1 minute read

CONTRACTUALPERFORMANCE GOLDFIELDS SUPERPIPE

General

The performance of the Goldfields Superpipe Contract is assessed using six primary performance indicators which include maintenance, water quality monitoring and reporting and system performance. Monthly reports provide detailed performance against all contractual requirements.The Monthly Service Fee payments are calculated in accordance with the formula in the Project Deed

Advertisement

Volume

There was NO raw water transferred via the Goldfields Superpipe in 2022/23. (Note ~2MLwas transferred from Colbinabbin to Sandhurst during a pumping exercise)

Atotal of 890 ML was supplied via the Sandhurst Reservoir backflow pipeline into the Coliban Rural System.This supply was utilised to supplement Spring Gully Reservoir and Lockwood pipeline system.

This article is from: