Graduate Urban Design Portfolio'24

Page 1

Urban Design + Architecture

.
portfolio
Selected works 2020 - 2024 Columbia GSAPP _ M.S.AUD ’24 MAHE Dubai _ B.Arch ‘21
THARIKA RAMAN M

0.1 0.5 0.7 0.6 0.2 0.4 0.3

Caribbean Co-Op Spring Studio : East Portland, Jamaica 2024

Shared Canvas Fall Studio : Atlanta, Georgia 2023

The Right to Stay Cool Summer Studio : Bronx, New York 2023

Centering the Youth Community Engagement : Bronx, New York 2023

Al Hudayirat - Waterfront & Port Development

Abu Dhabi, UAE 2022

Project Dynasty - High Rise Mixed-Use Development Riyadh, Saudi Arabia 2022

Reimagining Old Dubai

Al Ras Dubai, UAE 2020

Working Drawing Details and Abstract Drawings

INTERNSHIP + WORKSHOP COLUMBIA GSAPPUD STUDIO
/ Contents
2020 - 2024 01 - 14 15 - 22 23 - 30 31 - 32 33 - 40 41 - 46 47 - 54 55 - 60
Miscellaneous

Site Instructor

Group Project

Columbia GSAPP | M.S.AUD | - Spring UD Studio‘23 0.1

CARIBBEAN CO - OP

Individual Work Theme : : : : :

Prospect Beach, East Portland, Jamaica

Kate Orff, Thaddeus Pawlowski

Team of 4

Narrative, Drawings and Illustrations

Adapt to a changing climate and coastline together

The Fisherfolk of Prospect Beach and Coral Farmers of Alligator Head Foundation.

The mission is to establish a cooperative model, addressing challenges faced by Jamaican fisherfolk amidst the changing dynamics of overfishing, climate change, and increasing tourism. By restoring reef health and adapting to a changing climate & coastline together, we aim to preserve their long-standing relationship with the ocean while ensuring economic growth and food security. Here, locals come together to steward the ocean’s resources, forging a sustainable path forward while preserving the beauty and biodiversity of our coastal ecosystems. Therefore, to imagine a future where Prospect Beach becomes an ecological hub.

01

What if Prospect Beach became an ecological hub, driven by community resilience, restoring its reef and coastline through a co-operative ownership model ?

physical and visual waterfront access

Prospect Beach lacks vital fishing infrastructure despite being a public beach in Port Antonio. Pollution and limited public space worsen issue. And, Leveraging Alligator Head’s initiatives offer opportunities to improve marine health and livelihoods, transforming it into a resilient hub.

and

04 03
Lack of Dock Infrastructure No Storage Facilities Inadequate infrasturcture for the fisherfolk Limited Polluted water edges Lack of Public space

To focus on establishing a fisherfolk cooperative to address evolving needs and environmental changes.

Phase 01: Fishermen adapt to declining fish populations, exploring coral nurseries and aquaculture.

Phase 02: Scaling up involves private sector and NGO collaboration to improve reef health and accommodate more fisherfolk.

Phase 03: Establishing a Fishermen’s Opportunity Corridor along the East Portland coast via road and waterways. Phase 04: Implementing monitoring and evaluation programs ensures the effectiveness and sustainability of alternate livelihood programs and reef restoration activities.

06 05
07 08 PHASING STRATEGY FOR CARIBBEAN CO-OP
09
Fisherfolk Co-Op : Community Center
10
Cultivation of Irish Sea Moss and Coral Reef Nurseries Fisherfolk Co-Op : Community Center

Denise from Alligator Head Foundation emphasized the need to scale up coral nurseries, requiring more personnel and infrastructure. Inspired by her insight, as an initial step, our Education Hub proposal involves converting abandoned buildings into wet-labs and fish hatcheries to train fisherfolk towards sustainable livelihoods.

And going ahead, dock infrastructure and stilted buildings will support coral out-planting as well as adapt to the rising sea level. Our vision is to scale up this initiative to replant millions of corals, accommodate fisherfolk along the East Portland coast, and transform Prospect into an ecological hub, adapting to climate and coastline changes.

0.1 EDUCATION HUB - YEAR 2025 Wetlabs Citizen Science Training Fish Hatchery Coral Nursery
11
Wetlabs over abandoned buildings 0.2 EDUCATION HUB - YEAR 2100 Dock Infrastructure Coral Farming Workshop + Event space Mangrove Restoration Irish Sea Moss
12
Dock Infrastructure
13 14

In the heart of the Auburn, a few surviving stores stand as symbols of resilience, yet they feel constrained. Therefore, we propose selective destruction, rejecting abandoned facades for vibrant community spaces. This initiative aims to revive the spirit of Auburn’s past by fostering dialogue in devalued spaces. Our approach seeks to legitimize a neglected aspect of the community, often overlooked by historical preservation, showcasing potential for inclusive growth.

[3] Reclaiming spaces below the freeway for handmade markets.

[4] Illustrating the revival of communities through vibrant gatherings.

Auburn Avenue elevation, transformation of devalued plots for shared experiences.

18 17
[5]
[4] [2] Tracing Bedouin Nomadism onto Auburn Avenue. [5]
[2]
[3]
20 19 [7]
[6] [6] After Property strategy for cultural sustainability. [7] Oblique view illustrating pedestrianization and clustered ollaborative spaces. [8] Cafe-adjacent space for communal cookouts.
22 21

THE RIGHT TO STAY COOL

Site Instructor

Group Project

Columbia GSAPP | M.S.AUD | - Summer UD Studio ‘23 0.3

Individual Work : : : : Harlem, Bronx, NYC

Nans Voron, Sagi Golan

Team of 4

Zoning and concept stage, axonometric renders, illustrations

Theme :

Heat Resilience and its Effects

The aim of the project is to reduce extreme heat for vulnerable residences by re-thinking the relationship between nature and people in cities. To provide nature based solutions for the community of Harlem and create a livable environment.

24 23

Areas of Intervention

In order to transform this neighborhood 4 scales of intervention are proposed :

- Pocket Parks

- Bio Corridor

- Green Towers

- Wind Gardens

26 25

The Main Bio corridor has been reduced to 2 lanes from 6 lanes by providing more space for the bio swale and storm water collection. By increasing tree canopy the wide pavements are now transformed into parks and relaxing zones. The corridor also consists of bike lane, urban furniture and the buffer zone between the green space and the street absorb CO2, noise pollution and heat. This results in lowering the temperature and keep the main corridor cooler for the neighborhood.

Proposed to bring back the wetlands into the parking lots to cool down the dark concrete surfaces as it emits a more heat. This resulted in reducing the parking lot by 80% and the surfaces of the parking lot is changed to permeable pavers to cool down the temperature. To engage and create an interactive space for the community, the park provides events and markets along the wetland edges. Increase in tree canopy and the wetlands restoration helps in improving the comfort levels for the community.

Interventio 01 - Bio Corridor existing existing 107°F 104°F proposed proposed 82°F 86°F Intervention 02 - Pocket Parks 28 27

To mitigate high temperatures and address heat disparities in vulnerable Harlem neighborhoods, reintroducing nature is seen as a highly effective strategy. This initiative aims to provide a sustainable future for residents by leveraging the benefits of natural elements to cool the area.

wetlands
Park Green Building Bio - Corridor Wind Garden bike lane bio-swale seating space & landscape wind towers
Pocket
30 29

0.4

CENTERING THE YOUTH

Columbia GSAPP | M.S.AUD | - Fall Seminar ‘23

Site

Instructor

Group Project

Individual Work : : : :

Kingsbridge Armory Harlem, Bronx, NYC

Kaja Kühl

Team of 4

Collage, Posters and Photographed the workshop

Theme :

Community Engagement and Workshop

Our project was centered around the question - “ How can W 195 street become an extended space for the youth ? ” . Drawing from the aspirations of the Together for Kingsbridge Vision Plan “ to prioritize the youth ” , we used our project as an opportunity to engage with the students, parents and teachers at the primary school “ PS 340 ” to envision the street as a space that is not meant solely for cars. Our engagement activity consisted of two parts. First, we collaged the street with activities that could create the vitality desired and demonstrate the possibilities the street could host. Then, we invited the students to draw, color and paste stickers over an illustrated map, to discuss activites they would like to have in their neighborhood.

Youtube <link> - Centering the Youth

Columbia GSAPP <page link> - Extreme Scale

How can the street better accommodate pedestrian and vehicular traffic at different times of the day?

• To create an active urban street that will also benefit the Kingsbridge armoury

• To ensure safe mobility for children to hang and play

32 31

AL HUDAYIRAT PORT DEVELOPMENT 0.5

LWK + Partners Dubai Studio | Internship 2022 - 2023

Site Instructor Type Role : : : :

Abu Dhabi, UAE

Kourosh Salehi, MithunVarghese, Subby Rani

Masterplan and Urban Design illustrations, drawings and design

The Ports has embarked on a development program to enhance the maritime sector as an attempt to support the city’s vision in becoming one of the top ten maritime cities in the world. The main aim is to provide a series of onshore and maritime facilities that deliver much required amenities for the public and all who participate in water activities in and around the shores. The services range from providing alternative transportation modes like sea ferries and terminals, additional marine stations and berthing options together with suitable Public realm and commercial.

34 33
Masterplan of the key facilities for the Port & Waterfront Development Retail & F&B Parking Visitor Centre & Public Amenities Boats & Jet Skis Breakwater Cafe Services & Utilities ENTRANCE - TO THE FACILITES WATERFRONT VIEWS 3 10 6 7 11 12 9 1 2 3 4 5 6 10 10 10 11 12 12 7 8 9
RECEPTION & CAFE MARITIME - EXHIBITION HALL KIOSKS GLAMPING ZONE OBSERVATORY TOWER ROWING LEARNING CENTRE FISHING LEARNING CENTRE 1 4 5 2 8 9 Plot Area: 142,717.32 sqm 36 35
YATCH
CLUB MARINA OFFICE
Site Sections A B C C’ B’ A’ Observatory Tower Coral Farming Zone Water Basin for Canoeing Recreational zone Channel Connectivity towards Marina Section AA’ Section BB’ Water Basin for Canoeing Observatory Tower Channel Connectivity towards Marina Public Amenities Car / Pedestrian Bridge WaterFront Activities Pedestrian Bridge Marina Section CC’ Car Parking Jogging / Buggy / Pedestrian Route Water Basin for Canoeing
Cabanas
38 37
Kayak Leaning Center

To design a Cafe in a contemporary style with neutral shades. Building the cafe along the breakwater to enhance the quality of waterfront development and to invite more users.

40 39
Breakwater Cafe

Site Instructor

Type

PROJECT DYNASTY

LWK + Partners Dubai Studio | Internship 2022 - 2023

Role : : : :

Abu Dhabi, UAE

Kourosh Salehi, MithunVarghese, Subby Rani

Masterplan and Mixed-Use Development

illustrations, design development and working drawings

Project Dynasty is a highly ambitious development seeking to be a jewel as part of waterfront development. The design ideas reflect aspiring vision of soaring heights and yet grounded with values of the land and people.

42 41
0.6

Identifying key site features to inform the design.

Mixed Use Development - Proposed Key Features

1. Multi-level waterfront podium, offices and parking

2. Sea view Residential tower (46 storeys)

3. Sea view Hotel and Residential tower (69 storeys)

4. Integrated Public Realm

Optimizing Views.

Enhancing arrival experience and integrating the white house through unified public realm design.

Segregating towers and office complex along the two sides of the white house. commercial activity.

PARKING BUILDING

HEALTH + WELLBEING OFFICES

LEISURE DECK

Unifying architectural language of the towers and the office complex.

LEISURE DECK

OUTDOOR FUNCTIONS SPACE ACTIVE RETAIL EDGE

ROOFTOP MAJLIS HOTEL & RESIDENTIAL UNIT (69 STOREYS) RESIDENTIAL UNIT (46 STOREYS) OFFICE BUILDING (16 FLOORS)
44 43
GL Mixed - Use (hotel & residential : 69 storeys) Unit White house (clients house) Offices GROUND FLOOR +0.00 PODIUM +3.60 PODIUM +7.20 PODIUM +10.80 LEVEL +14.40 LEVEL +18.00 LEVEL +21.60 LEVEL +25.20 LEVEL +28.80 LEVEL +32.40 LEVEL 10 +36.00 LEVEL 11 +39.60 LEVEL 12 +43.20 LEVEL 13 +46.80 LEVEL 14 +50.40 LEVEL 15 +54.00 LEVEL 16 +57.60 LEVEL 17 +61.20 LEVEL 18 +64.80 LEVEL 19 +68.40 LEVEL 20 +72.00 LEVEL 21 +75.60 LEVEL 22 +79.20 LEVEL 23 +82.80 LEVEL 24 +86.40 LEVEL 25 +90.00 LEVEL 26 +93.60 LEVEL 27 +97.20 LEVEL 28 +100.80 LEVEL 29 +104.4 LEVEL 30 +108.00 LEVEL 31 +111.60 LEVEL 32 +115.20 LEVEL 33 LEVEL 34 +118.80 LEVEL 35 +122.40 LEVEL 36 +126.00 LEVEL 37 +129.60 LEVEL 38 +133.20 LEVEL 39 +136.80 LEVEL 40 +140.40 LEVEL 41 +144.00 LEVEL 42 +147.60 LEVEL 43 +151.20 LEVEL 44 +154.80 LEVEL 45 +158.40 LEVEL 46 +162.00 LEVEL 47 +165.60 LEVEL 48 +169.20 LEVEL 49 +172.80 LEVEL 50 +176.40 LEVEL 51 +180.00 LEVEL 52 +183.60 LEVEL 53 +187.20 LEVEL 54 +190.80 LEVEL 55 +194.40 LEVEL 56 LEVEL 57 LEVEL 58 LEVEL 59 LEVEL 60 LEVEL 61 LEVEL 62 LEVEL 63 LEVEL 64 LEVEL 65 LEVEL 66 LEVEL 67 LEVEL 68 LEVEL 69 +198.00 +201.60 +205.20 +208.80 +212.40 +216.00 +219.60 +223.20 +226.80 +230.40 +234.00 +237.60 +241.20 +244.80 +248.40 BASEMENT LEVEL -4.00 Section AA P0038-LWK-DXB-AR-GE-301 1:500 Drawn Scale Checked Date Drawing Title Drawing No. Client OFFICE 901, FLOOR THE ONE TOWER, BARSHA HEIGHTS, P.O. BOX 340675, DUBAI, UAE T +971 43716300 +971 43716399 lwk@lwkp.com Consultant - This drawing and the contents herein are the copyright of LWKP Architects L.L.C - No part of the drawing and the design contained herein may be reproduced without the prior written consent of director of LWKP Architects L.L.C - Do not take measurements directly from this drawing. - Check and verify all dimensions on site. - Read this drawing conjunction with the specifications and all other related drawings. - Notify the Architect immediately any discrepancy found herein. General Notes Project Name DATE DESCRIPTION REV. CHECKED DRAWN Lead Consultant Project Dynasty Residential, Hotel & Office 14th Sept 2022 SUB MVA A SUB MVA PRE-CONCEPT DESIGN 14.09.22 Section AA 1 AR-GE-301 SCALE 1:500 A GROUND FLOOR +0.00 PODIUM +3.60 PODIUM +7.20 PODIUM +10.80 LEVEL +14.40 LEVEL +18.00 LEVEL +21.60 LEVEL +25.20 LEVEL +28.80 LEVEL +32.40 LEVEL 10 +36.00 LEVEL 11 +39.60 LEVEL 12 +43.20 LEVEL 13 +46.80 LEVEL 14 +50.40 LEVEL 15 +54.00 LEVEL 16 +57.60 LEVEL 17 +61.20 LEVEL 18 +64.80 LEVEL 19 +68.40 LEVEL 20 +72.00 LEVEL 21 +75.60 LEVEL 22 +79.20 LEVEL 23 +82.80 LEVEL 24 +86.40 LEVEL 25 +90.00 LEVEL 26 +93.60 LEVEL 27 +97.20 LEVEL 28 +100.80 LEVEL 29 +104.4 LEVEL 30 +108.00 LEVEL 31 +111.60 LEVEL 32 +115.20 LEVEL 33 LEVEL 34 +118.80 LEVEL 35 +122.40 LEVEL 36 +126.00 LEVEL 37 +129.60 LEVEL 38 +133.20 LEVEL 39 +136.80 LEVEL 40 +140.40 LEVEL 41 +144.00 LEVEL 42 +147.60 LEVEL 43 +151.20 LEVEL 44 +154.80 LEVEL 45 +158.40 LEVEL 46 +162.00 LEVEL 47 +165.60 LEVEL 48 +169.20 LEVEL 49 +172.80 LEVEL 50 +176.40 LEVEL 51 +180.00 LEVEL 52 +183.60 LEVEL 53 +187.20 LEVEL 54 +190.80 LEVEL 55 +194.40 LEVEL 56 LEVEL 57 LEVEL 58 LEVEL 59 LEVEL 60 LEVEL 61 LEVEL 62 LEVEL 63 LEVEL 64 LEVEL 65 LEVEL 66 LEVEL 67 LEVEL 68 LEVEL 69 +198.00 +201.60 +205.20 +208.80 +212.40 +216.00 +219.60 +223.20 +226.80 +230.40 +234.00 +237.60 +241.20 +244.80 +248.40 BASEMENT LEVEL -4.00----Section AA P0038-LWK-DXB-AR-GE-301 1:500 Drawn Scale Checked Date Drawing Title Drawing No. Approved Revision No. Client OFFICE 901, FLOOR THE ONE TOWER, BARSHA HEIGHTS, P.O. BOX 340675, DUBAI, UAE +971 43716300 +971 43716399 lwk@lwkp.com Consultant - This drawing and the contents herein are the copyright LWKP Architects L.L.C - No part the drawing and the design contained herein may be reproduced without the prior written consent director LWKP Architects L.L.C - Do not take measurements directly from this drawing. - Check and verify all dimensions on site. - Read this drawing in conjunction with the specifications and all other related drawings. - Notify the Architect immediately of any discrepancy found herein. General Notes Project Name DATE DESCRIPTION REV. Lead Consultant Project Dynasty Residential, Hotel & Office A 14th Sept 2022 SUB MVA KSA PRE-CONCEPT DESIGN 14.09.22 2(3B.) (2B.) 2(3B.) (2B.) 2(3B.) (2B.) 2(3B.) (2B.) (5B.) (3B.) A A 46 45 F1-1 F1-2 F1-B F1-F LIFT LIFT MEP ROOM LIFT F1-1 F1-2 F1-A F1-F LIFT LIFT MEP ROOM LIFT F1-1 F1-2 F1-A F1-B F1-F F1-A F1-E Office Ground Floor to Level P0038-LWK-DXB-AR-GE-130 1:200 KEY SECTION Drawn Scale Checked Date Drawing Title Drawing No. Client OFFICE FLOOR THE ONE TOWER, BARSHA HEIGHTS, +971 43716300 +971 43716399 - This drawing and the contents herein are LWKP Architects L.L.C - No part the drawing and the design contained without prior written consent director - Do not take measurements directly from - Check and verify dimensions site. - Read this drawing conjunction with the drawings. - Notify Architect immediately any discrepancy General Notes Project Name Lead Consultant Project Dynasty Residential, Hotel & Office 14th Sept 2022 SUB MVA PRE-CONCEPT DESIGN 14.09.22 Office Ground Floor SCALE 1:200 Office - Level 1, 2, 3,4, 5, 6, 7, 8, 9, 12, 13, 14, 15 2 SCALE 1:200 Office Level Link 10 & 11 3 SCALE 1:200 Office Level 16 4 SCALE 1:200 Legend Services Parking Circulation Amenities F&B Retail Offices Hotel Majlis 2 BHK 3 BHK 4 BHK 5 BHK F1-C F1-D LIFT LIFT MEP ROOM LIFT F1-C F1-D LIFT LIFT MEP ROOM LIFT F1-C F1-D LIFT LIFT MEP ROOM LIFT F1-1 F1-2 F1-A F1-B F1-F Office Ground Floor to Level 16 P0038-LWK-DXB-AR-GE-130 1:200 N KEY SECTION Scale Date Drawing Title Drawing No. Approved Revision No. Client OFFICE 901, FLOOR ONE TOWER, BARSHA HEIGHTS, P.O. BOX 340675, DUBAI, UAE +971 43716300 +971 43716399 lwk@lwkp.com Consultant - This drawing and the contents herein are the copyrightwithout the prior written consent director LWKP Architects L.L.C - Do not take measurements directly from this drawing. - Check and verify all dimensions on site. - Read this drawing conjunction with the specifications and all other related drawings. - Notify the Architect immediately any discrepancy found herein. Project Name Project Dynasty Residential, Hotel & Office A 14th Sept 2022 SUB MVA KSA PRE-CONCEPT DESIGN Office - Ground Floor 1 AR-GE-130 SCALE 1:200 Office Level 1, 2, 3,4, 5, 6, 7, 8, 9, 12, 13, 14, 15 2 AR-GE-130 SCALE 1:200 Office - Level Link 10 & 11 3 AR-GE-130 SCALE 1:200 Office Level 16 AR-GE-130 SCALE 1:200 Legend Services Parking Circulation Amenities F&B Retail Offices Hotel Majlis 2 BHK BHK 4 BHK BHK Hotel and Residential Unit Office
Unit

REIMAGINING OLD DUBAI

Site Instructor

Group Project

Manipal Academy of Higher Education Dubai ‘2020

Individual Work Workshop : : : : :

Al Ras, Deira Creek, Dubai UAE

Hrvoje Cindric, Bhakti More Team of 4 illustrations, modelling and drawings

See Our Cities 2020

Global Urban Space Observation + Intervention Project

This design aims to enhance the journey of tourists and residents by supporting both their activities in a Covid-19 safe environment.

48 47
0.7

waterfront edge

The Waterfront Zone

The area was before used as a minor port which was shifted few years back and now is only dedicates for the abra.

The waterfront provides opportunity for development and hence to provide a much safer environment for the toursits as well as the residents. By adding shading devices, green spaces and few activities to engage the users

Improving the waterfront stretch to create a more inviting and functional waterfront environment that caters to the needs of both residents and boat operators.

This includes improving boat parking arrangements, ensuring sufficient seating, especially near the abra station, and upgrading the outdoor shops and cafeteria with adequate shading and seating options. Additionally, creating a designated unloading area for dinner cruise trucks can streamline operations and prevent disruptions along the waterfront.

50 49 Site Location : Al Ras, Dubai
1m 3m sikka Gold Souq 5.5m 8m 5.5m 2m 7m 2m 7m 2m 4m 9m
BEFORE COVID Activity Mapping AFTER COVID

To provide arched shading that features Mashrabiya patterns and seating spaces with adequate lighting. | material: recycled palm tree wood |

To provide a safer streetscape with cycle tracks and planters.

52 51
Stepped seating along the waterfront for the boat operators.
54 53

Miscalleneuos

(working drawings + abstract drawings)

Project Type Role VX Dubai Studio | Junior Architect | 2023

MAG Group F.Z.E - G+1 Town Houses, Dubai, UAE

Masterplan

Construction + Working drawings

56 55
A A 2A 1A B B 2 1 1A-a 3A 4A-a C B E A MAID ROOM KITCHEN FOYER STAIRCASE NEIGHBOR PLOT NEIGHBOR PLOT +0.150 SSL +0.200 FFL LIVING DINING +0.150 FFL TERRACE +0.150 FFL BACKYARD +0.050 FGL MINIMUM OF 25% OF THE PLANTED AREA SHALL BE LOCAL SPECIES ADOPTED TO DUBAI & REGION CLIMATE PALM TREE AS PER DM GREEN BUILDING REQUIREMENT GARAGE THE HATCHED AREA INDICATES HARDSCAPE WITH SRI GREATER THAN 29 +0.150 FPL MAIN ENT. RECYCLABLE AND NON RECYCLABLE BIN GROUND FLOOR PLAN MAID'S TOI. +0.450 SSL +0.500 FFL BATH PLOT LIMIT PLOT LIMIT PLOT LIMIT PLOT LIMIT BASEMENT FLOOR PLAN -2.20 SSL WATER TANK PUMP ROOM -2.20 SSL C E A 4 5 6 VOID A A 2A 1A B 2 3 1 1A-a 3A 4A-a MASTER BED DRESS RM BATH-1 BEDROOM-2 BEDROOM-1 CORRIDOR C 1 2 3 4 5 6 B E A STAIRCASE FIRST FLOOR PLAN MASTER BATH TERRACE BACKYARD BELOW +4.000 SSL +4.050 FFL +4.050 SSL +4.100 FFL +4.000 SSL +4.050 FFL +3.175 SSL +3.275 FFL CANOPY +3.175 SSL CANOPY TOP +3.400 TOP CANOPY BALCONY-1 PLOT LIMIT PLOT LIMIT VOID +7.250 SSL +7.300 CANOPY TOP +9.125 TOP +7.725 SSL +9.125 TOP +9.525 TOP +9.525 TOP +8.075 TOP +9.125 TOP ROOF TILES SHALL HAVE SRI EQUAL OR GREATER THAN 78 A A 2A 1A B B 3 1 1A-a 3A 4A-a ROOF PLAN +7.250 SSL +7.300 CANOPY TOP TERRACE BELOW ROOF TERRACE CANOPY 04a +9.525 TOP CANOPY BELOW CANOPY TOP +3.400 TOP PLOT LIMIT PLOT LIMIT C 1 2 3 4 5 6 B E A SITE PLAN ROOF TERRACE +9.125 TOP +7.725 SSL +9.125 TOP +9.525 TOP +9.525 TOP +8.075 TOP +9.125 TOP +8.325 TOP VOID +7.250 SSL +7.300 CANOPY TOP TERRACE BELOW CANOPY CANOPY BELOW TOWNHOUSE TYPE-3B ROAD NEIGHBOR PLOT NEIGHBOR PLOT GATE LEVEL PER SETTING OUT PLANS CANOPY TOP +3.20 SSL TERRACE GROUND FLOOR BALCONY@ FIRST FLOOR +3.900 SSL +3.950 FFL BACKYARD @ GROUND FLOOR PALM TREE AS PER DM GREEN BUILDING REQUIREMENT MINIMUM OF 25% OF THE PLANTED AREA SHALL BE LOCAL SPECIES ADOPTED TO DUBAI & REGION CLIMATE NEIGHBOR PLOT PLOT LIMIT PLOT LIMIT C B E A 1 2 3 4 5 6 GREEN BUILDING COMPLIANCE WALL TYPE LEGEND W1
Floor Plans
Overall Elevation

Town house Elevations - Type 1

Town house Elevations - Type 4

Town house Elevations - Type 2

Town house Elevations - Type 3

Town house Elevations - Type 5 Overall Section

58 57 NEIGHBOR PLOT NEIGHBOR PLOT EXT-04 E-03 EXT-02 ELEVATION-1 1:100 1 A 203 ELEVATION-2 1:100 3 203 NEIGHBOR PLOT NEIGHBOR PLOT PLOT LIMIT EXT-01 E-03 EXT-04 EXT-03 EXT-01 EXT-03 EXT-03 E-03 EXT-01 ELEVATION-1a 1:100 2 A 203 E-03 EXT-01 EXT-02 BALCONY FFL +4.05 FFL NEIGHBOR PLOT NEIGHBOR PLOT EXT-01 E-03 EXT-04 EXT-03 EXT-01 E-03 EXT-01 EXT-02 1.8M HIGH PARTITION WALL FROM BALCONY FFL 1.8M HIGH PARTITION WALL FROM BALCONY FFL GROOVES 100MM WIDE,10MM DEEP VERTICAL GROOVES IN PLASTER GROOVES 100MM WIDE,10MM DEEP VERTICAL GROOVES IN PLASTER GROOVES 100MM WIDE,10MM DEEP VERTICAL GROOVES IN PLASTER EXT-01 FIRST FLOOR ROOF GROUND FLOOR PARAPET 0.000 +4.100 FFL +7.725 SSL +0.20 FFL +9.525 TOP ROAD LEVEL PARAPET +9.125 TOP CANOPY TOP +3.40 SSL ENTRANCE +0.50 FFL FIRST FLOOR ROOF GROUND FLOOR PARAPET 0.000 +4.100 FFL +7.725 SSL +0.20 FFL +9.525 TOP ROAD LEVEL PARAPET +9.125 TOP CANOPY TOP +3.40 SSL ENTRANCE +0.50 FFL FIRST FLOOR ROOF GROUND FLOOR PARAPET 0.000 +4.100 FFL +7.725 SSL +0.20 FFL +9.525 TOP ROAD LEVEL PARAPET +9.125 TOP CANOPY TOP +3.40 SSL ENTRANCE +0.50 FFL PLOT LIMIT A C A C B B A C NEIGHBOR PLOT PLOT LIMIT NEIGHBOR PLOT PLOT LIMIT +2.000 TOP 0.150 0.00 GROUND FLR 0.200 Entrance +0.35 FFL +3.40 TOP CANOPY TOP FIRST FLOOR ROOF GROUND FLOOR PARAPET +4.00 FFL +7.60 SSL +0.20 FFL +9.40 TOP ELEVATION-3a 1:100 6 A 101 3 4 5 6 NEIGHBOR PLOT PLOT LIMIT NEIGHBOR PLOT PLOT LIMIT + 0.150 0.00 GROUND FLR 0.200 Entrance +0.35 FFL +3.40 TOP CANOPY TOP FIRST FLOOR ROOF GROUND FLOOR PARAPET +4.00 FFL +7.60 SSL +0.20 FFL +9.40 TOP ELEVATION-4a 1:100 7 A 101 1 2 3 4 6 +2.000 TOP NEIGHBOR PLOT PLOT LIMIT NEIGHBOR PLOT PLOT LIMIT +2.000 TOP 0.150 0.00 GROUND FLR 0.200 Entrance +0.35 FFL +3.40 TOP CANOPY TOP FIRST FLOOR ROOF GROUND FLOOR PARAPET +4.00 FFL +7.60 SSL +0.20 FFL +9.40 TOP ELEVATION-3 1:100 4 101 1 3 4 5 6 NEIGHBOR PLOT PLOT LIMIT NEIGHBOR PLOT PLOT LIMIT +2.000 TOP + 0.150 0.00 GROUND FLR 0.200 Entrance +0.35 FFL +3.40 TOP CANOPY TOP FIRST FLOOR ROOF GROUND FLOOR PARAPET +4.00 FFL +7.60 SSL +0.20 FFL +9.40 TOP ELEVATION-4 1:100 5 A 101 1 2 3 4 6 CANOPY TOP CANOPY TOP 1.8M HIGH PARTITION WALL FROM BALCONY FFL 1.8M HIGH PARTITION WALL FROM BALCONY FFL EXTERNAL FINISHES LEGEND E-03 GREEN BUILDING REGULATION COMPLIANCE NOTES FACADE DR-01 WIN-01 EXT-04 EXT-03 EXT-02 EXT-01 TOWN HOUSE-3B ELEVATIONS 1:100 01.08.2018 NQ SP pw://350904_MAG DISTRICT SS A 207 AB 1 Project title: Drawing title: Client Drawn by: Scale(s): Project no: Drawing no: Date drawn: Checked Revision Cad file ref. Approved 350904 Consultant KEY PLAN NOTES Status 1. DO NOT SCALE THE DRAWINGS FOLLOW (THE MM) WRITTEN DIMENSIONS UNLESS OTHERWISE MENTIONED. 2. IMPERIAL (FEET) DIMENSIONS SHOWN ON THIS DRAWINGS ARE APPROXIMATE. 3. EACH DRAWING SHALL BE READ IN CONJUNCTION WITH ALL OTHER DRAWINGS & THE GENERAL STANDARD DETAILS. IN CASE OF ANY DISCREPANCIES BRING TO THE KNOWLEDGE OF ENGINEER AND SAME TO BE RESOLVED PRIOR TO EXECUTION OF WORK. 4. DIMENSIONS SHOWN ON THESE DRAWINGS ARE STRUCTURAL DIMENSIONS. UNLESS NOTED OTHERWISE. 5. ALL LEVELS INDICATED ON THESE DRAWINGS ARE BASED ON DESIGN LEVEL ±0.00 )FOR EQUIVALENT DATUM LEVEL REFER TO MASTER PLAN LAYOUT. ALL LEVELS SHOULD BE VERIFIED AT SITE PRIOR TO EXECUTION OF WORK. MAG GROUP F.Z.E DRAWINGS ARE APPROXIMATE. OF ANY DISCREPANCIES BRING TO THE 4. DIMENSIONS SHOWN ON THESE DRAWINGS ARE STRUCTURAL DIMENSIONS. UNLESS ALL LEVELS INDICATED ON THESE DRAWINGS EQUIVALENT DATUM LEVEL REFER TO MASTER AUTHORITY SUBMISSION AS BUILT REVISED PROPOSED G+1 TOWN HOUSES HADAEQ SHEIKH MOHAMMED BIN RASHID ON PLOT NO. 6314111 AT PLOT NO. 6314111 09/11/23 6314111 357808-10-3 +4.290 FFL +7.980 SSL +0.35 FFL +9.630 TOP 0.000 +0.150 FPL A D C B ROOF PARAPET FIRST FLOOR GROUND FL. (MAIN.ENT.) ROAD LEVEL E-03 ELEVATION-1 1:100 1a 205 E-03 EXT-01 EXT-02 EXT-01 EXT-01 EXT-03 EXT-01 NEIGHBOR PLOT EXT-04 +9.230 TOP BOUNDARY WALL +2.00 FFL +3.400 CANOPY TOP +4.290 FFL +7.980 SSL +0.35 FFL +9.630 TOP 0.000 +0.150 FPL A D C B ROOF PARAPET FIRST FLOOR GROUND FL. (MAIN.ENT.) ROAD LEVEL E-03 E-03 ELEVATION-1 1:100 1 205 E-03 EXT-01 EXT-02 EXT-01 EXT-01 EXT-03 EXT-01 NEIGHBOR PLOT EXT-04 +9.230 TOP BOUNDARY WALL +2.00 FFL +3.400 CANOPY TOP EXT-03 20MM GROOVES 100MM WIDE,10MM DEEP VERTICAL GROOVES PLASTER 20MM GROOVES 100MM WIDE,10MM DEEP VERTICAL GROOVES PLASTER +4.290 FFL +7.980 SSL +0.35 FFL +9.630 TOP ± 0.000 +0.150 FPL ROOF PARAPET FIRST FLOOR GROUND FL. (MAIN.ENT.) ROAD LEVEL 1' 1 2 3 4 5 6 ELEVATION-4 1:100 3 205 +3.400 FFL CANOPY TOP +2.00 FFL NEIGHBOR PLOT EXT-01 EXT-03 EXT-03 EXT-01 GREEN BUILDING REGULATION COMPLIANCE NOTES FACADE EXTERNAL FINISHES LEGEND E-03 DR-01 WIN-01 EXT-04 EXT-03 EXT-02 EXT-01 0.000 +4.290 FFL +7.980 SSL +0.35 FFL +9.630 TOP 5 4 +0.150 FPL 2 3 6 ROOF PARAPET FIRST FLOOR GROUND FL. (MAIN.ENT.) ROAD LEVEL BOUNDARY WALL +8.430 TOP +3.400 CANOPY TOP A D C +2.00 FFL ELEVATION-2 1:100 3 A 205 ELEVATION-3 1:100 4 A 205 1' EXT-03 EXT-02 EXT-01 EXT-03 EXT-01 EXT-02 E-03 EXT-01 EXT-01 E-03 EXT-03 NEIGHBOR PLOT EXT-03 E-03 +9.230 TOP +9.230 TOP NEIGHBOR PLOT EXT-01 +2.00 FFL BOUNDARY WALL +4.290 FFL +7.980 SSL +0.35 FFL +9.630 TOP 0.000 +0.150 FPL ROOF PARAPET FIRST FLOOR GROUND FL. ROAD LEVEL +3.400 CANOPY TOP 100MM WIDE,10MM DEEP VERTICAL GROOVES IN PLASTER 100MM WIDE,10MM DEEP VERTICAL GROOVES IN PLASTER 20MM GROOVES 20MM GROOVES E-03 -2.200 WATER TANK +2.000 TOP 0.150 0.00 GROUND FLR + 0.200 Entrance +0.500 FFL +4.100 FFL FIRST FLOOR +7.725 SSL ROOF +9.525 TOP PARAPET +3.40 TOP CANOPY TOP +0.20 FFL GROUND FLR 2 INTERNAL PLOT LIMIT ENTRANCE SECTION-AA 1:100 1 A 305 1 4 BACKYARD MASTER BATH TERRACE LIVING DINING STAIR-03 DRESS 6 GARAGE 9 8 11 12 3 03 05 EXTERNAL PLOT LIMIT PAT-01 PAT-01 PAT-01 PAT-03 PAT-02 FIRST FLOOR ROOF GROUND FLOOR PARAPET ± 0.000 +4.100 FFL +7.725 SSL +0.20 FFL +9.525 TOP ROAD LEVEL PARAPET +9.125 TOP A C STAIR PLOT LIMIT PLOT LIMIT CORRIDOR B SECTION-BB 1:100 2 A 305 LIVING DINING 12 PAT-01 PAT-01 PAT-01 INTERNAL FINISHES PAT-01 PAT-02 PAT-03 NEIGHBOR PLOT PLOT LIMIT PLOT LIMIT FIRST FLOOR ROOF GROUND FLOOR PARAPET 0.000 +4.100 FFL +7.725 SSL +0.20 FFL +9.525 TOP ROAD LEVEL PARAPET +9.125 TOP 0.150 FPL ELEVATION-1 1:100 1 206 NEIGHBOR PLOT 100MM WIDE,10MM DEEP VERTICAL GROOVES IN PLASTER DOOR AS PER SCHEDULE ENTRANCE +0.500 FFL 20MM GROOVES 1.8M HIGH PARTITION WALL FROM BALCONY FFL A C B NEIGHBOR PLOT PLOT LIMIT PLOT LIMIT FIRST FLOOR ROOF GROUND FLOOR PARAPET ± 0.000 +4.100 FFL +7.725 SSL +0.20 FFL +9.525 TOP ROAD LEVEL PARAPET +9.125 TOP 0.150 FPL ELEVATION-1a 1:100 2 206 ENTRANCE +0.500 FFL 100MM WIDE,10MM DEEP VERTICAL GROOVES IN PLASTER 20MM GROOVES 1.8M HIGH PARTITION WALL FROM BALCONY FFL A C B ELEVATION-2 1:100 3 PLOT LIMIT C A FIRST FLOOR ROOF GROUND FLOOR PARAPET 0.000 +4.100 FFL +7.725 SSL +0.20 FFL +9.525 TOP ROAD LEVEL PARAPET +9.125 TOP 0.150 FPL PLOT LIMIT 206 NEIGHBOR PLOT NEIGHBOR PLOT 20MM GROOVES 100MM WIDE,10MM DEEP VERTICAL GROOVES IN PLASTER EXT-01 E-03 EXT-01 EXT-03 E-03 EXT-01 EXT-02 E-03 E-03 EXT-01 EXT-01 EXT-01 EXT-03 EXT-04 EXT-02 EXT-03 EXT-01 E-03 EXT-04 EXT-01 EXT-03 EXT-03 E-03 EXT-01 EXT-02 EXT-04 EXT-01 10 NEIGHBOR PLOT PLOT LIMIT NEIGHBOR PLOT PLOT LIMIT +2.000 TOP 0.150 0.00 GROUND FLR 0.200 +0.500 FFL +3.40 TOP CANOPY TOP FIRST FLOOR ROOF PARAPET +4.100 FFL +7.725 SSL +0.20 FFL +9.525 TOP ELEVATION-3 1:100 4 1 4 206 LIVING/DINING (MAIN. ENT.) (LIVING/DINING) 1.8M HIGH PARTITION WALL FROM BALCONY FFL EXT-01 EXT-03 2500MM/2850MM (WIDTH) 2700 (HEIGHT) CLEAR OPENING FOR FUTURE EXPANSION NEIGHBOR PLOT PLOT LIMIT NEIGHBOR PLOT PLOT LIMIT +2.000 TOP 0.150 0.00 GROUND FLR 0.200 +0.500 FFL +3.40 TOP CANOPY TOP ELEVATION-4 1:100 5 1 2 3 4 5 6 FIRST FLOOR ROOF GROUND FLOOR PARAPET +0.20 FFL 206 LIVING/DINING (LIVING/DINING) (MAIN. ENT.) +4.100 FFL +7.725 SSL +9.525 TOP 1.8M HIGH PARTITION WALL FROM BALCONY FFL EXT-01 EXT-03 2500MM/2850MM (WIDTH) 2700 (HEIGHT) CLEAR OPENING FOR FUTURE EXPANSION EXTERNAL FINISHES LEGEND E-03 GREEN BUILDING REGULATION COMPLIANCE NOTES FACADE DR-01 WIN-01 EXT-04 EXT-03 EXT-02 EXT-01 TOWN HOUSE-2B ELEVATIONS 1:100 10.11.2019 NQ SP SS A 206 AB 1 Project title: Drawing title: Client Drawn by: Scale(s): Project no: Drawing no: Date drawn: Checked Revision Cad file ref. Approved 350904 Consultant KEY PLAN NOTES Status 1. DO NOT SCALE THE DRAWINGS FOLLOW (THE MM) WRITTEN DIMENSIONS UNLESS OTHERWISE MENTIONED. 2. IMPERIAL (FEET) DIMENSIONS SHOWN ON THIS DRAWINGS ARE APPROXIMATE. 3. EACH DRAWING SHALL BE READ IN CONJUNCTION WITH ALL OTHER DRAWINGS & THE GENERAL STANDARD DETAILS. IN CASE OF ANY DISCREPANCIES BRING TO THE KNOWLEDGE OF ENGINEER AND SAME TO BE RESOLVED PRIOR TO EXECUTION OF WORK. 4. DIMENSIONS SHOWN ON THESE DRAWINGS ARE STRUCTURAL DIMENSIONS. UNLESS NOTED OTHERWISE. 5. ALL LEVELS INDICATED ON THESE DRAWINGS ARE BASED ON DESIGN LEVEL ±0.00 )FOR EQUIVALENT DATUM LEVEL REFER TO MASTER PLAN LAYOUT. ALL LEVELS SHOULD BE VERIFIED AT SITE PRIOR TO EXECUTION OF WORK. MAG GROUP F.Z.E AUTHORITY SUBMISSION AS BUILT REVISED PROPOSED G+1 TOWN HOUSES HADAEQ SHEIKH MOHAMMED BIN RASHID ON PLOT NO. 6314111 AT PLOT NO. 6314111 09/11/23 6314111 357808-10-3 REVISIONS / ISSUE Client Consultant KEY PLAN NOTES Status 1. DO NOT SCALE THE DRAWINGS FOLLOW (THE MM) WRITTEN DIMENSIONS UNLESS OTHERWISE MENTIONED. 2. IMPERIAL (FEET) DIMENSIONS SHOWN ON THIS DRAWINGS ARE APPROXIMATE. 3. EACH DRAWING SHALL BE READ IN CONJUNCTION WITH ALL OTHER DRAWINGS & THE GENERAL STANDARD DETAILS. IN CASE OF ANY DISCREPANCIES BRING IT TO THE KNOWLEDGE OF ENGINEER AND SAME TO BE RESOLVED PRIOR TO EXECUTION OF WORK. 4. DIMENSIONS SHOWN ON THESE DRAWINGS ARE STRUCTURAL DIMENSIONS. UNLESS NOTED OTHERWISE. 5. ALL LEVELS INDICATED ON THESE DRAWINGS ARE BASED ON DESIGN LEVEL ±0.00 )FOR EQUIVALENT DATUM LEVEL REFER TO MASTER PLAN LAYOUT. ALL LEVELS SHOULD BE VERIFIED AT SITE PRIOR TO EXECUTION OF WORK. MAG GROUP F.Z.E AUTHORITY SUBMISSION AS-BUILT REVISED PLOT NO. 6316826 PLOT LIMIT ROOF FIRST FLOOR ROOF GROUND FLOOR PARAPET 0.000 +4.290 FFL +7.980 SSL +0.35 FFL +9.630 TOP ROAD PLOT LIMIT A D C B +2.00 FFL DRESSING MASTER BATH CORRIDOR BATH-2 LIVING DINING ADJACENT TOWNHOUSE 20 11 SECTION-AA 1:100 1 A 303 +0.35 FFL 0.150 GROUND FLOOR 0.000 ROAD 0.200 ENTRANCE FPL PLOT LIMIT +4.290 FFL +7.980 SSL ROOF +9.630 TOP PARAPET ROOF 1 3 6 +2.00 FFL FIRST FLOOR -2.200 WATER TANK +3.400 SSL CANOPY TOP LIVING DINING GARAGE BACKYARD TERRACE CORRIDOR BATH-1 STAIR PLOT LIMIT FRONT SIDE ENTRANCE 1' 7 8 11 13 5 15 LAUNDRY SECTION-BB 1:100 2 A 303 GREEN BUILDING REGULATION COMPLIANCE NOTES FACADE EXTERNAL FINISHES LEGEND E-03 DR-01 WIN-01 EXT-04 EXT-03 EXT-02 EXT-01 06/12/23 6316826 360699-14-2

Abstract 02 : Demolition by Neglect

Gaines Hall in Vine City, Atlanta, Georgia USA has been in a flux. Once historically renown for its identity as a place of Black Intellectualism through economic disadvantage and urban development, is nearly demolished by neglect.

Abstract 01 : Opposition to Territoriality

The India - Sri Lanka maritime border in the Palk Strait, though clear on paper, becomes ambiguous due to changing landscapes and security concerns. This leads to a recurring tension between the two nations as Indian Fisherman constantly venture into Sri Lankan waters on the grounds of straying for livelihood, defying established property norms.

Abstract 03 : Streets beyond Property Line

Stray cattles establish their own domain within the dynamic urban environment that they’re set in, challenging the regime of property. They generally occupy public spaces and streets in an urban setting, negotiating their presence with vehicles and pedestrians. And, this phenomenon highlights the intricate choreography of movement within the urban system, where two parallel forces of movement intersect, and coexist with each other.

Abstract 05 : Theft precedes and produces property

A continual process that merges theft and commodification in one moment by creating conditions that compel the transfer of Indigenous lands to settlers. Indigenous “ownership” is recognized, but only retroactively, in its negation, underscoring the idea that even something that seemingly belongs to no one can indeed be stolen. It is through this act of theft that land becomes legible as property.

60 59
Abstract 04 : Unsettling Transition Bellwood Quarry, Atlanta Georgia
Abstract Drawings | Columbia GSAPP_AUD |

thank you .

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.