Almanac Issue 21

Page 28

ALETAR

T a r t u s

A l e x a n d r i a

ALETAR RFS Year:

1997

Est. End of Service Date: 2022 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs: Owners:

System Supplier:

• Alexandria (Egypt) • Tartus (Syria)

733

5 Gbps

1 Fiber Pair

Lebanese Ministry of Telecom (6.25%), Syrian Telecom (46.875%), Telecom Egypt (46.875%) Alcatel Submarine Networks

System Installer: FCR Cableship:

LANDING POINTS:

23,000,000

System Maintainer:

Vercors

Telecom Egypt

Region: EMEA


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.