USER’S GUIDE
SINGLE DRUM E-LINE SYSTEM
Section 5: Maintenance This section contains maintenance schedules and procedures for the Single Drum E-Line System. WARNING! Failure to perform required equipment maintenance could result in equipment shut down or malfunction.
5.1 Maintenance Schedules Some manuals and guides for OEM (Original Equipment Manufacturer) found in the appendices. Please see the manuals and guides located in “Appendix B: OEM Components” for maintenance procedures for third-party, OEM components such as transmissions, motors, pumps, and the generator. NOTE: Appendix B is only available in the electronic version of this manual.
5.1.1 Daily Maintenance Perform the following inspections and tasks at the beginning of every operating day or before starting the engine. Table 5-1: Daily Maintenance Tasks
MAINTENANCE POINT
TASK
AIR TANKS Air tank (located in the Use the bleed-off valve to purge water from the tank. The Power Pack) valve is located at the bottom of the tank.
MISCELLANEOUS Hydraulic fluid level
Inspect the tank for correct hydraulic oil level with the system unloaded.
Hoses
Inspect for kinks, leaks, pinholes, or other defects. Inspect hose ends - remove and replace if any problems are found. DANGER! Do not use hands or any other body part to test for leaks! Use a piece of wood or cardboard.
© LEE SPECIALTIES, 2016
REV 0 87