Jonathan Ting Selected Works

Page 1

jonathan ting selected works contents professional installation impact of one 16 mission bay block 9a 2 [mid-rise affordable housing] m residence 13 [residential] shurayrah hotel 9 [hospitality]

MISSION BAY BLOCK 9A

EAST
RENDERINGS
VIEW
BY MITHUN

CONSTRUCTION TYPE: BUILDING:

UNITS:

PROGRAMS:

TYPE I-B FOR-SALE AFFORDABLE HOUSING 148

UNITS, BIKE ROOM, YOGA ROOM, CONFERENCE ROOM, COMMUNITY ROOM, OUTDOOR TERRACE, CHILDREN’S PLAYGROUND

CONTRIBUTION:

DESIGN: COMMON SPACE, CORRIDOR, UNITS

PLANS/ELEVATIONS: EXTERIOR, PLANS, RCPS

COORDINATION: RCP, LANDSCAPE, MEP

SCHEDULES: DOOR, STOREFRONT, FINISH

FURNITURE: BUDGET, FLOOR PLAN

PHASES INVOLVED: SD, DD, CD, CA

NORTH ELEVATION

MATERIALS PALETTE

SOUTH ELEVATION

MATERIALS PALETTE

MATERIALS PALETTE

CONTRIBUTION: ELEVATIONS

RENDERING UNDERLAY BY MITHUN

JANUARY 2021
CHINABASINST MISSIONROCKST BAYVIEW
CAC MEETING
ENTRY OBBY RES DENT AL UN TS M SS ON ROCK ST CH NA BAS N ST Exposed Concrete Slab Edge Perforated Metal Panels Boardform Concrete with 2”x2” reveals Exposed Concrete Slab Edge Painted Dark Grey Exposed Concrete Slab Edge With Clear Sealer Exposed Concrete Slab Edge Painted Medium Grey Perforated Metal Panels Boardform Concrete with 2”x2” reveals Exposed Concrete Slab Edge Painted Light Grey MISSION BAY BLOCK 9A / CD & 100% SD SUBMISSION 3_R2 / OCTOBER 22, 2020 Exposed Concrete Slab Edge With Clear Sealer Perforated Metal Panels Boardform Concrete with 2”x2” reveals Exposed Concrete Slab Edge Painted Light Grey MISSION BAY BLOCK 9A CD & 100% SD SUBMISSION 3_R2 OCTOBER 22, 2020 MISSION BAY BLOCK 9A CD & 100% SD SUBMISSION 3_R2 OCTOBER 22, 2020 Boardform Concrete with 2”x2” reveals Perforated Metal Panels MISSION BAY BLOCK 9A CD & 100% SD SUBMISSION 3_R2 OCTOBER 22, 2020 58 Exposed Concrete Slab Edge With Clear Sealer Perforated Metal Panels Boardform Concrete with 2”x2” reveals Exposed Concrete Slab Edge Painted Light Grey EX T PA SAGEW AY MP ROOM M SS ON ROCK ST 0 20 40
MISSION BAY BLOCK 9A / CD & 100% SD SUBMISSION 3_R2 / OCTOBER 22, 2020 Window Mullions & Frame Exposed Concrete Slab Edge With Clear Sealer Perforated Metal Panels Boardform Concrete with 2”x2” reveals Exposed Concrete Slab Edge MISSION BAY BLOCK 9A CD & 100% SD SUBMISSION 3_R2 / OCTOBER 22, 2020 Painted Dark Grey Exposed Concrete Slab Edge With Clear Sealer Exposed Concrete Slab Edge Painted Medium Grey Perforated Metal Panels Boardform Exposed Concrete Slab Edge Painted Light Grey MISSION BAY BLOCK 9A / CD & 100% SD SUBMISSION 3_R2 OCTOBER 22, 2020 Exposed Concrete Slab Edge With Clear Sealer Perforated Metal Panels Exposed Concrete Slab Edge Painted Light Grey MISSION BAY BLOCK 9A CD & 100% SD SUBMISSION 3_R2 / OCTOBER 22, 2020 Exposed Concrete Slab Edge With Clear Sealer MISSION BAY BLOCK 9A CD & 100% SD SUBMISSION 3_R2 / OCTOBER 22, 2020 Boardform Concrete with 2”x2” reveals Perforated Metal Panels Interior Wood Wall Panels MATERIALS PALETTE Cement
MISSION BAY BLOCK 9A / CD & 100% SD SUBMISSION 3_R2 OCTOBER 22, 2020 Exposed Concrete Slab Edge With Clear Sealer Exposed Concrete Slab Edge Painted Medium Grey Perforated Metal Panels Boardform Concrete Exposed Concrete Slab Edge Painted Light Grey NTERS P19 PARK
MISSION BAY BLOCK 9A CD & 100% SD SUBMISSION 3_R2 OCTOBER 22, 2020 58 Window Mullions & Frame Exposed Concrete Slab Edge With Clear Sealer Perforated Metal Panels Boardform Concrete with 2”x2” reveals Exposed Concrete Slab Edge MISSION BAY BLOCK 9A / CD & 100% SD SUBMISSION 3_R2 / OCTOBER 22, 2020 58 Painted Dark Grey Exposed Concrete Slab Edge With Clear Sealer Exposed Concrete Slab Edge Painted Medium Grey Perforated Metal Panels Boardform Concrete with 2”x2” reveals Exposed Concrete Slab Edge Painted Light Grey MISSION BAY BLOCK 9A CD & 100% SD SUBMISSION 3_R2 OCTOBER 22, 2020 58 Exposed Concrete Slab Edge With Clear Sealer Perforated Metal Panels Boardform Concrete with 2”x2” reveals Exposed Concrete Slab Edge Painted Light Grey MISSION BAY BLOCK 9A CD & 100% SD SUBMISSION 3_R2 OCTOBER 22, 2020 58 Exposed Concrete Slab Edge With Clear Sealer Boardform Concrete with 2”x2” reveals MISSION BAY BLOCK 9A CD & 100% SD SUBMISSION 3_R2 / OCTOBER 22, 2020 61 Boardform Concrete with 2”x2” reveals Perforated Metal Panels Boardform Concrete with 2”x2” reveals Boardform Concrete with
Cement Plaster (Stucco) Perforated Metal Panels Boardform
Cement Plaster (Stucco) MISSION BAY BLOCK 9A / CD & 100% SD SUBMISSION 3_R2 / OCTOBER 22, 2020 58 Exposed Concrete Slab Edge With Clear Sealer Exposed Concrete Slab Edge Painted Medium Grey Perforated Metal Panels Boardform Concrete with 2”x2” reveals Exposed Concrete Slab Edge Painted Light Grey MISSION BAY BLOCK 9A / CD & 100% SD SUBMISSION 3_R2 / OCTOBER 22, 2020 ALT.2 PROPOSED: Pantone #173C ALT.1: Pantone #7579 C ALT.2: Pantone #4013C Painted Metal Accent Color Benjamin Moore 2014-10 Cement Plaster (Stucco) Benjamin Moore OC-17 Hardie panel (like East Facade) Window Mullions & Frame Benjamin Moore 2127-30 Exposed Concrete Slab Edge & Columns, With Clear Sealer ConcreteWall & Planters Painted Medium Grey Cement Plaster (Stucco) Benjamin Moore 1616 L P L P EX T E ECTR CAL TRA H B K ROOM P19 PARK BR DG V EW W AY A B F H G C J L D 20 40

CONTRIBUTION: 3D MODELING, DETAILING, MATERIAL RENDERINGS BY RENDERING TEAM

7

4 9 A7.11 7 A7.11 6 A7.11 FINISH CEILING SEE RCP STRUCTURAL SLAB, SSD WIRE HANGERS CONT LED STRIP LIGHT @ 45 DEGREE ANGLE, S.E.D. WP 2' MAX C-HANGER HEAVY DUTY T-RAIL FRAMING BEYOND DARK ANODIZED ALUMINUM INSULATION AT LEVEL 8 CEILING 2 1 / 2 WP 2"2" 1 3/4" CLEAR ANODIZED ALUM. FLAT BAR WITH CONCEALED FASTENERS TO MATCH L ANGLE CLEAR ANODIZED FRY REGLET DRMZ-625-625 5/8" GYP 1/2" Z-FURRING 4" 2 3 5 / 8 SCHEDULED PARTITION SEE PLANS CONT LED STRIP LIGHT @ 45 DEGREE ANGLE, S.E.D. 1 3/4" CLEAR ANODIZED ALUM. FLAT BAR WITH CONCEALED FASTENERS TO MATCH WP DARK ANODIZED AUMINUM 2 1/2" VERTICAL STUDS @ 16" 0.C. 2 1 / 2 " L ANGLE 2" 1/2" Z-FURRING CLEAR ANODIZED FRY REGLET DRMZ-625-625 5/8" GYP WP 2 3 5 / 8 BASEBOARD TO EXTEND INTO GYP WRAP 1/4" GAP GYP. WRAP PANEL, SEE FINISH SCHEDULE PARTITION, AS SCHEDULED 1 4 exists between information contained herein and the stamped, signed documents, the information on the signed doc uments is to be interpreted as correct. In addition, errors and discrepancies can be inadvertently introduced into electronic media by differing hardware, software and operators. upon part or in whole, for any future work on the same building(s) or site(s) or or any other project. The recipient of this information shall not copy, use or modi fy thisinformation without the prior written authorization of Mithun, Inc. The dr awings and/or data contained herein conform to Mithun,Inc.'s standard specification for sof tware and file format. Mithun, Inc. will review any request for providing data a different file format(s) if such request is made in writing by the ori ginal recipient. Such a request may be considered to be change in arising out of any unauthorized use, reuse or modification or in any way connected with, the incompati bility, readability, or durability of the information contained herein bythe recipient or any person or entity that acquires or obtains this information thereon from the reci pient without written authorization from Mithun, Inc. This agreement to defend, indemnif y and hold Mithun, Inc. harmless also applies to the use of this information on any pro ject or construction site without the involvement of Mithun, Inc. in the constr uction phase services normally MAYOR ED 17-02 PRIORITY PERMIT 5 / 2 7 2 0 2 2 6 1 4 : 4 1 P M 2 GYP. WRAP FRONT SECTION 5 GYP. WRAP SIDE ELEVATION 1" = 1'-0" 3 GYP. WRAP CUT SECTION 8 GYP. WRAP EDGE @ CEILING -SECTION DETAIL 6" = 1'-0" 9 GYP. WRAP EDGE @ WALL -PLAN DETAIL 3" = 1'-0" 6 GYP. WRAP BASE DETAIL 9 A7.11 7 A7.11 6 A7.11 FINISH CEILING SEE RCP STRUCTURAL SLAB, SSD WIRE HANGERS CONT LED STRIP LIGHT @ 45 DEGREE ANGLE, S.E.D. WP 2' MAX C-HANGER HEAVY DUTY T-RAIL FRAMING BEYOND DARK ANODIZED ALUMINUM INSULATION AT LEVEL 8 CEILING 2 1 2 WP 2"2" 1 3/4" CLEAR ANODIZED ALUM. FLAT BAR WITH CONCEALED FASTENERS TO MATCH L ANGLE CLEAR ANODIZED FRY REGLET DRMZ-625-625 5/8" GYP 1/2" Z-FURRING 4" 2 3 5 8 SCHEDULED PARTITION SEE PLANS CONT LED STRIP LIGHT @ 45 DEGREE ANGLE, S.E.D. 1 3/4" CLEAR ANODIZED ALUM. FLAT BAR WITH CONCEALED FASTENERS TO MATCH WP DARK ANODIZED AUMINUM 2 1/2" VERTICAL STUDS @ 16" 0.C. 2 1 / 2 " L ANGLE 2" 1/2" Z-FURRING CLEAR ANODIZED FRY REGLET DRMZ-625-625 5/8" GYP WP 2 3 5 8 BASEBOARD TO EXTEND INTO GYP WRAP 1/4" GAP GYP. WRAP PANEL, SEE FINISH SCHEDULE PARTITION, AS SCHEDULED 1 / 4 reason a conflict exists between information contained herein and the stamped, signed documents, the information on the signed doc uments is to be interpreted as correct. In addition, errors and discrepancies can be inadvertently introduced into electronic media by differing hardware, software and operators. used or relied upon n part or in whole, for any future work on the same building(s) or site(s) or or any other project. The recipient of this information shall not copy, use or modi fy thisinformation without the prior written authorization of Mithun, Inc. The dr awings and/or data contained herein conform to Mithun,Inc.'s standard specification sof tware and file format. Mithun, Inc. will review any request for providing data n different file format(s) such a request is made in writing by the ori ginal recipient. Such request may considered to be a change in arising or allegedly arising out of any unauthorized use, reuse or modification or in any way connected with, the incompati bility, readability, or durability of the information contained herein bythe recipient or any person or entity that acquires or obtains this information thereon from the reci pient without written authorization Mithun, Inc. This agreement to defend, indemnif hold Mithun, Inc. harmless also applies to the use of this information on any pro ject or construction site without the involvement of Mithun, Inc. in the constr uction phase services normally MAYOR ED 17-02 PRIORITY PERMIT 5 / 2 7 / 2 0 2 2 6 : 1 4 : 4 1 P M 1/2" = 1'-0" 2 GYP. WRAP FRONT SECTION 1/2" = 1'-0" 5 GYP. WRAP SIDE ELEVATION 1" = 1'-0" 3 GYP. WRAP CUT SECTION 6" = 1'-0" 8 GYP. WRAP EDGE @ CEILING -SECTION DETAIL 6" = 1'-0" 9 GYP. WRAP EDGE @ WALL -PLAN DETAIL 3" = 1'-0" 6 GYP. WRAP BASE DETAIL FINISH CEILING SEE RCP STRUCTURAL SLAB, SSD WIRE HANGERS CONT LED STRIP LIGHT @ 45 DEGREE ANGLE, S.E.D. WP 2' MAX C-HANGER HEAVY DUTY T-RAIL FRAMING BEYOND DARK ANODIZED ALUMINUM INSULATION AT LEVEL 8 CEILING 2 1 2 2"2" 1 3/4" CLEAR ANODIZED ALUM. FLAT BAR WITH CONCEALED FASTENERS TO MATCH L ANGLE CLEAR ANODIZED FRY REGLET DRMZ-625-625 5/8" GYP 1/2" Z-FURRING 4" 2 3 5 8 " SCHEDULED PARTITION SEE PLANS CONT LED STRIP LIGHT @ 45 DEGREE ANGLE, S.E.D. 1 3/4" CLEAR ANODIZED ALUM. FLAT BAR WITH CONCEALED FASTENERS TO MATCH WP DARK ANODIZED AUMINUM 2 1/2" VERTICAL STUDS @ 16" 0.C. 2 1 / 2 L ANGLE 1/2" Z-FURRING CLEAR ANODIZED FRY REGLET DRMZ-625-625 5/8" GYP 2 " 3 5 8 " BASEBOARD TO EXTEND INTO GYP WRAP RECESSED DOWNLIGHT, S.E.D. HEAVY DUTY T-RAIL WIRE HANGERS C-HANGER STRUCTURAL SLAB, SSD Mithun, Inc. Disclaimer Any information contained in these electronic files is for informational purposes only Recipient acknowledges that the information contained herein may either be in draft form or may be revised at any time. Accordingly, Mithun, Inc. makes no representations as to the accuracy of this information. If for any reason a conflict exists between information contained herein and the stamped, signed documents, the information on the signed doc uments is to be interpreted as correct. In addition, errors and discrepancies can be inadvertently introduced into electronic media by differing hardware, software and operators. All information contained in this electronic data prepared by Mithun, Inc. as instrum ents of service are the property of Mithun, Inc., which expressly reserves al ownership rights including any common law, statutory or copyrights. This elect ronic data isintended for use on the project specified, and shall not be used or relied upon n part or in whole, for any future work on the same building(s) or site(s) or or any other project. The recipient of this information shall not copy, use or modi fy thisinformation without the prior written authorization of Mithun, Inc. The dr awings and/or data contained herein conform to Mithun,Inc.'s standard specification for sof tware and file format. Mithun, Inc. will review any request services. The recipient agrees, to the fullest extent permitted by law, to defend, indemnify, and hold Mithun, Inc., its shareholders and employees, harmless from and against any claim liability, demands, losses, damages, penalties or cost (including attorney's fe es and defense costs, whether or not suit is filed) arising or allegedly arising out of any unauthorized use, reuse or modification or in any way connected with, the incompati bility, readability, or durability of the information contained herein bythe recipient or any person or entity that acquires or obtains this information thereon from the reci pient without written authorization from Mithun, Inc. This agreement to defend, indemnif and hold Mithun, Inc. harmless associated with such project. Your use of the attached/enclosed media, shall constitute an acceptance of the above. 6" = 1'-0" 8 GYP. WRAP EDGE @ CEILING -SECTION DETAIL 6" = 1'-0" 9 GYP. WRAP EDGE @ WALL -PLAN DETAIL 6" = 1'-0"
INTEGRATED RECESSED DOWNLIGHT DETAIL
7

BOLD

STRONG AND CONFIDENT IN FORM AND COLOR

CONFIDENT IN FORM AND COLOR

PARKLEX GOLD

parklex gold concrete

CONCRETE

bike racks

BIKE RACKS

mullions

PARKLEX GOLD

CONCRETE

FURNITURE COLOR

INTERIORS INSPIRATION: DECOMPRESSION FROM THE CITY furniture color

2021 DECOMPRESSION ZONE FROM THE CITY
BLOCK 9A INTERIORS | | 06 MAY
MBS BLOCK 9A INTERIORS | FURNITURE COLOR STUDY | 06 MAY 2021
palette
COLOR
BIKE RACKS MULLION FURNITURE
9A INTERIORS | |
MULLION

CONTRIBUTION: 3D MODELING, DETAILING, MATERIAL

RENDERINGS BY RENDERING TEAM

7

Hotel Arrival View

SHURAYRAH HOTEL plot 5

Dune landscape complementing the natural shape of buildings. Arrival as a discovery.

rendering by kkaa

BUILDING:

UNITS:

PROGRAMS:

HOTEL

250 TOTAL GUESTROOMS, SUITES, VILLAS, PUBLIC AREAS, MEETING BANQUET, FITNESS, SPA, OFFICES, RESTAURANT, CAFES

CONTRIBUTION:

CONCEPT: MAIN FLOOR PLAN

DESIGN: MAIN FLOOR PLAN, GUESTROOMS

PLANS: MAIN FLOOR PLAN, GUESTROOMS

PHASES INVOLVED: SD

CONCEPT: WAVE SCAPE

DRAWING INSPIRATION FROM THE WAVES FROM THE SURROUNDING RED SEA, THIS FLOOR PLAN AIMS TO BRING THE ORGANIC FLOW INTO THE INTERIOR ARCHITECTURE OF THE GROUND FLOOR.

CONTRIBUTION: FLOOR PLAN + CONCEPT MOOD BOARD

9
Kengo Kuma & Associates 50% Interior Concept Design Report 2019/08/25
TERRACED FLOOR LOUNGE COUNTER CRAFTMANSHIP DETAILS BLENDING INSIDE/ OUTSIDE
Arrival Lobby - Concept I WAVE SCAPE

GUEST ROOM FLOOR PLAN A

GUEST ROOM FLOOR PLAN B

bleached oak chestnut

sandstone

10 5x 10m Layout Rooms
4,750m 10m 5x 10m Layout
Kengo Kuma & Associates 50% Interior Concept Design Report R00- Plot 5 DRAFT 2019/08/25 25 Standard Type A Classical Standard Guest Rooms- Option A Classical type- Raw textures & delicate louvers Twin Basin 1.20m Sliding Screen Balcony layout to be updated (day bed + 800mm diam. table & 2 chairs Seating/ dinning Closet Bathroom KKAA Ginzan Hotel, Japan INTIMATE SPA Oak Screens Plastered Walls Materials Pallete - Option A Bleach Oak Oak Louvers Natural Fibers Carpet Sandstone
Standard Type A Classical
Rooms Standard Type B Island Standard Type A Classical
MOOD
oak louvers
natural fiber sandstone CONCEPT
BOARD
Standard Type B Island Standard Type C Stone Scape Kengo Kuma & Associates 50% Interior Concept Design Report R00- Plot 5 DRAFT 2019/08/25 31 Standard Type C Stone Scape Standard Guest Rooms- Option C Stone Scape Inspired - Softness & Hard contrasts Seating/ dinning Closet Bathroom Stone Scape Raw Linen Walls Plastered Walls Door Wood panel Balcony layout to be updated (day bed + 800mm diam. table & 2 chairs Kengo Kuma & Associates 50% Interior Concept Design Report R00- Plot 5 DRAFT 28 TV w/ articulation bracket Rattan Screens Furniture as accent KKAA Opposite House Hotel, Beijing SOFISTICATED CRAFTMANSHIP Balcony layout to be updated + 800mm diam. table & 2 chairs Materials Pallete - Option C White Oak Floor Marble Bathroom FFE Fabrics Raw Linen Walls Pallete - Option B Chestnut “Naguri” Sandstone Rattan Screens FFE fabrics GUEST ROOM FLOOR PLAN B white oak marble rattan screen ffe fabrics ffe fabric raw linen MATERIALS PALETTE MATERIALS PALETTE CONCEPT MOOD BOARD CONCEPT MOOD BOARD

M RESIDENCE

FIRM:

ROLE:

PROGRAMS:

Y.A. STUDIO / MPD DDESIGN

INTERIOR DEIGNER

REVIT, SKETCHUP, ADOBE SUITE, ENSCAPE

LOCATION:

BUILDING:

PROGRAMS:

NORTHERN CALIFORNIA RESIDENTIAL

LIVING, BEDROOMS, FOYER, SKI ROOM, GARAGE, KITCHEN, MUDROOM, OFFICE

CONTRIBUTION: DESIGN: BEDROOMS, BATHROOMS, GARAGE, LIVING ROOM, MUDROOM, SKI ROOM, OFFICE

PLANS/ELEVATIONS: INTERIOR, RCPS, FINISH

PLANS, ENLARGED

COORDINATION: ARCHITECT, CLIENT

PHASES INVOLVED: SD, DD, CD

SET: REVIT SETUP, MANAGEMENT, ARCH COORDINATION

13
LAUNDRY STAIR REFUSE 100 109 BUNK VEST 112 122 BUNK ROOM BED COVERED PATIO 118 SPA ID3.2 ID4.3 ID4.3 ID4.4 ID4.4 PLAY ZONES MUD ROOM 105 CLEARANCE: COORDINATE WITH ID4.1 ID4.5 COUNTER ID4.6 REF ID4.5 ID4.4 SHADES LEGEND ACCENT WALLS LEGEND WALL COVERING (POWDER ROOM) WALL COVERING (PRIMARY BEDROOM) Martine Paquin Design 2021 SHEET NO. TITLE: PRICING SET NOT FOR CONSTRUCTION JOB NO: 21019 JT, TH, SHH, CHECKED BY: MP-ID2.1 FIRST FLOOR PLAN 1/4" 1'-0" FIRST FLOOR PLAN WATER GARDEN SKI DECK SLOPE SIDE DECK 201 DBL. GARAGE BAY 104 ENTRY PATIO REC ROOM BUNK ROOM BED 113 BUNK ROOM BATH BATH 117 STAIR PER ARCHITECT PER ARCHITECT CONCRETE FLOOR PER ARCHITECT JOINTS CONCRETE, TYP. THRESHOLD TYP. FINISH LEGEND STEEL TITLE: ISSUANCE: PRICING SET NOT FOR CONSTRUCTION JOB NO: 21019 CHECKED BY: MP 8/24/2022 5:04:40-ID2.3 FIRST FLOOR FINISH PLAN FIRST FLOOR FINISH PLAN ID4.7 ID4.7 ID4.8 ID4.10 ID4.10 ID4.9 ID4.9 OUTDOOR DINING OUTDOOR LIVING 221 FIREPIT DECK GUEST SUITE GUEST BATH 214 W.I.C. 215 PRIVATE DECK PDR/GST BATH GUEST SUITE ID4.9 OPEN OPEN BELOW FLOOR DROP ID4.10 STAIR PER ARCHITECT ID4.9 ID4.1 CONFIRM SAUNA/HOT TUB? SHADES LEGEND BLACKOUT -ROLLERSHADES MOTORIZED -SINGLE ROLL RECESSED PERFORATED -SOLAR ROLLERSHADES MOTORIZED -SINGLE RO RECESSED ACCENT WALLS LEGEND WOOD 1x8 WOOD 1x6 RESILIANT SOLID PANELS WALL COVERING (POWDER ROOM) WALL COVERING (PRIMARY BEDROOM) PRECAST CONCRETE WALL -BOARD FORMED STEEL Martine Paquin Design 2021 ISSUANCE: PRICING SET NOT FOR CONSTRUCTION 8/24/2022 5:04:36-ID2.2 SECOND FLOOR PLAN 1'-0" SECOND FLOOR PLAN PANTRY NOOK 206 KITCHEN OUTDOOR DINING 222 OUTDOOR LIVING 221 FIREPIT DECK 220 BRIDGE GUEST BATH PRIVATE DECK 219 216 PDR/GST BATH GUEST SUITE 209 OPEN TO BELOW ARCHITECT DINING TITLE: ISSUANCE: PRICING SET NOT FOR CONSTRUCTION JOB NO: 21019 CHECKED BY: MP 8/24/2022 5:04:44-ID2.4 SECOND FLOOR FINISH PLAN 1/4" 1'-0" SECOND FLOOR FINISH PLAN
LEVEL 1: FLOOR PLAN
LEVEL 2: FINISH PLAN
2: FLOOR PLAN
LEVEL 1: FINISH PLAN
LEVEL

TITLE:

SECOND FLOOR ELECTRICAL PLAN OUTLETS (REF ONLY)

KITCHEN ELECTRICAL PLAN

COFFEE MAKER 2'8 1/2" 10' 2" 1' 0"2' 0" 2" 13' 8" 1' 0" 1 1/2" 2' 11 1/2"2' 11 1/2"2'0"2'0" 1 1/2" FREEZER WINE FRIDGE DRINK FRIDGE MICROWAVE 8'7" 2' 1" 6 1/2"1' 6"3' 1/2"1' 6"6 1/2" PANTRY NOOK KITCHEN 1/2" 1/2" 4"3' 0" 2' 6"2' 1/2" 1/2" 1' 4 1/4"1' 9"1' 9 1/2"1' 3/4" 2 1/2" 14' 8" STORAGE TABLE 3'-7 1/2" x 7'-3" 1' 9" 6" 1' 9" 42" BBQ REFRIGERATOR 2' 8" 1 1/2" 2' 8" 1 1/2" 2' 8" 1/2" 1' 3 1/4" 1/2" 1' 3 1/4" 2 1/2" 11' 1/2" BELOW: OVEN 1 1/2"2' 1/4"2' 1/4"2' 8 1/4"2' 1/4"2 1/4"1 1/2" 2' 1" 4'0" 2' 0" 3 1/2" 1' 2"1'0" 6' 11 1/2" 1 1/2"1' 11 1/2"1' 11 1/2"2' 6"1' 11 1/2"1' 11 1/2"3' 0"2 1/2" 1 1/2"2' 0"2' 0"3' 0"2' 0"2' 11 1/4"1' 5 3/4" 1/2" 3' 10 1/2" DISHWASHER TRASH 32" SINK DISHWASHER 3' 0" 4' 5 1/2" ROOMBA VACUUM PROJECT © Martine Paquin Design 2021 SHEET NO. TITLE: ISSUANCE: PRICING SET NOT FOR CONSTRUCTION JOB NO: 21019 DRAWN BY: JT, TH, SHH, SL CHECKED BY: MP PRINTED: FOR CLIENT REVIEW 8/23/2022 8/24/2022 5:05:28 PM MOORE RESIDENCE INTERIOR DESIGN LOT 17 MARTIS 2519150 GLADES PLACE, PLACER COUNTY, CA APN: 110660017 ID3.5 SECOND FLOOR ENLARGED PLANSSTAIR, NOOK, PANTRY, KITCHEN, DINING & BBQ 1/2" = 1'-0" 1 ENLARGED PLAN -STAIR NOOK / PANTRY KITCHEN / DINING BBQ NO.DESCRIPTION DATE OPEN TO BELOW DN STAIR PER ARCHITECT
END OF ISLAND SHEET NO.
NOTE: AT ISLAND, NO POPUP OUTLET OR AT
ISSUANCE: JOB NO: DRAWN BY: CHECKED BY: PRINTED: 1
ID2.10
NO.DESCRIPTION ENLARGED KITCHEN PLAN
15 OPEN TO BEYOND SERVE REFRIGERATOR 3' 1" 5'10" 1'3"3" 3'0" 5' 8 1/2" 2 1/2" RECESSED SHADE, S.A.D. FIXED SIDE PANEL CUPS/GASSESCUPS/GASSES OVEN COOKIE SHEET POTS/PANS SPICES POTS/PANS POT FILLER WINE GLASSES UTENSILS DISHES DISHES SILVERWARE SERVING WOOD PANEL HOOD 5'6" 8' 11" VERIFY WITH ARCHITECT 1' 0" 3' 0" GUARDRAIL PER ARCHITECT WINE FRIDGE DRINK FRIDGE FIREPLACE PER ARCHITECT RECESSED SHADE, S.A.D. 4'0" STEEL PLATE AT TOP AND SIDE OF CONCRETE WALL 3'0" 3' 0" 1' 6" 3" CUSHION 3'0" 3'0" PLUG MOLD LED STRIP LIGHT ON BEAMS DECORATIVE TRUSSES, S.A.D. 3'0" INTEGRAL DRAINBOARD DISHWASHER DISHWASHER TRASH LED STRIP LIGHT ON BEAMS PROJECT © Martine Paquin Design 2021 SHEET NO. TITLE: ISSUANCE: PRICING SET NOT FOR CONSTRUCTION JOB NO: 21019 DRAWN BY: JT, TH, SHH, SL CHECKED BY: MP PRINTED: FOR CLIENT REVIEW 8/23/2022 8/24/2022 5:06:14 PM MOORE RESIDENCE INTERIOR DESIGN LOT 17 MARTIS 2519150 GLADES PLACE, PLACER COUNTY, CA APN: 110660017 ID4.6 SECOND FLOOR ELEVATIONS - KITCHEN 1/2" = 1'-0" 2 KITCHEN ELEVATIONS 1/2" = 1'-0" 1 KITCHEN ELEVATIONS 1/2" 1'-0" 3 KITCHEN ELEVATIONS 1/2" = 1'-0" 4 KITCHEN ELEVATIONS NO.DESCRIPTION DATE OPEN TO BEYOND SERVE REFRIGERATOR 3'1" 5' 10" 1'3"3" 3' 0" 5'8 1/2" 2 1/2" RECESSED SHADE, S.A.D. FIXED SIDE PANEL CUPS/GASSESCUPS/GASSES OVEN COOKIE SHEET POTS/PANS SPICES POTS/PANS POT FILLER WINE GLASSES UTENSILS DISHES DISHES SILVERWARE SERVING WOOD PANEL HOOD 5' 6" 8'11" VERIFY WITH ARCHITECT 1'0" 3'0" GUARDRAIL PER ARCHITECT WINE FRIDGE DRINK FRIDGE FIREPLACE PER ARCHITECT RECESSED SHADE, S.A.D. 4' 0" STEEL PLATE AT TOP AND SIDE OF CONCRETE WALL 3' 0" 3'0" 1'6" 3" CUSHION 3'0" 3'0" PLUG MOLD LED STRIP LIGHT ON BEAMS DECORATIVE TRUSSES, S.A.D. 3'0" INTEGRAL DRAINBOARD DISHWASHER DISHWASHER TRASH LED STRIP LIGHT ON BEAMS PROJECT © Martine Paquin Design 2021 SHEET NO. TITLE: ISSUANCE: PRICING SET NOT FOR CONSTRUCTION JOB NO: 21019 DRAWN BY: JT, TH, SHH, SL CHECKED BY: MP PRINTED: FOR CLIENT REVIEW 8/23/2022 8/24/2022 5:06:14 PM MOORE RESIDENCE INTERIOR DESIGN LOT 17 MARTIS 2519150 GLADES PLACE, PLACER COUNTY, CA APN: 110660017 ID4.6 SECOND FLOOR ELEVATIONS - KITCHEN 1/2" = 1'-0" 2 KITCHEN ELEVATIONS 1/2" = 1'-0" 1 KITCHEN ELEVATIONS 1/2" 1'-0" 3 KITCHEN ELEVATIONS 1/2" = 1'-0" 4 KITCHEN ELEVATIONS NO.DESCRIPTION DATE OPEN TO BEYOND SERVE REFRIGERATOR 3' 1" 5'10" 1' 3"3" 3'0" 5' 8 1/2" 2 1/2" RECESSED SHADE, S.A.D. FIXED SIDE PANEL CUPS/GASSESCUPS/GASSES OVEN COOKIE SHEET POTS/PANS SPICES POTS/PANS POT FILLER WINE GLASSES UTENSILS DISHES DISHES SILVERWARE SERVING WOOD PANEL HOOD 5'6" 8' 11" VERIFY WITH ARCHITECT 1' 0" 3' 0" GUARDRAIL PER ARCHITECT WINE FRIDGE DRINK FRIDGE FIREPLACE PER ARCHITECT RECESSED SHADE, S.A.D. 4'0" STEEL PLATE AT TOP AND SIDE OF CONCRETE WALL 3'0" 3' 0" 1' 6" 3" CUSHION 3' 0" 3' 0" PLUG MOLD LED STRIP LIGHT ON BEAMS DECORATIVE TRUSSES, S.A.D. 3' 0" INTEGRAL DRAINBOARD DISHWASHER DISHWASHER TRASH LED STRIP LIGHT ON BEAMS PROJECT © Martine Paquin Design 2021 SHEET NO. TITLE: ISSUANCE: PRICING SET NOT FOR CONSTRUCTION JOB NO: 21019 DRAWN BY: JT, TH, SHH, SL CHECKED BY: MP PRINTED: FOR CLIENT REVIEW 8/23/2022 8/24/2022 5:06:14 PM MOORE RESIDENCE INTERIOR DESIGN LOT 17 MARTIS 2519150 GLADES PLACE, PLACER COUNTY, CA APN: 110660017 ID4.6 SECOND FLOOR ELEVATIONS - KITCHEN 1/2" = 1'-0" 2 KITCHEN ELEVATIONS 1/2" 1'-0" 1 KITCHEN ELEVATIONS 1/2" 1'-0" 3 KITCHEN ELEVATIONS 1/2" = 1'-0" 4 KITCHEN ELEVATIONS NO.DESCRIPTION DATE KITCHEN ELEVATIONS

impact of one

diffa’s (design industries foundation fighting aids)

annual diffa by design fundraising event.

$2500

the impact of one: can you sense the growth of a united society through the influence of the individual? the enlightening of the individual about hiv/aids contributes to a broader understanding and support of one another. we are stronger together when walls are broken down and questions answered.

durodola ajayi, sara herrera, atique rahman, jonathan ting

faculty mentor: ian gordon

design mentors: input creative studio

completion: 2020

client budget concept team contribution

3d modelling, material sourcing, budgeting, woodwork & building

16
unfinished wood red velvet led strips metal conduit interior build process
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.