
WORKS 2020 WORKS 2025
WORKS 2020 WORKS 2025
May 2020 – Present
Aug 2019 – May 2020
Oct 2018 – Aug 2019
Oct 2017 – Sept 2018
July 2016 – Sept. 2017
Lead architectural coordination and design development for commercial and institutional projects. Responsible for managing consultant coordination, client meetings, building permit applications, and construction documentation. Oversaw BIM workflows using Revit and managed drawing packages through various project phases.
Drafted permits for Residential and Small Commercial Projects. Conducted site visits, 3D Scanned As-Built conditions, and produced drawing sets using a Revit BIM360 Model.
Designs for mixed use + entertainment destinations, theme parks, water parks, visitor attractions, and resorts around the world as well as distinct urban spaces in Canada. Design process includes master planning, 3D modeling, 3D visualization and producing schematic design and design development packages.
Worked on large scale educational and hospitality architecture in Vietnam including a Beach Resort, an eco school, and an offshore university. Oversaw design through to design development, construction drawings, and construction review. Responsibilities included reporting to the Principal Architect to review on a weekly basis. Upon review, design packages would be submitted to the Client.
Worked on competition and large-scale museum, institutional and residential design. Responsibilities included 3D modeling, design development, producing construction drawings, and preparing presentations. Participated in massing studies, producing daily drawings and diagrams. Work environment was in a studio setting with a small team.
2016
2025
Bachelor’s of Architectural Science
Toronto Metropolitan University, Toronto, Canada
Registered Architect | California, USA
Completion of Architect Registration Exams in 2024. Expected to complete the CSE in May 2025.
Design Development to Close Out May 2020 - January 2025
Phase 2 Parcel Acreage
Total Building Area
Garage area, number of stories, and height
Total parking count
Parking ratio
Allowable FAR
May 2020 - January 2024
Design Development to Close Out
Roles & Responsibilities
- The Development the Massings of the Amenity Buildings
- The Design and Development of the Towers’ Skin
- Producing Weekly Design Presentations throughout the DD & CD Phase
- Lead the production of the Construction Documents
- Coordination of Post Permit Bulletins
- Provided RFI Responses throughout CA Phase.
Elevations of the Conference Center
Conference Center Render, Viewed from the heart of the site.
May 2020 - January 2025
Design Development to Close Out
Roles & Responsibilities
- The Development the Massings
- Applying for Re-Entitlement in South San Francisco
- The Design and Development of the Material Selection & Composition of the Skin
- Lead the production of the Construction Documents
- Coordination of Post Permit Bulletins
- Provided RFI Responses throughout CA Phase.
Drawing documentation of the Lounge and Terrace
August 2023 - January 2025
Schematic Design to Close Out
Project Info:
- 75 000 SF of Leasable Area constructed in Level 3 & 4 for two multi-tenant plans.
Roles & Responsibilities: Project Architect
- Coordinated BIM Model with Design-Build Engineering Consultants
- Testfitted the suites and developed final layout with lead designer.
- Developed Permit Documentation: Resolved Exiting, Plumbing Calculations, CalGreen Checklists and General Code Compliance
- Full Construction Administration services
- Set Milestone Deadlines and Organized Internal team to deliver drawings and respond to Construction Administration Tasks on time
January 2024 - April 2025
Design Development to Close Out
Project Info:
- 12,000 SF Fitness Center, including a shower area + a Building Management Office for the use of the Kilroy Oysterpoint Operating Team.
Roles & Responsibilities: Project Architect
- Coordinated BIM Model with Design-Build Engineering Consultants
- Developed Permit Documentation: Resolved Exiting, Plumbing Calculations, CalGreen Checklists and General Code Compliance
- Full Construction Administration services
- Set Milestone Deadlines and Organized Internal team to deliver drawings and respond to Construction Administration Tasks on time
Elevation drawings of the Fitness Area
KEYNOTES - FLOOR PLAN AE426
Building Management Office Waiting Area