ELSIESRIVIER
JANJIRA
EYECARE
SPRING SAVINGS
Shop 2A Janjira Centre • 308 Halt Road • Elsies River, 7490 OURNeWnO Tel: 067 959 8770 / 021 932 4105 Fax: 021 932 4106 • Email: janjiraeyecare@gmail.com
PACKAGE DEALS:
Single vision from R899 Bifocal from R999 Multifocal from R1499
COMPOST 15DM
Top up with changeable tinting for only R850 Or fixed tinting for only R200
WAS R16.95
NOW
Offer valid 31 October 2019. Visit us in store for more info.
Offer valid until 27 October2019
T&C’s apply. Lay-byes accepted. Most medical aids accepted. Cash special. While stocks last.
www.stodels.com
X1VTJ4F5-AL231019
Woensdag, 23 Oktober 2019 | Tel: 021 910 6500 | e-pos: nuus@tygerburger.co.za
@TygerBurger
X1VQVQQE-AL231019
TygerBurger 11 tydskrifte + 35 koerante
Netwerk24. Alles op een plek.
Teken in by www.netwerk24.com.
Repair work to this building will start in April next year. PHOTO: TARRYN-LEIGH SOLOMONS
BONTEHEUWEL: R19 MILLION UPGRADES PLANNED
New look for Bontas CBD TARRYN-LEIGH SOLOMONS @tarryns07
R
esidents of Bonteheuwel should get ready to see changes in the area’s central business district (CBD) soon. The town centre forms part of the City of Cape Town’s Mayoral Urban Regeneration Programme (Murp). The objective of the R19 million upgrade is to improve the general condition, func-
tionality, attractiveness and safety of the town centre. The Mayco member for urban management, Grant Twigg says the town centre in its current condition does little to encourage people to visit and spend time in the space. “The town centre is an important component of the MURP for Bonteheuwel as it is viewed by many residents as the heart of the suburb. It has the potential to play an important role in the day to day needs of the com-
munity. It has very little to offer to prospective investors. “The upgrade, together with accompanying initiatives which are linked to making the centre safe, clean, attractive (through beautification) and events and activations within the space, form part of the City’s holistic and integrated plan to revitalise the town centre. The idea is to encourage people to spend more time at the town centre and also to encourage investment into the area,”
says Twigg. The CBD upgrade work comprises of three components which include: . Public space upgrade – this comprise upgrading and revitalising the hard landscaping and forecourt of the library building, including a link to the subcouncil building as well as a multi-use play space that could facilitate different activities (both active and passive). V To page 2.
VALID UNTIL 30 NOVEMBER 2019 • MOST MEDICAL AIDS ACCEPTED • LAY-BYES ACCEPTED • PLEASE CALL FOR APPOINTMENT
Colour Contact Lenses
R220
BIFOCAL PACKAGE
Complete Specs
R650
R450
Designer and Budget Packages Available
X1VTEYVD-AL231019