Feeney Design Rail Horizontal Cable Install Guide

Page 1

ALUMINUM RAILING INSTALLATION INSTRUCTIONS

v2012

Horizontal Cable Systems 1) Check Contents Of Packages: Verify that all parts have arrived and that they match the packing list. 1A) Coastal applications: Confirm grommets fit post holes and isolation pads are correct for your system.

Terminal Post 9/32” holes

HH Cap

Intermediate Posts 3/16” holes

3/8" Lag Bolt

2) Anchor Posts: Position all main posts (space EE posts a maximum of 5’ or 6’ on center - depending Washer on system). The posts for the Threaded Terminal fittings (with 9/32” holes) and the posts for the Quick-Connect ®SS fittings (with 3/8” holes) should EE be positioned at opposite ends, and the intermediate Surface Washer Mounting 3/8" posts (with 3/16”) holes positioned in between. Lag Bolt Remember, you must have a minimum of 3” of thread HH penetration into solid wood for proper attachment; additional Cap wood blocking and/or longer bolts may be required. Expansion anchors can be supplied for concrete base. Post Cap • Surface mounting: anchor each post using provided hardware (see detailed sheet included in your order ) with retaining washers and large plastic caps. • Fascia mounting: anchor each post using provided hardware with retaining washers and large plastic caps. Finish with an internal post cap by pre-drilling post & screwing a H screw through the side of the post and cap flange to secure cap. If you are mounting posts using the stanchion mount or fascia bracket mount methods, please call for additional installation details. 3) Cut & Snap Cap Rails: Cut the cap rail to length and then snap it into position on top of the posts. Be sure 90˚ to attach decorative end plates (see step #5) to any ends that butt-up against a wall face or that have limited access. • Butt splices: always cut the cap rail at 90 degrees and center the joint over a post. Use a rectangular splice plate with four H screws to secure this joint. • Mitered joints with double corner posts: the cap rail will extend past each of the corner posts and the 45˚ actual miter joint will be unsupported. Remember to cut each cap rail miter at 1/2 the total corner angle (i.e. if the corner angle is 90 degrees, cut each miter at 45 degrees). Add one splice plate to connect and stabilize the miter joint. Insert the plate before setting the two rail sections down of top of the posts; use eight (8) H screws to secure the splice plate to the rails.

QC Post 3/8” holes

H Screw

Fascia Mounting bolt number & pattern varies, depending on your system

Butt Splice

90˚

H Screws From Below

Splice Plate

Double Corner Post Miter Splice Plate

45˚ H Screws

From Below Single Corner Post Miter

• Mitered joints with single corner posts: cut each cap rail miter at 45˚ 45˚ 1/2 the total corner angle (i.e. if the corner angle is 90 degrees, cut each miter at 45 degrees) Center the joint over the corner post. Add one splice plate to connect and stabilize the miter joint. From Insert the plate before setting the two rail sections down of top of Below the ost; use eight (8) H screws to secure the splice plate to the rails. Also, on each side of the miter cut, screw a H screw through the cap rail flange and into the post face. continued on next page

H Screws

Splice Plate


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.