Guidelines for implementation of Phase – II of Grid Connected Rooftop Solar

Page 1

Guidelines for implementation of Phase – II of Grid Connected Rooftop Solar: Component A solarsmiths.com/blog/knowledge/guidelines-for-implementation-of-phase-ii-of-grid-connected-rooftop-solar

Being a part of Intended Nationally Determined Contributions, India has committed to expanding to 40% by the year 2030 in the contribution of installed capacity of electric power from non-fossil-fuel sources. The rooftop solar with RTS plant installed majorly on the roof of a building along with included open contiguous land where the live electricity connection has been provided by the concern DISCOMS. The Government, on 19th February 2019 approved Phase-II of “ Grid Connected Rooftop and Small Solar Power Plants Programme” for gaining a cumulative capacity by 2022 of 40 GW RTS. In Phase-II, it is considered that DISCOMs and its local offices as the nodal points for implementation of the RTS programme. The key objectives here are to promote grid-connected RTS in all consumer segments, to bring rapid deployment of RTS, to create awareness, HR development, capacity etc. and develop additional RTS capacity of 38000 MW in the country by the year 31.12.2022. There were significant issues seen in Phase 1 due to which Phase 2 was introduced, and the considerable components of Phase 2 were Component A and Component B. Let us understand more about component A: Setting up of 4k MW of grid-connected to the rooftop solar projects in the residential premises with central financial assistance: Suppose the residential sector has maximum up to 3 kW capacity. In that case, CFA will have 40% of benchmark cost, which may differ as per the general category States/UTs and special category state/UTs. If the residential sector is having above 3 kW capacity and up to 10 kW capacity, CFA will be 40% up to 3 kW plus 20% for RTS system above 3 kW and up to 10 kW If Group housing societies/RWA for up to 500 kWp@ 10kWp/house with the upper limit being inclusive of individual rooftop plants, CFA will be 20% here. MNRE will align capacity for installation of RTS System in the residential sector by DISCOMS in the ensuing year.

The implementing body shall invite Expression of Interest for empanelment of agencies for supply, testing, installation, testing & commissioning of RTS system in a residential area. To ensure quality and post-installation services, only manufacturers and system 1/2


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.