Tai Pham_Part 2 Sample Portfolio 2023

Page 1

Architectural Assistant

(RIBA Part 2 MArch)

Tai Pham

Architectural Assistant (Part 2) - Tai Pham

Tel: 07478871455, Email: taipham29@hotmail.co.uk,

PERSONAL PROFILE

My current skill level BIM is at Levels 2 across RIBA STAGE 1-5, through the interactions between new challenges and my astute problem-solving, which identifies a strong vision.

Pro-active in delivering technical tender processes in social housing, commercial, industrial and data centres. Able to work on various scale plans, from master plans to detailed construction.

Critical thinking, curiosity and reflecting independently on various concepts, studies of model-making, drawings and digital modelling.

ARCHITECTURAL SKILLS

• PENCILS – Communication between Site and Design Conceptual.

• AUTOCAD – 2D Technical Drawings

• RHINO – 2D and 3D Drawings to Support Physical Modelling.

• V-RAY & 3DSMAX - Atmosphere Rendering

• SKETCH UP - 3D Modelling.

• INDESIGN – Presentation Format.

• REVIT – 3D Design Process.

• ILLUSTRATOR – Visual Adjustment.

• PHOTOSHOP – Visual Rendering.

ADDITIONAL

• Lumion – Rendering plug-in Revit.

• Enscape - Live rendering plug in Revit.

• Microstation - Drawings

• Twinmotion - Landscape Rendering

ARCHITECTURE RELATED EMPLOYMENT

ARCHITECTURAL PART 1 ASSISTANT at Hyphen

PROJECTS: Cloud House- Phase 2(2022-23) + Volta (2022-23)

RIBA 4-5 – Data Centre for Client and Subcontractor (Construction and As-built)

• Assisted with construction tender package of 5 storeys.

• Weekly meetings and coordination.

• Reviewing building regulations and spefications with client approval.

• Assisting as-built tender package.

• Snagging report on site visits.

OTHER PROJECTS:

RIBA 4, Amazon Warehouse: revised drawings from as-built visit.

ARCHITECTURAL PART 1 ASSISTANT at Conran and Partners

PROJECT: Porttobello Square Masterplan(2a to 3b) for 25 Months (2019-2021)

RIBA 1-4 - Housing Regeneration mixed use tenure of 1000homes.

• Assisted drawing packages for Pre-app, Meetings and Consultancy.

• Schedules building elements quantities, areas and costs.

• Produce diagrammatic and visual graphic for DAS.

• Modelling buildings parameters.

• Physical model making for bay studies

• Detailing construction for Phase 2

• Liaison building suppliers.

Other Project:

• Lower Marsh- Office (RIBA 3-4)

• Green Man Lane - 1200 homes (RIBA 2-3)

ARCHITECTURAL ASSISTANT at Medical Architecture (Summer 2019).

• Assisted the team in presenting the concept design of a hospital on Prince Edward Island, Canada.

• Illustrated local context - recreation, existing site, and hospitality.

ARCHITECTURAL INTERNSHIP TUTOR ASSISTANT (Summer in 2016 &2017).

• Worked along with a team of architects, timber construction, on-site assembled and disassembled for public cinema.

• Involved in making cynoprints on fabric for structure’s skin.

Phase2a Phase2b Data centre Phase3

Architectural Assistant (Part 2) - Tai Pham

Tel: 07478871455, Email: taipham29@hotmail.co.uk,

OWN PERSONAL DEVELOPMENT ACTIVITIES

MAKING FURNITURE

• Self-built softwood sheets for daily functional uses for home and office.

• Continue DIY using old and new materials for saving the cost and waste.

OTHER EMPLOYMENT

LASER/PRINT OPERATOR at London Metropolitan University (2017-2019) (2021-2022).

• Layout guide and helping clients to select the right material for their model making.

• Software mentoring provided to individuals to improve presentation skills.

• Provided advice to improve quality of print.

CUSTOMER ASSISTANT at Print Britannia (Summer 2017).

• Assisted senior team to deliver a large print.

• Dealt with customer enquiries and complaints.

• Delivered package to local customers.

• Organised selling products to increase sale,

• Helped customers to design business cards.

EDUCATION

London Metropolitan University – The CASS

• Part 2 MArch (2021-2023)

• Part 1 Architecture BA HONS, graduated 2019achieved First Class.

• Highgate Wood - (2014-2015)

• 2 A levels & BTEC. - Art, Mathematics and Business.

• John Loughborough School (11 GCSE’s)

INTERESTS

REFEREES

Name: Robert Scott (Senior Architect)

Tel: +44 (0)7980270488

Email: rob.scott@astudio.co.uk

AWARD

• ELAG Part I Shortlist Integrated Design Audit in 2018/19. (Sustainability Design).

FLUID FORMS SCULPTURE - I found myself fascinated by the manipulation of unexpected forms, leading to seamless possibilities. Paper allowed to explore form and construction of freedom.

More Activities:

• Cycling to work and study.

• DIY computer components.

• Photography - Lightpainting.

Name: Ingrid Petit (Associate)

Tel: +44(0)7580 271363

Email: ingrid@feildenfowles.co.uk

CLOUD HOUSE (PHASE 2)

Design: Data Centre

Location: Millhabour (Isle of Dogs)

GIA: 2100sqm RIBA: 4-5

The project comprises phase 2 fit out works to an existing recently refurbished data centre. This will include but not limited to. 3 new data halls – 1st, 2nd and 4th floor. 2 new generators to be located on the GF. New transformers to be located on the GF. Third floor LV switch rooms and battery rooms. Roof plant –additional condensing units. New services to the new rooms and to connect new equipment with existing

VOLTA

Design: Data Centre

Location: Great Sutton Str (Farringdon)

GIA: 700sqm RIBA: 4-5

5.420 5.600 5.600 BONNINGTON HOUSE BELLERIVE HOUSE 5.420 5.420 5.420 Rm0.09 Rm0.11 SBMVA Rm0.07 Gen Rm0.18 Gen Structural bracing Deliveries Unpacking Rm0.13 TX Build Room Rm0.20 Service Yard Rm0.14 Stair Core S0.02 Gen Rm0.15 Gen Rm0.16 Vent. Riser R0.01 Riser R0.15 Riser R0.02 Accesible WC Rm0.29 Reception Rm0.01 Build Room Rm0.22 Circulation Store Rm0.21 Cleaners Cupboard Rm0.28 Stair Core S0.01 Lift RD2.20 Customer Service Security Office Rm0.05 Sec. Lobby R0.03 Rm0.02 Structural bracing installation generators and reinstate the facade afterwards Wall FMC1 New plinths for plant D0.17.01 FMC1 D0.18.02 FMC1 D0.14.07 5.650 Align Align 910 appx. 1695 suit 125 appx. 1685 suit. 910 200fire dampers, nom.185mm deep, 200 surface (max.+-5mm) FMC1 FMC1 FMC1 FMC SW2 SW2 FMC1 FMC SW2 Align New dampers, nom.185mm deep, Fermacell lining, 12.5mm Fermacell lining, 12.5mm Fermacell ceiling, 12.5mm frame. 3900mm AFFL, max. Waffle soffit Waffle soffit above 4000 Appx. 760 suit avoid existing Appx. 760 suit Additional Fermacell shaftwalls FMC SW2 4200 avoid existing Fermacell ceiling, 12.5mm Fermacell board system frame. 3100mm from the top existing Deviation +5mm, -0mm. See note Fermacell ceiling, 12.5mm system frame. 3100mm from the top existing beams, supporting the generator. Deviation 5mm, -0mm. See note 7. Appx. 760 suit Appx. 760 suit 200 D0.14.06 700 5310 6720 5307 6730 6720 5250 6725 5233 6730 5175 6745 6755 5160 5310 EQ 2100 EQ 2100 4200 EQ 2100 EQ 2100 3900 3900 match Phase 1= appx. 1855 New finish Phase M&E equipment. Refer to M&E drawings for further detail. LEGEND: Phase walls Existing Phase walls WALL LEGEND: NOTES Existing & Phase 1 door numbers not shown for clarity. Provide wall penetrations for Phase Services. Provide fire stopping where services pass through fire seperating wall. Make walls good following services installations and decorate them to the required finish. Remove/open existing soffits/ceilings as required for installation of Phase services. Make ceilings/soffits good following services installation and decorate them to the required finish. Allow for works existing raised floor as necessary for installation Phase services, including any making good and new floor finishes. Details of partition heads under waffle soffits as per Phase to be agreed. Fire separation be maintained. Partitions and linings forming the enclosure of Phase attenuators to have maxium deviation +5mm -5mm from the dimensions stated. This is required by the attenuator supplier installer. Acoustic barriers in the ceilings over attenuators to be advised by AVK -60mm stone wool barrier per attenuator? Drawing dimensions of the existing walls are measured by Gratte Brothers on 18/10/2022 Attenuators outline London, EC1V 8BB +44 20 7940 3170 Phase AB01 Coordination Plan_00_Ground Floor Gratte Brothers Cloud House GB7863- HYP- -DR-GF-00101 8245 SCALE: 50 1 00_Coordination Plan_Ground Floor RevDescription ByCheckDate P01 Information TPJM25.07.22 P02 For Comments Discussion about TPJM09.09.22 P03 For Comments Discussion about TPJM30.09.22 P04 For Comments Discussion about TPJM08.11.22
0201 0201 0200 0200 0201 0201 Lift LIFT DATA HALL STAGING ROOM BREAK OUT ROOM ELEC. RISER STAIR 03 LIFT LOBBY ELEC. RISER COMMS. RISER COMMS. RISER M&E. RISER MECHANICAL RISER A STORE MECHANICAL RISER STAIR 01 PUMPROOM A PUMPROOM DATA HALL STAIR 02 MEETING ROOM STAIR 06 RADIATOR ROOM RADIATOR ROOM A FFL 0.540 FFL + 0.540 FFL 0.540 FFL 0.318 FFL + 0.025 FFL 0.025 FFL 0.540 Jane Street Office W1 W1 W1 W1 FFD003b FFD005a FFD007a FFD001a FFD004a FFD006a FFD003a FFD002a FFD008a FFD009a STORAGE COLD AISLE 0.000 FFD013 W1 FFL + 0.000 FFL 0.000 FFL 0.540 W1 FFL + 0.000 FFL 0.000 FFL 0.000 FFL 0.540 1600 50600 appx. 1530 P2 P1 W1 Lift call button 624 1100 Lift shown schematically based historical drawings, size and and position the call button and Mesh partition soffit with mesh door, access control emergency release button Not 750mm clear passage recommended for escape but given the nature the space, the low occupancy and the fact that there will be max. person the security lobby who can see out through the mesh partition we find this arrangement acceptable. Approved inspector's comments be sought P2 Single leaf door change P3 1175 625 FFD010d New partitions Existing walls/partitions/floor LEGEND W1 BG Gyproc Wallboard system A206142 Total thickness 122mm Gypframe 70 S 50 'C' Studs at 600mm centres Lining layers 12.5mm Gyproc Wallboard Insulation 50mm Isover APR Taped and jointed Required fire resistance 60 minutes Sound insultation Rw 50dB Max. height 4000mm Deflection head 20mm unless advised otherwise by structural engineer As confirmed by GB on 12.09.2022 scale from this drawing. The Hyphen Group Ltd Project Drawing Scale Date Author Checked London, EC1V 8BB +44 20 7940 3170 info@hyphen.archi AS BUILT AS1 100 @A1 Proposed Plan - 01_First Floor 11/22/22 TP JM 4 8488 Volta DC - 1st Floor XXXX-HYP-01-DR-A-0100 Gratte Brothers 100 1 Proposed Plan -01_First Floor Partition added RevDescription ByCheckDate AS1 AS-built TPJM28.03.23 P1 For Comments TPJM22.11.22 P2 For Comments TPJM13.12.22 P3 For Comments TPJM07.02.23

PORTOBELLO MASTERPLAN

Design: Mixed-use residential Location: Portobello Rd (Kensington) Homes: 1020 dwellings

RIBA: 2-4

Phase 3 offers a unique opportunity to ensure that the principles of re-establishing the historic street pattern are carried through, thus reconnecting the estate to the wider neighbourhood and promoting the importance of Portobello Road at its most northerly point. Importantly, this phase also offers the provision of a new community centre in a prominent location offering easy access to those from a range of local communities.

The proposals are an appropriate response to the local context and will be a positive contribution to the surrounding urban grain. Substantially improved public realm in and around the site with new pedestrian routes and open spaces will provide a new vibrant amenity to residents and local community. The site provides an opportunity to create a new heart for the neighbourhood, providing much needed residential accommodation and new community centre.

Neighbourhood square
CONRAN PARTNERS Date: WTN_WORNINGTON PH3_AREA SCHEDULE Revision: Summary Mix Notes: 1B1P 4B min targets revised 02 Block 5 totals this mix: 0 2 TOTALS – Phase 3: 1B1P 1B1P1B2P. 1B2P‐WA 2B3P‐WA 2B3P.2B3P+ 2B4P‐WA 2B4P.2B4P+3B4P3B5P.3B6P.4B7P.5B8P.5B9P. Social Rent Shared Ownership Market Sale 010220000001000 240 24 BLOCK 10a 611013011200000 0 727 34 BLOCK 10b 018110011000400 350 35 BLOCK 10c 0318001300122000 300 30 BLOCK 10d 01801001100022000 340 34 BLOCK 5a 01621001100020200 340 34 BLOCK 5b 01802001110030000 350 35 BLOCK 5c 01500200400000 210 21 21 BLOCK 8 561200084700070 0 0130 130 130 BLOCK 9 111708165014107003311200 2137157 377 3%45%2%4%1%0%4%28%0%0%9%3%0.5%0.0%0% 56.5%1.9%41.6% 100% Mix (by unit): 11 % Affordable: 2.9% Wheelchair units Target dwelling numbers by tenure: Target Wheelchair units:38 (10% of sitewide total) 198 10 149357 Wch units ‐ Block ‐10 28 15 ‐3 8 20 Wch units Block 0 (Over Target)(Shortfall)(Over Target)(Over Target) Wch units Block 10 Total Provided38 Dwellings by Phase: 0 Homes in Phase 1: 324 Homes in Phase 2: 319 Homes in Phase 3 (as above): 377 Homes in All 3 phases: 1020 3Bed + 4 Bed 47% 38% 12% 226 Totals 0.0% 58.4% 0 BLOCK 9 TOTAL MIX 142 46 178 NOTE: Work in progress issue: Updated to match drawing issue of 02.02.21, but requires further design development including coordination with consultants, which will result in some changes to areas. Subject to discussions with RBKC Planning, GLA and Building Control. Prepared for Catalyst Housing Group for design development. 3 5 Bed BLOCK 8 BLOCK 5b BLOCK 5c BLOCK 10a BLOCK 10b BLOCK 10c BLOCK 10d BLOCK 5a Tenure 1 Bed 2 Bed 1 Bed 2 Bed 3Bed S0‐P04x7d5.23b 12.02.2021 Minor updates on Apartment NIAs in Blocks 5&10. Updated mix in Block 9. Updated GIAs at Ground floor level to reflect revised design. Additional 5B9P in Block 5C 54 38 9 6 0 37 28 13.03 SUMMARY MIX MAXIMUM NUMBER OF HOMES Dual AspectSingle AspectTotalsNorth‐East facing apartments BLOCK 5&10 102 120 222 BLOCK 8 15 6 21 6 BLOCK 9 110 20 130 14 Totals 227 146 373 20 61% 39% 100% 5.4% Dual AspectSingle AspectTotalsNorth‐East facing apartments BLOCK 5&10 102 124 226 BLOCK 8 15 6 21 6 BLOCK 9 110 20 130 14 Totals 227 150 377 20
Public realm and frontage

LOWER MARSH TRINITY COLLEGE

Design: Mixed-use office

Location: Lower Marsh (Lambeth)

GIA: 1120sqm

RIBA: 3-4

This proposal is for a mixed-use development comprising retail to the ground floor frontage on to Lower Marsh and basement below; flexible retail to the rear of the site at ground and basment levels and office space to first, second, third and fourth floors. Retail at ground floor is in the spirit of Lower Marsh, contributing to the rich streetscape that has developed over the last century. The flexible retail unit has a frontage on to Granby Place and the potential to spill out on to part of the public realm.

Design: Student accommodation

Location: Trinity college (Bristol)

RIBA: 0

A cloister of flexible modules customisable to suit individual occupants, through to larger co-living spaces set around an existing mature cedar tree and copse where we have retained as many existing trees as possible.

LADYWELL GREEN MAN LANES

Design: Mixed-use residential Location: Green man lane (Ealing)

Homes: 920 dwellings

RIBA: 3

The mix of homes ranges from one-bedroom flats to four-bedroom apartments and houses. The first phase included a dramatic cyma curved frontage building that incorporates a community café and energy centre, signalling change for the area and instilling renewed pride for residents. The scheme is a flagship project for the Police’s Secured by Design initiative, creating safer neighbourhoods through design innovation, and was selected by CABE Design Council as a case study for successful community co-design.

Design: Mixed -use residential Location: Ladywell (Lewisham)

RIBA: 0 BID

94 7.03 GRANBY PLACE: URBAN CLOISTER-DRAFT 100 Level 114 - 118 Lower Marsh Design and Access Statement London Borough of Lambeth Conran and Partners
Illustrative proposed view north from Green Man Lane 64 Green Man Lane LLP Design and Access Statement Conran and Partners November 2020 DRAFT ISSUE
Public square
Legend: 01 02 03 04 06 07 THE COMMUNAL CLOISTER Mary checking whether the cabbages are ready to pick Dhia really pleased with this summer’s runner beans Giacomo is taking break from the studio Kev is making yet another alteration his bike! Stan is running make and mend session Fatima’s children are inventing new games Max looking forward day off - perhaps a spot of gardening... 11am. Saturday morning Romborough Gardens Allotments

BUILDING CITY AND LANDSCAPE: VENTURE SWELLING (YR5)

Design: Embassy Office and Residential

Location: Regents Park

GIA: 5600sqm

The proposed scheme is a re-creation of the formal composition’s context, favouring Nash’s early design vision, spiritually inviting to the urban enclave. Here, buildings discreetly blend into the landscape, having been conceived as a single entity. The low-carbon and light construction materials are embedded with culturally significant elements, such as the use of bamboo, in a journey to retrieve lost social-ecological biodiversity.

Master plan: A diagolue between proportion and lush gardens

Discreetly between existing trees that allow an interest and appreciation for its sub-tropical atmosphere.

26/05/2023 21:43:33

Encapsulated with magical escapes and traditional construction, integrated materials with collective significant elements from foreign countries. A sense of discovering fugitive plants and the fragrance of perfumed flowers, to seek a bridge of co-existence transformation between our activities and rest of good nature.

SCALE (@ A1) 100 22/05/2023 22:14:12
Expressing the innovation and craftsmanship of light construction Bamboo solid light construction for an alfresco zone Elevated upon the saddle stones Gazing at sculptures in a blurred horizon A nostalgia nature like living on a cliff, and generously open-air to the communal garden. Horizontal bamboo cladding is cocooned around the building

A DEMOUNTABLE STRUCTURE FOR RENTABLE WORKSPACE (YR4)

Design: Studio Office

Location: Walthamstow Wetland

GIA: 2400sqm

Context - proposal approproriate height

Retains existing landscape ground South facade Panorama view from external staircase Outdoor meeting/ Breakout space Water collection, garden, swales and secondary entrance West-north facade - connecting to the nature

CLIMATE FACADE

Design: Small Community Primary School.

Location: Group G - Mallorca, Spain.

GIA: 2074sqm

Threshold and solar shading

Context ground proposal Proposal scale of the classroom and the hall

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.