Portfolio

Page 1


portfolio

vinícius caramez de macedo

contact information viniciuscdemacedo@gmail.com @cvynii

Vinícius Caramez de Macedo

2022-2023

Andrade Residence

Folding Plaza

Collective Housing

High School and Middle School

2021-Current

projects

Andorra National Museum

Retrofit and Paraná State Library Annex 2024

Village of Affection (Mixed Use Building)

Weefor ARQ Shuffle

Tullinløkka Pavillion 2025

experiences

Federal University of Paraná (UFPR)

Bachelor’s in Architecture and Urbanism

Scientific Initation on Modern Venezuelan Architecture

Research on Carlos Raúl Villanueva’s Works

Formas de Habitar Extension

GIS mapping

Architecture I Project Discipline Monitor

Student Assistant to the Professor - Correction and Orientation of Projects

Organization of Architecture and Urbanism Academic Week at UFPR

Graphical and Social Media Team

Participation on 120 Hours Competition

Andorra National Museum Concept Design

Internship at Ateliê 01

Development and Graphication of Schematic Designs, Feasibility Studies, Legal Projects and Social Media

Participation on 120 Hours Competition

Tullinløkka Pavillion Concept Design

Second Place on 3rd Weefor ARQ Open National Competition

Brazilian Competition on Housing

software skills language skills

shuffle design concept

120 hours student competition

andrade residence

first architecture project

shuffle

A personal design concept of a residential apartment building wherein the neighbour’s roof is your terrace

The boundary curve of the plot defines a rail for the rotation of the units, said rotation shuffles every three stories, this effect produces larger terraces on the corner units, making them larger than the rest

The ground floor houses stores and a public plaza for a better interface with the bustling nature of the city center and still reserves space inside for the lobby

The condominial program for gatherings and the relaxation of residents is located on the attic, which has a clear view of the many public spaces around town

Solo Design Concept Study

Location: Curitiba, Brazil

Softwares Used: Rhino + Grasshopper + ArchiCAD + Photoshop

andorra national museum

120 Hours is an anual competition with the challenge of designing a project in 5 days.

The 2024 edition proposed a museum for Andorra, a city at the frontier of both France and Spain.

The demands were kept largely vague, freeing the participant up to employ whatever program, scale and structure they so chose. The exception being the obligation to include temporary and permanent exposition rooms.

Solo project Location: Andorra Softwares Used: Rhino + Illustrator + Photoshop

andrade residence

A house designed for the family “Andrade”, a fictitious family created for the process of the class.

In the class the students were tasked with creating characters for which our classmates would design. For the project in question, I was tasked to design for a family with a baker for a mother, a trucker for a father, a med student for a daughter and they had periodic visits from their extended family.

On this first experience with architecture there was the oportunity of dealing with the professional environment present in the family’s daily life.

Solo Project

Location: Curitiba, Brazil

Softwares used: ArchiCAD + Illustrator + Enscape

+3,10

concrete brick

aluminium flashing mastic

shading clay

concrete floor bedding

waterproofing blanket

rockwool

reinforced concrete slab

weefor ARQ

Second Place for the third open national architecture competition for the developer Weefor

This competition was for the design of an apartment building with a set of demands: A single core for vertical circulation, a percentage of private area that equaled 11 units per floor, natural ventilation for master suite bathrooms, the placement of a store on the ground floor, a set of condominial programs with pre-defined areas as well as a consideration as to the connection between the current and future competition developments, due to the fact that the next would have the neighbouring plot as its placement.

Shared Project

Location: Curitiba, Brazil

Applicant’s Contribution: Concept design team, modelling, unit design team, sections and diagrams

Softwares Used: ArchiCAD

natural ventilation

for natural ventilation the units were moduled on the presumption that there would be a rift between each one, where windows would be located

connections

an internal garden and ramps connect the current plot to the next development, just as a public square connects the project to the urban tissue. there is also natural ventilation for the underground garage, connecting it to the outside

insolation and water reuse

every unit receives natural sunlight, and the attic is equipped with a set solar panels. rainwater was to be collected on the attic’s roof and to be transferred to the underground garage for storage and reuse on the building

synthesis

all these decisions culminated on an L-shaped tower that opens itself for a public square and the next competition development

Each atom of that stone, each mineral flake of that night filled mountain, in itself forms a world. The struggle itself toward the heights is enough to fill a man’s heart. One must imagine Sisyphus happy

viniciuscdemacedo@gmail.com

- Albert Camus (1942)

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.