E
D
C
B
A
(206)778 6878
OWNER: Kevin Thatcher, Eric Swenson, and Fausto Vitello.
0
0
0
DESIGNER: Thanh Vu 14418 42nd Ave S Tukwila WA, 98168 (206) 778 6878
1
Reference Grid
0
Wall centered on the Grid Line
0
CONTRACTOR SUB-CONSULTANT DESCRIPTION: Existing place is SKB architect's building to be converted to a Thrasher's skateboard shop.
DRAWING REFERENCE SYMBOLS
VICINITY MAP
Ref View Name 1 1
A101
1
DESCRIPTION
2
ISSUE DATE
NOTE: Center line of studs shall be located on Reference Grid Lines or centered between the Grid Lines unless otherwise indicated.
DRAWN BY: THANH VU
BUILDING REFERENCE GRID 1/4" = 1'-0"
THRASHER SKATEBOARD STORE
0
DRAWING INFORMATION
Interior elevation
1 Ref View Name
Room name
Room name
Room number
101 101 1t
North Arrow DRAWING REFERENCE SYMBOL 1/4" = 1'-0"
MATERIAL SYMBOLS
3
CLIENT: THRASHER'S OWNER
Sheet number
A101
001
Section number
SIM
PROJ. NO.:
1
PROJECT SITE: 2333 3RD AVE SEATTLE
DRAWING INDEX 4
Hard Wood Floor
2X2" Ceramic Tile
1
Cover Sheet A0.0 Title Page A1.0 First Floor Plan A1.1 Second Floor Plan A2.0 First Floor Reflected Ceiling Plan A2.1 Second Floor Reflected Ceiling Plan A3.0 First Floor Finish Plan A3.1 Second Floor Finish Plan A4.0 Building Sections A4.1 Building Sections (if needed) A5.0 Door and Window Schedules A5.1 Partition Types A6.0 Interior Elevations A7.0 Vertical Circulation A8.1 Details A8.2 Details E1.0 First Floor Electrical, Data and Communication Plan E1.1 Second Floor Electrical, Data and Communication Plan
3/23/2014 11:34:47 AM
1. All work shall conform to the requirements of the City and State of Rumford, Rhode Island and the International Building Code, 2003 Edition and with the requirements of other agencies having jurisdiction. 2. One copy of all building permits shall be submitted to the Architect. 3. Contractor shall verify all conditions and measurements at the project site. Any discrepancies with project drawings or documents shall be reported to the Architect. 4. All existing construction to remain shall be repaired to be in working condition, unless otherwise noted. 5. All dimensions are to finish face of masonry, face of concrete, centerline of steel, face of mill work, or fixtures unless otherwise noted. Dimensions are not adjustable without architect's approval unless noted as "+/-". Verify dimensions marked "V.I.F." prior to commencement of construction and notify architect in writing of any inconsistencies. 6. All dimensions, notes and details shown on one portion of a drawing shall apply typically to all opposite hand and/or conditions unless otherwise noted. 7. Contractor shall not scale drawings. Dimensions shall govern. Drawings at a large scale shall take precedence over drawings of a small scale. Details shall govern over plans, sections and elevations. 8. Contractor shall verify rough opening requirements with manufacturer's unit dimensions and requirements. Provide blocking or shims as required for installation. Where conditions prevent provision of required rough opening, specifics of the situation shall be reported in writing to the Architect. 9. All mounting of equipment, fixtures or accessories - including wall, floor and ceiling installation- shall be as required to meet provisions of the International Building Code and Rhode Island Building Code, 2003 Editions and manufacturer's instructions. In cases of differences contractor shall notify architect in writing. All casework shall be secured to support blocking at walls. 10. Contractor shall notify architect immediately of all utilities determined in the course of construction as being necessary to be removed which have not otherwise been noted for removal. Contractor shall remove such utilities only after consultation with the architect and owner. All utilities removed shall be disconnected, cut back to source and capped. All penetrations created by the removal of utilities shall be sealed to match adjacent construction and finishes. 11. Delays resulting from failure to supply submittals and information shall be the responsibility of the General Contractor. Appropriate stepsshall be taken to make up lost time. 12. Contractor shall maintain project identification sign as per Architect's direction. 13. Contractor shall protect area and new or existing materials and finishes from damage which may occur from construction, demolition, dust, water, etc. and shall provide and maintain temporary barricades, closure walls, etc., as required to protect the public during the period of construction. Damage to new and existing materials, finishes, structures, and equipment shall be repaired or replaced to the satisfaction of the Owner at the expense of the General Contractor. 14. Work areas are to remain secure and lockable during construction. Contractor shall remove all rubbish and waste materials of allsub contractors and trades on a daily basis and shall exercise strict control over job cleaning to prevent any dirt, debris or dust from affecting any finished areas in or outside the job site. Burning of debris on the site shall not be permitted. 15. Upon completion, the Contractor shall leave the premises and all affected areas clean and in an orderly manner ready for move-in. This is to include cleaning of all glass (including inside of exterior glass) and frames, both new and existing. 16. Contractor shall not proceed with any work requiring additional compensation beyond the contract amount without written authorization from the architect or owner's representative. Failure to obtain written authorization shall invalidate any claim for additional compensation.
PROJECT INFORMATION
Manufacturer Manhole Minimum Mirror Miscellaneous Movement Joint Module Line Masonry Opening Machine Screw Mounted Mullion North Not In Contract Number Nominal Not To Scale Overall On Center Outside Diameter (dim.) Office Opposite Hand Opening Opposite Overflow Scupper Piece Portland Cement Plaster Plate, Plastic Phase Plastic Laminate Plaster Plywood Pair Point Partition Pressure Treated Quarry Tile Riser, Radius Roof Drain Roof Vent Reference Refrigerator Reinforced Required Resilient Room Rough Opening Redwood Rain Water Leader South See Architectural Drawings Solid Core Seat Cover Dispenser Schedule Soap Dispenser Section Shelf Shower Sheet Similar Score Joint Specification Square See Structural Drawings Service Sink Stainless Steel Station Standard Steel Storage Structural Self Tapping Screw Suspended Symmetrical Tread, Telephone Towel Bar Top of Curb Telephone Terrazzo Tongue and Groove Thick Top of Parapet Top of Pavement Top of Steel Television Top of Wall Typical Unfinished Unless Otherwise Noted Uninterrupted Power Source Vertical Vestibule West With Water Closet Window Dimension Wood Without Where Occurs Waterproof Water Resistant Wood Screw Wainscot Weight
PROJECT INFORMATION
SHEET INFORMATION
Mfr. M.H. Min. Mir. Misc. M.J. M.L. M.O. M.S. Mtd. Mul. N. N.I.C. No. # Nom. N.T.S. O.A. O.C. O.D. Off. O.H. Opg. Opp. O.S. Pc. P.C.P. Pl. Ph. P. Lam. Plas. Plywd. Pr. Pt. Ptn. P.T. Q.T. R. R.D. R.V. Ref. Refr. Reinf. Reqd. Resil. Rm. R.O. Rwd. R.W.L. S. S.A.D. S.C. S.C. D. Sched. S.D. Sect. Sh. Shr. Sht. Sim. S.J. Spec. Sq. S.S.D. S.Sk. SSt. Sta. Std. Stl. Stor. Str. S.T.S. Susp. Sym. T. T.B. T.C. Tel. Ter. T.&G. Thk. T.O.P. T.P. T.O.S. T.V. T.W. Typ. Unf. U. O. N. U. P. S. Vert. Vest. W. W/ W.C. W.D. Wd. W/O W.O. W.P. W.R. W.S. Wsct. Wt.
Ref View Name
Acoustical Above Finish Floor Aggregate Aluminum Approximate Architectural Area Drain Americans with Disabilities Act Board, Bead Bituminous Backing Plate Building Block Blocking Beam Bottom Built-Up Cabinet Catch Basin Control Joint Ceiling Cement Ceramic Cast Iron Ceiling Clear Column Concrete Connection Construction Continuous Corridor Countersunk Double Department Detail Diameter Dimension Dispenser Down Door Opening Door Drawer Downspout Dry Standpipe Drawing Existing East, Electrical Each Expansion Joint Elevation Electrical Elevator Emergency Enclosure Electrical Panelboard Equal Equipment Electric Water Cooler Existing Exposed Expansion Exterior Fire Alarm Flat Bar Floor Drain Foundation Flat Head Finish Floor Fluorescent Face of Concrete Face of Finish Face of Studs Fireproof Frame Fiberglass-Reinforced Plaster Foot or Feet Footing Furring Gauge Galvanized Glass Grid Line Gypsum Wall Board Hose Bibb Hollow Core Hardwood Hardware Hollow Metal Horizontal High Point Height Inside Diameter (dim.) Insulation Janitor Joint Kitchen Laboratory Laminate Lavatory Laminated Plastic Ligh Maximum Metal Bolt Mechanical Membrane Metal
BUILDING REFERENCE GRID
Ref View Name
Acous. A.F.F. Aggr. Al. Approx. Arch. A.D. A.D.A. Bd. Bitum. Bkp. Bldg. Blk. Blkg. Bm. Bot. B.U. Cab. C.B. C.J. Ceil. Cem. Cer. C.I. Clg. Clr. Col. Conc. Conn. Constr. Cont. Corr. Ctsk. Dbl. Dept. Det. D Dim. Disp. Dn. D.O. Dr. Dwr. D.S. D.S.P. Dwg. (E) E. Ea. E.J. El. Elec. Elev. Emer. Encl. E.P.B. Eq. Equip. E.W.C. Exst. Expo. Exp. Ext. F.A. F.B. F.D. Fdn. F.H. Fin. Fl. Fluor. F.C. F.F. F.S. Fprf. Fr. F.R.P. Ft. Ftg. Furr. Ga. Galv. Gl. G.L. gwb. H.B. H.C. Hdwd. Hdwe. H.M. Horiz. H.P. Ht. I.D. Ins. Jan. Jt. Kit. Lab. Lam. Lav. L.P. Lt. Max. M.B. Mech. Memb. Met.
GENERAL NOTES
NOTES:
3/23/2014 11:34:47 AM E:\Studio 3\practice studio 3 FINAL.rvt
ABBREVIATIONS
THANH.VU@BELLEVUECOLLEGE.EDU
5
TITLE PAGE
3D SECTION
A0.0