Builders choice magazine september 2013

Page 42

THE BUILDERS CHOICE commercial

The St John Wundowie project was one aimed at producing a modern energy efficient building which provided comfort of occupancy, a reduction in ongoing operational costs and a continuation of the long standing interaction between St John and the surrounding communities it serviced.

TEMPFENCE

TEMPORARY FENCING HIRE • All Areas • Competitive Rates • Pool Fencing • Private/Residential • Commercial

transport and handling, but one of the main benefits of using the SIP system (manufactured in Western Australia by SIPS Industries) is the reduction of the number of trades required and the speed with which a project can be completed. Typically, the complete system is delivered to site ready for assembly by fully qualified construction teams, alleviating the problems of scheduling trades and offering substantially reduced completion time. Through the use of this emerging SIP technology the suppliers and installers on this project provided a demonstration of its effectiveness in meeting regional and remote building requirements in an extremely timely manner - taking 72 calendar days, or 50 working days from “slab down” to project completion. Parent company, the JWH Group, fields a growing number of enquiries from a variety of persons and organisations who

• Construction Sites • Demolition Sites • Outdoor Events • Insurance Work • WA Owned & Operated

COOMBS CARTAGE & EARTHMOVING Semi Tipper, Backhoe, Excavator, Bobcat & Low Loader Hire. Sand, Gravel, Blue Metal, Garden Soils & Mulch Supplied & Delivered.

Phone Allan on (08) 9573 6440 Mobile: 0407 421 193 Fax: (08) 9573 6656 Email: coombs.cartage@bigpond.com

42 The Builders Choice Magazine – September 2013


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.