PORTFOLIO PEDRO Tunde

Content
• SEGRO V Park
Coordinated roofing models, as-built documentation, maintenance data
• Nigeria Extractive Industries Transparency Initiative HQ
Concept Development, 2-D Presentation, 3-D modelling, Design Visualization
• Nigeria-Sao Tome & Principe Joint Development Authority HQ
Concept Development, 2-D Presentation, 3-D modelling, Design Visualization
• Gusau Cargo Airport
Concept Development, 2-D Presentation, 3-D modelling, Design Visualization, Construction Documentation
• IBIS Hotel
Concept Development, 2-D Presentation, 3-D modelling, Design Visualization, Construction Documentation
• Interior WookWork Limited Factory
Concept Development, 3-D modelling, Design Visualization, Construction Documentation, Steel structure modelling and detailing
• Student Hostel , Vocational & Entrepreneurship Development Centre
Concept Development, 2-D Presentation, 3-D modelling, Design Visualization, Construction Documentation
Content
• Ornel Production Warehouse
3-D modelling, Design Visualization, Construction Documentation, Steel structure modelling and 2-D construction detailing
Schedules and Legends
Door, Window, Finishes Schedule. Door and Window Legend
• Interior WoodWork Office Furniture Modelling
Revit Furniture Family Modelling,
• Pedestrain Bridge Proposal
3-D modelling, Design Visualization



SEGRO V-PARK
Project Title Industrial Development
Location London
Team Eco Green Group
Role
• Align Roof BIM Models to BIM Execution plan.
• Structure BIM Data for Transition to Facility Management.
• Development of Roof Components BIM model
Software Used • Revit





The building of about 2,712 sqm on 24 floors and 76 meters high aims to achieve exemplary environmental quality with a strong emphasis on urban integration, energy performance, and user comfort.
A volume sculpted by the constraints of the site. The project evolved out of a contextual study reconciling the morphology of the block, urban regulations, and the building mass's exposure to solar gain






Transparency
Initiative HQ
Project
Title Nigeria Extractive Industries
Transparency Initiative
HQ Building (The Talking Drums)
Location CBD, Abuja, Nigeria
Building Are 2,560 sqm
Number of Floors 24 Floors
Team Conceptstudios
Limited
My Role
Software Used
• Concept Development
• 2D Presentation drawings
• 3D Modelling
• Design Visualization
• Revit






FIRST FLOOR (1ST-4TH Floor typical plan)


FIFTH FLOOR

SIXTH FLOOR



Project Title Nigeria-Sao Tome & Principe Joint Development Authority HQ
Location CBD, Abuja, Nigeria
Size 755sqm
Number of Floors 7 Floors
Role • Concept Development • 3D Modelling • Design Visualization
Software Used • Revit • Photoshop








GROUND FLOOR

UPPER GROUND FLOOR

