Turf Matters May / June 2018

Page 28

WORLD CUP

Laurence Gale takes a look behind the scenes at the venue for the World Cup final to be held in Moscow in July

W

ith the FIFA World Cup less than two months away, many of the stadium venues will be focusing on ensuring their playing surfaces are fit for purpose and one venue in the spotlight will be the Luzhniki Stadium selected by the Russia 2018 FIFA World Cup committee as the venue for the final, which will be held on 15 July 2018. The original stadium was demolished in 2013 to give a way for the construction of a new stadium. The self-supported cover was retained. The facade wall was retained as well, due to its architectural value and later was reconnected to a new building. During the construction a brand new DessoGrass Master pitch was installed in 2015. GrassMaster is an ideal hybrid grass system for top-level tournaments, multifunctional sports pitches, venues with a busy schedule and state-of-the-art training facilities. A total of 20 million in-house produced High Performance Fibres (HPF) deliver a reinforced natural grass playing surface that is proven to 28 | Turf Matters | May-June 2018

last for up to 15 years or more. The job of looking after the pitch at the Luzhniki Stadium is down to Head Groundsman Vladislav Lysenko who has been employed at the club for 15 years, 12 in the role of Head Groundsman and, since 2014, in the role of consultant and a member of the RFPL commission for assessing the quality of football fields in Russia. The number of ground staff employed at the stadium varies between four and nine depending on the fixtures and quite often the weather conditions. Seasonal renovations are usually carried out during the winter break of fixtures in December, the success of the renovation work will go a long way to retaining a healthy tight sward going into the new year for the resumption of the championship and European cup fixtures. With over 30 games played at the stadium the use of their MDM Lighting rigs plays an important part in retaining grass cover particularly during the winter months. Maintenance of the pitch is centred on keeping the sward heathy by

mowing at a height of between 2328mm, mowing two to three times a week depending on conditions using a fleet of Dennis G860’s mowers. An ongoing programme of aeration, fertilising ,overseeding along with a good post game repair strategy of divoting, brushing and cleaning up with rotary mowers helps keep the pitch in good health. Feeding regimes are centred on providing a balance of liquid and granular feeding products such as COMPO, Florovit, ICL, YARA Mila. Vladisav has a comprehensive range of equipment supplied by iGo, Dennis, Toro, A.Carraro, SISIS, Redexim and Caiman which he uses as part of his maintenance programme. I am sure Vladislav Lysenko and his staff are going to be kept very busy in the coming weeks to ensure the Luzhniki Stadium pitch can cope with onslaught of this year’s FIFA World Cup matches and having the opportunity to produce the playing surface for this year’s World Cup Final being held at the Stadium.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Turf Matters May / June 2018 by Turf Matters & Landscaping Matters - Issuu