TREG Current Projects

Page 1


Active Investment Opportunities

Logan Station

Location: 1000 W 200 S Logan, Utah 84321

Status: Under Construction (Phase A)

Key Strategic Features:

o 182 luxury townhomes, 362 upscale apartments –location, amenitization, and energy will surpass anything else in the applicable market.

o 35,000 SF neighborhood grocer – highly curated, an immediate draw for the project and community.

o 19,000 SF retail – bringing additional food, lifestyle, and wellness to the doorsteps of residents and guests.

Broke Ground (Phase A): June 2024

Completion (Phase A1): June 2025

LP Investment Opportunity (Phase A): $6.0m

Total Development Costs (Phase A): $24.3m

The Logan Station project is leading the way in the development of the west side of Logan. With 1000 West providing quick access to the north and south ends of Cache Valley, it is quickly becoming a popular road for commercial tenants, including the recently-constructed Costco superstore. With premium finishes, incredible amenities, and thoughtfully curated retail tenants, Logan Station is positioned to become a premier destination in Logan, Utah for tenants and guests.

Logan Station: Master Site Plan

Phase A

68 Townhomes

200 SOUTH STREET

Logan Station Phase A: Site Plan

Phase A (under construction)

• 68 luxury townhomes

• 1+ acres of activated green space

• 2 car garages

• Pickleball and outdoor amenities

• Pedestrian and bicycle friendly

Phase B (design & pre-construction)

• 122 premium apartments

• 12,000 SF ground floor retail

• Covered parking

Future Development

• 35,000 SF retail grocery store

• 12,000 SF food service retail

• 15,000 SF of premium amenities

• Additional luxury residences

• Activated green space with neighborhood programming

River’s Edge

Location: 900 E Main Street

Tremonton, Utah 84337

Status: Pre-Construction (Phase 1)

Key Strategic Features:

o 203 townhomes, and 228 apartments with green space and park amenities along with direct to the Malad River walking and biking trails.

o 24,000 SF retail – offering premium locations thoughtfully curated retail, restaurants, and wellness

o 256 single family residential lots – horizontal improvements of the first 2 phases are complete, with the first phase completed and occupied.

Groundbreaking (Phase 1): Q3 2025

Completion (Phase 1a): Q3 2026

LP Investment Opportunity (Phase 1): $4.7m

Total Development Costs (Phase 1): $14.8m

The River’s Edge master planned community is already the premier living destination in Tremonton, Utah, with two phases of single-family residential lots finished and a third phase underway. As the retail projects, multifamily, and additional amenities are constructed –including a 7-acre city park and associated biking and walking paths –its popularity can only increase.

River’s Edge: Master Site Plan

River’s Edge MFR Phase 1: Site Plan

SFR Phase 1 & 2 (complete)

• 36 single family lots completed and sold, bringing energy to the area

MFR Phase 1 (pre-construction)

• 18 premium townhomes

• 36 premium apartments

• Premier location just off Main Street in Tremonton City near shopping, restaurants, and grocery.

Future Development

• 24,000 SF retail

• 220 single family lots

• 185 premium townhomes

• 192 premium apartments

• Premium clubhouse with pool area.

• 7-acre park, highly amenitized with active green space, sport courts, gathering areas, and walking trails.

Riverwest at Logan Gateway

Location: 100 W 800 S Logan, Utah 84321

Status: Pre-Construction

Key Strategic Features:

o 62 luxury apartments – prime location on the Logan River Trail within walking distance to Logan’s most popular restaurants.

o 70,000 SF office building – 100% leased and occupied, the office building is the focal point of the entrance to the downtown metro in Cache Valley, Utah.

o 12,000 SF retail – food and lifestyle tenants in place, including Chipotle, SuperChix, Zao Asian Café, and Tropical Smoothie Café.

LP Investment Opportunity: $5.0m

Total Development Costs: $16.8m

The Logan Gateway project has been a valuable addition to the Logan community. The Riverwest apartments will complete the wildly popular Logan River Trail, which will include a tunnel under Main Street that will connect the east and west sides of Main Street together for pedestrian traffic. Logan Gateway already boasts some of the most popular restaurants in the city, which will result in fantastic synergy with the Riverwest apartments.

Logan Gateway: Master Site Plan

Office

Riverwest at Logan Gateway: Site Plan

Phase I (complete)

• 70,000 SF office (fully leased and occupied; tenants include Thermo Fisher, Adams Wealth Advisors, and Prime International).

• 12,500 SF retail (fully leased and occupied; tenants include Chipotle, SuperChix, Tropical Smoothie Café, and Zao Asian Café).

Phase II (pre-construction)

• 62 luxury apartments

• Premium location on the Logan River Trail within walking distance of Logan’s most popular restaurants

• Luxury finishes throughout

• Activated green space

Future Development (Pre-construction)

• 8,000 SF food service retail

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
TREG Current Projects by Trivium RE Group - Issuu