S t r a t e g i e s
P R O G R A M & Our project comes alive through three stages. First one consists of cleaning and expanding the drain. The cleanup is because water is planned to be seen as a point of convergence for users and can also be reusable. Its expansion is due to flood avoidance and water stagnations. The second stage goes more towards the mobility of the area. Today the car is the protagonist of our streets and this causes many environmental and fluidity problems. Non-motorized
P H A S E S
transport must be the basis of any urban planning project and this is why we created a road axis that respects pedestrians and bicycles that perfectly joins car roads. The third stage breaks down the design of public space. We take the drain as the central axis for the design of a linear park, which is complemented by another convergence space in the existing wetland area. It is here where water becomes the guiding axis for social cohesion in the area.
2 6