consists of 5 levels over a podium, with a precast garage wrapped by the residential programs, with a total of 366 units and 513 parking spaces.

DESIGN INTENT:

The main challenge was going to mediate between site boundaries and its topography simultaneously. All building access were kept on the flattest portion which gave the opportunity of centralizing the garage and having immediate vehicular access to the existing road and providing 1 courtyard on each side.

MASTER PLAN RESIDENTIAL
ALEXANDRIA, VIRGINIA
24

ALEXANDRIA, VIRGINIA

DESCRIPTION:

This is a re-adapted Alexandrian site with approximately 400,000 GSF and 280 units. It has 2 underground garage levels and 6 stories above ground.

DESIGN INTENT:

The main courtyard is at ground level complementing it with an inner pedestrian connection. Each unit on ground level has its secondary access to the sidewalk creating an active streetscape. The brick aesthetic of the building also responds to its historic district surrounding.

UNION SQUARE MIXED-USE HOTEL NORTH CAPITOL, DC

DESCRIPTION:

This DC site is located adjacent to the North Capitol street with upper levels of hospitality use and retail on the ground level.

DESIGN INTENT:

The client wanted a more classical approach with some modern aesthetics. The conceptual process was intended to gather precedents, material samples and volumetric approaches to come up with multiple schemes for client presentations.

BUS BARN RESIDENTIAL
WMATA
25

DESCRIPTION:

A two weeks mixed-use design effort with a total of 9 stories and 2 basement levels. The building had multiples inner courtyards, roof terrace and a 1st level retail zone.

DESIGN INTENT:

This Waterfront project combines the exterior area and the proposed public plaza. The idea was to open the program and unit views towards the activities. In addition, waterfront restaurants were proposed in the marina basin. Its secondary side connections present a clear drop-off area in order to reach the heart of the program. The interior spaces consist of a fitness club, management offices, condominium and apartment. Some retail to the north, restaurants to the south and parking spaces. The typical floor plan maintains the apartment and condominium areas divided, each with its core and inner courtyards. The penthouse level has additional units and a infinity pool deck with its complementary amenities. The integrity of the building was meant to balance its massing on the sides and kept its opening as sharing zones.

SITE PLAN PLANS MASSING VIEWS SECTION & SITE STUDIES
POINT RFP WASHINGTON, DC
RIVER
26

SUNBURST AT DOMINION SQUARE FAIRFAX, VIRGINIA

DESCRIPTION:

This CDP submission was a 1-month design effort for a residential program with a total of 21 levels, 7 parking levels and 2 basement levels.

DESIGN INTENT:

Its location is in a triangular lot that is surrounded by mixed-use and multifamily buildings, the challenge was to spread the overall massing in a wider area of the block. This masterplan was divided between a base and an alternate option (each one consisted of Phase 1 and 2), which all was submitted at the same time. The intention was to have 2 residential massing’s with a shared vehicular access that managed the traffic outside of the main street. The design filters the parking levels by introducing the language of screens and softens the building massing by articulating the facade with balconies.

ARCHITECTURAL

SHADOW ALL YEAR STUDIES
PHASE 2 PLANS
SECTIONS & EXTERIOR MASSING/SITE VIEWS
27

SIBLEY PROTON CENTER WASHINGTON, DC

DESCRIPTION:

An RFP for custom graphics in CA phase, that lasted 2 months. It was a 1-person effort to study graphic possibilities for the following spaces: a public corridor, 3 nurse stations, 3 gantry spaces and a kid’s playroom.

DESIGN INTENT:

The idea was to bring naturalistic graphics throughout specific areas of the 3-story building that went along with the color palette of each area and at the same time brought a visual movement that identified each one. The 3 nurse stations are situated in adult and pediatric spaces. The initial idea was to relate them to recognizable landscapes, but after client meetings the process went to more abstract approach. The initial image was to be kept yet explore a zoom-in that achieved a softer image for the wall covers. For the kid’s playroom, adjacent to the front desk, the graphic explored the cloudscape, an idea that was inspired from the shape of the room. The curved graphics were placed in a manner that interacted with adults and a kid alike by referencing their average eye level heights.

4 7 3 6 1 2 5 PEDIATRIC PLAY
- OPTION 1
ROOM
NURSE
STATION TYP PLAN
KIDS PLAYROOM FINAL PHOTO 3 NURSE STATIONS GRAPHICS KIDS PLAYROOM GRAPHIC
FINISH PALETTES BY AREA & INITIAL GRAPHICS COLOR SCHEME KIDS PLAYROOM PLAN
28
29

THE OTIS MIXED-USE

RICHMOND, VIRGINIA

OFFICE: HCM

IN CHARGE OF:

Worked directly with PM to develop from SD to DD; life safety plans, fire wall assembly, types and code diagrams.

Generating unit sf chart and parking layout with tabulations.

Creating, setting and documentation for unit division and edge of slab plans.

Cartooning and DD development for all building circulation.

INVOLVED IN:

Involved on exterior general markups, plans overall/partial documentation and sections clean-up for SD/DD phase.

PROJECT STATUS: Completed

UHEALTH TOWER ENTRANCE COMPETITION

MIAMI, FLORIDA

OFFICE: STANTEC

IN CHARGE OF:

Graphic representation of site and interior spaces, which included: plans, elevations and sections.

Modeling proposed site, existing context and metro conditions.

Merging old drawing set into the Revit model for context data.

INVOLVED IN:

Overall project daily design team meetings.

Fast Revit 2D updates.

Final rendering retouch.

Daily individual design meetings with principal.

POTOMAC YARD-BLD 15/19 MIXED-USE

ALEXANDRIA, VIRGINIA

OFFICE: HCM

IN CHARGE OF:

Developing unit and building matrix for B15 and building diagrams for DSUP submission.

Unit layout development for B15.

INVOLVED IN:

Producing gross area plans and schedules.

Assisted on exterior and coordination.

Elevations material markups, charts and section clean-up.

Coordination of site with LA.

PROJECT STATUS: Construction

SIBLEY PROTON CENTER

WASHINGTON, DC

OFFICE: STANTEC

IN CHARGE OF:

Brainstorming for initial concept ideas that considered each finish palettes by spaces.

CAD documentation.

Graphic representation and Design booklet.

INVOLVED IN:

Worked directly with principal in the design process.

Overall project design meetings.

Participation on all client presentations.

PROJECT STATUS: Completed

BANNEKER HIGH SCHOOL COMPETITION

SHAW, DC

OFFICE: STANTEC

IN CHARGE OF:

Graphic quality of diagrams.

Initial hand sketch studies.

Revit modeling for 3D-printing production.

INVOLVED IN:

Organizing presentation format and content

Team brainstorming sessions and research for ideas.

Worked directly with designer and principals for conceptual development.

RIVER POINT RFP

WASHINGTON, DC

OFFICE: WDG

IN CHARGE OF:

Translating conceptual sketches of plan and sections into CAD.

Graphic representation of site, plans, sections and massing views.

Designing the waterfront plaza, exterior areas, restaurant orientation and massing.

Communication with landscape architect in order to incorporate the sketches into the courtyard areas.

INVOLVED IN:

Worked directly with principal in design process.

Assisted in Boma chart development for total estimation of units, square footage and floor levels.

30

1100 NY AVENUE RFP

WASHINGTON, DC

OFFICE: STANTEC

IN CHARGE OF: Building photography and as-built documentation.

Complete Revit modeling and initial set-up.

Graphic representation of axonometric design concept.

Image & furniture research for initial ideas in each space.

INVOLVED IN: Design process for initial concept ideas.

Storyboard tiling in InDesign layout.

Final presentation for the client.

PROJECT STATUS: Project awarded, in CA

SUNBURST AT DOMINION SQUARE

FAIRFAX, VIRGINIA

OFFICE: WDG

IN CHARGE OF: Translating conceptual sketches into CAD and documentation of supplementary information.

CAD presentation sheets layout for CDP submission and the graphic representation for: site, plans, sections and massing views.

Coordinating and adding consultants parameters into the project.

3D sketch-up modeling and all year shadow studies, including massing views.

INVOLVED IN: Worked directly with principal in design process.

UAB PROTON THERAPY CENTER

BIRMINGHAM, ALABAMA

OFFICE: STANTEC

IN CHARGE OF:

Extensive Revit modeling and documentation of site and building interior spaces that included RCPs, FFP, enlarged interior plans, elevations, millwork, building sections, typical details of building base, partitions, typical ceiling and mounting heights.

Development of sheet formatting and index setup.

Production and updates of project schedule.

Coordination with Civil/MEP drawings and other consultants.

Initial to final development of equipment specs.

Selection of all interior material palettes for each building area and samples requests to manufacturers.

Coordination of project rendering production, timeframe and retouching final rendered images to ensure quality.

Development of all supplemental graphic representations.

INVOLVED IN:

Weekly consultant (conference calls) and team meetings.

Participation on all client presentations.

Concept and design development of site, lobby and public spaces with principal designer.

Documentation of overall building plans.

All project phases including RFI and submittals.

PROJECT STATUS: Completed

HEFEI ION MEDICAL CENTER

HEFEI, CHINA OFFICE: STANTEC

IN CHARGE OF: Revit modeling and documentation of site and interior spaces (in metrics).

Coordination of grading with civil drawings.

Selection of all interior material palettes for each building area and sample requests to manufacturers.

Development of supplemental graphic representations.

Coordination of project rendering production, time-frame and retouching final rendered images to ensure quality.

INVOLVED IN:

Overall project design team meetings.

Participation on all client presentations.

Worked directly with principal designer on the development/ documentation of site, parking above/below grade, lobby and public spaces.

Production of design book, in both English and Chinese.

Concept to Design Development.

PROJECT STATUS: Completed

Participation on all consultant meetings until final submission.

31
UAB PROTON THERAPY CENTER 32
GEORGIA PROTON CENTER DELRAY PROTON CENTER PARK CENTRAL APARTMENTS 33
HEFEI ION MEDICAL CENTER 34
MD ANDERSON CENTER UM PROTON CENTER 35
B Architecture + Landscape Architecture + Other Fields Background in 34 - 47

THE HISTORIC GATE TO THE ENTRANCE OF BOCA DEL INFIERNO

from a regional experience to a phenomenological consideration

This design at Pozuelo (Guayama) aims to merge in one project, ecological and social considerations while taking advantage of the rich history of the site. The dry forest landscape is the predominant in this south region location. In addition, the geological formation of the area is half closed, since the area behaves as a peninsula that forms part of Jobos bay.

The main idea for the project is to simultaneously make use of the ecological and historical landscape, while presenting a program of ecolodges integrated to it. To achieve this, the history of the cultural landscape became the essence of the design strategy, presenting the additional element of black tourism, since the history of the bay is full of slaves, pirates and witchcraft anecdotes.

industrial presence community presence vial new spacial reconsiderations visual interaction + possible entrance to other site visits network on internal accessible connections MARITIME ENTRANCE TO OLD JOBOS PORT + VILLA PESQUERA MARITIME ENTRANCE TO OLD + NEW INDUSTRIAL SITE AREA posible guest village areas near Boca del Infierno entrance PLACE MAKING SCOPE “...en ríos de azúcar y de melaza. Prieto trapiche de sensual zafra, el caderamen, masa con masa, exprime ritmos, suda que sangra, y la molienda culmina en danza...” Danza Negra -Luis Palés Matos ENTRANCE OLD + NEW INDUSTRIAL SITE AREA JOBOS ECOBAY PARK JOBOS MARITIME ENTRANCE TO OLD JOBOS PORT + VILLA PESQUERA Mapping idea inventory Half-closed spatial experiences by adjoining programs Layers of residual edges condition Labyrinth experience develop by contraction vs. expansion + distance between turn changes Expansion area Programmed zones Resulting edges areas Historical area Industrial area Ecological area Community area Contraction area Turning of orientation Mayor concentration of turning changes
38
39
40
vertical garden in tensor pieces sitting furniture in private inner rain garden station for 1st stop of gray water stepping stone of artificial wetlands for 2nd gray
3 4 5 6 41
mayor biodiversity in ecological corridor wellness pavilion with yoga deck + healing garden

A CONSERVATORY BETWEEN ARCHITECTURE & DANCE

a space for the disperse stages scenery

This research started with an inventory of exiting spaces for the dance teaching in all of Puerto Rico which the evidence suggested were mostly private companies in rented locales & few public high schools. In addition, there was a study of comparison between the other scenic arts (music & theater), in order to recognize the absence of formal pedagogy at university level in the dance field.

The identified zone nourishes from a concentration of cultural programs, which differs from the rest of the Metropolitan area. The design approach promotes an active community with public spaces that help to minimize the elitist aspect that has alienated the art

the dance.

Currently there are two scenic arts that have bachelor’s degree at universities such as U.P.R., U.S.C. and the Conservatory of Music, while the branch of dance has no present program.

Meanwhile, there are many private companies in rented local spaces. The question relies if is possible to consolidate a design program that promote a public institutional unitersitie degree in the formal education of the arts in Puerto Rico.

“Art is the reflection of the society in which it manifest...is an artistic represataion

Meanwhile,
to
a
a
Currently there are two scenic arts that have bachelor’s degree at universities such as U.P.R., U.S.C. and the Conservatory of Music, while the branch of dance has no present program.
there are many private companies in rented local spaces. The question relies if is possible
consolidate
design program that promote
public institutional unitersitie degree in the formal education of the arts in Puerto Rico.
“Art is the reflection of the society in which it manifest...is an artistic represataion based on social, cultural, economic and political funda ments...presenting itself as an integral part of a historic colectivity...it
Parti Sketch Currently there are two scenic bachelor’s degree at universities U.S.C. and the Conservatory branch of dance has no present Meanwhile, there are many in rented local spaces. The possible to consolidate a design promote a public institutional the formal education of the “Art is the reflection of the society in which it manifest...is represataion based on social, cultural, economic and ments...presenting itself as an integral part of a historic Parti Sketch Lugo-Ferrer, Rodolfo J. (1994). Artes Plásticas en Puerto Rico. Yagrumal Model museum’s garden opening to corner of the block Floor plan idea of covers between buildings Idea of differentiation of the dancing studios from the other programs 27 Idea of based on social, cultural, economic and political fundaments...presenting itself as an integral part of a historic colectivity...it has always been the path in which individuals find identification with a Parti Sketch First design explorations of the initial process Trilogy concept of a spacial unity Model museum’s garden opening to corner of the block Floor plan idea of covers between buildings Idea of differentiation studios from Intentions of the covering in moments of sustainable solutions
that have such as U.P.R., Music, while the program. companies relies if is program that unitersitie degree in Puerto Rico.
Lugo-Ferrer, Rodolfo J. (1994). Panorama Histórico de las Artes Plásticas en Puerto Rico. Yagrumal # 2. Print. First design explorations of the initial process First design explorations of the initial process Trilogy concept of a spacial unity Model museum’s garden opening to corner of the block Floor plan idea of covers between buildings Idea of differentiation of the dancing studios from the other programs
27
Intentions of the covering in moments of direct sun as sustainable solutions of
42
43
44
CO.DA. PR ENTRANCE & PARK PUBLIC MUSEUM GARDEN ACCESS 45

Materials of representation: Diversity of types of colored ink.

Material of representation:

Completely use of black & red ink.

Material of representation: Completely use of colored pencils.

Materials of representation: Charcoal pencils mixed with colored pencils & ink.

54

Materials of representation: Diversity of types of colored ink.

Material of representation: Completely use of colored pencils.

Materials of representation: Charcoal pencil with watercolor area.

Materials of representation: Charcoal pencils mixed with colored pencils.

55

Material of representation: Completely use of pastels in colors. Exercise of studying movement of the fabric fall.

Material of representation: Completely use of pastels in colors.

Material of representation: Completely use of pastels in colors. Exercise of studying constant movement of the human body.

Material of representation: Completely use of pastels in colors. Exercise of studying contrast of clothes tectonic.

56

Material of representation: Completely use of pastels in colors. Exercise of studying contrast of clothes tectonic.

Material of representation: Completely use of pastels in colors.

Material of representation: Completely use of pastels in colors. Exercise of light and shadow effect on sculpture surface.

Material of representation: Completely use of pastels in colors.

57

This compilation of projects, throughout multiple portfolios, present how the search between space & form permeates as a philosophy of design across my different growing phases as a student. Likewise it has been a constant movement toward diverse learning environments in order to complement all the disciplines of interest with the purpose of forming a particular kinetic perspective of design.

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Portfolio & Resume of Vivian Maldonado-Freytes by Vivian Maldonado - Issuu