Submarine Cable Almanac Issue 34

Page 243

SAC

SOUTH AMERICAN CROSSING System Details

Landing Points

RFS Year

2001

• Buenaventura (Colombia)

• Lurin (Peru)

EOS Year

2026

• Saint Croix (United States)

• Fortaleza (Brazil)

Est. System Cost (USD)

$520,000,000

• Fort Amadour (Panama)

• Las Toninas (Argentina)

Length (km)

15,983

• Valparaiso (Chile)

• Santos (Brazil)

Design Capacity (Tbps)

4.84

• Puerto Viejo (Venezuela)

• Rio de Janeiro (Brazil)

Fiber Pairs

4

Wavelengths per Fiber Pair

30

Capacity per Wavelength (Gbps)

40

Owners

CenturyLink

System Installer

Alcatel Submarine Networks

Upgrader

Infinera, Infinera

Upgrade Year

2010, 2011

Upgrade Capacity (Gbps)

10, 10

Region

Americas

Contact Email

Andy.Pitman@centurylink.co m

View industry news related to this cable system

Page 243


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.