SP-RF-L5-GLV

Page 1

Letter # SP-RF-L5-GLV

South Podium roof joint Lv 5 Galv retainer Construction Specialties, Inc. 6696 State Route 405, PO Box 380 Muncy, Pennsylvania (570) 546-5941 Fax: (570) 546-8022 www.c-sgroup.com

January 19, 2016 Spectrum Specialty Builders Attn: Dan Pridemore 3902 West Valley Hwy North, Suite 500 Auburn, WA 98001 Project: Lincoln Square II

Location: Bellevue, WA

C/S Project #156859 Re: Brake shaped metal for fire barrier flange attachment

Mr. Pridemore, In reference to the above mentioned project it has come to our attention that the use of the brake shaped metal for use in attaching the flange of the fire barrier system is a concern. Referenced in the following detail is UL assembly FF-D-2009 that outlines the requirement of the flanges, see 3.A. The intent of the listing is state the requirements of the flange attachment for proper fastener placement and size. It is in our opinion that this attachment point will not affect the performance of the fire barrier and is acceptable for use as shown. If additional information is required, please feel free to contact us. Sincerely,

Justin Moon Product Development Specialist Expansion Joint Cover Systems P: 570-546-4602 E: jmoon@c-sgroup.com Encl Cc: file, Pam Weihermuller (C/S)


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.