Fort York National Historic Site Visitor Centre
Siqi Zhang
Introduction to Revit Architecture Scale Project number Date Drawn by Half Size Set COURSE:
KENSEK 2023/2/23 17:53:16 A100 COVER PAGE Project Number Fort York Visitor Center Owner Issue Date Siqi Zhang No. Description Date 1 coverpage
ARCH 507 | SPRING 2023 INSTRUCTOR: KAREN
ARCH507 2023 SPRING
COURSE: ARCH 507 | SPRING 2023 INSTRUCTOR: KAREN KENSEK
UP DN UP DN DN DN DN57' - 0" 125' 0" 165' 0" 18'5" 30'0" 17'0" 45' 5" 20'0" 250' 0" 97'7" 15' 0" 16' 0" 25'1" 332' 11 1/2" 29'11 1/2" 15'9 9/16" 57' 0" 42'9 1/16" 109' 4 11/16" 7'3" 31' 6" 8'0" Introduction to Revit Architecture Scale Project number Date Drawn by Half Size Set
1" = 20'-0" 2023/2/23 17:53:19 A103 PLAN AND INTERIOR PERSPECTIVE Project Number
York Visitor Center Owner Issue Date Author 1" = 20'-0" 1 01 FLOOR PLAN 1" = 20'-0" 2 02 FLOOR PLAN No. Description Date
Fort
01 FLOOR PLAN 0' - 9" 02 FLOOR PLAN 15' - 3" Level 3 25' - 3" Level 4 30' - 3" Level 5 -4' - 0" 5'0" 20' 0" 16' 11 31/32" 6' 0" 17'6" 14'6" 14' 9" 11'9" 01 FLOOR PLAN 0' - 9" 02 FLOOR PLAN 15' - 3" Level 3 25' - 3" Level 4 30' - 3" Level 5 -4' - 0" 15'6" 20'0" 13'6" 17'0" 11' 0" 9'0" 5' 0" 2 A104 8'1 25/32" 11'0" 14'6" 19'8 1/8" 6'8" 01 FLOOR PLAN 0' - 9" 02 FLOOR PLAN 15' 3" Level 3 25' 3" Level 4 30' 3" 2 A104 Level 5 -4' - 0" 17'3" 20'0" 2' 0" 2'0" 6'11" 1'1" 2'8 1/2" 2'8 1/2" Introduction to Revit Architecture Scale Project number Date Drawn by Half Size Set COURSE:
INSTRUCTOR:
As indicated 2023/2/23 17:53:22 A104 WALL SECTION & PARTIAL PERSPECTIVE Project Number
York Visitor Center Owner Issue Date Author 1" = 20'-0" 1 South 1" = 20'-0" 2 Section 2 1/8" = 1'-0" 3 Section 1 1/8" = 1'-0" 4 East No. Description Date
ARCH 507 | SPRING 2023
KAREN KENSEK
Fort
DN UPORIENTATION 1 VAULT 2 MULTI-FUNCTION 3 KITCHEN 4 ADMINISTRATION 5 ADMINISTRATION 6 MEETING ROOM 7 MECHANICAL AREA 8 OFFICE 10 OFFICE 11 ADMINISTRATION 12 OFFICE 13 OFFICE 14 LOBBY 15 MECHANICAL AREA 16 MECHANICAL AREA 17 LOBBY 18 GALLERY 19 RESTROOM 20 RESTROOM 21 RESTROOM 22 RECEPTION 23 TIME TUNNEL 24 GALLERY 25 MECHANICAL AREA 26 CAFE 27 13 CORRIDOR 28 Room Legend ADMINISTRATION CAFE CORRIDOR GALLERY GARAGE KITCHEN LOBBY MECHANICAL AREA MEETING ROOM MULTI-FUNCTION OFFICE ORIENTATION RECEPTION RESTROOM TIME TUNNEL VAULT GARAGE 29 2 A4-5 INSTRUCTOR: 2023 SPRINT ARCH 507 KAREN KENSEK STUDENT: SIQI ZHANG COURCE: ARCH 507 PROJECT NAME: TIME SPENT: 5 Hr GOOD THINGS: BAD THINGS: Fort York Visitor Center It is a good review of the content on the class. Many skills used in this assignment are same with assignment 1. 1" = 20'-0" 1 01 FLOOR ROOMS Room Schedule Number Name Area Count 1 ORIENTAT ION 1221 SF 1 2 VAULT 477 SF 1 3 MULTI-FU NCTION 943 SF 1 4 KITCHEN 576 SF 1 5 ADMINIST RATION 252 SF 1 6 ADMINIST RATION 380 SF 1 7 MEETING ROOM 330 SF 1 8 MECHANIC AL AREA 1553 SF 1 9 Room Not Placed 1 10 OFFICE 194 SF 1 11 OFFICE 169 SF 1 12 ADMINIST RATION 1672 SF 1 13 OFFICE 182 SF 1 14 OFFICE 444 SF 1 15 LOBBY 296 SF 1 16 MECHANIC AL AREA 186 SF 1 Room Schedule Number Name Area Count 17 MECHANIC AL AREA 1130 SF 1 18 LOBBY 345 SF 1 19 GALLERY 3384 SF 1 20 RESTROO M 156 SF 1 21 RESTROO M 114 SF 1 22 RESTROO M 114 SF 1 23 RECEPTIO N 1337 SF 1 24 TIME TUNNEL 423 SF 1 25 GALLERY 3191 SF 1 26 MECHANIC AL AREA 160 SF 1 27 CAFE 1462 SF 1 28 CORRIDO R 430 SF 1 29 GARAGE 1929 SF 1
INSTRUCTOR: 2023 SPRINT ARCH 507 KAREN KENSEK STUDENT: SIQI ZHANG COURCE: ARCH 507 PROJECT NAME: TIME SPENT: 5 Hr GOOD THINGS: BAD THINGS: Fort York Visitor Center It is a good review of the content on the class. Many skills used in this assignment are same with assignment 1. Doors Schedule Family Type Cost Count Mark Width Height Image Door-Curtai n-Wall-Dou ble-Glass Door-Curtai n-Wall-Dou ble-Glass 300.00 1 6' - 0" 13' - 7" Door-Curtai n-Wall-Sing le-Glass Door-Curtai n-Wall-Sing le-Glass 2800.00 8 3' - 11" <varies> Door-Doubl e-Flush_GL ASS 68" x 80" 400.00 2 <varies> 5' - 8" 6' 8" Door-Doubl e-Flush_Pa nel-DoubleActing 68" x 80" 1600.00 8 <varies> 5' - 8" 6' 8" Door-FlushConstructio n SpecialtiesAcrovyn-Pa ir-Dutch Door Double_Dut ch_Non Rated_SCL _DD SCL5-NR 400.00 1 18 6' - 0" 10' - 0" Door-FlushConstructio n SpecialtiesAcrovyn-Pa ir-Panel-Ma dison <varies> 0.00 3 <varies> <varies> <varies> Door-FlushConstructio n SpecialtiesAcrovyn-Si ngle-PanelSomerset <varies> 3150.00 7 <varies> 3' - 0" 7' 0" Door-Overh ead-Rolling 168'' x 168'' 990.00 3 <varies> 14' 0" 10' - 0" DoorLeaf_ Wooden DoorLeaf_ Wooden 0.00 1 40 3' - 0" 8' 0" Single-Flus h 30" x 80" 500.00 5 <varies> 2' - 6" 6' 8" Sliding_Do or-Hawa-Ju nior_100_Z _Wall_Mou nt SoftStop 0.00 1 6 2' - 9 1/8" 6' 10 17/32" Grand total: 40 10140.00 40 Window Schedule Family Type Cost Width Image metal panel window metal panel window 100.00 3' 0" metal panel window metal panel window 100.00 3' 0" metal panel window metal panel window 100.00 3' 0" metal panel window metal panel window 100.00 3' 0" metal panel window metal panel window 100.00 3' 0" metal panel window metal panel window 100.00 3' 0" metal panel window metal panel window 100.00 3' 0" metal panel window metal panel window 100.00 3' 0" metal panel window metal panel window 100.00 3' 0" metal panel window metal panel window 100.00 3' 0" metal panel window metal panel window 100.00 3' 0" Window-Do uble-Hung 30" x 46" 250.00 8' 0" Grand total: 12 1/2" = 1'-0" Doors & Windows Legend Copy 1 door curtain wall double glass scanned picture
Parameter differences: ROD MATERIAL 1, ROD MATERIAL 2, PANEL MATERIAL 2, FRAME-OUT-R, OFFSET
Pattern-based adaptive components:
This adaptive component is based on the triangle checkerboard pattern. It have a doublelayer frame with different diameter mullions. Three panels are installed on each component, all of them have changable material parameter.
Trellis form generation:
This form is generated by four different sizes and angles of triangles on different plans.
INSTRUCTOR: 2023 SPRINT ARCH 507 KAREN KENSEK STUDENT: SIQI ZHANG COURCE: ARCH 507 PROJECT NAME: TIME SPENT: 5 Hr GOOD THINGS: BAD THINGS: Fort York Visitor Center It is a good review of the content on the class. Many skills used in this assignment are same with assignment 1.
INSTRUCTOR: 2023 SPRINT ARCH 507 KAREN KENSEK STUDENT: SIQI ZHANG COURCE: ARCH 507 PROJECT NAME: TIME SPENT: 5 Hr GOOD THINGS: BAD THINGS: Fort York Visitor Center It is a good review of the content on the class. Many skills used in this assignment are same with assignment 1.
INSTRUCTOR: 2023 SPRINT ARCH 507 KAREN KENSEK STUDENT: SIQI ZHANG COURCE: ARCH 507 PROJECT NAME: TIME SPENT: 5 Hr GOOD THINGS: BAD THINGS: Fort York Visitor Center It is a good review of the content on the class. Many skills used in this assignment are same with assignment 1. 12" = 1'-0" 1 exterier all 12" = 1'-0" 2 exterier rendering 2_1 2 12" = 1'-0" interior rendering_1
01 FLOOR PLAN 0' 9" 02 FLOOR PLAN 15' 3" Level 3 25' 3" Level 4 30' 3" 2 A104 Level 5 -4' - 0" Cast-in-place concrete Soda Lime Glass EIFS Exterior Insulation Air Infiltration Barrier Soda Lime Glass Aluminum 6061 Rigid foam insulation board Cast-in-place concrete 3'3 1/32" 13' 6 5/8" 15'4 21/32" 9'5 5/8" 18'4" 24'6" 13' 7" 13' 7" INSTRUCTOR: 2023 SPRINT ARCH 507 KAREN KENSEK STUDENT: SIQI ZHANG COURCE: ARCH 507 PROJECT NAME: TIME SPENT: 5 Hr GOOD THINGS: BAD THINGS: Fort York Visitor Center It is a good review of the content on the class. Many skills used in this assignment are same with assignment 1. 1/4" = 1'-0" 2 Section 3 1 section perspective
INSTRUCTOR: 2023 SPRINT ARCH 507 KAREN KENSEK STUDENT: SIQI ZHANG COURCE: ARCH 507 PROJECT NAME: TIME SPENT: 5 Hr GOOD THINGS: BAD THINGS: Fort York Visitor Center It is a good review of the content on the class. Many skills used in this assignment are same with assignment 1. 1 explosion
curtain wall
Roof
Green roof
Slope
Metal penal
curtain wall
First floor
Second floor
PROJECT DESCRIPTION: 8 STORY, MIXED-USE, HIGH-RISE BUILDING
HEIGHT LIMIT: 85 FT.
CONSTRUCTION TYPE: TYPE IV
PROJECT ADDRESS: 723 N. MAIN STREET LOS ANGELES, CA 90012
ACCESSOR PARCEL NUMBER (APN): 5408-013-031
SITE GROSS AREA: 36,000 SQ. FT.
BUILDING AREA ANALYSIS: LOT AREA: 34,770.9 SQ. FT.
AREA: 38790 ABOVE GROUND.
ZONING DESIGNATION: FAR = BUILDING AREA LOT AREA: 0.819
USE: COMMERCIAL (STORES AND OFFICES)
OCCUPANCY: B/ M, 1/ 200 SF FIRE DISTRICT: 4 AREA MAP
SPRING STUDIO PROJECT
Designer: Louise Wang & Siqi Zhang
Scale Project number Date Drawn by Checked by 850 BLOOM WALK LOS ANGELES, CA 90089 723 N. MAIN ST. LOS ANGELES, CA 90012
COURSE:
2022
KAREN KENSEK TEAM 09 Michael Hricak & Karen Kensek SEAL SIGNATURE 12/11/2022 3:53:23 PM A-01 TITLE PAGE ASSIGNMENT 05 11/10/2022 AXONOMETRIC No. Description Date 3/16" = 1'-0" Sheet Index Sheet Number Sheet Name A-01 TITLE PAGE A-02 SITE PLAN A-03 FOUNDATION PLAN & SECTION A-04 GROUND FLOOR PLAN A-05 TYPICAL FLOOR PLAN A-14 ACCESS PLAN & EXIT DISCHARGE A-06 ROOF PLAN A-07 SYSTEMS COORDINATION A-08 EXTERIOR ELEVATIONS A-09 BUILDING SECTIONS A-10 SCHEDULES A-11 LARGE SCALE WALL SECTIONS A-13 LADBS BULLETIN GUIDELINES A-12 DETAILS
ARCH 526 FALL
INSTRUCTORS: MICHAEL HRICAK
FLOOR
SPRING STUDIO PROJECT
-A-08 1 -B C D E F A SECTION SECTION C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 C1517 M0820 M0820 M0820 M0820 M0820 M0820 M0820 M0820 M0820 M0820 M0820 M0820 18884.19 Small office 01 17347.09 Small office 02 18565.16 Small office 03 18952.18 Small office 04 33133.16 Meeting room 05 33396.31 Large office 06 19311.00 Small office 07 18916.50 Small office 08 17677.40 Small office 09 19599.88 Small office 10 SECTION 2-2 SECTION 2-2 SECTION 1-1 SECTION 1-1 Restroom 13 5 192 192 312 192 192 1080 130 117 124 126 16 199 160 552 166 880 68 312 144 43 228 156 120 Scale Project number Date Drawn by Checked by 850 BLOOM WALK LOS ANGELES, CA 90089 723 N. MAIN ST. LOS ANGELES, CA 90012
Designer: Louise Wang & Siqi Zhang COURSE: ARCH 526 FALL 2022 INSTRUCTORS: MICHAEL HRICAK KAREN KENSEK TEAM 09 Michael Hricak & Karen Kensek SEAL SIGNATURE 12/11/2022 3:53:27 PM A-05 TYPICAL FLOOR PLAN ASSIGNMENT 05 11/10/2022 No. Description Date Room 601 Large office TYPICAL FLOOR PLAN 3/16" = 1'-0"
SECTION 2-2
SPRING STUDIO PROJECT
SECTION 1-1
±0.000 F1 F2 4.636 B C D E F3 8.103 F4 11.824 F A F5 15.545 F6 19.266 F7 22.987 F8 26.708 F9 30.429 F10 34.150 ±-0.673 FOUNDATION PLAN F11 37.198 SECTION 2-2 SECTION 2-2 ±-1.438 FOUNDATION ROOF TOP 35.166 2 A-11 A-12 ±0.000 F1 F2 4.636 2 3 4 6 F3 8.103 F4 11.824 7 1 F5 15.545 F6 19.266 F7 22.987 F8 26.708 F9 30.429 F10 34.150 ±-0.673 FOUNDATION PLAN F11 37.198 SECTION 1-1 SECTION 1-1 1 A-11 ±-1.438 FOUNDATION ROOF TOP 35.166 FOOTING DETAIL FOOTING DETAIL 3 A-12 5Scale Project number Date Drawn by Checked by 850 BLOOM WALK LOS ANGELES, CA 90089 723 N. MAIN ST. LOS ANGELES, CA 90012
Designer: Louise Wang & Siqi Zhang COURSE: ARCH 526 FALL 2022 INSTRUCTORS: MICHAEL HRICAK KAREN KENSEK TEAM 09 Michael Hricak & Karen Kensek SEAL SIGNATURE 12/11/2022 3:53:34 PM A-09 BUILDING SECTIONS ASSIGNMENT 05 11/10/2022 No. Description Date
SPRING STUDIO PROJECT
±0.000 F1 2 F6 19.266 F7 22.987 F10 34.150 ±-0.673 FOUNDATION PLAN ±-1.438 FOUNDATION 3721 1438 ROOF TOP 35.166 36604 C1517 254 419 3048 254 419 254 1184 CLT FLOOR M_Timber Softwood, Lumber CLT FLOOR CLT PANEL WALL CLT FLOOR CLT PANEL WALL CLT PANEL WALL CLT FLOOR M_Timber Softwood, Lumber Reinforced Concrete Precast Concrete M_Sleeve Foundation M_Railing Round 3 A-12 ±0.000 F1 E F F7 22.987 F8 26.708 F10 34.150 ±-0.673 FOUNDATION PLAN ±-1.438 FOUNDATION ROOF TOP 35.166 3721 1438 1016 36604 254 419 254 419 GLASS CURTAIN WALL M_Timber Softwood, Lumber CLT FLOOR M_Timber Softwood, Lumber CLT FLOOR M_Timber Softwood, Lumber CLT FLOOR Reinforced Concrete - Precast Concrete M_Sleeve Foundation 4877 Scale Project number Date Drawn by Checked by 850 BLOOM WALK LOS ANGELES, CA 90089 723 N. MAIN ST. LOS ANGELES, CA 90012
Designer: Louise Wang & Siqi Zhang COURSE: ARCH 526 FALL 2022 INSTRUCTORS: MICHAEL HRICAK KAREN KENSEK TEAM 09 Michael Hricak & Karen Kensek SEAL SIGNATURE 12/11/2022 3:53:36 PM A-11 LARGE
ASSIGNMENT 05 11/10/2022 No. Description Date
SECTION 1 WALL SECTION 2
SCALE WALL SECTIONS
WALL
SPRING STUDIO PROJECT
E F8 26.708 RIGID INSULATION 5-PLY CLT FLOOR SLAB Air Infiltration Barrier CONCRETE TOPPING GYPSUM CEILING PANEL Aluminum Aluminum Steel, 45-345 Steel Softwood, Lumber 10 1 1 3 5 1 10 17 8 ±0.000 F1 B ±-0.673 FOUNDATION PLAN ±-1.438 FOUNDATION Reinforced Concrete Precast Concrete Softwood, Lumber CONCRETE TOPPING Air Infiltration Barrier RIGID INSULATION 5-PLY CLT FLOOR SLAB GYPSUM CEILING PANEL Softwood, Lumber Glass 10 1 1 3 5 1 11 17 71 16 16 31 18 18 14 2 E F10 34.150 ROOF TOP 35.166 ? Air Infiltration Barrier CONCRETE TOPPING 3-PLY CLT WALL PANEL CLADDING Air Infiltration Barrier CLADDING RIGID INSULATION CLADDING Air Infiltration Barrier 3-PLY CLT WALL PANEL GYPSUM WALL PANEL GYPSUM CEILING PANEL Softwood, Lumber 5 1 3 10 17 8 10 41 1 1 F8 26.708 F9 30.429 5-PLY CLT FLOOR SLAB RIGID INSULATION Air Infiltration Barrier CONCRETE TOPPING RIGID INSULATION 3-PLY CLT WALL PANEL GYPSUM WALL PANEL Air Infiltration Barrier CLADDING Steel, 45-345 Aluminum DOUBLE PANEL GLAZING WITH 1" AIR GAP Softwood, Lumber Steel, 45-345 Aluminum GYPSUM CEILING PANEL 10 17 10 8 2 2 4 1 1 1 1 1 3 5 1 10 110 Scale Project number Date Drawn by Checked by 850 BLOOM WALK LOS ANGELES, CA 90089 723 N. MAIN ST. LOS ANGELES, CA 90012
Designer: Louise Wang & Siqi Zhang COURSE: ARCH 526 FALL 2022 INSTRUCTORS: MICHAEL HRICAK KAREN KENSEK TEAM 09 Michael Hricak & Karen Kensek SEAL SIGNATURE 12/11/2022 3:53:37 PM A-12 DETAILS ASSIGNMENT 05 11/10/2022 No. Description Date FLOOR SLAB TO WALL FOOTING DETAIL ROOF AND PAEAPAT WINDOW DETAIL