02 04 08 cantilever f21/arc3011 silverlake mixed-use s22/arc3021 simone biles orthopedic surgery center f22/arc4011

the cantilever

was designed with the intent of understanding the properties of a cantilever in architectural design. Taking on a diving-board like shape with its base anchored in the side of a hill and its tail reaching over the valley supported by tension cables, the Cantilever experiments with stairs, overhanging platforms, and glass to form a building.

The building stands on six steel columns which reach deep into the hill for stability and is supported by steel framing throughout, and is composed of 10x10x10 feet modules stacked in various ways to form a T-shaped structure. The centermost node is insulated and is enclosed in fiber cement siding.

3/4” CONCRETE ROOF TILES 3/8” SCREWS @ 6 IN. OC FLASHING STEEL PANEL SUPPORTS WEATHER BARRIER RIGID INSULATION PLYWOOD SHEATHING 2 X 8 ROOF JOISTS BATT INSULATION GYPSUM BOARD 1/4” CONCRETE PANELS 1/2” SCREWS STEEL PANEL SUPPORTS JOINT FLASHING WEATHER BARRIER RIGID INSULATION PLYWOOD SHEATHING 6 X 6 STEEL FRAMING 2 X 6 WOOD FRAMING BATT INSULATION GYPSUM BOARD ROOF EXTERIOR WALL FLOOR WOOD VENEERED FLOOR PLYWOOD SUBFLOORING 2 X 6 WOOD FRAMING 6 X 6 STEEL FRAMING FLASHING CONCRETE SLAB FOUNDATION 6 X 6 STEEL FRAMING ANCHOR BOLTS BASE PLATE CONCRETE FOUNDATION CONCRETE FOOTING DRAWING NOT TO SCALE DRAWING NOT TO SCALE DRAWING NOT TO SCALE DRAWING NOT TO SCALE WALL SECTION 0 1 2 4 FT A B C D E RIGID INSULATION BATT INSULATION CONCRETE STEEL 02

fall 2021/arc3011 - third year design studio

cantilever
EL. +0’-0” EL. +12’-4” EL. +31’-6” EL. +11’-7” 3/4” CONCRETE ROOF TILES 3/8” SCREWS @ 6 IN. OC FLASHING STEEL PANEL SUPPORTS WEATHER BARRIER RIGID INSULATION PLYWOOD SHEATHING 2 X 8 ROOF JOISTS BATT INSULATION GYPSUM BOARD 1/4” CONCRETE PANELS 1/2” SCREWS STEEL PANEL SUPPORTS JOINT FLASHING WEATHER BARRIER RIGID INSULATION PLYWOOD SHEATHING 6 X 6 STEEL FRAMING 2 X 6 WOOD FRAMING BATT INSULATION GYPSUM BOARD ROOF EXTERIOR WALL FLOOR WOOD VENEERED FLOOR PLYWOOD SUBFLOORING 2 X 6 WOOD FRAMING 6 X 6 STEEL FRAMING FLASHING CONCRETE SLAB FLOOR PLAN 0 1 2 4 8 FT WALL SECTION 0 1 2 4 FT 50’-0” 10'-0" 20’-0" 10'-0" 2’-6” 2’-8” 2’-6” 1’-2” 10'-0" 10'-0" 10'-0" 1 2 1 2 3 2 A B C D E A B C D E UP DN UP A A B B EL. +0’-0” EL. +12’-4” EL. +31’-6” EL. +11’-7” 3/4” CONCRETE ROOF TILES 3/8” SCREWS @ 6 IN. OC FLASHING STEEL PANEL SUPPORTS WEATHER BARRIER RIGID INSULATION PLYWOOD SHEATHING 2 X 8 ROOF JOISTS BATT INSULATION GYPSUM BOARD 1/4” CONCRETE PANELS 1/2” SCREWS STEEL PANEL SUPPORTS JOINT FLASHING WEATHER BARRIER RIGID INSULATION PLYWOOD SHEATHING 6 X 6 STEEL FRAMING 2 X 6 WOOD FRAMING BATT INSULATION GYPSUM BOARD ROOF EXTERIOR WALL FLOOR WOOD VENEERED FLOOR PLYWOOD SUBFLOORING 2 X 6 WOOD FRAMING 6 X 6 STEEL FRAMING FLASHING CONCRETE SLAB DRAWING NOT DRAWING NOT DRAWING NOT FLOOR PLAN 0 1 2 4 8 FT WALL SECTION 0 1 2 4 FT 50’-0” 10'-0" 20’-0" 10'-0" 2’-6” 2’-8” 2’-6” 1’-2” 10'-0" 10'-0" 10'-0" 1 2 1 2 3 2 A B C D E A B C D E UP A A B B 03

silverlake mixed-use

spring 2022/arc3021 - third year design studio

SOUTHWEST PERSPECTIVE

SILVERLAKE BOULEVARD

CORNER OF EFFIE AND OCCIDENTAL
NORTHEAST PERSPECTIVE SECOND LEGEND 1. EGRESS 2. ELEVATOR 3. STUDIO 4. ONE 5. TWO 04
SECTION A SECTION B EFFIE STREET SILVERLAKE BOULEVARD NORTH OCCIDENTAL BOULEVARD SECOND FLOOR PLAN 1 1 2 3 5 5 EGRESS STAIR ELEVATOR STUDIO UNIT ONE BEDROOM UNIT TWO BEDROOM UNIT 0 4 8 16 32 SECTION A SECTION B EFFIE STREET SILVERLAKE BOULEVARD NORTH OCCIDENTAL BOULEVARD SECOND FLOOR PLAN 1 1 2 3 5 5 LEGEND 1. EGRESS STAIR 2. ELEVATOR 3. STUDIO UNIT 4. ONE BEDROOM UNIT 5. TWO BEDROOM UNIT 0 4 8 16 SECTION B EFFIE STREET NORTH OCCIDENTAL BOULEVARD 1 1 2 3 5 5 N 0 4 8 16 32 05

this proposal

for a mixed-use multifamily development stakes its claim on the corner of Effie and Occidental right here in Silverlake, Los Angeles, California. With ground floor retail, mix of twelve dwelling units, and underground on-site parking, this Silverlake Mixed-Use development brings new life to the neighborhood by providing housing as well as an exciting new social center for shopping and dining.

REVISIONS

0 4 8 16 32 0 4 8 16 32 SILVERLAKE BOULEVARD EFFIE STREET WEST ELEVATION NORTH ELEVATION Level 1 0' - 0" Level 2 15' - 0" Level 3 25' - 0" Level 4 35' - 0" Level 5 45' - 0" A B C D E Level 1 0' - 0" Level 2 15' - 0" Level 3 25' - 0" Level 4 35' - 0" Level 5 45' - 0" 3 4 5 6 7
N . D V L B L A T N E D I C C O DN DN PROJECT NUMBER DATE DRAWN BY CHECKED BY SCALE 4/10/2022 DRAWER CHECKER JOY CHEW ARC 3021 MICHAEL FOX
NOTES
A-100 1 2 3 4 5 6 7 C D E 06
SITE PLAN
08

orthopedic surgerycenter

the simone biles

Orthopedic Surgery Center aims to take a welcoming, non-intimidating approach to orthopedic surgery and wellness. Located in Beaverton, Oregon on the grounds of a fictional sports corporation headquarters, this surgical center is open to both employees of the company plus the athletes whom it sponsors. This surgery center puts emphasis on balance as a guiding concept, not only in its physical shape, resembling gymnastic balance beams, but in the services offered, ranging from mental health recovery to physical therapy to elective orthopedic surgerical procedures.

fall 2022/arc4011 - healthcare design studio
SIMONE BILES 09
project team: franklin iraheta janine lam cynthia morales khoudia sylla joy chew
10
12 13 14 11 15 11 1 1 1 Lobby + waiting 5,216 sqft 12 Pre-OP/Recovery 6,159 sqft 13 ASC-OP Procedure 8,981 sqft 14 Sterile Processing 2,581 sqft 11 Building Support 1,227 sqft 15 Physical Therapy 21,907 sqft 16 17 18 19 11 1 1 16 Office C 2,694 sqft 17 Clinic C 7,963 sqft 18 Staff Amenities 1,930 sqft 11 Building Support 3,035 sqft 19 1 Lobby + waiting 6,602 sqft Orthopedic Clinic 3,079 sqft 1 2 3 4 5 6 7 8 9 10 11 1 Lobby + waiting 10,136 sqft 2 Optometry 3,028 sqft 3 Vision Essentials 2,000 sqft 4 Pulmonary Clinic 4,820 sqft 5 Outpatient Lab 1,435 sqft 6 Outpatient Pharmacy 4,373 sqft 7 Office B 2,763 sqft 8 Clinic B 7,931 sqft 9 Clinic A 8,004 sqft 10 Office A 2,700 sqft 11 Building support 3,650 sqft 12 13 14 11 15 11 1 1 1 Lobby + waiting 5,216 sqft 12 Pre-OP/Recovery 6,159 sqft 13 ASC-OP Procedure 8,981 sqft 14 Sterile Processing 2,581 sqft 11 Building Support 1,227 sqft 15 Physical Therapy 21,907 sqft 16 17 18 19 11 1 1 16 Office C 2,694 sqft 17 Clinic C 7,963 sqft 18 Staff Amenities 1,930 sqft 11 Building Support 3,035 sqft 19 1 Lobby + waiting 6,602 sqft Orthopedic Clinic 3,079 sqft 11
chewjoyan@gmail.com jachew@cpp.edu +714 854 2758 linkedin.com/in/joy-chew instagram.com/studiosnoy

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.