VICTORACEVEDO PROFESSIONALPORTFOLIO
I was born and raised in Brooklyn, NY. Growing up in NYC, I was always immersed in different cultures and constantly observed the changing world around me. As I grew older I found myself interested in the surrounding buildings, cultures and nature and how they come together. This has fueled my interest in how architecture shapes us and vice-versa.
I graduated in May of 2018 from Carnegie Mellon University with an accredited Bachelor’s degree in Architecture and a minor in Chinese Language and Culture. I have a strong interest in residential design and working with passivehaus and net zero design standards. While attending CMU, I took environmental/net zero energy graduate level courses as a way of further exploring these topics.
My minor in Chinese has helped me open up mentally and broaden my understanding of the world around me. Learning new languages has always been an interest of mine and through learning a language, your perception of the world changes. I have discovered words and emotions that don’t exist in the other languages I know as well as how certain traits and colors can have a certain perception in one society, but a completely different one in another. As I grow in the field of architecture, I would like to continue to explore and learn from different cultures while helping to shape my own. Continuing to push for a more integrated society where buildings and systems are better integrated to create a more sustainable and healthy living environment for both the world and occupants.
Avocet Tower
National Research Center for Health
Disparities at Howard University
Gadsden & Greene
Student Housing
Pan Am Shopping Center Redevelopment
UNIVERSITY PROJECTS
Moveable Community Porches
Bethnal Green Gasworks
Apartments
PROFESSIONAL PROJECTS
Avocet Tower 7373 Wisconsin Ave, Bethesda, MD (Phase CD, CA) 586,638 SF Office Tower, LEED-CS Platinum
Avocet Tower is a mixed-use development with 370,000 gsf class A office space, 220 key AC Marriott Hotel, and restaurant. The office portion of Avocet Tower has a unique footprint that features an offset core. This establishes a large, flexible, open floor plan with natural lighting for each floor. Office tenants have exclusive access to a 5,000-square-foot fitness center and a roof terrace with panoramic views of Washington, DC. The building features a variety of sustainable design features, including view glass windows, bio-retentions, EV charging stations, a 10,000 sf plaza with a water feature and bike storage room. My main responsibilities were to coordinate with consultants and subcontractors to solve issues in the field, review submittals, perform site visits, write field reports, and lead the documentation efforts for LEED which resulted in a LEED-CS Platinum certification.
D D ND1 N D ND N BHMP = 353 7512 A
WISCONSIN AVE
WAVERLY
157 - 11 1/2 1 53 5 / 8"
PROPERTY LINE 2 - 1" TO PRO PERTY L I NE 21 0 T O N DPS STAMP
MONTGOMERY AVE.
. WAVE RLY ST .
ST.
FIRETRUCKACCESS
AVOCET TOWER SITE PLAN
Prior to Covid-19, we toured the precast and curtain wall manufacturing plants to see materials that would be used on the project, reviewed mockups at both plants, and witnessed testing of the facade using the propeller of a plane. Due to Covid-19, overseas markets were shut down and as a result, the building design changed. I redesigned both the fitness center locker room and bike storage room, worked with interior designers to reselect finishes, and helped coordinate the moving of MEP systems due to added knock-out panels in the building for potential multi-floor offices. As the building progressed, I was sent out to create and review punch lists and ensure the contractor was making the appropriate repairs before closing out items. After the building opened, I was selected to be a speaker for a NAIOP sponsored tour of the building and its sustainable features.
CURTAIN WALL WINDOW TESTING
PUNCHED WINDOW TESTING PUNCHED WINDOW TESTING PRECAST MOCKUP
PUNCHED WINDOW MOCKUP
OFFICE LOBBY CONSTRUCTION PROGRESS PHOTO
OFFICE LOBBY COMPLETION PHOTO
2ND FLOOR EL. 17' 6" 1ST FLOOR OFFICE LOBBY EL. -2' 9" 3RD FLOOR EL. 26' 10" 4TH FLOOR EL. 36' 2" 5TH FLOOR EL. 45' 6" 6TH FLOOR EL. 54' 10" 7TH FLOOR EL. 64' 11" 8TH FLOOR EL. 76' 4 1/4" 9TH FLOOR EL. 87' 9 1/2" 10TH FLOOR EL. 99' 2 3/4" 11TH FLOOR EL. 110' 8" 12TH FLOOR EL. 122' 1 1/4" 13TH FLOOR EL. 133' 6 1/2" 14TH FLOOR EL. 144' 11 3/4" 15TH FLOOR EL. 156' 5" 16TH FLOOR EL. 167' 10 1/4" 17TH FLOOR EL. 179' 3 1/2" 18TH FLOOR HOTEL 14 EL. 190' 8 3/4" 19TH FLOOR EL. 202' 2" 20TH FLOOR EL. 213' 7 1/4" 21ST FLOOR EL. 225' 0 1/2" 22ND FLOOR EL. 237' 11 1/2" PENTHOUSE ROOF TERRACE EL. 250' 0" PENTHOUSE ROOF EL. 271' 3" OFFICE TOP 20 EL. 289' 4 21/32" PARKING LEVEL 1 EL. -18' 3" PARKING LEVEL 2 EL. -27' 9" H1 B H5 H.2 H.3 H.4 H6 E H.8 H.7 STAIR TRANSFER LEVEL EL. 7' 6" A D C 18'1 5/8" 12' 0 1/2" 12' 11" 11' 5 1/4" 11' 5 1/4" 11' 5 1/4" 11' 5 1/4" 11' 5 1/4" 11' 5 1/4" 11' 5 1/4" 11' 5 1/4" 11' 5 1/4" 11' 5 1/4" 11' 5 1/4" 11' 5 1/4" 11' 5 1/4" 11' 5 1/4" 10' 1" 9' 4" 9' 4" 9' 4" 9' 4" 10' 0" 10'3" 15' 6" 9' 6" 9' 11" 11' 4" PENTHOUSE MEZZANINE EL. 261' 4" 084413.A 084413.A 084413.A 107316.A 033000.F 083213.A 034500.A 084413.A 034500.A 033000.J 033000.F 077200.A 033000.C 92900.B 92900.B 033000.C 074214.23.A 074214.23.A 084413.A HOTEL 1/ LEVEL 1 EL. 0' 4" 2ND FLOOR EL. 17' 6" 3RD FLOOR EL. 26' 10" 4TH FLOOR EL. 36' 2" 5TH FLOOR EL. 45' 6" 6TH FLOOR EL. 54' 10" 18TH FLOOR HOTEL 14 EL. 190' 3/4" 19TH FLOOR EL. 202' 2" 20TH FLOOR EL. 213' 1/4" 21ST FLOOR EL. 225' 1/2" 22ND FLOOR EL. 237' 11 1/2" PENTHOUSE ROOF TERRACE EL. 250' 0" PARKING LEVEL 1 EL. -18' 3" PARKING LEVEL 2 EL. -27' 9" HOTEL 13 EL. 177' 7" HOTEL 12 EL. 167' 5" HOTEL 3 EL. 75' 11" HOTEL 4 EL. 86' 1" HOTEL 5 EL. 96' 3" HOTEL 6 EL. 106' 5" HOTEL 7 EL. 116' 7" HOTEL 8 EL. 126' 9" HOTEL 9 EL. 136' 11" HOTEL 10 EL. 147' 1" HOTEL 11 EL. 157' 3" H1 B H5 H.2 H.3 H.4 H6 E H.8 H.7 A D C HOTEL 2 EL. 65' 9" 12' 0 1/2" 12' 11" 11' 5 1/4" 11' 5 1/4" 11' 5 1/4" 13'1 3/4" 10' 2" 10'2" 20' 4" 10' 2" 10' 2" 20' 4" 10' 2" 10' 2" 10'2" 10'11" 9' 4" 9' 4" 9'4" 9' 4" 17' 2" 18' 7" 9' 6" PENTHOUSE MEZZANINE EL. 261' 4" 11' 4" 084433.C 085113.A 034500.A 034500.A 230000.B 280000.A 034500.A 107316.A 084413.A 084413.A 074214.23.A 033000.F 033000.J 033000.F 033000.J 2. FOR SPECIFIC ALUMINUM FINISH TYPES REFER TO SHEETS A4.10 -A4.13 A 123456789 10 11 12 13 14 15 16 17 18 B C D E F G H K M N P DPS STAMP P:\2015\20150359\d-7 drawings\d -7-1 revit\use rs\20150359_v17_Wi sconsin Ave_abbanm.rvt 2 1 2 0 1 9 1 2 0 7 : 4 1 P M P R O J E C T N U M B E R 2 0 1 5 0 3 5 9 P R O J E C T N A M E A V O C E T T O W E R S H E E T N U M B E R A 4 0 3B U L D N G S E C T O N S SCALE: 1/16" = 1'-0" A4.03 2SECTION EAST TO WEST SECTION SCALE: 1/16" = 1'-0" A4.03 1SECTION WEST TO EAST SECTION STRUCT.) 033000.J CAST-IN-PLACE CONCRETE (REFER TO STRUCT.) 034500.A ARCHITECTURAL PRECAST 074214.23.A COMPOSITE METAL PANEL 077200.A 36"x36" ROOF HATCH 084413.A GLAZED ALUMINUM UNITIZED SYSTEM 085113.A ALUMINUM WINDOW 089119.A ALUMINUM LOUVER (TYPE LV-1) 92900.B EXTERIOR GYPSUM BOARD WITH 1" PAINTABLE REVEAL (PITTCON; SWR-100-063) 107316.A GLASS AND STRUCTURAL ALUM. CANOPY 230000.B MECHANICAL FAN UNIT 280000.A EMERGENCY CALL BOX SYSTEM 2ND FLOOR EL. 17' 6" 1ST FLOOR OFFICE LOBBY EL. -2' 9" 3RD FLOOR EL. 26' 10" 4TH FLOOR EL. 36' 2" 5TH FLOOR EL. 45' 6" 6TH FLOOR EL. 54' 10" 7TH FLOOR EL. 64' 11" 8TH FLOOR EL. 76' 4 1/4" 9TH FLOOR EL. 87' 9 1/2" 10TH FLOOR EL. 99' 2 3/4" 11TH FLOOR EL. 110' 8" 12TH FLOOR EL. 122' 1/4" 13TH FLOOR EL. 133' 1/2" 14TH FLOOR EL. 144' 11 3/4" 15TH FLOOR EL. 156' 5" 16TH FLOOR EL. 167' 10 1/4" 17TH FLOOR EL. 179' 1/2" 18TH FLOOR HOTEL 14 EL. 190' 3/4" 19TH FLOOR EL. 202' 2" 20TH FLOOR EL. 213' 1/4" 21ST FLOOR EL. 225' 1/2" 22ND FLOOR EL. 237' 11 1/2" PENTHOUSE ROOF TERRACE EL. 250' 0" PENTHOUSE ROOF EL. 271' 3" OFFICE TOP 20 EL. 289' 21/32" PARKING LEVEL 1 EL. -18' 3" PARKING LEVEL 2 EL. -27' 9" 2 3 4 5 6 8.1 9 10 11 12 G 7 PENTHOUSE MEZZANINE EL. 261' 4" 18'1 5/8" 9' 11" 11' 4" 12' 0 1/2" 12' 11" 11' 5 1/4" 11' 5 1/4" 11' 5 1/4" 11' 5 1/4" 11' 5 1/4" 11' 5 1/4" 11' 5 1/4" 11' 5 1/4" 11' 5 1/4" 11' 5 1/4" 11' 5 1/4" 11' 5 1/4" 11' 5 1/4" 11' 5 1/4" 10' 1" 9' 4" 9' 4" 9' 4" 9' 4" 20'3" 15' 6" 9' 6" 089119.B 034500.A 280000.F 033000.J 033000.F 055813 084113.A 089119.B 084433.A 084413.A 074214.23.A 260000.C 033650.A 033650.A ATLANTA NEW YORK WASHINGTON © Alexandria, VA 22314 (703) 519-6152 coopercarry.com SCOPE DOCUMENTS The Construction Documents have not been complete therefore this drawing may be incomplete or not coordinated The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owne and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. Principal-in-Charge Project Manager Project Architect Staff Architect Project No. Date Drawing No. 123456789 10 11 12 13 14 15 16 17 18 A B C D E F G H J K L M N 2018 COOPER CARRY DPS STAMP Professional Certification. hereby certify that these documents were prepared or approved by me, and tha am duly licensed professional architect under the laws of the State of Maryland License No. 15754 Expiration Date: 03/29/2019 A4.04 02/01/19 20150359 STEVE SMITH STEVE SMITH JAMES SPENCER JOSHUA CRUZ BUILDING SECTIONS AVOCET TOWER 7373 WISCONSIN AVENUE ♦ AVOCET TOWER INVESTORS, LLC SCALE: 1/16" = 1'-0" A4.04 1SECTION NORTH TO SOUTH 051200.F STEEL BEAM (REFER TO STRUCT.) 055813 COLUMN COVER 084113.A WINDOW WALL (TYPE WND-1) 084413.A GLAZED ALUMINUM UNITIZED CURTAIN SYSTEM 084433.A STRUCTURAL GLASS WALL SYSTEM 089119.B ALUMINUM LOUVER (TYPE LV-2) 111200.C TRAFFIC ACCESS CONTROL /TICKET DISPENSER 220000.H TOPPING SLAB TRENCH CONNECTED TO DOWN SPOUT DRAINS 260000.C LIGHT FIXTURE AS SCHEDULED 280000.F RECESSED FIRE DEPARTMENT BOX 320000.B CHAIN LINK FENCE 320000.D OVERHEAD CHAINLINK GARAGE DOOR ISSUANCES No.Drawing Issue DescriptionDate PERMIT SET 02/01/19 EAST - WEST BUILDING SECTION NORTH - SOUTH BUILDING SECTION
Trellis Brise-soleil provides refuge from extreme sun exposure
Terrace and Green Roof
Provides access to nature in light-filled outdoor space, providing 360-degree views of the entire metro area
Responsible Materials
Implemented local and low-emitting building products
Native Plantings
Reduce potable water use and restore habitat for pollinator species
Bio-retention Collects rainwater to reduce strain on local stormwater system
View Glass
Reduces solar heat gain and glare, also improving energy efficiency
Biophilic Beauty
Statue inspired by birds in flight
LEED Platinum tower located in dense downtown Bethesda, MD
office tower
AVOCET TOWER PLAZA
AVOCET TOWER SUSTAINABLE FEATURES
ROOF TERRACE
Disparities at Howard University 2300 Georgia Ave, Washington, DC (Phase SD, DD) 179,170 SF Lab/Office Building with 235,000 SF of Future Additions
National Research Center for Health
The National Research Center for Health Disparities is a flexible multi-tenant, multi-phase lab/office building for researching and addressing health disparities in minority communities. The aim is to attract startups from within and outside of Howard as well as established biomedical operations looking to partner with the university’s faculty and researchers. During the second and third phases, plans include adding another 235,000 SF of Class A lab/office spaces, support, amenities, and retail to activate the Georgia Avenue corridor. Following weekly meetings with the client, my responsibilities included creating floor plan/elevation iterations based on client feedback, developing documentation for zoning, and revising area calculations.
MARKETING DIAGRAM
PHASE 2 -2ND FLOOR EL. 124' -6" PHASE 2 -3RD FLOOR EL. 139' -6" PHASE 2 -4TH FLOOR EL. 154' -6" PHASE 2 -5TH FLOOR EL. 169' -6" PHASE 2 -6TH FLOOR EL. 184' -6" PHASE 2 -AMENITY/PH EL. 200' -9" PHASE 2 PH ROOF EL. 220' -9" PHASE PARKING LEVEL EL. 89' -6" PHASE BRYANT ST. RETAIL LOWER EL. 102' -0" PHASE -2ND FLOOR EL. 126' -1" PHASE -3RD FLOOR EL. 141' -1" PHASE -4TH FLOOR EL. 156' -1" PHASE -5TH FLOOR EL. 171' -1" PHASE -6TH FLOOR EL. 186' -1" PHASE -AMENITY/PH EL. 200' -9" PHASE PARKING LEVEL 1 EL. 93' -4" PHASE -1ST/GRD. FLOOR EL. 114' -1" PHASE PH ROOF EL. 220' -9" PHASE PARKING LEVEL EL. 79' -6" PHASE 2A-STAIR TRANSFER EL. 115' -11" MEASURING POINT EL. 110' -9 3/8" MEASURING POINT EL. 110' -9 3/8" PHASE 2B PHASE 3 0" 20' 0" 16' 3" 15' 0" 15' 0" 15' 0" 15' 0" 8' 7" 13' 11" 12' 6" 10' 0" 89' 11 5/8" EL12 EL3 EL2 3' 8" EL1 EL5 EL6 46' 3/4" 20' 9" 12' 0" 15' 0" 15' 0" 15' 0" 15' 0" 14' 8" 20' 0" 0" 89' 11 5/8" 4' 0" 12' 0" 24' 0" 10' 0" SETBACK 20' 6" 12' 0" © 625 North Washington Alexandria, (703) coopercarry.com SCOPE DOCUMENTS The Contract Documents Issued for [Conceptual Design, Schematic Design, Design Development, Partial Construction Documents Issuance up to Issued for Construction] are intende to be development and as such, may be neither complete no coordinated.The [Construction Manager, Contractor, Design/Builder] is responsible complete and coordinated pricing [and execution] of the Work, include items necessary for the proper execution and completion Work, as shown, specified, reasonably inferred or equired Project.For Work of delegated designs; systems, assemblies, components and materials shall comply with national state requirements.The [Construction Manager, Contractor, Design/Builder] shall inform the Owner and Architect, in timely fashion, of any omissions, inconsistencies or errors in the Contrac Documents. Principal-in-Charge Project No. 5 7 9 10 11 12 13 14 15 16 17 18 B C D E F G H K L M N P B C D E F G H K L M N P 2022 THE CENTER FOR CONNECTIVE ARCHITECTURE Reserved for DCRA Stamp R e s e a r c h C e n e r f o r H e a t h D s p a t e s 2 0 2 2 0 6 5 R 2 1 H O W A R D L A BB L D G A R C H r v 20220065 BRENT AMOS EXTERIOR ELEVATION WEST -PHASE 3 NRCHD WASHINGTON, D.C. ♦ LOT 3 LAB LLC PROJECT NAME: NRCHD ELEVATION -WEST -PHA SE 3 KEYNOTES LEGEND KEY VALUE KEYNOTES EL1 EXTRUDED ALUMINUM HORIZONTAL BLADE SCREEN EL2 ULTRA HIGH PERFORMANCE CONCRETE PANEL U.H.P.C (TYP) EL3 CURTAIN WALL WINDOW SYSTEM EL5 SIDED SSG CURTAIN WALL WINDOW SYSTEM EL6 CUSTOM ALUMINUM MULLION EXTRUSION BY CURTAIN WAL MANUFACTURER EL11 OVERHEAD COILING DOOR EL12 6" WIDE CUSTOM METAL SCREENING ISSUANCES No.Drawing Issue DescriptionDate 40% DESIGN DOCUMENTATION ZONING SPECIAL EXCEPTIONS PHASE -1ST/GRD. FLOOR EL. 108' -4" PHASE -2ND FLOOR EL. 124' -6" PHASE -3RD FLOOR EL. 139' -6" PHASE -4TH FLOOR EL. 154' -6" PHASE -5TH FLOOR EL. 169' -6" PHASE -6TH FLOOR EL. 184' -6" PHASE -AMENITY/PH EL. 200' -9" PHASE PH ROOF EL. 220' -9" PHASE PARKING LEVEL EL. 89' -6" PHASE GEORGIA AVE RETAIL EL. 109' -6" PHASE 3 -2ND FLOOR EL. 126' -1" PHASE 3 -3RD FLOOR EL. 141' -1" PHASE -4TH FLOOR EL. 156' -1" PHASE -5TH FLOOR EL. 171' -1" PHASE -6TH FLOOR EL. 186' -1" PHASE -AMENITY/PH EL. 200' -9" PHASE PARKING LEVEL EL. 93' -4" PHASE 3 -1ST/GRD. FLOOR EL. 114' -1" PHASE 3 PH ROOF EL. 220' -9" PHASE PARKING LEVEL EL. 79' -6" A420 1 A421 A424 MEASURING POINT EL. 110' -9 3/8" MEASURING POINT EL. 110' -9 3/8" EL5 EL1 109' 11 5/8" 2' 3/8" EL3 EL4 EL9 80' 3" EL5 PHASE 3 PHASE 2A 47' 0" 4' 7" 4' 0" 89' 11 5/8" 20' 9" 12' 0" 15' 0" 15' 0" 15' 0" 15' 0" 14' 8" 20' 0" 0" 0" 20' 0" 16' 3" 15' 0" 15' 0" 15' 0" 15' 0" EL7 EL7 EL5 EL5 EL6 EL2 9' 0" 54' 8" EL2 SETBACK 20' 7" SCOPE DOCUMENTS The Contract Documents Issued for [Conceptual Design, Schematic Design, Design Development, Partial Construction Documents or Other Issuance up to Issued for Construction] are intende to be at that level development and as such, may be neither complete no coordinated.The [Construction Manager, Contractor, Design/Builder] is responsible for complete and coordinated pricing [and execution] of the Work, and shall include items necessary for the proper execution an completion of the Work, as shown, specified, reasonably inferred or equired for a complete Project.For Work of delegated designs; systems, assemblies, components and materials shall comply with national state and local requirements.The [Construction Manager, Contractor, Design/Builder] shall inform the Owner and Architect, in timely fashion, of any discovered omissions, inconsistencies or errors in the Contrac Documents. Principal-in-Charge Project Manager Project Architect Staff Architect Project No. Date Drawing No. A 1 3 5 7 10 11 12 13 14 15 16 17 18 B C D E F G H J K A B C D E F G H J K B M 3 6 0 / 2 0 2 2 0 0 6 5 N a o n a R e s e a r c h C e n t e r o r H e a h D s p a r i e s / 2 0 2 2 0 6 5 R 2 1 H O W A R D L A BB L D G A R C H r v t 1 0 / 1 5 2 0 2 2 7 : 1 2 : 4 8 P M A410 09/02/22 20220065 BRENT AMOS BRANDON DANKE JAMES SPENCER VICTOR ACEVEDO EXTERIOR ELEVATIONEAST -PHASE 3 NRCHD WASHINGTON, D.C. ♦ LOT 3 LAB LLC PROJECT NUMBER: 20220065 PROJECT NAME: NRCHD SHEET NUMBER: A410EXTERIOR ELEVATION -EAST -PHA SE 3 SCALE: 3/32" = 1'-0" A410 A231 1 PHASE 3 EAST ELEVATION ISSUANCES No.Drawing Issue DescriptionDate 40% DESIGN DOCUMENTATION 09/02/2022 ZONING SPECIAL EXCEPTIONS 09/02/2022 EAST ELEVATION WEST ELEVATION
TYPICAL OFFICE LAB LAYOUT AND PENTHOUSE
GROUND FLOOR PLAN
Gadsden & Greene Student Housing
University of South Carolina, Columbia, SC (Phase CD, CA) 650,000 GSF Mixed-Use Student Housing (938 Beds)
Gadsden & Greene is an on-campus student housing project at the University of South Carolina. The project includes a 12 story residential building with much-needed informal social and group meeting spaces, dining, and retail food options. With connectivity in mind, the buildings integrate with the surrounding community and downtown Columbia. Along the base of the building is space for future retail tenants. In addition, a 40,000 sf academic innovation center is planned for the primary corner of the building. This space will be a resource and amenity to the entire campus. During documentation efforts for this project, I was responsible for assigning and reviewing intern tasks, creating unit plans, modeling stairs and elevators, and beginning detailing efforts. As we moved into construction, my tasks included reviewing submittals, updating plans based on VE decisions, and preparing documentation and narratives for upcoming bulletins.
TYPICAL RESIDENTIAL FLOOR PLAN
COURTYARD RENDER
COURTYARD RENDER
Shopping Center Redevelopment Fairfax, VA (Phase SD, DD) Multi phase strip mall conversion into an upzoned mixed-use development PROJECT NO. Fairfax, Virginia © 2015 C C, . 625 North Washington Street, Suite 200, Alexandria, Virginia 22314 703 519 6152 703 519 7127 TOWNHOUSEOPENSPACEGARAGE/BOH/LOADING 0 50 N OVERALL SITE PLAN - RETAIL LEVEL BLOCK 4 EXISTING GAS STATION NUTLEY STREET LEE HWY EXISTING CEMETERY EXISTING RETAIL BLOCK 2 BLOCK 3 BLOCK 1
Pan Am
Pan Am Shopping Center is going through a proposed redevelopment to densify and introduce housing to a once single use development. The phasing of the project allows for tenants to be relocated into the new buildings while also allowing for construction to begin while other leases on the site are still active. The redevelopment includes 4 blocks of new construction as well as an extension of the Michael’s and a new CVS drive thru. I was involved in the development of block 3 and assisted the team in the development of unit plans and elevations for the site. The redlines shown on the floor plans were a collaboration between the project manager and myself, resulting in a progression of the plans through iterative idea sharing.
BLOCK 3 TYPICAL FLOOR PLAN LAYOUT WITH HAND DRAWN REDLINES
2 BEDROOM CORNER UNIT FLOOR PLAN
REVIT FLOOR PLAN WITH REDLINES ON TRACE
BLOCK 3 - ENLARGED TYPICAL
UP UP UP 24'0" 90' - 0 1/8" 30' - 0 1/8" 24' - 0" 36' - 0" 67'0" 5'0" 30' - 0" 5' - 0" 16' - 7" 02/23/2022Notes BLOCK 3 - ENLARGED UP UP UP 24'0" 67'0" 5'0" 30'0" 30' - 0" 5' - 0" 16' - 7" 34' - 2 5/8" PAN-AM SHOPPING CENTER Fairfax, Virginia
APARTMENT LEVEL PLAN UP UP 30'0" 16' - 7" 34' - 2 5/8" RESULTING FLOOR PLAN
PROJECT NO. 20200171.00 REVISION NO. 000 DATE 02/23/2022Notes PAN-AM SHOPPING CENTER Fairfax, Virginia © 2015 C C, . 625 North Washington Street, Suite 200, Alexandria, Virginia 22314 703 519 6152 703 519 7127
BLOCK 1 EAST ELEVATION AND INSPIRATION PHOTOS
BLOCK 1 - EAST ELEVATION / PRECEDENT IMAGERY 3D V IEWS
PROJECT NO. REVISION NO. 02/23/2022Notes
et, Suite 200, Alexandria, Virginia 22314 703 5
PAN-AM SHOPPING CENTER
BLOCK 3 - ELEVATION / PRECEDENT IMAGERY 3D VIEWS
BLOCK 3 SOUTH ELEVATION AND INSPIRATION PHOTOS
LEARN LOUNGE PLAY
Manchester, Pittsburgh, PA
Manchester Academic Charter School
The MACS school came to us to help them solve their challenge of having too many unused lots. Recognizing the potential to not only benefit the school community, but also the neighborhood as a whole, we developed a moveable piece that can be used to activate these once unused spaces. The porch design was inspired by the elaborate and colorful porches of the surrounding Manchester neighborhood. We worked with school faculty and students to get feedback on what kinds of uses were most desired and attended events at the school to build rappor t and assist in teaching the students new skills such as woodworking. As a monitor in the digital fabrication lab, I was in charge of fabricating all architectural elements including the columns. I also managed the budget and ordered all materials, cut the wood for the frame and helped sand/paint the elements. I created the following plan and axon to show how the porches can be used as a catalyst to redevelop an abandoned lot owned by MACS that was once a residence for a Tuskegee Airmen.
CONSTRUCTING THE FRAME
ASSEMBLING THE CANOPY
CNCING ARCHITECTURAL ELEMENTS
COMMUNITY EVENT
POST CNC COLUMNS
COMMUNITY EVENT
Existing Airplane Planters
Renovated Private Residence
Community Test Kitchen
Community Garden
Deck/Dining Area
Existing Trees With Added Benches
Tuskegee Airmen Museum / Community Space
DEVELOPING A COMMUNITY GARDEN/GATHERING SPACE WITH ADAPTABLE PORCHES
DEVELOPING A COMMUNITY GARDEN/GATHERING SPACE WITH ADAPTABLE PORCHES
MARKET STALL/ COMMUNITY BOARD TRELLIS FOR PLANTS/ HANGOUT SPACE OUTDOOR READING NOOK
1) Existing Structure
2) Extrude Void
3) Inner Atrium/Lightwell
4) Reduce Floorplate/ Increase Light
5) Egress
6) Balconies Act as Shading Devices
Building Structural System
7) Rotate Building/Increase Terrace and Ground Light
8) Structural System
9) Final Result
Building Egress System
London is currently confronting an affordability crisis and by choosing to develop underutilized and more unconventional sites, London will be able to increase its housing stock. The site contains two prominent gasometers (no. 2 and no. 5). Preservation of the gasometer’s structural steel/iron as a historical and cultural landmark allows for clear delineations of public and private spaces. Keeping these structures also creates opportunities to embed energy generation while simultaneously addressing variation in the urban fabric. Replicating the idea of exposed structure, the apartment design showcases the structure on the outside. The units rotate as they go up to help provide sun for the terraces and shade/rain protection for the hallways. This also allows each unit to have a unique view of the city.
TYPICAL RESIDENTIAL FLOOR PLAN
2-BEDROOM UNIT A
2-BEDROOM UNIT B
UNIT AXONS
3-BEDROOM UNIT
UNIT SECTIONAL PERSPECTIVE INTERIOR UNIT RENDERING
RENDER OF EXTERIOR HALLWAY