Surya N. Pradhan
Experienced architect with 10 years of expertise in interior workplace design and turnkey project management. Skilled in creating functional and visually appealing work environments that optimize productivity and reflect organizational identity. Collaborative approach in understanding client requirements and objectives to develop innovative design concepts. Strong project management skills with a keen eye for detail, ensuring seamless execution from conceptualization to implementation. Proficient in budgeting, scheduling, and resource allocation to deliver high-quality results within specified timeframes and budget constraints. Track record of successfully completing various turnkey projects, exceeding client expectations. Blend of creativity and organizational acumen for delivering successful and aesthetically pleasing workspaces.
Content 01 National Trust For The Handicapped, New Delhi 02 Newsroom- Hindustan Times, New Delhi 03 Staubli Office, Gurugram 08 Federation Of Indian Mineral Industries headquarter, New Delhi 09 Fever 104 fm New delhi Mumbai 06 IARC Office Saket, New Delhi 04 Eco-Work Co-working space, bangalore 05 EBZ Office at Bestech business zone, Gurugram, Haryana 17 Micromax Informatics Ltd, Gurugram 10 HT Media HMVL Offices at Various Locations 11 STPI Office Building at Kochi, Kerela 12 Nutritional Rehabilitation Center at Angul, Odisha 13 Prajamandal Building at Angul, Odisha 14 Gangwal’s Villa at Kishangarh, Rajasthan 15 Panchatatva park, Angul, Odisha 16 Kukudanga Waterfront, Angul,Odisha 17 Rani Park Development Theme Park Talcher, Odisha
Ph- +919873089313 Email: surya4100@gmail.com | Linkedin: https://www.linkedin.com/in/surya -n-pradhan-6412892b/ Architect
SOFTWARE SKILLS HOBBIES JOURNEY TILLNOW
Lower Parel, Mumbai
NATIONAL TRUST FOR THE HANDICAPPED (New Delhi)
We provided a comprehensive service of Architecture and Interior design for the project that includes a 200 strength institute for the differently-abled which includes educational and vocational curriculum, a 500 seater auditorium, and corporate spaces for both JSPL and JSW.
Various architectural elements have been designed for the building by using unique materials. In the front a 4 meter high entrance made of glass doors and GRC cladding paves the way for an open to sky atrium connected to a multipurpose hall and an auditorium on opposite ends. The rear side of the building constitutes of the school area with highly equipped vocational trustees and federation. Two fully furnished high-end suits are also designed for visiting trustees.
01
Various architectural elements have been designed for the building by using unique materials. In the front a 4 meter high entrance made of glass doors and GRC cladding paves the way for an open to sky atrium connected to a multipurpose hall and an auditorium on opposite ends. The rear side of the building constitutes of the school area with highly equipped vocational classroom equipment and facilities. The designed for visiting trustees.
GRC CLADDING FACE FASCIA GRC PANEL ELE EIXED GLASS PANEL PANEL 0000 STONE CLADDING BEAM FACE BEAM cladding finish) GLASS DOOR PANEL PANEL CONCRETE STIFFENER COLUMN 230X230 STONE CLADDING SCALE 1:75 CORRIDOR Swing OPEN BEAM GRC CLADDING REFER DETAIL DRAWING FFL. GF. +29550 Scale 1:100 Glass Canopy Detail Glazing abovePivot Stone Cladding 11870 T.O.P +1050 MASONRY WALL PANEL 5180 6800 6800 5760 Scale 1:100 Scale 1300 Scale 1:100 BEAM MASONRY WALL 14725 STONE CLADDING +450 PANEL GLASS DOOR PANEL PANEL STONE CLADDING 2790 2790 11870 B.O.BEAM GRC GRC 2790 2790 2790Outside Inside Outside Inside--Outside Inside-Outside Inside Outside Inside NOTE:- ELEMENTS PANELS INSTALLATION 10MM THK.(SINGLE) SUBJECT STRUCTURE DEIGN. 525 101 525 101 525 101 525 101 525 101 525 480 480 480 100 101 101 101 101 283 525 364 364 364 scale NTH-DD-AR-05-0105/R7 drg. no. Owner architects project DRAWING NOT TO BE SCALED, ONLY WRITTEN DIMENSIONS TO ANY DISCREPANCY FOUND SITE SHALL INFORMED TO THE ARCHITECT'S OFFICE FOR FINAL DECISION CONTRACTOR SHALL CHECK ALL DIMENSIONS AND ANGLES SITE THIS READ CONJUCTION WITH ALL RELEVANT ARCHITECTURAL, STRUCTURAL, SERVICESS OR ANY OTHER DRAWINGS ISSUED THE CONTRACTOR SITE FOR CONSTRUCTION. LAYOUT SHALL BE DONE WITH THEODOLITE AND OTHER SURVEYING PRIOR START ANY CONSTRUCTION AT SITE INSTRUMENTS ONLY. FOLLOWED. NOTES: DATE R S No. DESCRIPTION R&G ARCHITECTS INTERNATIONAL 705-706, KIRTI SHIKHAR, PLOT NO. 11 DISTT. CENTRE JANAK PURI,NEW DELHI-110058 Phone: 25528744-45 PROPOSED COMPLEX & TRAINING INSTITUTE GROUND FLOOR PLAN NATIONAL TRUST FOR THE HANDICAPPED N T H 204 Sophia's Choice #7 St. Marks Road Banglore-560001 1:150 M/s.R&G ARCHITECTS INTERNATIONAL reserves exclusive right drawings and documents under the copyright and the same cannot used, reproduced,modified,tempered circulated without the written permission M/s. ARCHITECTS INTERNATIONAL ALL DIMENSIONS ARE MM AND LEVELS ARE METERS ALL EXTERNAL DIMENSIONS ARE WITHOUT CLADDING 17 NOV. 2012 R-0 GENERAL REVISIONS MODIFICATIONS 20 NOV. 2012 R-1 GOOD FOR CONSTRUCTION 26 DEC. 2012 R-2 GENERAL REVISIONS MODIFICATIONS RECEPTION WAITING 8270 7985 TRAINING ROOM 7450 5270 STUDENTS COMMON AREA 10270 12125 H.O.D. 5040X 6155 LOBBY 5185X 2950 CAFETARIA 10970 15820 LIFT 1750 2860 LIFT 1750 2860 AUDITORIUM 25435 20555 (324 SEATER) STAGE MULTI-FUNCTION 14655 15705 PRE-FUNCTION 6490 5600 GALLERY 5770 7480 LANDSCAPED AREA ENTRANCE VEHICULAR RAMP EXIT FROM BASEMENT VEHICULAR RAMP ENTRY FOR BASEMENT CUT OUT KITCHEN 5570 KITCHEN 5055 6590 REFER KITCHEN DETAIL REFER KITCHEN DETAIL POT WASH STORE 1825X 2500 WALL LVL.: +1050 FFL: +1650 LVL.: +1050 LVL.: +1050 FFL: +600 LVL.: +950 LVL.: +1050 OPEN SKY LANDSCAPED AREA OPEN TO SKY OPEN SKY LVL.: +1050 SECRETARIAL STAFF 7885 6040 1 4 WHEEL CHIAR FOYER 2640 2200 GENTS 3770 5990 Q Q 4000 2820 600 5760 7900 2100 5720 6590 6740 3225 4000 4065 12 13 16 11 14 15 18 19 20 21 21 8a 2800 2240 7275 4000 2820 5180 6740 6590 6740 5180 Gx Gy Gz Hx 7225 3270 9a 2800 600 2240 5760 6800 WATER DISPENSER GIRLS 3210X5870 BOYS 3725X5870 900 900 700 OUT CUT OUT 1015 3000 CUT OUT CUT OUT CUT OUT OUT 3000 CUT OUT 1200 CUT OUT CUT OUT CUT OUT 760 1000 CUT OUT OUT CUT OUT UP 2523 LVL.: +300 1260 750 SLAB SLAB SLAB SLAB SLAB 900X1600 900X1800 SLAB 15a 13a 135 Sx 230 1520 1520 1520 230 1520 230 CUT OUT SLAB LVL.: +1050 ESCAPE STAIRCASE EXIT DOOR FFL +550 PLANTER RAMP DN LVL. +150 RAMP DN RAMP UP FIRST FLOOR LVL. RAMP FIRST FLOOR LVL. +1050 LVL. +550 LVL. +950 230 1300 115 1675 1265 1500 1265 115 1440 115 TOIL. 1950 1820 1820 230 1490 230 2050 115 1260 2050 2060 1200 230 3710 1200 650 115 8270 1455 1120 2240 1140 2240 1120 2240 1120 2240 1120 1460 1120 1720 ST-1 ST-2 ST-4 ST-7 ST-3 ST-5 +300 FROM BASEMENT 2930313233343536 5040 115 2000 635 1200 4160 1275 7885 1500 810 2560 230 10270 5540 2000 STAIR DETAIL REF. DRG. NO. AR-401 STAIR DETAIL REF. DRG. AR-0402 STAIR DETAIL REF. DRG. NO. AR-403 STAIR DETAIL REF. DRG. AR-0404 STAIR DETAIL REF. DRG. AR-405 STAIR DETAIL REF. DRG. NO. AR-0406 STAIR DETAIL REF. DRG. NO. AR-0407 170 230 170 230 230 1340 1120 1980 1120 1980 1120 1980 1120 1980 1120 115 115 115 115 115 14655 1918 230 1285 230 230 6750 1120 1120 1120 115 115 115 115 115 115 CANOPY ABOVE 3015 1980 115 1120 1195 1120 115 6490 1120 1980 1980 1120 1120 115 115 1675x 2000 TOIL. 1400x 2000 TOILET DETAIL REF. DRG. AR-0501 ATRIUM DETAIL REF. DRG. NO. AR-0409 TOILET DETAIL REF. DRG. NO. AR-0502 TOILET DETAIL REF. DRG. NO. AR-0502 AUDITORIUM DETAIL REF. DRG. AR-0301 GROUND FLOOR PLAN 230 300 1140 2000 1140 1505 RM. 1615x2860 1615 1120 1980 1120 2030 TSS: +1550 2400 1200 1200 010305 3300 900 3300 900 FHC CUT OUT 520X1545 250 255 CUT OUT 330X1490 METAL METAL JALI FLOOD LIGHTS FLOOD LIGHTS CANOPY ABOVE C B D 1700 4115 660 1700 3015 230 R7940 R6025 R6025 R7940 08 FEB 2013 R-3 REVISION GREEN ROOM PLAN R3 RAMP SLOPE 1:12 12a 2430 LIFT 2525 2140 LIFT 2525 2140 +3450 2000 2350 2000 D10 FCD W26 W26 FCD W23 W23 W27 W27 6751 CUT OUT 1120 545 1850 1120 1120 LANDSCAPED AREA 02 MAY 2013 R-4 REVISION ST-6 AND ATRIUM LIFT LOBBY COLUMNS PER STRU. DETAIL 5025 2655 LVL.: +950 LVL.: +1050 LVL.: +1050 1200 115 R4 LVL.: +950 1351 Glass FOYER 2755 1800 LADIES 3770 5960 2000 230 FIRE CONTROL 3000 3000 555 FCD FHC FHC 1000 FCD 22 AUG 2013 R-5 GENERAL REVISIONS MODIFICATIONS 2980 9000 1800 2400 W31 W31 W31 2240 1760 1155 1120 2400 5720 HOLD 29 AUG 2013 R-6 GENERAL REVISIONS MODIFICATIONS R6 R6 R6 R6 W26 W26 OPEN SKY 7325 2150 775 3300 1200 3600 11993 LVL.: +1050 1500 3790 230 1000 6260 JANITOR GENTS TOILET LADIES TOILET 5770 OFFICE 3260 3080 SPACE 05 NOV 2013 R-7 REVISIONS DUE TO AS/SITE CONDITIONS ADVANCE COPY FOR APPROVAL 6260
NEWSROOM - HINDUSTAN TIMES (New Delhi)
In an environment necessitating constant communication, creativity, and collaboration, the imperative lies in crafting a fresh, open, and dynamic design that is paramount for establishing the project’s identity. The Newsroom, featuring a collective setup comprising approximately 650 workstations, has been meticulously planned to facilitate the comprehensive functioning of all three arms of the company: Hindustan Times, Hindi Times building at New delhi. arrangement of workstations, promoting transparency and openness within the space semi-open elements are strategically incorporated in all meeting and cabin rooms, effectively eliminating barriers to interaction.
02
STAUBLI OFFICE (Gurugram, Haryana)
Stäubli is a global mechatronics solution provider with three dedicated activities: Connectors, Robotics and Textile, serving customers who want to increase their productivity in many industrial sectors. We had to create design which would drive the young energitic professionals ahead
of a stand alone building fully dedicated to the company. In response to the demand for solutions that propel young, energetic professionals forward in their expeditions, we meticulously crafted a design that aligns with their vision. Emphasizing simplicity, clarity, and minimalistic aesthetics, our design ensures seamless integration with their theme. As a result, we have successfully cultivated a vibrant and positive work environment that fosters productivity and well-being for these dynamic professionals
03
ECO - WORK CO-WORKING SPACE (Bangalore)
Eco-Work represents a contemporary co-working space meticulously crafted to accommodate 250 workstations, offering a comprehensive range of common facilities. These amenities include a well-equipped Conference Hall, Meeting rooms, Toilets, Lunch area, and Huddle spaces, Infant Properties, the esteemed client, sought to incorporate this co-working space on the consideration, the space was meticulously designed to seamlessly cater to the needs of both the co-working tenants and Infant Properties. The shared facilities were strategically planned and integrated to ensure effortless utilization by both entities, fostering a harmonious and productive environment for all occupants.
04
GROUND FLOOR
FIRST FLOOR
EBZ Office at Bestech business Zone (Gurugram , Haryana)
The EBZ SysTec India Pvt. Ltd. is part of EBZ Group supporting automotive industry in the area of complete process chain of tooling and production line installation. From engineering to manufacturing.
the Bestech business zone, Gurugram for EBZ SysTec India Pvt. Ltd. The space had a unique concept for the design of both workstations and cabin areas.
05
International Asset Reconstruction Company (New Delhi)
encompassed an area of 6000 square feet, which combined three distinct commercial units. The primary objective was to optimize the utilization of the ceiling height, leading to the decision to implement an open ceiling design throughout the space. Additionally, powder-coated oval ducts and other essential services were incorporated to meet the necessary requirements.
06
MICROMAX INFORMATICS LTD (Gurugram, Haryana)
the interior and the workstations that are used by most staff in the open area with direct access to natural light. The project was done on an execution only Basis.
07
FEDERATION OF INDIAN MINERAL INDUSTRIES (New Delhi)
FIMI (Federation of Indian Mineral Industries) is a 350-member body looking after the interests of the mining and mineral production industries in the country.
08
Fever 104 fm OFFICE (Mumbai | New Delhi)
Fever 104 stands as a prominent radio station in the nation, boasting a vast and dedicated audience. The process of crafting its studio necessitated optimal acoustics throughout the space, with special emphasis on the studios, all while establishing an ambiance that resonates with the brand’s esteemed heritage. ideas among the workforce, a critical aspect in a fast-paced, creative environment such as Fever 104 fm. The exposed ceiling artfully integrates with the brand’s graphical design and color palette within the interior, further enhancing its overall aesthetic appeal.
09
HT MEDIA LTD (New Delhi, Kanpur, Lucknow)
members but also to establish an atmosphere that fosters open communication and collaboration. kitchen facility.
This huddle space serves as an informal meeting area, encouraging chance encounters and providing an ideal platform for idea exchanges and enhanced communication among employees. Recognizing the immense value of impromptu discussions and brainstorming sessions, this space aims to stimulate creativity and innovation, enabling teams to explore fresh perspectives and cultivate a collaborative culture.
By fostering an environment that nurtures teamwork, knowledge sharing, and cohesive creation of an engaged and dynamic workforce. The synergistic combination of functional design and an emphasis on collaborative harmonious and productive work environment. We trust that these strategic arrangements will within the organization.
Sector : Corporate
Services : Interiors
Client : HMVL
Size 8,000 - 30,000 sqft
10
STPI Office Building (Kochi, Kerela)
The proposed bbuilding was to be constructed in 2 phases. Phase-1 to have a maximum area of 30,000 sqft whereas the phase-2 to have max area of 94,000 sqft. Both the blocks (Phases) of the building to have a common service core so that it can be constrrcted with the phase 1 design while also it can be used for cumulatively for both of the spaces after completion of the phase-2 of the building.
in line with the site existing topography the 2 phases/blocks were designed on split level with a level difference of 2.1m in between them with services and lift lobbies at different levels connected with an open staircase connecting the two blocks. This results in seamless connectivity between the two blocks as one has to climb only 2.1m to access the lobby in the other block.
11
NRC Building (Angul, Odisha)
The Nutritional Rehabilitation Centre (NRC) is a specialized healthcare facility dedicated to treating children under the age of 10 who suffer from malnutrition. The center’s design is in line with modern hospital standards, ensuring a conducive environment for treatments and care. Considering informative, and educative. The interior spaces are thoughtfully planned to accommodate various treatment procedures while also providing ample space for educational activities. The center emphasizes educating caregivers and parents about the nutritional values of different foods and grains. This approach ensures that once the children are discharged, their families can continue providing them with appropriate nourishment.
12
Outside the facility, a large playground caters to children of different age groups. This area serves not only as a recreational space but also as an opportunity for physical activity, aiding in the overall well-being of the children. Additionally, a small vegetable garden is incorporated into the campus design. This garden serves as an interactive learning space where children and their families can explore and understand locally available nutritious foods, fostering a deeper understanding of healthy dietary choices.
01 12 10 02 07 06 08 04 KITCHEN BATH #03 W1 W1 W1 W1 W2 W1 G3 UP WC UP ELECTRICAL ROOM LANDING GR. FLOOR LANDING DINING DORMITORY #01 (10 BEDED) CORRIDOR GR. FLOOR UP UP PLAY AREA W1 STAIRCASE RISER: 150MM RAMP #01 WINDOW SEATING DOUBLE MURAL RECEPTION 400 1187 2675 4025 400 3400 250 1050 1050 1050 1050 1175 4350 150 400 2000 1340 1200 1200 600 780 4350 150 1500 2150 4650 4650 400 1737 2050 103-AR-FLP-01 ThisDrawingandDesignaretheintellectualpropertyof AYRLIN STUDIO.Thismaynotbereproduced,copied,circulatedorbe usedforanyotherpurposesapartfromitsintendedpurpose without written permission from AYRLIN STUDIO. 2.Thisdrawingistobereadinconjunctionwiththerelevant specifications and conditions contract. 3.Alldimensionsareonlytobereadandnotmeasuredor scaled. 4.Thisdrawingunlessstampedandsignedgoodfor constructionbyallagenciesconcernedshallnotbeused foranysiteworks,procurementofmaterialsorforany construction activity on site. 5.Anyandallinformationinthisdrawingissubjecttodue verificationandacceptancebytheprojectmanagement agency/Client.Discrepanciesifanyshallbebroughttothe notice immediately. 6.Anyandallmaterialsspecifiedinthisdrawingaresubjectto variationsincolor,grain,texture,tone,warpingetc.which areinherenttonaturalmaterialsaswellastomanmade materials due the manufacturing processes involved. 7.Alllevelsindicatedonthisdrawingarefinishedlevelsunless expressly specified. 8.Thisdrawingistobereadinconjunctionwithallother services/structure/otherconsultantsdrawingsasmaybe applicable. 9.Alldimensionsaretobeverifiedonsitebythecontractor andanydiscrepancyshallbebroughttothenoticeofthe project management agency. 10.Thisdrawingshallinnowaysubstitutetheneedforthe clientoranyotheragencytocomplywithanyandall statutoryrequirements,inspections,activitiesandor compliance. 11.AYRLIN STUDIO shallnotbeliablefortheaccuracyof executiononsiteoftheinformationcontainedinthis drawing. R0 GROUND FLOOR FURNITURE LAYOUT PLAN 10 02 05 09 11 BATH G2 DOUBLE AREA FRAME AS/SHOP DWG DN DORMITORY #02 COUNSELING ROOM NURSE STATION GENTS TOILET LADIES TOILET CORRIDOR LANDING 1ST FLOOR LANDING (10 BEDED) RAMP STORAGE 990 1050 400 2675 3400 2025 300 2025 1650 1750 2475 600 3825 3461 11150 103-AR-FLP-02 ThisDrawingandDesignaretheintellectualpropertyof AYRLIN STUDIO.Thismaynotbereproduced,copied,circulatedorbe usedforanyotherpurposesapartfromitsintendedpurpose without written permission from AYRLIN STUDIO. 2.Thisdrawingistobereadinconjunctionwiththerelevant specifications and conditions contract. 3.Alldimensionsareonlytobereadandnotmeasuredor scaled. 4.Thisdrawingunlessstampedandsignedgoodfor constructionbyallagenciesconcernedshallnotbeused foranysiteworks,procurementofmaterialsorforany construction activity site. 5.Anyandallinformationinthisdrawingissubjecttodue verificationandacceptancebytheprojectmanagement agency/Client.Discrepanciesifanyshallbebroughttothe notice immediately. 6.Anyandallmaterialsspecifiedinthisdrawingaresubjectto variationsincolor,grain,texture,tone,warpingetc.which areinherenttonaturalmaterialsaswellastomanmade materials due manufacturing processes involved. 7.Alllevelsindicatedonthisdrawingarefinishedlevelsunless expressly specified. 8.Thisdrawingistobereadinconjunctionwithallother services/structure/otherconsultantsdrawingsasmaybe applicable. 9.Alldimensionsaretobeverifiedonsitebythecontractor andanydiscrepancyshallbebroughttothenoticeofthe project management agency. 10.Thisdrawingshallinnowaysubstitutetheneedforthe clientoranyotheragencytocomplywithanyandall statutoryrequirements,inspections,activitiesandor compliance. 11.AYRLIN STUDIO shallnotbeliablefortheaccuracyof executiononsiteoftheinformationcontainedinthis drawing. R0 FIRST FLOOR FURNITURE LAYOUT PLAN G 05 04 GRC FIXED FRAME AS/SHOP DWG DN FEEDING ROOM VISION IMPAIRMENT HEARING IMPAIRMENT TOILETS FOR DIFFERENTLY ABLED REGISTRATION WAITING LOBBY LIFT SHAFT 1800 1650 LANDING LANDING 2ND FLOOR STAIRCASE STAIRCASE RISER: 150MM DENTAL BENCH LOW STORAGE 150 500 600 800 600 724 600 1425 1050 1316 1800 900 400 1600 3800 1800 3461 150 250 1325 3525 600 2475 4525 2950 300 2025 2025 103-AR-FLP-03 ThisDrawingandDesignaretheintellectualpropertyof AYRLIN STUDIO.Thismaynotbereproduced,copied,circulatedorbe usedforanyotherpurposesapartfromitsintendedpurpose without written permission from AYRLIN STUDIO. 2.Thisdrawingistobereadinconjunctionwiththerelevant specifications and conditions contract. 3.Alldimensionsareonlytobereadandnotmeasuredor scaled. 4.Thisdrawingunlessstampedandsignedgoodfor constructionbyallagenciesconcernedshallnotbeused foranysiteworks,procurementofmaterialsorforany construction activity site. 5.Anyandallinformationinthisdrawingissubjecttodue verificationandacceptancebytheprojectmanagement agency/Client.Discrepanciesifanyshallbebroughttothe notice immediately. 6.Anyandallmaterialsspecifiedinthisdrawingaresubjectto variationsincolor,grain,texture,tone,warpingetc.which areinherenttonaturalmaterialsaswellastomanmade materials due manufacturing processes involved. 7.Alllevelsindicatedonthisdrawingarefinishedlevelsunless expressly specified. 8.Thisdrawingistobereadinconjunctionwithallother services/structure/otherconsultantsdrawingsasmaybe applicable. 9.Alldimensionsaretobeverifiedonsitebythecontractor andanydiscrepancyshallbebroughttothenoticeofthe project management agency. 10.Thisdrawingshallinnowaysubstitutetheneedforthe clientoranyotheragencytocomplywithanyandall statutoryrequirements,inspections,activitiesandor compliance. 11.AYRLIN STUDIO shallnotbeliablefortheaccuracyof executiononsiteoftheinformationcontainedinthis drawing. R0 SECOND FLOOR FURNITURE LAYOUT PLAN SPACE FOR SOLAR PANEL INSTALLATION RWP RWP RIDGE SPACE FOR SOLAR PANEL INSTALLATION RWP RWP DN LANDING STAIRCASE TREAD: 300MM RISER: 150MM TERRACE LVL SPACE FOR SOLAR PANEL INSTALLATION 01 03 10 09 04 PROVISION FOR LIFT O/H TANK LVL TERRACE LVL 103-AR-LP-04 ThisDrawingandDesignaretheintellectualpropertyof STUDIO.Thismaynotbereproduced,copied,circulatedorbe usedforanyotherpurposesapartfromitsintendedpurpose without written permission from AYRLIN STUDIO. 2.Thisdrawingistobereadinconjunctionwiththerelevant specifications and conditions contract. 3.Alldimensionsareonlytobereadandnotmeasuredor scaled. 4.Thisdrawingunlessstampedandsignedgoodfor constructionbyallagenciesconcernedshallnotbeused foranysiteworks,procurementofmaterialsorforany construction activity site. 5.Anyandallinformationinthisdrawingissubjecttodue verificationandacceptancebytheprojectmanagement agency/Client.Discrepanciesifanyshallbebroughttothe notice immediately. 6.Anyandallmaterialsspecifiedinthisdrawingaresubjectto variationsincolor,grain,texture,tone,warpingetc.which areinherenttonaturalmaterialsaswellastomanmade materials due manufacturing processes involved. 7.Alllevelsindicatedonthisdrawingarefinishedlevelsunless expressly specified. 8.Thisdrawingistobereadinconjunctionwithallother services/structure/otherconsultantsdrawingsasmaybe applicable. 9.Alldimensionsaretobeverifiedonsitebythecontractor andanydiscrepancyshallbebroughttothenoticeofthe project management agency. 10.Thisdrawingshallinnowaysubstitutetheneedforthe clientoranyotheragencytocomplywithanyandall statutoryrequirements,inspections,activitiesandor compliance. 11.AYRLIN STUDIO shallnotbeliablefortheaccuracyof executiononsiteoftheinformationcontainedinthis drawing. TERRACE FLOOR LAYOUT RCC COLUMN AS/STRUCTURAL DETAILS MM GROOVES GRIT FINISH MM THK KOTA STONE COPING DARK GREY POWDER COATED FINISH MS 30X30MM BOX SECTION GRIT FINISH 2950 RCC COLUMN AS/STRUCTURAL DETAILS PLASTER WITH GRIT FINISH BRICK WALL INSIDE OUTSIDE ELEVATION PLAN 2950 2950 800 DARK GREY POWDER COATED FINISH MS 30X30MM BOX SECTION GRIT FINISH DARK GREY POWDER COATED FINISH MS 30X30MM BOX SECTION BRICK WALL Inside Site Outside Plaster finish Column mm mm Groove Concrete Coping Plaster Groove Brick Masonry Inside Site Outside mm flats Frame 30X30 grey powder coated section Plaster with finish 900 900 950 300 800 NOTES GENERAL NOTES: 103-AR-LP-07 This Drawing and Design are the intellectual property AYRLIN STUDIO This may not be reproduced, copied, circulated be used any other purposes apart from intended purpose without written permission from AYRLIN STUDIO. 2.This drawing be read conjunction with the relevant specifications and conditions contract. 3.All dimensions are only be read and not measured scaled. 4.This drawing unless stamped and signed good for construction by agencies concerned shall not be used for any site works, procurement materials any construction activity on site. 5.Any and information drawing subject due verification and acceptance project management agency/Client. Discrepancies any shall brought to the notice immediately. 6.Any and materials specified this drawing are subject variations color, grain, texture, tone, warping etc. which are inherent natural materials well manmade materials due the manufacturing processes involved. 7.All levels indicated drawing finished levels unless expressly specified. 8.This drawing read conjunction with other services/structure/other consultants drawings may be applicable. 9.All dimensions are be verified on contractor and any discrepancy shall be brought the notice of the project management agency. 10.This drawing shall way substitute the need the client any other agency comply with any and statutory requirements, inspections, activities and compliance. 11.AYRLIN STUDIO shall be liable the accuracy execution on the information contained this drawing. NO.DATE CLIENT: PROJECT: DESCRIPTION REVISIONS TITLE:ARCHITECT:DRAWING NO.:AYRLIN STUDIO reserves excusive right the drawings and documents under copyright act and same cannot used, reproduced, modified, tempered circulated without written permission AYRLIN STUDIO. DISTRICT MINERAL FOUNDATION ANGUL AYRLIN STUDIO PMC: BRIDGE AND ROOF CO. (INDIA) LTD R0.18.09.2022 BRIDGE AND ROOF CO. LIMITED, OCHC Complex, Floor, Near Ram Mandir, Janpath, Unit-Ill, Bhubaneswar, Odisha 751001 B-13, Gound floor, Block-B, Manbhari Kunj, Gali no-12, Meethapur Extension, Badarpur, New delhi-110044 R1 REV: BOUNDARY WALL DETAILS AYRLINSTUDIO 18SEPTEMBER2022 GOODFOR CONSTRUCTION NUTRITION REHABILITATION CENTER & DISTRICT EARLY INTERVENTION CENTER NRC DEIC GOOD FOR CONSTRUCTION
13
PRAJAMANDALA Building (Talcher,Odisha)
a space for the community to come together and engage in social gatherings, discussions, and learning.
The building design incorporates ample open spaces that seamlessly connect with the main areas, such as the Multipurpose Hall, which serves as a hub for various social gatherings. The library, adorned with a beautiful dome, features both closed and open spaces thoughtfully curated to enhance users’ experiences. Moreover, the careful integration of outdoor spaces and staircases in the courtyard fosters an educative, interesting, and enjoyable ambiance.
Amidst the culturally rich context of Angul, the Prajamandal Building stands as a tribute to the city’s heritage. It blends seamlessly with its surroundings, serving as a beacon of remembrance, community engagement, and continuous learning for generations to come.
14
Gangwal’s Villa Interior (Kishangarh)
Our main aim was to create spaces where one would feel at complete sync with oneself and nature. We wanted to drive the interiors in a very sustainable manner that would inspire generations to come into a more responsible living. We created a theme that is modern rustic with a natural and earthy palette of locally available stones and timber. The colour palette is muted in neutral shades with some accents to add a touch of playfulness.
15
The main aim is to create spaces where one would feel at complete sync with oneself and nature. We would help create spaces and elements that would be educative while being interesting and fun.
We can create a theme that can be driven by our core existence –“PANCHA TATVA”- the elements of life.
We would design the model park with a vision to put it in a global platform with respect to theme and design elements. It would be a place to sojourn. It would sit beautifully in the culturally rich context of Angul. It would attract tourists to come visit this PANCHA TATVA Park and admire and learn about our existence and also relax. For local people it will provide a great source of pride and they can come for a perfect day of leisure. Adults and kids alike can enjoy the different spaces, elements and functions dedicated to different age groups and to activate different stimulus.
ThisDrawingandDesignaretheintellectualpropertyof AYRLIN STUDIO.Thismaynotbereproduced,copied,circulatedorbe usedforanyotherpurposesapartfromitsintendedpurpose without written permission from AYRLIN STUDIO. 2.Thisdrawingistobereadinconjunctionwiththerelevant specifications and conditions contract. 3.Alldimensionsareonlytobereadandnotmeasuredor scaled. 4.Thisdrawingunlessstampedandsignedgoodfor constructionbyallagenciesconcernedshallnotbeused foranysiteworks,procurementofmaterialsorforany construction activity on site. 5.Anyandallinformationinthisdrawingissubjecttodue verificationandacceptancebytheprojectmanagement agency/Client.Discrepanciesifanyshallbebroughttothe notice immediately. 6.Anyandallmaterialsspecifiedinthisdrawingaresubjectto variationsincolor,grain,texture,tone,warpingetc.which areinherenttonaturalmaterialsaswellastomanmade materials due the manufacturing processes involved. 7.Alllevelsindicatedonthisdrawingarefinishedlevelsunless expressly specified. 8.Thisdrawingistobereadinconjunctionwithallother services/structure/otherconsultantsdrawingsasmaybe applicable. 9.Alldimensionsaretobeverifiedonsitebythecontractor andanydiscrepancyshallbebroughttothenoticeofthe project management agency. 10.Thisdrawingshallinnowaysubstitutetheneedforthe clientoranyotheragencytocomplywithanyandall statutoryrequirements,inspections,activitiesandor compliance. 11.AYRLIN STUDIO shallnotbeliablefortheaccuracyof executiononsiteoftheinformationcontainedinthis drawing. (INTERPRETATION CENTER) ThisDrawingandDesignaretheintellectualpropertyof AYRLIN STUDIO.Thismaynotbereproduced,copied,circulatedorbe usedforanyotherpurposesapartfromitsintendedpurpose without written permission from AYRLIN STUDIO. 2.Thisdrawingistobereadinconjunctionwiththerelevant specifications and conditions of contract. 3.Alldimensionsareonlytobereadandnotmeasuredor scaled. 4.Thisdrawingunlessstampedandsignedgoodfor constructionbyallagenciesconcernedshallnotbeused foranysiteworks,procurementofmaterialsorforany construction activity site. 5.Anyandallinformationinthisdrawingissubjecttodue verificationandacceptancebytheprojectmanagement agency/Client.Discrepanciesifanyshallbebroughttothe notice immediately. 6.Anyandallmaterialsspecifiedinthisdrawingaresubjectto variationsincolor,grain,texture,tone,warpingetc.which areinherenttonaturalmaterialsaswellastomanmade materials due to the manufacturing processes involved. 7.Alllevelsindicatedonthisdrawingarefinishedlevelsunless expressly specified. 8.Thisdrawingistobereadinconjunctionwithallother services/structure/otherconsultantsdrawingsasmaybe applicable. 9.Alldimensionsaretobeverifiedonsitebythecontractor andanydiscrepancyshallbebroughttothenoticeofthe project management agency. 10.Thisdrawingshallinnowaysubstitutetheneedforthe clientoranyotheragencytocomplywithanyandall statutoryrequirements,inspections,activitiesandor compliance. 11.AYRLIN STUDIO shallnotbeliablefortheaccuracyof executiononsiteoftheinformationcontainedinthis drawing. SECTIONS & DETAILS 16
Aim would be to create a park that is not only a recreational green space in nature but also and encourages different ecologies.
The vision for this development is “To inspire a sustainable development that establishes an unique waterfront design, strengthens the neighbourhood and creates a feeling of belonging by providing diverse cultural, recreational and economic opportunities for all. Establish the riverfront as an important natural habitat with landscape design to help create a diverse habitat
• The site spreads across 11.6 acres (approx)
sediment. (As we can see the different timelines from google earth)
• The site have level differences which can be coherently dealt with in the proposed design.
• •
17
This is an open space system which lies in very close proximity to the famous Talcher Palace. It spreads in an opulent area of some 30 acres but we chose a program to utilize an area of approx 10 acres. The client wanted us to create a program that could complement the palace too. We listened to what the site had to offer and the need of the place and what potential it carried and designed a program for our design. We used the existing pond and decided to utilise it and created a modern ghat and a waterfront development which would have the capacity to house many informal and casual outings for the localites and tourists alike.To promote local business, space for vendors and small stores were provided in the entrance plaza area which is also a sculptural court to attract tourists and become a focal attraction of the site.
We intended to create a nature themed adventure park wherein the core design tenet would be nature and activities and functions designed around nature.
This park spread out in an area of 4.5 acre in Ganjam district in Orissa is built as an interaction and recreational zone catering to the district. It is themed around the heritage of tribal culture of the place.
This public park encourages the involvement of the local art and craft along with artisans and it sets culture as backdrop for the various public recreational activities. This park is one of a kind themed parks in the district and will be a major crowd and tourist puller.
18
Surya N. Pradhan
Ph- +919873089313
Email: surya4100@gmail.com
Linkedin: https://www.linkedin.com/in/surya-n-pradhan-6412892b/
Thank You for looking!
2023 Architecture portfolio