INTEGRATEDPROJECTARC60904
CADANGANMEMBINA1UNITPUSATKOMUNITI5TINGKATYANGMENGANDUNGI:
TINGKATBAWAH-RUANGPASARSENI,KEDAISENI,RUANGRESTORAN
2)TINGKATSATU-AUDITORIUM,PERPUSTAKAAN,BILIKBASUHBATIK
3)TINGKATDUA-PERPUSTAKAAN,STESENWAXINGBATIK
4)TINGKATTIGA-BENGKELBATIK,RUANGMENGECATDANMENGERINGKANBATIK
5)TINGKATEMPAT-RUANGJAHITAN,GALERISENI
DRAWING
KeyPlan,LocationPlan,SitePlan
GroundFloorPlan
FirstFloorPlan
SecondFloorPlan
ThirdFloorPlan
RoofPlan
SectionA-A'
SectionB-B'
NorthElevation
SouthElevation
WestElevation
DoorSchedule
WindowSchedule
DRAWINGREFNO. DRAWNBY
TEEYIERN
TEEYIERN
TEEYIERN
TEEYIERN
SOHSIUJEAN
SOHSIUJEAN
SOHSIUJEAN
SOHSIUJEAN
LIMEEMIN
LIMEEMIN
LIMEEMIN
EJAZAZREE
EJAZAZREE
BombaKeyPlan,LocationPlan,SitePlan
BombaGroundFloorPlan
BombaFirstFloorPlan
BombaSecondFloorPlan
BombaThirdFloorPlan
CHOWQINGYING
CHOWQINGYING
CHOWQINGYING
CHOWQINGYING
CHOWQINGYING
EJAZAZREE LIMEEMIN SOHSIUJEAN TEEYIERN 345736 346661 351387 345215 346348 DBKL/BP/02-01 DBKL/BP/03-01 DBKL/BP/03-02 DBKL/BP/03-03 DBKL/BP/03-04 DBKL/BP/03-05 DBKL/BP/03-06 DBKL/BP/05-01 DBKL/BP/05-02 DBKL/BP/05-03 DBKL/BP/04-01 DBKL/BP/04-02 DBKL/BP/06-01 DBKL/BP/06-02 DBKL/BP/07-01 DBKL/BP/08-01 FourthFloorPlan LIMEEMIN 19 BombaFourthFloorPlan CHOWQINGYING 20 DBKL/BP/08-02 DBKL/BP/08-03 DBKL/BP/08-04 DBKL/BP/08-05 21 22 23 WindowSchedule WindowSchedule WindowSchedule DBKL/BP/06-03 DBKL/BP/06-04 DBKL/BP/06-05 EJAZAZREE EJAZAZREE EJAZAZREE
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18
SHEETNO.
DI41,LEBOHAMPANG,CITYCENTER,50100KUALALUMPUR,WILAYAHPERSEKUTUANKUALALUMPUR UNTUKTETUANTAYLOR'SUNIVERSITYSDN.BHD Assignment1:DocumentationofBuildingPlanSubmission AR.NURULALIAAHAMAD
CHOWQINGYING
DEWANBANDARAYAKUALALUMPUR
CADANGANPEMBANGUNAN1BLOKPUSATKOMUNITITINGKATYANG MENGANDUNGI
1)TINGKATBAWAHRUANGPASARSENI,KEDAISENI,RUANGRESTORAN
2)TINGKATSATUAUDITORIUM,PERPUSTAKAAN,BILIKBASUHBATIK
3)TINGKATDUAPERPUSTAKAAN,STESENWAXINGBATIK
4)TINGKATTIGABENGKELBATIK,RUANGMENGECATDANMENGERINGKAN BATIK
5)TINGKATEMPATRUANGJAHITAN,GALERISENI DI41,LEBOHAMPANG,CITYCENTER,50100KUALALUMPUR, WILAYAHPERSEKUTUANKUALALUMPUR UNTUKTETUANTAYLOR'SUNIVERSITYSDN.BHD UNTUKTETUANTHINKCITY
THINKCITYSDNBHD Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
THINKCITYSDNBHD Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
AR.WONG DIRECTOR
LISTOFDRAWINGS DISEMAK DILUKIS SKALA TARIKH NO.LUKISAN TAJUKLUKISAN REVISION BPSUBMISSION 01-01 1 LEMBAGA ARKITEK MALAYSIA STATUSLUKISAN TANDATANGANARKITEK ARKITEK ARKITEKPROFESIONAL Ar.Bob No.PendaftaranLAMA/L100 NAMA,TANDATANGANDANNO.K/PPENYEWA NO.SIRI COPPENDAFTARANJABATAN
AR.NURULALIAAHAMAD TEEYIERN10/05/2023 DBKL/BP/01-01 AR.WONG DIRECTOR
TAJUKCADANGAN NAMA,TANDATANGANDANNO.K/PPEMAJU&PEMILIKTANAH COPKELULUSANTANDATANGANPENGARAHJABATANKAWALAN&PENGAWASANBANGUNAN
P C
COPKELULUSANTANDATANGANPENGARAHJABATANKAWALAN&PENGAWASANBANGUNAN DEWANBANDARAYAKUALALUMPUR
TAJUKCADANGAN
CADANGANPEMBANGUNAN1BLOKPUSATKOMUNITITINGKATYANG MENGANDUNGI
1) TINGKATBAWAHRUANGPASARSENI,KEDAISENI,RUANGRESTORAN 2) TINGKATSATUAUDITORIUM,PERPUSTAKAAN,BILIKBASUHBATIK
3) TINGKATDUAPERPUSTAKAAN,STESENWAXINGBATIK 4) TINGKATTIGABENGKELBATIK,RUANGMENGECATDANMENGERINGKAN BATIK
5) TINGKATEMPATRUANGJAHITAN,GALERISENI DI41,LEBOHAMPANG,CITYCENTER,50100KUALALUMPUR, WILAYAHPERSEKUTUANKUALALUMPUR UNTUKTETUANTAYLOR'SUNIVERSITYSDN.BHD UNTUKTETUANTHINKCITY
NAMA,TANDATANGANDANNO.K/PPEMAJU&PEMILIKTANAH
THINKCITYSDNBHD LevelNo36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
AR.WONG DIRECTOR
NAMA,TANDATANGANDANNO.K/PPENYEWA
THINKCITYSDNBHD LevelNo36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
ARKITEK
TANDATANGANARKITEK
Ar.Bob No.PendaftaranLAMA/L100
DISEMAK DILUKIS SKALA TARIKH NO.LUKISAN TAJUKLUKISAN REVISION
1
BPSUBMISSION
LEMBAGA ARKITEK MALAYSIA STATUSLUKISAN
NO.SIRI COPPENDAFTARANJABATAN
AR.NURULALIAAHMAD10/05/2023
DIRECTOR
AR.WONG
KEYPLAN LOCATIONPLAN SITEPLAN 02-01 TEEYIERN DBKL/BP/02-01 ARKITEKPROFESIONAL
KEYPLAN NTS 01 07 LOCATIONPLAN NTS 01 07 LOCATIONPLAN 1:200 01 07 N MEDANPASAR AMPANG SENTUL PUDU PLUS EXPRESSWAY N TAPAKCADANGAN N 5 4 3 2 F E D C B 1 A 625 2000 2250 2250 6 2550 2450 2450 2000 875 10325 4700 18950 H FIRERATEDDOOR FD1 SCHEDULEOFBOMBA COMPONENTS 600MM(W)2100MM(H) SD SMOKEDETECTOR KELUARSIGN EMERGENCYLIGHT K EL FIREALARM HOSEREEL EMERGENCYBREAK GLASS FIREHYDRANT DRYPOWDERFIRE EXTINGUISHER FA BG DP H EXISTINGFIREHYDRANT SITEBOUNDARY DROPOFF
900WIDTHCHECKEREDSTEELEXTERNALFIRESTAIRCASE WITH900MMHEIGHTSTEELTUBERAILINGSTOMANUF'S DETAIL R=175MM,T=250MM PRECASTCONCRETEPLANTERBOXWITH300MMSOIL DEPTHTOENGR'SDETAIL
150MMTHICKBRICKWALLTOENGR'SDETAIL
150X150MMRCCOLUMNTOENGR'SDETAIL
1000WIDTHRCRAMPC/WCEMENTRENDER
SCHEDULEOFFINISHES
1)TINGKATBAWAHRUANGPASARSENI,KEDAISENI,RUANGRESTORAN
2)TINGKATSATUAUDITORIUM,PERPUSTAKAAN,BILIKBASUHBATIK
3)TINGKATDUAPERPUSTAKAAN,STESENWAXINGBATIK
4)TINGKATTIGABENGKELBATIK,RUANGMENGECATDANMENGERINGKAN BATIK
5)TINGKATEMPATRUANGJAHITAN,GALERISENI DI41,LEBOHAMPANG,CITYCENTER,50100KUALALUMPUR, WILAYAHPERSEKUTUANKUALALUMPUR UNTUKTETUANTAYLOR'SUNIVERSITYSDN.BHD
UNTUKTETUANTHINKCITY
DOORSCHEDULE
DESCRIPTION
WOODENSINGLELEAFDOOR
200MMTHICKRCSHEARWALL(2HOURRATED)W/15MM THK.CEMENTPLASTERANDPAINTEDONBOTHSIDES
SERVICELIFTTOENGR'SDETAIL
1300MMWIDTHRCSTAIRCASEWITH1100MMHEIGHT TIMBERRAILINGTOMANUF'SDETAIL R=175MM,T=250MM
150MMTHICKCONCRETEWALLWITHOFF-FORMFINISHON BOTHSIDESTOARCH'SDETAIL 300X400MMSTEELCOLUMNTOENGR'SDETAIL
110MMCONCRETEMASONRYWALL(2HOURRATED) W/20MMTHK.CEMENTPLASTERANDPAINTEDONBOTH SIDES
900WIDTHPRECASTRCFIRESTAIRCASEWITH900MM HEIGHTSTEELTUBERAILINGSTOMANUF'SDETAIL R=175MM,T=250MM
THINKCITYSDNBHD Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
THINKCITYSDNBHD
Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
ARKITEKPROFESIONAL Ar.Bob No.PendaftaranLAMA/L100
GROUNDFLOORPLAN
GROUNDFLOORPLAN SCALE1:100 N
FLOORFINISHES FF-1 FF-2 FF-3 POWERTROWELEDCONCRETEFINISH ENGINEEREDTIMBERFLOORING 10MMNON-SLIPHOMOGENEOUSTILES(BATHROOM) WALLFINISHES WF-1 WF-2 PLAINCEMENTPLASTEREDPAINTED 10MMCERAMICTILES FF-4 CEILING SKIMCOATED&PAINTEDWITHEMULSIONPAINT CEMENTPLASTEREDANDPAINTEDONFLOORSLAB CF-2 CF-1 FINISHEDLEGENDS FLOOR FINISHES FF-1 WALLFINISHES CF-1WF-1 CEILING FINISHFLOOR LEVEL NATURALVENTILATIONMECHANICALVENTILATION NVMVFFL+CARPETTILES TOILETPARTITION25MMTHK LAMINATEDPHENOLICPARTITIONBOARD WF-3 GF 01 02 03 04 05 06 07 08 09 ROOM ARTISANALMARKET CAFETERIA KITCHEN ARTSTORE SIDECORRIDOR LIFTLOBBY FIRESTAIRCASE1 FIRESTAIRCASE MALE&FEMALETOILET REQUIRED FLOORAREA (sq.m) 10 11 OKUTOILET PROVIDED sq.m % NATURALLIGHTING ACTION PROVIDED sq.m % NATURALVENTILATION ACTION AREA (sq.m) 10% REQUIRED FLOORAREA (sq.m) 5% 114.34 27.22 11.87 19.76 251.95 7.55 9.46 10.11 2.79 BATIKDRYINGAREA 167.79 PANTRY 2.80 24.04 12 STORAGEROOM 1.29 12 M&EROOM1 0.88 12 0.66 12 M&EROOM2 11.434 2.722 1.187 1.976 25.195 0.755 0.946 1.011 0.279 16.779 0.280 2.404 0.129 0.088 0.066 5.717 1.361 0.594 0.988 12.598 0.378 0.473 0.506 0.140 8.390 0.140 1.202 0.065 0.044 0.033 UP UP 5 4 3 2 F E D C B 1 A 1250 4000 4500 4500 6 5100 4900 4900 4000 1750 20650
UP UP 4700 18950 250MMTHICKCONCRETEPARTYWALL
STEELCOLUMNTOENGR'SDETAIL
N/A N/A N/A 2.000 OPEN N/A N/A 100% 21.14% 0% ML 0% ML 0% ML 0% ML 0% ML N/A N/A N/A OPEN N/A N/A 100% 0% 0% 0% 0% 0% MV MV MV MV MV OPEN 100% OPEN 100% OPEN 100% OPEN 100% OPEN 100% OPEN 100% OPEN 100% OPEN 100% N/A 0% ML N/A 0% MV N/A 0% ML N/A 0% MV OPEN 100% OPEN 100% 2.000 21.14% DISEMAK DILUKIS SKALA TARIKH NO.LUKISAN TAJUKLUKISAN REVISION BPSUBMISSION 1 LEMBAGA ARKITEK MALAYSIA STATUSLUKISAN TANDATANGANARKITEK ARKITEK NAMA,TANDATANGANDANNO.K/PPENYEWA NO.SIRI COPPENDAFTARANJABATAN TAJUKCADANGAN NAMA,TANDATANGANDANNO.K/PPEMAJU&PEMILIKTANAH AR.WONG DIRECTOR COPKELULUSANTANDATANGANPENGARAHJABATANKAWALAN&PENGAWASANBANGUNAN DEWANBANDARAYAKUALALUMPUR CADANGANPEMBANGUNAN1BLOKPUSATKOMUNITITINGKATYANG MENGANDUNGI
AR.NURULALIAAHAMAD10/05/2023 AR.WONG DIRECTOR
03-01 TEEYIERN
DBKL/BP/03-01
03 01
910MM(W)X2100MM(H)HRFIRERATEDSINGLELEAFDOOR 1700MM(W)2100MM(H)DOUBLELEAFGLASSDOOR 900MM(W)X2100MM(H)AUTOMATICDOOR D4800MM(W)2100MM(H)WOODENSINGLELEAFDOOR WINDOWSCHEDULE CODE W51000MM(W)2000MM(H) DIMENSION(WxH) DESCRIPTION SINGLEPANELCASEMENTWINDOW W62400MM(W)4500MM(H)SINGLEPANELFULLLENGTHFIXEDWINDOW W74200MM(W)3500MM(H)SINGLEPANELFULLLENGTHFIXEDWINDOW D1 FD1 D1 D1 D1 D1 D1 D1 D2 D4 D5 D7 W5 W6 W7 W6 36.30 183.70% N/A 0% MV A 4-02 B 05 05 03 02 05 01 4-01 A 4-02 B MVFFL+0.215 BATIKDRYINGAREA KITCHEN ARTISANALMARKETSPACE SIDECORRIDOR ARTSTORE GREENSPACE GREENSPACE GREENSPACE GREEN SPACE FIVE-FOOTWALKWAY LIFTLOBBY STAIRCASE STAIRCASE M&EROOM STAIRCASE PANTRY STORAGEROOM GREENSPACE 19.42sqm 27.22sqm 11.87sqm 0.66sqm 0.88sqm 1.29sqm 114.34sqm 251.95sqm 19.76sqm 10.11sqm 2.79sqm 7.55sqm 9.46sqm 2.80sqm 24.04sqm 167.79sqm 50MM FF-1 FF-1 NVFFL+0.215 FF-1WF-1 NVFFL+0.215 CF-2 FF-1WF-1 MVFFL+0.215 CF-2 FF-1 NVFFL+0.215 FF-1 DP FF-3WF-3CF-1 FF-3WF-3CF-1 FF-1WF-1CF-1 FF-1WF-1CF-1FF-1WF-1CF-1
CODE D1 D2 FD1 600MM(W)X2100MM(H) D5 DIMENSION(WxH)
D7
1500MM(W)2100MM(H)WOODENDOUBLELEAFDOOR
DEWANBANDARAYAKUALALUMPUR
150X50MMGALVANIZEDAALUMINUMFINTOSPEC'SDETAIL
250MMTHICKCONCRETEPARTYWALL
1000MMWIDTHRCSTAIRCASEWITH1100MMHEIGHT TIMBERRAILINGTOMANUF'SDETAIL R=175MM,T=250MM
150X150MMRCCOLUMNTOENGR'SDETAIL
7000MMWIDTHRCSEATINGWITH1100MMHEIGHTTIMBER RAILINGTOENGR'SDETAIL R=400MM,T=750MM
150X50MMGALVANIZEDAALUMINUMFINTOSPEC'SDETAIL
900MMSHSRAILINGWITHSTEELHANDRAILTOMANUF'S DETAIL
SERVICELIFTTOENGR'SDETAIL
1300MMWIDTHRCSTAIRCASEWITH1100MMHEIGHT TIMBERRAILINGTOMANUF'SDETAIL R=175MM,T=250MM
300X400MMSTEELCOLUMNTOENGR'SDETAIL
150MMTHICKCONCRETEWALLWITHOFF-FORMFINISHON BOTHSIDESTOARCH'SDETS.
110MMCONCRETEMASONRYWALL(2HOURRATED) W/20MMTHK.CEMENTPLASTERANDPAINTEDONBOTH SIDES
900WIDTHPRECASTRCFIRESTAIRCASEWITH900MM HEIGHTSTEELTUBERAILINGSTOMANUF'SDETAIL R=175MM,T=250MM
150MMTHICKCONCRETEBOXWITH1000MMDEPTHTO ENGR'SDETAIL
STEELCOLUMNTOENGR'SDETAIL
CADANGANPEMBANGUNANBLOKPUSATKOMUNITI5TINGKATYANG MENGANDUNGI
1)TINGKATBAWAHRUANGPASARSENI,KEDAISENI,RUANGRESTORAN
2)TINGKATSATUAUDITORIUM,PERPUSTAKAAN,BILIKBASUHBATIK
3)TINGKATDUAPERPUSTAKAAN,STESENWAXINGBATIK
4)TINGKATTIGABENGKELBATIK,RUANGMENGECATDANMENGERINGKAN BATIK
5)TINGKATEMPATRUANGJAHITAN,GALERISENI DI41,LEBOHAMPANG,CITYCENTER,50100KUALALUMPUR, WILAYAHPERSEKUTUANKUALALUMPUR UNTUKTETUANTAYLOR'SUNIVERSITYSDN.BHD UNTUKTETUANTHINKCITY
THINKCITYSDNBHD
Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
THINKCITYSDNBHD
Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan
UP DN DN DNUP UP UP FD1 FD1 D1 D1 D1 D1 D1 D1 D5 D6 D7 W1 W5 W8 W11 W11
SCALE1:100 N SCHEDULEOFFINISHES FLOORFINISHES FF-1 FF-2 FF-3 POWERTROWELEDCONCRETEFINISH ENGINEEREDTIMBERFLOORING 10MMNON-SLIPHOMOGENEOUSTILES(BATHROOM) WALLFINISHES WF-1 WF-2 PLAINCEMENTPLASTEREDPAINTED 10MMCERAMICTILES FF-4 CEILING SKIMCOATED&PAINTEDWITHEMULSIONPAINT CEMENTPLASTEREDANDPAINTEDONFLOORSLAB CF-2 CF-1 FINISHEDLEGENDS FLOOR FINISHES FF-1 WALLFINISHES CF-1WF-1 CEILING FINISHFLOOR LEVEL NATURALVENTILATIONMECHANICALVENTILATION NVMVFFL+CARPETTILES TOILETPARTITION25MMTHK LAMINATEDPHENOLICPARTITIONBOARD WF-3 BATIKWASHINGSTATION LIBRARY AUDITORIUMSEATING LIFTLOBBY FIRESTAIRCASE1 FIRESTAIRCASE2 MALE&FEMALETOILET OKUTOILET OPENDECK GF 01 02 03 04 05 06 07 08 09 ROOM PROVIDED sq.m % NATURALLIGHTING ACTION PROVIDED sq.m % NATURALVENTILATION ACTION AREA (sq.m) REQUIRED FLOORAREA (sq.m) 10% REQUIRED FLOORAREA (sq.m) 5% 37.83 33.73 30.82 57.02 7.55 9.46 10.11 2.79 19.00 STORAGEROOM 1.29 10 M&EROOM1 0.88 11 0.66 12 M&EROOM 3.783 3.373 3.082 5.702 0.755 0.946 1.011 0.279 1.900 0.129 0.088 0.066 1.892 1.687 1.541 2.851 0.378 0.473 0.506 0.140 0.950 0.0645 0.044 0.033 5 4 3 2 F E D C B 1 A 1250 4000 4500 4500 6 5100 4900 4900 4000 1750 20650 900WIDTHCHECKEREDSTEELEXTERNALFIRESTAIRCASE
DETAIL R=175MM,T=250MM PRECASTCONCRETEPLANTERBOXWITH300MMSOIL DEPTHTOENGR'SDETAIL 150MMTHICKBRICKWALLTOENGR'SDETAIL
FIRSTFLOORPLAN
WITH900MMHEIGHTSTEELTUBERAILINGSTOMANUF'S
200MMTHICKRCSHEARWALL(2HOURRATED)W/15MM THK.CEMENTPLASTERANDPAINTEDONBOTHSIDES
4700 18950
N/A N/A N/A OPEN N/A N/A 100% 0% ML 0% ML 0% ML 0% ML 0% ML N/A N/A N/A OPEN N/A N/A 100% 0% 0% 0% 0% 0% MV MV MV MV MV OPEN 100% OPEN 100% 4.4 7.717% ML 4.4 7.717% 2.000 21.14% 2.000 21.14% DISEMAK DILUKIS SKALA TARIKH NO.LUKISAN TAJUKLUKISAN REVISION BPSUBMISSION 1 LEMBAGA ARKITEK MALAYSIA STATUSLUKISAN TANDATANGANARKITEK ARKITEK NAMA,TANDATANGANDANNO.K/PPENYEWA NO.SIRI COPPENDAFTARANJABATAN TAJUKCADANGAN NAMA,TANDATANGANDANNO.K/PPEMAJUPEMILIKTANAH AR.WONG DIRECTOR COPKELULUSANTANDATANGANPENGARAHJABATANKAWALANPENGAWASANBANGUNAN
AR.NURULALIAAHAMAD10/05/2023 AR.WONG DIRECTOR
KualaLumpur FIRSTFLOORPLAN 03-02 TEEYIERN DBKL/BP/03-02 ARKITEKPROFESIONAL Ar.Bob No.PendaftaranLAMA/L100 03 02 DOORSCHEDULE CODE D1600MM(W)X2100MM(H) DIMENSION(WH) DESCRIPTION WOODENSINGLELEAFDOOR FD1910MM(W)X2100MM(H)2HRFIRERATEDSINGLELEAFDOOR D7900MM(W)2100MM(H)AUTOMATICDOOR D64100MM(W)2100MM(H)SLIDINGGLASSDOOR WINDOWSCHEDULE CODEDIMENSION(WxH) DESCRIPTION W12000M(W)2200MM(H)FOLDINGLOUVEREDWINDOW W51000MM(W)X2000MM(H)SINGLEPANELCASEMENTWINDOW W88900MM(W)3000MM(H)PANELFULLLENGTHFIXEDWINDOW W112000MM(W)3500MM(H)SINGLEPANELFULLLENGTHFIXEDWINDOW 26.700 79.16% N/A 0% MV 14.000 73.68% N/A 0% MV OPEN 100% OPEN 100% A B 05 05 03 02 05 01 4-01 A 4-02 B LIBRARY OPENDECK AUDITORIUM FIRE STAIRCASE FIRE STAIRCASE STAIRCASE STAIRCASE 37.83sqm 33.73sqm 30.82sqm 57.02sqm 19.00sqm 7.55sqm 9.46sqm MALEFEMALETOILET M&EROOM STORAGEROOM OKUTOILET M&EROOM 0.66sqm 0.88sqm 1.29sqm 10.11sqm 2.79sqm DP DP 50MM MVFFL+4.705 CF-1 FF-3WF-3 MVFFL+4.700 CF-1 FF-1WF-1 MVFFL+4.715 CF-1 FF-1WF-1 MVFFL+4.715 CF-1FF-1WF-1 MVFFL+4.715 CF-1 MVFFL+4.710 NVFFL+4.715 FF-2WF-1CF-1 FF-1WF-1CF-1
DEWANBANDARAYAKUALALUMPUR
150X50MMGALVANIZEDAALUMINUMFINTOSPEC'SDETAIL
1000MMWIDTHRCSTAIRCASEWITH1100MMHEIGHT TIMBERRAILINGTOENGR'SDETAIL R=175MM,T=250MM
150X150MMRCCOLUMNTOENGR'SDETAIL
7000MMWIDTHRCSEATINGWITH1100MMHEIGHTTIMBER RAILINGTOENGR'SDETAIL R=400MM,T=750MM 1000MMWIDTHRCSTAIRCASEWITH1100MMHEIGHT TIMBERRAILINGTOENGR'SDETAIL R=175MM,T=250MM
CADANGANPEMBANGUNAN1BLOKPUSATKOMUNITI5TINGKATYANG MENGANDUNGI
1)TINGKATBAWAHRUANGPASARSENI,KEDAISENI,RUANGRESTORAN
2)TINGKATSATUAUDITORIUM,PERPUSTAKAAN,BILIKBASUHBATIK
3)TINGKATDUAPERPUSTAKAAN,STESENWAXINGBATIK
4)TINGKATTIGABENGKELBATIK,RUANGMENGECATDANMENGERINGKAN BATIK
5)TINGKATEMPATRUANGJAHITAN,GALERISENI DI41,LEBOHAMPANG,CITYCENTER,50100KUALALUMPUR, WILAYAHPERSEKUTUANKUALALUMPUR UNTUKTETUANTAYLOR'SUNIVERSITYSDN.BHD UNTUKTETUANTHINKCITY
SERVICELIFTTOENGR'SDETAIL
900MMSHSRAILINGWITHSTEELHANDRAILTOMANUF'S DETAIL
150MMTHICKCONCRETEWALLWITHOFF-FORMFINISHON BOTHSIDESTOARCH'SDETS.
110MMCONCRETEMASONRYWALL(2HOURRATED) W/20MMTHK.CEMENTPLASTERANDPAINTEDONBOTH SIDES
DOORSCHEDULE CODE D1 FD1
DIMENSION(WxH) DESCRIPTION WOODENSINGLELEAFDOOR 910MM(W)2100MM(H)HRFIRERATEDSINGLELEAFDOOR
600MM(W)2100MM(H) D5
THINKCITYSDNBHD Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
8900MM(W)X3000MM(H)5PANELFULLLENGTHFIXEDWINDOW
W112000MM(W)X3500MM(H)SINGLEPANELFULLLENGTHFIXEDWINDOW
W122600MM(W)X3500MM(H)SINGLEPANELFULLLENGTHFIXEDWINDOW
THINKCITYSDNBHD Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
ARKITEKPROFESIONAL Ar.Bob No.PendaftaranLAMA/L100
SECONDFLOORPLAN
SECONDFLOORPLAN SCALE1:100 N
FLOORFINISHES FF-1 FF-2 FF-3 POWERTROWELEDCONCRETEFINISH ENGINEEREDTIMBERFLOORING 10MMNON-SLIPHOMOGENEOUSTILES(BATHROOM) WALLFINISHES WF-1 WF-2 PLAINCEMENTPLASTEREDPAINTED 10MMCERAMICTILES FF-4 CEILING SKIMCOATEDPAINTEDWITHEMULSIONPAINT CEMENTPLASTEREDANDPAINTEDONFLOORSLAB CF-2 CF-1 FINISHEDLEGENDS FLOOR FINISHES FF-1 WALLFINISHES CF-1 CEILING FINISHFLOOR LEVEL NATURALVENTILATIONMECHANICALVENTILATION NVMVFFL+CARPETTILES TOILETPARTITION25MMTHK LAMINATEDPHENOLICPARTITIONBOARD WF-3 WF-1 BATIKWAXINGSTATION LIBRARY OPENDECK LIFTLOBBY FIRESTAIRCASE FIRESTAIRCASE2 GF 01 02 03 04 05 06 07 08 09 ROOM PROVIDED sq.m % NATURALLIGHTING ACTION PROVIDED sq.m % NATURALVENTILATION ACTION AREA (sq.m) REQUIRED FLOORAREA (sq.m) 10% REQUIRED FLOORAREA (sq.m) 5% 83.65 19.34 44.42 7.55 9.46 10.11 2.79 MALE&FEMALETOILET OKUTOILET 9.04 FIRESTAIRCASE3 21.60 STORAGEROOM 1.29 M&EROOM 0.88 0.66 M&EROOM2 10 11 12 8.365 1.934 4.442 0.755 0.946 0.904 2.160 0.129 0.088 0.066 4.183 0.967 2.221 0.378 0.473 0.452 1.080 0.065 0.044 0.033 1.011 0.279 0.506 0.140 5 4 3 2 F E D C B 1 A 1250 4000 4500 4500 6 5100 4900 4900 4000 1750 20650 900WIDTHCHECKEREDSTEELEXTERNALFIRESTAIRCASE WITH900MMHEIGHTSTEELTUBERAILINGSTOMANUF'S DETAIL R=175MM,T=250MM PRECASTCONCRETEPLANTERBOXWITH300MMSOIL DEPTHTOENGR'SDETAIL 150MMTHICKBRICKWALLTOENGR'SDETAIL 200MMTHICKRCSHEARWALL(2HOURRATED)W/15MM THK.CEMENTPLASTERANDPAINTEDONBOTHSIDES 900WIDTHPRECASTRCFIRESTAIRCASEWITH900MM HEIGHTSTEELTUBERAILINGSTOMANUF'SDETAIL R=175MM,T=250MM
SCHEDULEOFFINISHES
150X50MMGALVANIZEDAALUMINUMFINTOSPEC'SDETAIL 300X400MMSTEELCOLUMNTOENGR'SDETAIL STEELCOLUMNTOENGR'SDETAIL UP DN DN DN UP UP UP DN 4700 18950 900WIDTHPRECASTRCFIRESTAIRCASEWITH900MM HEIGHTSTEELTUBERAILINGSTOMANUF'SDETAIL R=175MM,T=250MM 250MMTHICKCONCRETEPARTYWALL N/A N/A N/A OPEN N/A N/A 100% 0% ML 0% ML 0% ML 0% ML 0% ML N/A N/A N/A OPEN N/A N/A 100% 0% 0% 0% 0% 0% MV MV MV MV MV 2.000 22.12% 2.000 22.12% OPEN 100% OPEN 100% 2.000 21.14% 2.000 21.14% 8.800 10.5% 8.800 10.5% DISEMAK DILUKIS SKALA TARIKH NO.LUKISAN TAJUKLUKISAN REVISION BPSUBMISSION 1 LEMBAGA ARKITEK MALAYSIA STATUSLUKISAN TANDATANGANARKITEK ARKITEK NAMA,TANDATANGANDANNO.K/PPENYEWA NO.SIRI COPPENDAFTARANJABATAN TAJUKCADANGAN NAMA,TANDATANGANDANNO.K/PPEMAJUPEMILIKTANAH AR.WONG DIRECTOR COPKELULUSANTANDATANGANPENGARAHJABATANKAWALAN&PENGAWASANBANGUNAN
AR.NURULALIAAHAMAD10/05/2023 AR.WONG DIRECTOR
03-03 TEEYIERN DBKL/BP/03-03
03 03
1700MM(W)2100MM(H)DOUBLELEAFGLASSDOOR D4800MM(W)2100MM(H)WOODENSINGLELEAFDOOR D7900MM(W)X2100MM(H)AUTOMATICDOOR
CODEDIMENSION(WH) DESCRIPTION W12000M(W)X2200MM(H)FOLDINGLOUVEREDWINDOW W51000MM(W)2000MM(H)SINGLEPANELCASEMENTWINDOW W8
WINDOWSCHEDULE
FD1 FD1 D1 D1 D1 D1 D1 D1 D5 D5 D7 W1 W1 W1 W5 W5 W11 W11 W12 W8 W12 4.400 20.37% 4.400 20.37% 35.800 185.109% N/A 0% MV A 4-02 B 05 05 03 02 05 01 4-01 A 4-02 B LIBRARY OPENDECK BATIKWAXINGSTATION FIRE STAIRCASE FIRE STAIRCASE STAIRCASE STAIRCASE STAIRCASE FIRE 19.34sqm 44.42sqm 83.65sqm LIFTLOBBY 7.55sqm 9.46sqm 9.04sqm 21.60sqm M&EROOM 0.66sqm 0.88sqm 1.29sqm 10.11sqm 2.79sqm 50MM DP FF-3WF-3CF-1 FF-3WF-3CF-1 FF-1WF-1CF-1 FF-1WF-1CF-1FF-1WF-1CF-1 FF-1WF-1 FFL+8.210 CF-2 FF-2 NVFFL+8.210 FF-1WF-1CF-2
900WIDTHCHECKEREDSTEELEXTERNALFIRESTAIRCASE WITH900MMHEIGHTSTEELTUBERAILINGSTOMANUF'S
MENGANDUNGI
1)TINGKATBAWAHRUANGPASARSENI,KEDAISENI,RUANGRESTORAN
2)TINGKATSATUAUDITORIUM,PERPUSTAKAAN,BILIKBASUHBATIK
3)TINGKATDUAPERPUSTAKAAN,STESENWAXINGBATIK
4)TINGKATTIGABENGKELBATIK,RUANGMENGECATDANMENGERINGKAN BATIK
DOORSCHEDULE
WINDOWSCHEDULE
CODEDIMENSION(WxH) DESCRIPTION W21800MM(W)X500MM(H)SINGLEPANELCASEMENTWINDOW W31800MM(W)X1200MM(H) W41000MM(W)X2000MM(H)
SINGLEPANELCASEMENTWINDOW SINGLEPANELCASEMENTWINDOW
W51000MM(W)X2000MM(H)SINGLEPANELCASEMENTWINDOW
W112000MM(W)X3500MM(H)SINGLEPANELFULLLENGTHFIXEDWINDOW
W124200MM(W)3600MM(H)3PANELFULLLENGTHFIXEDWINDOW
W136400MM(W)X3500MM(H)PANELFULLLENGTHFIXEDWINDOW
W141200MM(W)X3500MM(H)SINGLEPANELFULLLENGTHFIXEDWINDOW
W154700MM(W)3500MM(H)3PANELFULLLENGTHFIXEDWINDOW
W164200MM(W)3600MM(H)3PANELFULLLENGTHFIXEDWINDOW
THINKCITYSDNBHD Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
THINKCITYSDNBHD Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
AR.WONG DIRECTOR
ARKITEKPROFESIONAL Ar.Bob No.PendaftaranLAM:A/L100
THIRDFLOORPLAN
5)TINGKATEMPATRUANGJAHITAN,GALERISENI DI41,LEBOHAMPANG,CITYCENTER,50100KUALALUMPUR, WILAYAHPERSEKUTUANKUALALUMPUR UNTUKTETUANTAYLOR'SUNIVERSITYSDN.BHD UNTUKTETUANTHINKCITY AR.NURULALIAAHAMAD
THIRDFLOORPLAN SCALE1:100 N
FLOORFINISHES FF-1 FF-2 FF-3 POWERTROWELEDCONCRETEFINISH ENGINEEREDTIMBERFLOORING 10MMNON-SLIPHOMOGENEOUSTILES(BATHROOM) WALLFINISHES WF-1 WF-2 PLAINCEMENTPLASTEREDPAINTED 10MMCERAMICTILES FF-4 CEILING SKIMCOATEDPAINTEDWITHEMULSIONPAINT CEMENTPLASTEREDANDPAINTEDONFLOORSLAB CF-2 CF-1 FINISHEDLEGENDS FLOOR FINISHES FF-1 WALLFINISHES CF-1 CEILING FINISHFLOOR LEVEL NATURALVENTILATIONMECHANICALVENTILATION NVMVFFL+CARPETTILES TOILETPARTITION25MMTHK LAMINATEDPHENOLICPARTITIONBOARD WF-3 WF-1 BATIKPAINTINGSTATION BATIKWASHINGAREA COMMONSPACE BATIKWORKSHOP OPENAREAWORKSHOP LIFTLOBBY FIRESTAIRCASE1 FIRESTAIRCASE GF 01 02 03 04 05 06 07 08 09 ROOM PROVIDED sq.m % NATURALLIGHTING ACTION PROVIDED sq.m % NATURALVENTILATION ACTION AREA (sq.m) 10 REQUIRED FLOORAREA (sq.m) 10% REQUIRED FLOORAREA (sq.m) 5% 10.11 2.79 MALE&FEMALETOILET OKUTOILET 7.55 9.04 STORAGEROOM 1.29 M&EROOM1 0.88 0.66 M&EROOM2 11 12 13 24.75 61.69 46.97 14.93 69.48 43.68 0.755 0.904 0.129 0.088 0.066 2.475 6.169 4.697 1.493 6.948 4.368 0.378 0.452 0.065 0.044 0.033 1.238 3.085 2.349 0.747 3.474 2.184 1.011 0.279 0.506 0.140 N/A N/A N/A OPEN N/A N/A 100% 0% ML 0% ML 0% ML 0% ML 0% ML N/A N/A N/A OPEN N/A N/A 100% 0% 0% 0% 0% 0% MV MV MV MV MV 2.000 22.12% 2.000 22.12% 14.12 30% 14.12 30% DISEMAK DILUKIS SKALA TARIKH NO.LUKISAN TAJUKLUKISAN REVISION BPSUBMISSION 1 LEMBAGA ARKITEK MALAYSIA STATUSLUKISAN TANDATANGANARKITEK ARKITEK NAMA,TANDATANGANDANNO.K/PPENYEWA NO.SIRI COPPENDAFTARANJABATAN TAJUKCADANGAN NAMA,TANDATANGANDANNO.K/PPEMAJUPEMILIKTANAH AR.WONG DIRECTOR COPKELULUSANTANDATANGANPENGARAHJABATANKAWALAN&PENGAWASANBANGUNAN DEWANBANDARAYAKUALALUMPUR CADANGANPEMBANGUNAN1BLOKPUSATKOMUNITI5TINGKATYANG
SCHEDULEOFFINISHES
-
10/05/2023
03-04 SOHSIUJEAN
DBKL/BP/03-04
03 04
DIMENSION(WH)
CODE D1600MM(W)X2100MM(H)
DESCRIPTION WOODENSINGLELEAFDOOR D4800MM(W)X2100MM(H)WOODENSINGLELEAFDOOR FD1910MM(W)X2100MM(H)2HRFIRERATEDSINGLELEAFDOOR D51700MM(W)X2100MM(H)DOUBLELEAFGLASSDOOR D7900MM(W)X2100MM(H)AUTOMATICDOOR D64100MM(W)2100MM(H)SLIDINGGLASSDOOR
N/A 0% ML N/A 0% MV 30.80 49.93% N/A 0% MV 15.12 34.62% N/A 0% MV N/A 0% ML N/A 0% MV
7.56 10.88% N/A 0% MV 5 4 3 2 F E D C B 1 A 1250 4000 4500 4500 6 5100 4900 4900 4000 1750 20650 DN DN DN UP UP UP 4700 18950 W4 FD1 FD1 D1 D1 D1 D1 D1 D1 D4 D4 D5 D3 D6 D7 W4 W4 W4 W2W3 W2W3 W5 W11 W11 W16 W16 W16 W12 W13 W14 W14 W15 A 4-02 B 05 05 03 02 05 01 4-01 A 4-02 B
DETAIL R=175MM,T=250MM PRECASTCONCRETEPLANTERBOXWITH300MMSOIL DEPTHTOENGR'SDETAIL 150MMTHICKBRICKWALLTOENGR'SDETAIL 200MMTHICKRCSHEARWALL(2HOURRATED)W/15MM THK.CEMENTPLASTERANDPAINTEDONBOTHSIDES 900WIDTHPRECASTRCFIRESTAIRCASEWITH900MM HEIGHTSTEELTUBERAILINGSTOMANUF'SDETAIL R=175MM,T=250MM 110MMCONCRETEMASONRYWALL(2HOURRATED)
SERVICELIFTTOENGR'SDETAIL 150X150MMRCCOLUMNTOENGR'SDETAIL 150MMTHICKCONCRETEWALLWITHOFF-FORMFINISHON
DETAIL 1000MMWIDTHRDSTAIRCASEWITH1100MMHEIGHT TIMBERRAILINGTOENGR'SDETAIL R=175MM,T=250MM 150X50MMGALVANIZEDALUMINUMFINTOSPEC'SDETAIL 110MMCONCRETEMASONRYWALL(2HOURRATED) W/20MMTHK.CEMENTPLASTERANDPAINTEDONBOTH SIDES 300X400MMSTEELCOLUMNTOENGR'SDETAIL STEELCOLUMNTOENGR'SDETAIL 250MMTHICKCONCRETEPARTYWALL BATIKWASHINGDECK COMMONSPACE BATIKWORKSHOP FIRE STAIRCASE STAIRCASE STAIRCASE FIRE BATIKPAINTINGSTATION STORAGEROOM 14.93sqm 69.48sqm 43.68sqm 61.69sqm 46.97sqm LIFTLOBBY 7.55sqm 24.75sqm 9.04sqm M&EROOM 0.66sqm 0.88sqm 1.29sqm 10.11sqm 2.79sqm 50MM DP FF-3WF-3CF-1 FF-3WF-3CF-1 FF-1WF-1CF-1 FF-1WF-1CF-1FF-1WF-1CF-1 NVFFL+11.710 FF-2WF-1CF-1 MVFFL+11.710 FF-2WF-1 MVFFL+11.710 MVFFL+11.710
W/20MMTHK.CEMENTPLASTERANDPAINTEDONBOTH SIDES
BOTHSIDESTOARCH'SDETS. 900MMSHSRAILINGWITHSTEELHANDRAILTOMANUF'S
900WIDTHCHECKEREDSTEELEXTERNALFIRESTAIRCASE WITH900MMHEIGHTSTEELTUBERAILINGSTOMANUF'S DETAIL
CADANGANPEMBANGUNAN1BLOKPUSATKOMUNITI5TINGKATYANG MENGANDUNGI
1)TINGKATBAWAHRUANGPASARSENI,KEDAISENI,RUANGRESTORAN
2)TINGKATSATUAUDITORIUM,PERPUSTAKAAN,BILIKBASUHBATIK
3)TINGKATDUAPERPUSTAKAAN,STESENWAXINGBATIK
4)TINGKATTIGABENGKELBATIK,RUANGMENGECATDANMENGERINGKAN BATIK
150X150MMRCCOLUMNTOENGR'SDETAIL
DESCRIPTION
WOODENSINGLELEAFDOOR
1800MM(W)X2100MM(H)WOODENDOUBLELEAFDOORD3
D4800MM(W)X2100MM(H)WOODENSINGLELEAFDOOR
900WIDTHPRECASTRCFIRESTAIRCASEWITH900MM HEIGHTSTEELTUBERAILINGSTOMANUF'SDETAIL R=175MM,T=250MM
200MMTHICKRCSHEARWALL(2HOURRATED)W/15MM THK.CEMENTPLASTERANDPAINTEDONBOTHSIDES
SERVICELIFTTOENGR'SDETAIL
110MMCONCRETEMASONRYWALL(2HOURRATED) W/20MMTHK.CEMENTPLASTERANDPAINTEDONBOTH SIDES
150MMTHICKCONCRETEWALLWITHOFF-FORMFINISHON BOTHSIDESTOARCH'SDETS. 900MMSHSRAILINGWITHSTEELHANDRAILTOMANUF'S DETAIL
910MM(W)X2100MM(H)2HRFIRERATEDSINGLELEAFDOOR
D64100MM(W)X2100MM(H)SLIDINGGLASSDOOR
900MM(W)X2100MM(H)AUTOMATICDOOR
D7
5)TINGKATEMPATRUANGJAHITAN,GALERISENI DI41,LEBOHAMPANG,CITYCENTER,50100KUALALUMPUR, WILAYAHPERSEKUTUANKUALALUMPUR UNTUKTETUANTAYLOR'SUNIVERSITYSDN.BHD UNTUKTETUANTHINKCITY
THINKCITYSDNBHD Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
WINDOWSCHEDULE
CODEDIMENSION(WH) DESCRIPTION
W41000MM(W)X2000MM(H)SINGLEPANELCASEMENTWINDOW
W51000MM(W)X2000MM(H)SINGLEPANELCASEMENTWINDOW
W88900MM(W)X3000MM(H)PANELFULLLENGTHFIXEDWINDOW W102000MM(W)3500MM(H)SINGLEPANELFULLLENGTHFIXEDWINDOW
W152560MM(W)4500MM(H)SINGLEPANELFULLLENGTHFIXEDWINDOW
W162560MM(W)4500MM(H)SINGLEPANELFULLLENGTHFIXEDWINDOW
W174800MM(W)3500MM(H)PANELFULLLENGTHFIXEDWINDOW
W184200MM(W)3600MM(H)PANELFULLLENGTHFIXEDWINDOW
W193400MM(W)5300MM(H)PANELFULLLENGTHFIXEDWINDOW
W204200MM(W)5000MM(H)PANELFULLLENGTHFIXEDWINDOW
THINKCITYSDNBHD Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
FOURTHFLOORPLAN SCALE1:100 N
FLOORFINISHES FF-1 FF-2 FF-3 POWERTROWELEDCONCRETEFINISH ENGINEEREDTIMBERFLOORING 10MMNON-SLIPHOMOGENEOUSTILES(BATHROOM) WALLFINISHES WF-1 WF-2 PLAINCEMENTPLASTEREDPAINTED 10MMCERAMICTILES FF-4 CEILING SKIMCOATEDPAINTEDWITHEMULSIONPAINT CEMENTPLASTEREDANDPAINTEDONFLOORSLAB CF-2 CF-1 FINISHEDLEGENDS FLOOR FINISHES FF-1 WALLFINISHES CF-1 CEILING FINISHFLOOR LEVEL NATURALVENTILATIONMECHANICALVENTILATION NVMVFFL+CARPETTILES TOILETPARTITION25MMTHK LAMINATEDPHENOLICPARTITIONBOARD WF-3 WF-1 BATIKSEWINGSTATION SEWINGSPILLOVERAREA ARTGALLERY BALCONY LIFTLOBBY FIRESTAIRCASE1 FIRESTAIRCASE2 GF 01 02 03 04 05 06 07 08 09 ROOM PROVIDED sq.m % NATURALLIGHTING ACTION PROVIDED sq.m % NATURALVENTILATION ACTION AREA (sq.m) REQUIRED FLOORAREA (sq.m) 10% REQUIRED FLOORAREA (sq.m) 5% 10.11 2.79 MALE&FEMALETOILET OKUTOILET 7.55 9.04 STORAGEROOM1 1.29 11 M&EROOM 0.88 12 0.66 13 M&EROOM2 24.75 8.39 89.11 25.38 53.05 STORAGEROOM2 STORAGEROOM3 14 15 0.40 7.05 0.755 0.904 0.129 0.088 0.066 2.475 0.839 8.911 2.538 5.305 0.040 0.705 0.378 0.452 0.043 0.044 0.033 1.238 0.420 4.456 1.269 2.653 0.020 0.353 1.011 0.279 0.506 0.140 5 4 3 2 F E D C B 1 A 1250 4000 4500 4500 4700 18950 6 5100 4900 4900 4000 1750 20650
SCHEDULEOFFINISHES
PRECASTCONCRETEPLANTERBOXWITH300MMSOIL
150MMTHICKBRICKWALLTOENGR'SDETAIL
R=175MM,T=250MM
DEPTHTOENGR'SDETAIL
1000MMWIDTHRCSTAIRCASEWITH1100MMHEIGHT
2400MMWIDTHRCSTAIRCASE
STEELCOLUMNTOENGR'SDETAIL DN DN DN UP 250MMTHICKCONCRETEPARTYWALL N/A N/A N/A N/A N/A 0% ML 0% ML 0% ML 0% ML 0% ML N/A N/A N/A N/A N/A 0% 0% 0% 0% 0% MV MV MV MV MV N/A 0% ML N/A 0% MV N/A 0% ML N/A 0% MV N/A 0% ML N/A 0% MV 2.000 22.12% 2.000 22.12% OPEN 100% OPEN 100% DISEMAK DILUKIS SKALA TARIKH NO.LUKISAN TAJUKLUKISAN REVISION BPSUBMISSION 1 LEMBAGA ARKITEK MALAYSIA STATUSLUKISAN TANDATANGANARKITEK ARKITEK NAMA,TANDATANGANDANNO.K/PPENYEWA NO.SIRI COPPENDAFTARANJABATAN TAJUKCADANGAN NAMA,TANDATANGANDANNO.K/PPEMAJUPEMILIKTANAH AR.WONG DIRECTOR COPKELULUSANTANDATANGANPENGARAHJABATANKAWALAN&PENGAWASANBANGUNAN DEWANBANDARAYAKUALALUMPUR
TIMBERRAILINGTOENGR'SDETAIL R=175MM,T=250MM 150X50MMGALVANIZEDALUMINUMFINTOSPEC'SDETAIL
R=175MM,T=250MM 300X400MMSTEELCOLUMNTOENGR'SDETAIL
AR.NURULALIAAHAMAD10/05/2023
DIRECTOR
AR.WONG
03-05 SOHSIUJEAN DBKL/BP/03-05
FOURTHFLOORPLAN
03 05
CODE D1 FD1 600MM(W)X2100MM(H) DIMENSION(WH)
ARKITEKPROFESIONAL Ar.Bob No.PendaftaranLAMA/L100
DOORSCHEDULE
FD1 FD1 D1 D1 D1 D1 D1 D1 D4 D4 D5 D6 D7 W4 W4 W4 W4 W4 W4 W4 W5 W11 W11 W16 W16 W12 W12 W16 14.00 26.39% 14.00 26.39% 5.60 22.06% N/A 0% MV 49.68 55.75% N/A 0% MV 14.00 56.57% N/A 0% MV 4-01 A 4-02 B 05 05 03 02 05 01 A 4-02 B BATIKSEWINGSTATION ARTGALLERY FIRE STAIRCASE FIRE STAIRCASE STORAGEROOM STORAGEROOM 89.11sqm 53.05sqm 8.39sqm 19.42sqm LIFTLOBBY 7.55sqm 24.75sqm 9.04sqm 0.40sqm SEWINGSPILLOVERAREA 25.38sqm 7.05sqm M&EROOM 0.66sqm 0.88sqm 1.29sqm 10.11sqm 2.79sqm 50MM DP FF-3WF-3CF-1 FF-3WF-3CF-1 FF-1WF-1CF-1 FF-1WF-1CF-1FF-1WF-1CF-1 FF-4WF-1 NVFFL+15.205 CF-1 FF-1WF-1CF-1 FF-1 FFL+15.210 FF-4WF-1 MVFFL+15.205 CF-1
W2113500MM(W)1900MM(H)PANELFULLLENGTHFIXEDWINDOW W2211400MM(W)3500MM(H)PANELFULLLENGTHFIXEDWINDOW
COPKELULUSANTANDATANGANPENGARAHJABATANKAWALAN&PENGAWASANBANGUNAN DEWANBANDARAYAKUALALUMPUR
TAJUKCADANGAN
CADANGANPEMBANGUNAN1BLOKPUSATKOMUNITI5TINGKATYANG MENGANDUNGI
1)TINGKATBAWAHRUANGPASARSENI,KEDAISENI,RUANGRESTORAN
2)TINGKATSATUAUDITORIUM,PERPUSTAKAAN,BILIKBASUHBATIK
3)TINGKATDUAPERPUSTAKAAN,STESENWAXINGBATIK
4)TINGKATTIGABENGKELBATIK,RUANGMENGECATDANMENGERINGKAN BATIK
NAMA,TANDATANGANDANNO.K/PPEMAJUPEMILIKTANAH
THINKCITYSDNBHD Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan
AR.WONG DIRECTOR
NAMA,TANDATANGANDANNO.K/PPENYEWA
THINKCITYSDNBHD Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan
AR.WONG DIRECTOR
ARKITEKPROFESIONAL
5)TINGKATEMPATRUANGJAHITAN,GALERISENI DI41,LEBOHAMPANG,CITYCENTER,50100KUALALUMPUR, WILAYAHPERSEKUTUANKUALALUMPUR UNTUKTETUANTAYLOR'SUNIVERSITYSDN.BHD UNTUKTETUANTHINKCITY AR.NURULALIAAHAMAD
ROOFPLAN SCALE1:100 N DISEMAK DILUKIS SKALA TARIKH NO.LUKISAN TAJUKLUKISAN REVISION BPSUBMISSION 1 LEMBAGA ARKITEK MALAYSIA STATUSLUKISAN
TANDATANGANARKITEK ARKITEK
NO.SIRI COPPENDAFTARANJABATAN
10/05/2023
KualaLumpur
ROOFPLAN 03-06 SOHSIUJEAN DBKL/BP/03-06
KualaLumpur
Ar.Bob No.PendaftaranLAMA/L100 03 06 5 4 3 2 F E D C B 1 A 1250 4000 4500 4500 6 5100 4900 4900 4000 1750 20650 STEELCOLUMNTOENGR'SDETAIL 4700 18950 DegreeSlope DegreeSlope DegreeSlope 20DegreeSlope 20DegreeSlope DegreeSlope 70DegreeSlope 400MMTHICK20°PITCHSTEELMETALDECKROOFC/W INSULATIONTOENGR'SDETAIL 400MMTHICK5°PITCHSTEELMETALDECKROOFC/W INSULATIONTOENGR'SDETAIL 400MMTHICKFLATSTEELMETALDECKROOFC/W INSULATIONTOENGR'SDETAIL 100MMUPVCRAINWATERDOWNPIPETOBEDISCHARGES TOTHESCUPPERDRAINBELOW 250MMWIDEGALVANIZEDSTEELROOFGUTTER 400MMTHICK70°PITCHSTEELMETALDECKROOFC/W INSULATIONTOENGR'SDETAIL 250MMTHICKCONCRETEPARTYWALL VOID
COPKELULUSANTANDATANGANPENGARAHJABATANKAWALAN&PENGAWASANBANGUNAN DEWANBANDARAYAKUALALUMPUR
250MMTHICKCONCRETEPARTYWALL
PREFABRICATEDSTEELCOLUMNTOENGR'SDETAIL
400MMTHICK20°PITCHSTEELMETALDECKROOFC/W INSULATIONTOENGR'SDETAIL
TAJUKCADANGAN
CADANGANPEMBANGUNAN1BLOKPUSATKOMUNITI5TINGKATYANG MENGANDUNGI
1)TINGKATBAWAHRUANGPASARSENI,KEDAISENI,RUANGRESTORAN
2)TINGKATSATUAUDITORIUM,PERPUSTAKAAN,BILIKBASUHBATIK
3)TINGKATDUAPERPUSTAKAAN,STESENWAXINGBATIK
4)TINGKATTIGABENGKELBATIK,RUANGMENGECATDANMENGERINGKAN BATIK
5)TINGKATEMPATRUANGJAHITAN,GALERISENI DI41,LEBOHAMPANG,CITYCENTER,50100KUALALUMPUR, WILAYAHPERSEKUTUANKUALALUMPUR UNTUKTETUANTAYLOR'SUNIVERSITYSDN.BHD
UNTUKTETUANTHINKCITY
PRECASTCONCRETEPLANTERBOXWITH300MMSOIL DEPTHTOENGR'SDETAIL
150X50MMGALVANIZEDALUMINUMFINTOSPEC'SDETAIL 900MMSHSRAILINGWITHSTEELHANDRAILTOMANUF'S DETAIL
150MMTHICKCONCRETEWALLWITHOFF-FORMFINISHON BOTHSIDESTOARCH'SDETS.
300MMTHICKCASTINSITUREINFORCEDCONCRETESLAB
150MMTHICK900MMHEIGHTCONCRETERAILINGTO ENGR'SDETAIL
900WIDTHCHECKEREDSTEELEXTERNALFIRESTAIRCASE WITH900MMHEIGHTSTEELTUBERAILINGSTOMANUF'S DETAIL R=175MM,T=250MM
150X150MMRCCOLUMNTOENGR'SDETAIL
150MMTHICKCONCRETEWALLWITHOFF-FORMFINISHON BOTHSIDESTOARCH'SDETAIL
1300MMWIDTHRCSTAIRCASEWITH1100MMHEIGHT TIMBERRAILINGTOMANUF'SDETAIL R=175MM,T=250MM 1000WIDTHRCRAMPC/WCEMENTRENDER
THINKCITYSDNBHD
Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
NAMA,TANDATANGANDANNO.K/PPEMAJUPEMILIKTANAH AR.WONG
NAMA,TANDATANGANDANNO.K/PPENYEWA
THINKCITYSDNBHD
Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
ARKITEK
TANDATANGANARKITEK
LEMBAGA ARKITEK MALAYSIA STATUSLUKISAN
ARKITEKPROFESIONAL Ar.Bob No.PendaftaranLAM:A/L100
SCALE1:100 GROUNDFLOOR 0 FIRSTFLOOR 4500 SECONDFLOOR 8000 THIRDFLOOR 11500 FOURTHFLOOR 15000 LOWERROOF 18500 F E D C BA 18750 1250 4000 4500 4500 4500 TOPROOF 24115 UPPERROOF 21618 4500 3500 3500 3500 3500 3118 2497 24115
NORTHELEVATION
DISEMAK DILUKIS SKALA TARIKH NO.LUKISAN
REVISION BPSUBMISSION 1
TAJUKLUKISAN
NO.SIRI COPPENDAFTARANJABATAN
DIRECTOR
AR.NURULALIAAHAMAD10/05/2023 AR.WONG DIRECTOR
05-01 LIMEEMIN DBKL/BP/05-01
NORTHELEVATION
05 01 VOID VOID VOIDVOIDVOID VOIDVOIDVOID
250MMTHICKCONCRETEPARTYWALL PREFABRICATEDSTEELCOLUMNTOENGR'SDETAIL
400MMTHICK70°PITCHSTEELMETALDECKROOFC/W INSULATIONTOENGR'SDETAIL
INSULATIONTOENGR'SDETAIL
400MMTHICK5°PITCHSTEELMETALDECKROOFC/W INSULATIONTOENGR'SDETAIL
1)TINGKATBAWAHRUANGPASARSENI,KEDAISENI,RUANGRESTORAN
2)TINGKATSATUAUDITORIUM,PERPUSTAKAAN,BILIKBASUHBATIK
3)TINGKATDUAPERPUSTAKAAN,STESENWAXINGBATIK
4)TINGKATTIGABENGKELBATIK,RUANGMENGECATDANMENGERINGKAN BATIK
5)TINGKATEMPATRUANGJAHITAN,GALERISENI DIATASLOT??,LEBOHAMPANG,KUALALUMPUR. UNTUKTETUANTHINKCITY
DI41,LEBOHAMPANG,CITYCENTER,50100KUALALUMPUR, WILAYAHPERSEKUTUANKUALALUMPUR UNTUKTETUANTAYLOR'SUNIVERSITYSDN.BHD UNTUKTETUANTHINKCITY
THINKCITYSDNBHD Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
150MMTHICKCONCRETEWALLWITHOFF-FORMFINISHON BOTHSIDESTOARCH'SDETS.
THINKCITYSDNBHD Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
900MMSHSRAILINGWITHSTEELHANDRAILTOMANUF'S DETAIL
SCALE1:100 GROUNDFLOOR 0 FIRSTFLOOR 4500 SECONDFLOOR 8000 THIRDFLOOR 11500 FOURTHFLOOR 15000 LOWERROOF 18500 F E D C AB TOPROOF 24115 UPPERROOF 21618 18950 1250 4000 4500 4500 4700 2497 3118 3500 3500 3500 3500 4500 24115 SOUTHELEVATION DISEMAK DILUKIS SKALA TARIKH NO.LUKISAN TAJUKLUKISAN REVISION BPSUBMISSION 1224 1 LEMBAGA ARKITEK MALAYSIA STATUSLUKISAN TANDATANGANARKITEK ARKITEK ARKITEKPROFESIONAL Ar.XXXXX No.PendaftaranLAMA/LXXX NAMA,TANDATANGANDANNO.K/PPENYEWA TAJUKCADANGAN NAMA JAWATAN NOK/P XXXXXXSDNBHD ADDRESS OFFICENUMBER COMPANYNOXXX NAMA,TANDATANGANDANNO.K/PPEMAJU&PEMILIKTANAH NAMA PEMILIKTANAH NOK/PXXX COPKELULUSANTANDATANGANPENGARAHJABATANKAWALAN&PENGAWASANBANGUNAN DEWANBANDARAYAKUALALUMPUR XXXXXXSDNBHD ADDRESS OFFICENUMBER COMPANYNOXXX
SOUTHELEVATION
CADANGANPEMBANGUNAN1BLOKPUSATKOMUNITI5TINGKATYANG MENGANDUNGI
AR.NURULALIAAHMAD10/05/2023 1224 NO.SIRI COPPENDAFTARANJABATAN
150X50MMGALVANIZEDALUMINUMFINTOSPEC'SDETAIL 1300MMWIDTHRCSTAIRCASEWITH1100MMHEIGHT TIMBERRAILINGTOMANUF'SDETAIL R=175MM,T=250MM 150MMTHICK900MMHEIGHTCONCRETERAILINGTO ENGR'SDETAIL
7000MMWIDTHRCSEATINGWITH1100MMHEIGHTTIMBER RAILINGTOENGR'SDETAIL R=400MM,T=750MM AR.WONG DIRECTOR
300MMTHICKCASTINSITUREINFORCEDCONCRETESLAB
400MMTHICK20°PITCHSTEELMETALDECKROOFC/W
AR.NURULALIAAHAMAD AR.WONG DIRECTOR
05-02 LIMEEMIN DBKL/BP/05-02 Ar.Bob
05 02 VOID VOID VOIDVOIDVOID VOID
No.PendaftaranLAM:A/L100
1)TINGKATBAWAHRUANGPASARSENI,KEDAISENI,RUANGRESTORAN
2)TINGKATSATUAUDITORIUM,PERPUSTAKAAN,BILIKBASUHBATIK
3)TINGKATDUAPERPUSTAKAAN,STESENWAXINGBATIK
4)TINGKATTIGABENGKELBATIK,RUANGMENGECATDANMENGERINGKAN BATIK
5)TINGKATEMPATRUANGJAHITAN,GALERISENI DIATASLOT??,LEBOHAMPANG,KUALALUMPUR. UNTUKTETUANTHINKCITY
DI41,LEBOHAMPANG,CITYCENTER,50100KUALALUMPUR, WILAYAHPERSEKUTUANKUALALUMPUR UNTUKTETUANTAYLOR'SUNIVERSITYSDN.BHD
UNTUKTETUANTHINKCITY
THINKCITYSDNBHD
Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
AR.WONG DIRECTOR
THINKCITYSDNBHD
Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
ARKITEKPROFESIONAL Ar.Bob No.PendaftaranLAMA/L100
WESTELEVATION SCALE1:100 GROUNDFLOOR 0 FIRSTFLOOR 4500 SECONDFLOOR 8000 THIRDFLOOR 11500 FOURTHFLOOR 15000 LOWERROOF 18500 5 4 3 12 6 TOPROOF 24115 UPPERROOF 21618 20650 1750 4000 4900 4900 5100 2497 3118 3500 3500 3500 3500 4500 24115 250MMTHICKCONCRETEPARTYWALL 150X50MMGALVANIZEDALUMINUMFINTOSPEC'SDETAIL 900MMSHSRAILINGWITHSTEELHANDRAILTOMANUF'S DETAIL PREFABRICATEDSTEELCOLUMNTOENGR'SDETAIL 150X150MMRCCOLUMNTOENGR'SDETAIL 300MMTHICKCASTINSITUREINFORCEDCONCRETESLAB 900WIDTHCHECKEREDSTEELEXTERNALFIRESTAIRCASE WITH900MMHEIGHTSTEELTUBERAILINGSTOMANUF'S DETAIL R=175MM,T=250MM 400MMTHICK20°PITCHSTEELMETALDECKROOFC/W INSULATIONTOENGR'SDETAIL 1300MMWIDTHRCSTAIRCASEWITH1100MMHEIGHT TIMBERRAILINGTOMANUF'SDETAIL R=175MM,T=250MM 150MMTHICKCONCRETEWALLWITHOFF-FORMFINISHON BOTHSIDESTOARCH'SDETS. 150MMTHICK900MMHEIGHTCONCRETERAILINGTO ENGR'SDETAIL 7000MMWIDTHRCSEATINGWITH1100MMHEIGHTTIMBER RAILINGTOENGR'SDETAIL R=400MM,T=750MM 1000MMWIDTHRCSTAIRCASEWITH1100MMHEIGHT TIMBERRAILINGTOENGR'SDETAIL R=175MM,T=250MM 400MMTHICK5°PITCHSTEELMETALDECKROOFC/W INSULATIONTOENGR'SDETAIL DISEMAK DILUKIS SKALA TARIKH NO.LUKISAN TAJUKLUKISAN REVISION BPSUBMISSION 1 LEMBAGA ARKITEK MALAYSIA STATUSLUKISAN TANDATANGANARKITEK ARKITEK NAMA,TANDATANGANDANNO.K/PPENYEWA TAJUKCADANGAN NAMA JAWATAN NOK/P XXXXXXSDNBHD ADDRESS OFFICENUMBER COMPANYNOXXX NAMA,TANDATANGANDANNO.K/PPEMAJUPEMILIKTANAH NAMA PEMILIKTANAH NOK/PXXX COPKELULUSANTANDATANGANPENGARAHJABATANKAWALAN&PENGAWASANBANGUNAN DEWANBANDARAYAKUALALUMPUR XXXXXXSDNBHD ADDRESS OFFICENUMBER COMPANYNOXXX CADANGANPEMBANGUNAN1BLOKPUSATKOMUNITI5TINGKATYANG
MENGANDUNGI
10/05/2023 NO.SIRI COPPENDAFTARANJABATAN
AR.NURULALIAAHAMAD AR.WONG DIRECTOR
WESTELEVATION LIMEEMIN 05-03 DBKL/BP/05-03
05 03 VOID VOID VOID VOID VOID VOID VOID VOID VOID VOID VOID
MENGANDUNGI
1)TINGKATBAWAHRUANGPASARSENI,KEDAISENI,RUANGRESTORAN
2)TINGKATSATUAUDITORIUM,PERPUSTAKAAN,BILIKBASUHBATIK
3)TINGKATDUAPERPUSTAKAAN,STESENWAXINGBATIK
4)TINGKATTIGABENGKELBATIK,RUANGMENGECATDANMENGERINGKAN BATIK
SECTIONA'-A
THINKCITYSDNBHD
Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
THINKCITYSDNBHD Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
AR.WONG DIRECTOR
ARKITEKPROFESIONAL Ar.Bob No.PendaftaranLAMA/L100
5)TINGKATEMPATRUANGJAHITAN,GALERISENI DI41,LEBOHAMPANG,CITYCENTER,50100KUALALUMPUR, WILAYAHPERSEKUTUANKUALALUMPUR UNTUKTETUANTAYLOR'SUNIVERSITYSDN.BHD UNTUKTETUANTHINKCITY AR.NURULALIAAHAMAD
SCALE1:100 GROUNDFLOOR 0 FIRSTFLOOR 4500 SECONDFLOOR 8000 THIRDFLOOR 11500 FOURTHFLOOR 15000 LOWERROOF 18500 5 4 3 12 6 TOPROOF 24115 UPPERROOF 21618 20650 1750 4000 4900 4900 5100 2497 3118 3500 3500 3500 3500 4500 24115 RCFOOTING&GROUNDBEAMTOENGR'SDETAIL 250MMTHICKCONCRETEPARTYWALL 150X50MMGALVANIZEDALUMINUMFINTOSPEC'SDETAIL 900MMSHSRAILINGWITHSTEELHANDRAILTOMANUF'S DETAIL PREFABRICATEDSTEELCOLUMNTOENGR'SDETAIL 150X150MMRCCOLUMNTOENGR'SDETAIL 300MMTHICKCASTINSITUREINFORCEDCONCRETESLAB 900WIDTHCHECKEREDSTEELEXTERNALFIRESTAIRCASE WITH900MMHEIGHTSTEELTUBERAILINGSTOMANUF'S DETAIL R=175MM,T=250MM 400MMTHICK20°PITCHSTEELMETALDECKROOFC/W INSULATIONTOENGR'SDETAIL 1300MMWIDTHRCSTAIRCASEWITH1100MMHEIGHT TIMBERRAILINGTOMANUF'SDETAIL R=175MM,T=250MM 150MMTHICKCONCRETEWALLWITHOFF-FORMFINISHON BOTHSIDESTOARCH'SDETS. 150MMTHICK900MMHEIGHTCONCRETERAILINGTO ENGR'SDETAIL 7000MMWIDTHRCSEATINGWITH1100MMHEIGHTTIMBER RAILINGTOENGR'SDETAIL R=400MM,T=750MM 1000MMWIDTHRCSTAIRCASEWITH1100MMHEIGHT TIMBERRAILINGTOENGR'SDETAIL R=175MM,T=250MM 300X150MMRCBEAMTOENGR'SDETAIL 400MMTHICK5°PITCHSTEELMETALDECKROOFC/W INSULATIONTOENGR'SDETAIL DISEMAK DILUKIS SKALA TARIKH NO.LUKISAN TAJUKLUKISAN REVISION BPSUBMISSION 1 LEMBAGA ARKITEK MALAYSIA STATUSLUKISAN TANDATANGANARKITEK ARKITEK NAMA,TANDATANGANDANNO.K/PPENYEWA NO.SIRI COPPENDAFTARANJABATAN TAJUKCADANGAN NAMA,TANDATANGANDANNO.K/PPEMAJUPEMILIKTANAH AR.WONG DIRECTOR COPKELULUSANTANDATANGANPENGARAHJABATANKAWALAN&PENGAWASANBANGUNAN
CADANGANPEMBANGUNANBLOKPUSATKOMUNITI5TINGKATYANG
DEWANBANDARAYAKUALALUMPUR
10/05/2023
04-01 SOHSIUJEAN DBKL/BP/04-01
SECTIONA-A'
04 01 VOID VOID VOID VOID VOID VOID VOID VOID VOID KITCHEN 11.87sqm ARTSTORE 19.76sqm PANTRY 2.80sqm LIBRARY 33.73sqm AUDITORIUM 30.82sqm BATIKWASHING STATION 57.02sqm LIBRARY 19.34sqm BATIKWAXING STATION 83.65sqm BATIKWORKSHOP 46.97sqm COMMONSPACE 43.68sqm BATIKPAINTING STATION 69.68sqm OPENWORKSHOP AREA 61.69sqm BATIKSEWING STATION 53.05sqm COMMONSPACE 19.42sqm ARTGALLERY 89.11sqm ARTISANALMARKET SPACE 114.34sqm
400MMTHICK20°PITCHSTEELMETALDECKROOFC/W INSULATIONTOENGR'SDETAIL
SECTIONB'-B
150X150MMRCCOLUMNTOENGR'SDETAIL 300MMTHICKCASTINSITUREINFORCEDCONCRETESLAB
COPKELULUSANTANDATANGANPENGARAHJABATANKAWALAN&PENGAWASANBANGUNAN
DEWANBANDARAYAKUALALUMPUR CADANGANPEMBANGUNAN1BLOKPUSATKOMUNITI5TINGKATYANG
3)TINGKATDUAPERPUSTAKAAN,STESENWAXINGBATIK
4)TINGKATTIGABENGKELBATIK,RUANGMENGECATDANMENGERINGKAN BATIK
5)TINGKATEMPATRUANGJAHITAN,GALERISENI DI41,LEBOHAMPANG,CITYCENTER,50100KUALALUMPUR, WILAYAHPERSEKUTUANKUALALUMPUR UNTUKTETUANTAYLOR'SUNIVERSITYSDN.BHD UNTUKTETUANTHINKCITY
900MMSHSRAILINGWITHSTEELHANDRAILTOMANUF'S DETAIL
NO.SIRI COPPENDAFTARANJABATAN TAJUKCADANGAN NAMA,TANDATANGANDANNO.K/PPEMAJUPEMILIKTANAH AR.WONG DIRECTOR
TIMBERRAILINGTOENGR'SDETAIL R=175MM,T=250MM 300X150MMRCBEAMTOENGR'SDETAIL ARKITEK
150MMTHICK900MMHEIGHTCONCRETERAILINGTO ENGR'SDETAIL TANDATANGANARKITEK
150X50MMGALVANIZEDALUMINUMFINTOSPEC'SDETAIL
ARKITEK MALAYSIA NAMA,TANDATANGANDANNO.K/PPENYEWA
KualaLumpur
AR.WONG
DIRECTOR
SECTIONB-B' 04-02 LIMEEMIN DBKL/BP/04-02
AR.NURULALIAAHAMAD10/05/2023
SCALE1:100 GROUNDFLOOR 0 FIRSTFLOOR 4500 SECONDFLOOR 8000 THIRDFLOOR 11500 FOURTHFLOOR 15000 LOWERROOF 18500 F E D C AB TOPROOF 24115 UPPERROOF 21618 18950 1250 4000 4500 4500 4700 2497 3118 3500 3500 3500 3500 4500 24115
250MMTHICKCONCRETEPARTYWALL
RCFOOTING&GROUNDBEAMTOENGR'SDETAIL
7000MMWIDTHRCSEATINGWITH1100MMHEIGHTTIMBER RAILINGTOENGR'SDETAIL R=400MM,T=750MM 1000MMWIDTHRCSTAIRCASEWITH1100MMHEIGHT
6300MMWIDTHRCSTEPSTOENGR'SDETAIL DISEMAK DILUKIS SKALA TARIKH NO.LUKISAN TAJUKLUKISAN REVISION BPSUBMISSION 1 LEMBAGA
150MMTHICKCONCRETEWALLWITHOFF-FORMFINISHON BOTHSIDESTOARCH'SDETS. STATUSLUKISAN
MENGANDUNGI
1)TINGKATBAWAHRUANGPASARSENI,KEDAISENI,RUANGRESTORAN
2)TINGKATSATUAUDITORIUM,PERPUSTAKAAN,BILIKBASUHBATIK
THINKCITYSDNBHD Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan
KualaLumpur
THINKCITYSDNBHD Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan
04 02 VOID VOID VOID VOIDVOIDVOID OPENDECK 37.83sqm AUDITORIUM 30.82sqm OPENWORKSHOP AREA 61.69sqm BALCONY 53.05sqm COMMONSPACE 19.42sqm SEWINGSPILLOVER AREA 53.05sqm
ARKITEKPROFESIONAL Ar.Bob No.PendaftaranLAMA/L100
COPKELULUSANTANDATANGANPENGARAHJABATANKAWALAN&PENGAWASANBANGUNAN DEWANBANDARAYAKUALALUMPUR
TAJUKCADANGAN
CADANGANPEMBANGUNAN1BLOKPUSATKOMUNITI5TINGKATYANG MENGANDUNGI
1)TINGKATBAWAHRUANGPASARSENI,KEDAISENI,RUANGRESTORAN
2)TINGKATSATUAUDITORIUM,PERPUSTAKAAN,BILIKBASUHBATIK
3)TINGKATDUAPERPUSTAKAAN,STESENWAXINGBATIK
4)TINGKATTIGABENGKELBATIK,RUANGMENGECATDANMENGERINGKAN BATIK
5)TINGKATEMPATRUANGJAHITAN,GALERISENI DI41,LEBOHAMPANG,CITYCENTER,50100KUALALUMPUR, WILAYAHPERSEKUTUANKUALALUMPUR UNTUKTETUANTAYLOR'SUNIVERSITYSDN.BHD UNTUKTETUANTHINKCITY
NAMA,TANDATANGANDANNO.K/PPEMAJU&PEMILIKTANAH
THINKCITYSDNBHD Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
AR.WONG DIRECTOR
NAMA,TANDATANGANDANNO.K/PPENYEWA
THINKCITYSDNBHD Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
AR.WONG DIRECTOR
ARKITEK
TANDATANGANARKITEK
ARKITEKPROFESIONAL Ar.Bob No.PendaftaranLAMA/L100
DOORSCHEDULE
DISEMAK DILUKIS SKALA TARIKH NO.LUKISAN TAJUKLUKISAN REVISION
1
BPSUBMISSION
LEMBAGA ARKITEK MALAYSIA STATUSLUKISAN
NO.SIRI COPPENDAFTARANJABATAN
10/05/2023
AR.NURULALIAAHAMAD
06-01 EJAZAZREE DBKL/BP/06-01
DOORTYPE D1 PLAN D2 D3 D4 FD1 ELEVATION 1500 1800 DESCRIPTION SINGLELEAFDOOR DOUBLELEAFDOOR 60MMPLYWOODTIMBERPANEL 70MMWIDTHANODISEDALUMINIUMFRAME 60MMPLYWOODTIMBERPANEL 70MMWIDTHANODISEDALUMINIUMFRAME DOUBLELEAFDOOR
HRFIRERATEDSINGLELEAFDOOR SOLIDHWFRAMEDDOORTOMANUF'SDETS
SIZE 600MM(W)X2100MM(H) FINISHES IRONMONGERY CONCEALEDBOLTDOORLATCH LOCATION W/C,STORAGE CONCEALEDBOLTDOORLATCH KITCHEN CONCEALEDBOLTDOORLATCH BATIKSEWINGSTATION PAINTED 1500MM(W)X2100MM(H) PAINTED 1800MM(W)X2100MM(H) PAINTED 800MM(W)X2100MM(H) PAINTED STORAGE,BATIKWAXINGSTATION, BATIKWASHINGDECK TOTALNOS GFLEVEL 7 1FLEVEL 6 2FLEVEL 6 3FLEVEL 6 4FLEVEL 6 GFLEVEL1FLEVEL2FLEVEL3FLEVEL4FLEVELGFLEVEL1FLEVEL2FLEVEL3FLEVEL4FLEVEL 1 GFLEVEL 1 1FLEVEL2FLEVEL 2 3FLEVEL 2 4FLEVEL 2 910MM(W)X2100MM(H) PAINTED BALLBEARINGFDHINGE STORAGE,FIRESTAIRCASE,OPENDECK GFLEVEL1FLEVEL 2 2FLEVEL 2 3FLEVEL 3 4FLEVEL 2 DOORTYPE D5 PLAN D6 D7 ELEVATION DESCRIPTION DOUBLELEAFGLASSDOOR 15MMTEMPEREDGLASSPANEL 50MMWIDTHANODISEDALUMINIUMFRAME SLIDINGGLASSDOOR 15MMTEMPEREDGLASSPANEL 60MMALUMINIUMFRAMETOSLIDINGDOOR AUTOMATICDOOR HOLLOWCORETIMBERPANEL 40MMSTAINLESSSTEELFRAME AUTOMATICDOORACTUATOR SIZE FINISHES IRONMONGERY LOCATION 1700MM(W)X2100MM(H) POWDERCOATED STAINLESSSTEELDOORHANDLE ARTSTORE,LIBRARY,BATIKWAXINGSTATION, BATIKPAINTINGSTATION,BALCONY TOTALNOS GFLEVEL 1 1FLEVEL2FLEVEL 2 3FLEVEL 2 4FLEVEL4100MM(W)X2100MM(H) POWDERCOATED STAINLESSSTEELGLIDE-ONRAILSYSTEM BATIKWASHINGSTATION,BATIKWORKSHOP,ARTGALLERY GFLEVEL1FLEVEL 2FLEVEL3FLEVEL 1 4FLEVEL 900MM(W)X2100MM(H) PAINTED ALUMINIUMAUTOMATICDOORCLOSER OKUW/C GFLEVEL1FLEVEL 1 2FLEVEL3FLEVEL 1 4FLEVEL 1 FFL FFL FFL FFL FFL FFL FFL FFL OUTSIDE INSIDE 1500 INSIDE 1800 OUTSIDE 800 INSIDE 900 INSIDE 1700 INSIDE OUTSIDE INSIDE 600 600 800 900 2100 1000 2100 1000 2100 1000 2100 1000 2100 1000 1700 850 850 2100 4100 820 2100 900 900 2100 SINGLELEAFDOOR 60MMPLYWOODTIMBERPANEL 70MMWIDTHANODISEDALUMINIUMFRAME CONCEALEDBOLTDOORLATCH OUTSIDE INSIDE 4100
60MMPLYWOODTIMBERPANEL 70MMWIDTHANODISEDALUMINIUMFRAME
40MMWIDTHELECTRO-GALVANIZEDSTEELFRAME
COPKELULUSANTANDATANGANPENGARAHJABATANKAWALAN&PENGAWASANBANGUNAN DEWANBANDARAYAKUALALUMPUR
TAJUKCADANGAN
CADANGANPEMBANGUNAN1BLOKPUSATKOMUNITITINGKATYANG MENGANDUNGI
1)TINGKATBAWAHRUANGPASARSENI,KEDAISENI,RUANGRESTORAN
2)TINGKATSATUAUDITORIUM,PERPUSTAKAAN,BILIKBASUHBATIK
3)TINGKATDUAPERPUSTAKAAN,STESENWAXINGBATIK
4)TINGKATTIGABENGKELBATIK,RUANGMENGECATDANMENGERINGKAN BATIK
5)TINGKATEMPATRUANGJAHITAN,GALERISENI DI41,LEBOHAMPANG,CITYCENTER,50100KUALALUMPUR, WILAYAHPERSEKUTUANKUALALUMPUR UNTUKTETUANTAYLOR'SUNIVERSITYSDN.BHD UNTUKTETUANTHINKCITY
NAMA,TANDATANGANDANNO.K/PPEMAJU&PEMILIKTANAH
THINKCITYSDNBHD LevelNo36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
AR.WONG DIRECTOR
NAMA,TANDATANGANDANNO.K/PPENYEWA
THINKCITYSDNBHD LevelNo36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
AR.WONG DIRECTOR
ARKITEK
TANDATANGANARKITEK
ARKITEKPROFESIONAL Ar.Bob No.PendaftaranLAM:A/L100
DISEMAK DILUKIS SKALA TARIKH NO.LUKISAN TAJUKLUKISAN REVISION BPSUBMISSION 1
LEMBAGA ARKITEK MALAYSIA STATUSLUKISAN
NO.SIRI COPPENDAFTARANJABATAN
AR.NURULALIAAHAMAD10/05/2023
06-03 EJAZAZREE DBKL/BP/06-03
WINDOWSCHEDULE
WINDOWTYPE PLAN W9 ELEVATION DESCRIPTION SINGLEPANELFULLLENGTHFIXEDWINDOW 50MMWIDTHANODISEDALUMINIUMFRAME 15MMGLASSPANEL SIZE FINISHES LOCATION 2000MM(W)X3500MM(H) POWDERCOATED CIRCULATION TOTALNOS GFLEVEL1FLEVEL 2 2FLEVEL 3FLEVEL 2 4FLEVEL 2 2000 FFL 3500 WINDOWTYPE W13 PLAN W14 W15 ELEVATION DESCRIPTION 4PANELFULLLENGTHFIXEDWINDOW 50MMWIDTHANODISEDALUMINIUMFRAME 15MMGLASSPANEL SINGLEPANELFULLLENGTHFIXEDWINDOW 50MMWIDTHANODISEDALUMINIUMFRAME 15MMGLASSPANEL 3PANELFULLLENGTHFIXEDWINDOW 50MMWIDTHANODISEDALUMINIUMFRAME 15MMGLASSPANEL SIZE 6400MM(W)X3500MM(H) FINISHES POWDERCOATED LOCATION OPENWORKSHOPAREA 1200MM(W)X3500MM(H) POWDERCOATED OPENWORKSHOPAREA 4700MM(W)X3500MM(H) POWDERCOATED CIRCULATION TOTALNOS GFLEVEL1FLEVEL2FLEVEL3FLEVEL 1 4FLEVELGFLEVEL1FLEVEL2FLEVEL3FLEVEL 2 4FLEVELGFLEVEL1FLEVEL2FLEVEL3FLEVEL 1 4FLEVEL6400 1600 1600 1600 1600 FFL 3500 1200 3500 FFL 4700 1570 1570 1570 FFL 3500 W10 W11 W12 SINGLEPANELFULLLENGTHFIXEDWINDOW 50MMWIDTHANODISEDALUMINIUMFRAME 15MMGLASSPANEL SINGLEPANELFULLLENGTHFIXEDWINDOW 50MMWIDTHANODISEDALUMINIUMFRAME 15MMGLASSPANEL 3PANELFULLLENGTHFIXEDWINDOW 50MMWIDTHANODISEDALUMINIUMFRAME 15MMGLASSPANEL 2560MM(W)X4500MM(H) POWDERCOATED CIRCULATION 2000MM(W)X4500MM(H) POWDERCOATED CIRCULATION 4800MM(W)X3500MM(H) POWDERCOATED OPENDECK GFLEVEL1FLEVEL2FLEVEL3FLEVEL4FLEVEL 1 GFLEVEL1FLEVEL2FLEVEL3FLEVEL4FLEVEL 1 GFLEVEL1FLEVEL2FLEVEL 2 3FLEVEL4FLEVEL 2 2560 FFL 3500 4500 1000 2000 FFL 4500 4800 1600 1600 1600 3500 FFL W16
15MMGLASSPANEL 4200MM(W)X3600MM(H) POWDERCOATED BATIKPAINTINGSTATION,ARTGALLERY GFLEVEL1FLEVEL2FLEVEL3FLEVEL 4FLEVEL 3 FFL 4200 1400 1400 1400 3600
3PANELFULLLENGTHFIXEDWINDOW 50MMWIDTHANODISEDALUMINIUMFRAME
COPKELULUSANTANDATANGANPENGARAHJABATANKAWALAN&PENGAWASANBANGUNAN DEWANBANDARAYAKUALALUMPUR
TAJUKCADANGAN
CADANGANPEMBANGUNAN1BLOKPUSATKOMUNITITINGKATYANG MENGANDUNGI
1)TINGKATBAWAHRUANGPASARSENI,KEDAISENI,RUANGRESTORAN
2)TINGKATSATUAUDITORIUM,PERPUSTAKAAN,BILIKBASUHBATIK
3)TINGKATDUAPERPUSTAKAAN,STESENWAXINGBATIK
4)TINGKATTIGABENGKELBATIK,RUANGMENGECATDANMENGERINGKAN BATIK
5)TINGKATEMPATRUANGJAHITAN,GALERISENI DI41,LEBOHAMPANG,CITYCENTER,50100KUALALUMPUR, WILAYAHPERSEKUTUANKUALALUMPUR UNTUKTETUANTAYLOR'SUNIVERSITYSDN.BHD UNTUKTETUANTHINKCITY
NAMA,TANDATANGANDANNO.K/PPEMAJU&PEMILIKTANAH
THINKCITYSDNBHD LevelNo36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
AR.WONG DIRECTOR
NAMA,TANDATANGANDANNO.K/PPENYEWA
THINKCITYSDNBHD LevelNo36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
AR.WONG DIRECTOR
ARKITEK
TANDATANGANARKITEK
No.PendaftaranLAMA/L100
AR.NURULALIAAHMAD
DISEMAK DILUKIS SKALA TARIKH NO.LUKISAN TAJUKLUKISAN REVISION
1
BPSUBMISSION
LEMBAGA ARKITEK MALAYSIA STATUSLUKISAN
NO.SIRI COPPENDAFTARANJABATAN
-
10/05/2023
06-04 EJAZAZREE DBKL/BP/06-04 ARKITEKPROFESIONAL Ar.Bob
WINDOWTYPE W17 PLAN W18 ELEVATION DESCRIPTION PANELFULLLENGTHFIXEDWINDOW 50MMWIDTHANODISEDALUMINIUMFRAME 15MMGLASSPANEL 3PANELFULLLENGTHFIXEDWINDOW 50MMWIDTHANODISEDALUMINIUMFRAME 15MMGLASSPANEL SIZE 3400MM(W)X5300MM(H) FINISHES LOCATION POWDERCOATED ARTGALLERY 4200MM(W)X5000MM(H) POWDERCOATED ARTGALLERY TOTALNOS GFLEVEL1FLEVEL2FLEVEL3FLEVEL4FLEVEL GFLEVEL1FLEVEL2FLEVEL3FLEVEL4FLEVEL 3 FFL 3400 1600 350 420 1030 3500 5300 1800 3900 4200 1400 1400 1400 3500 5000 1500 3900 FFL
WINDOWSCHEDULE
COPKELULUSANTANDATANGANPENGARAHJABATANKAWALAN&PENGAWASANBANGUNAN DEWANBANDARAYAKUALALUMPUR
TAJUKCADANGAN
CADANGANPEMBANGUNAN1BLOKPUSATKOMUNITI5TINGKATYANG MENGANDUNGI
1)TINGKATBAWAHRUANGPASARSENI,KEDAISENI,RUANGRESTORAN
2)TINGKATSATUAUDITORIUM,PERPUSTAKAAN,BILIKBASUHBATIK
3)TINGKATDUAPERPUSTAKAAN,STESENWAXINGBATIK
4)TINGKATTIGABENGKELBATIK,RUANGMENGECATDANMENGERINGKAN BATIK
5)TINGKATEMPATRUANGJAHITAN,GALERISENI DI41,LEBOHAMPANG,CITYCENTER,50100KUALALUMPUR, WILAYAHPERSEKUTUANKUALALUMPUR UNTUKTETUANTAYLOR'SUNIVERSITYSDN.BHD UNTUKTETUANTHINKCITY
NAMA,TANDATANGANDANNO.K/PPEMAJUPEMILIKTANAH
THINKCITYSDNBHD Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
AR.WONG DIRECTOR
NAMA,TANDATANGANDANNO.K/PPENYEWA
THINKCITYSDNBHD Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
AR.WONG DIRECTOR
ARKITEK
TANDATANGANARKITEK
ARKITEKPROFESIONAL Ar.Bob No.PendaftaranLAMA/L100
10/05/2023
AR.NURULALIAAHAMAD
DISEMAK DILUKIS SKALA TARIKH NO.LUKISAN TAJUKLUKISAN REVISION
1
BPSUBMISSION
LEMBAGA ARKITEK MALAYSIA STATUSLUKISAN
NO.SIRI COPPENDAFTARANJABATAN
-
06-05 EJAZAZREE DBKL/BP/06-05
WINDOWSCHEDULE
WINDOWTYPE W19 PLAN W20 ELEVATION DESCRIPTION 9PANELFULLLENGTHFIXEDWINDOW 50MMWIDTHANODISEDALUMINIUMFRAME 15MMGLASSPANEL 7PANELFULLLENGTHFIXEDWINDOW 50MMWIDTHANODISEDALUMINIUMFRAME 15MMGLASSPANEL SIZE FINISHES LOCATION 13500MM(W)X1900MM(H) POWDERCOATED COMMONSPACE 11400MM(W)X3500MM(H) POWDERCOATED BATIKSEWINGSTATION TOTALNOS GFLEVEL1FLEVEL2FLEVEL3FLEVEL4FLEVEL 2 GFLEVEL1FLEVEL2FLEVEL3FLEVEL4FLEVEL 1 13500 700 1600 1600 1600 1600 1600 1600 1600 1600 FFL 1900 3900 11400 1600 1620 1620 1620 1620 1620 1620 3500 3900 FFL
COPKELULUSANTANDATANGANPENGARAHJABATANKAWALAN&PENGAWASANBANGUNAN DEWANBANDARAYAKUALALUMPUR
TAJUKCADANGAN
CADANGANPEMBANGUNAN1BLOKPUSATKOMUNITI5TINGKATYANG MENGANDUNGI 1) TINGKATBAWAHRUANGPASARSENI,KEDAISENI,RUANGRESTORAN 2) TINGKATSATUAUDITORIUM,PERPUSTAKAAN,BILIKBASUHBATIK 3) TINGKATDUAPERPUSTAKAAN,STESENWAXINGBATIK 4) TINGKATTIGABENGKELBATIK,RUANGMENGECATDANMENGERINGKAN BATIK 5) TINGKATEMPATRUANGJAHITAN,GALERISENI DI41,LEBOHAMPANG,CITYCENTER,50100KUALALUMPUR, WILAYAHPERSEKUTUANKUALALUMPUR UNTUKTETUANTAYLOR'SUNIVERSITYSDN.BHD UNTUKTETUANTHINKCITY
NAMA,TANDATANGANDANNO.K/PPEMAJU&PEMILIKTANAH
THINKCITYSDNBHD Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan
AR.WONG DIRECTOR
NAMA,TANDATANGANDANNO.K/PPENYEWA
THINKCITYSDNBHD Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan
AR.WONG DIRECTOR
ARKITEK
TANDATANGANARKITEK
DISEMAK DILUKIS SKALA TARIKH NO.LUKISAN TAJUKLUKISAN REVISION
1
BPSUBMISSION
LEMBAGA ARKITEK MALAYSIA STATUSLUKISAN
NO.SIRI COPPENDAFTARANJABATAN
AR.NURULALIAAHMAD10/05/2023
KualaLumpur
KualaLumpur BOMBA KEYPLAN LOCATIONPLAN SITEPLAN 07-01 CHOWQINGYING DBKL/BP/07-01
Ar.Bob
KEYPLAN NTS 01 07 LOCATIONPLAN NTS 01 07 SITEPLAN 1:200 01 07 N MEDANPASAR BANGSAR CHOWKIT KAMPUNGBARU AMPANG BRICKFIELDS MONTKIARA SENTUL PUDU CHERAS PLUS EXPRESSWAY KUALALUMPUR N TAPAKCADANGAN N 5 4 3 2 F E D C B 1 A 625 2000 2250 2250 6 2550 2450 2450 2000 875 10325 4700 18950 FIRERATEDDOOR1 FD1 SCHEDULEOFBOMBA COMPONENTS 600MM(W)2100MM(H) SD SMOKEDETECTOR KELUARSIGN EMERGENCYLIGHT EL FIREALARM HOSEREEL EMERGENCYBREAK GLASS FIREHYDRANT DRYPOWDERFIRE EXTINGUISHER FA BG DP EXISTINGFIREHYDRANT SITEBOUNDARY DROPOFF
ARKITEKPROFESIONAL
No.PendaftaranLAMA/L100
COPKELULUSANTANDATANGANPENGARAHJABATANKAWALAN&PENGAWASANBANGUNAN DEWANBANDARAYAKUALALUMPUR
SCHEDULEOFFINISHES
900WIDTHCHECKEREDSTEELEXTERNALFIRESTAIRCASE WITH900MMHEIGHTSTEELTUBERAILINGSTOMANUF'S DETAIL R=175MM,T=250MM PRECASTCONCRETEPLANTERBOXWITH300MMSOIL DEPTHTOENGR'SDETAIL
CADANGANPEMBANGUNAN1BLOKPUSATKOMUNITI5TINGKATYANG MENGANDUNGI
1)TINGKATBAWAHRUANGPASARSENI,KEDAISENI,RUANGRESTORAN
2)TINGKATSATUAUDITORIUM,PERPUSTAKAAN,BILIKBASUHBATIK 3)TINGKATDUAPERPUSTAKAAN,STESENWAXINGBATIK 4)TINGKATTIGABENGKELBATIK,RUANGMENGECATDANMENGERINGKAN BATIK 5)TINGKATEMPATRUANGJAHITAN,GALERISENI DI41,LEBOHAMPANG,CITYCENTER,50100KUALALUMPUR, WILAYAHPERSEKUTUANKUALALUMPUR UNTUKTETUANTAYLOR'SUNIVERSITYSDN.BHD
UNTUKTETUANTHINKCITY
150X150MMRCCOLUMNTOENGR'SDETAIL 1300MMWIDTHRCSTAIRCASEWITH1100MMHEIGHT TIMBERRAILINGTOMANUF'SDETAIL R=175MM,T=250MM
150MMTHICKCONCRETEWALLWITHOFF-FORMFINISHON BOTHSIDESTOARCH'SDETAIL 300X400MMSTEELCOLUMNTOENGR'SDETAIL
THINKCITYSDNBHD Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
SERVICELIFTTOENGR'SDETAIL
110MMCONCRETEMASONRYWALL(2HOURRATED) W/20MMTHK.CEMENTPLASTERANDPAINTEDONBOTH SIDES
150MMTHICKBRICKWALLTOENGR'SDETAIL 200MMTHICKRCSHEARWALL(2HOURRATED)W/15MM THK.CEMENTPLASTERANDPAINTEDONBOTHSIDES 900WIDTHPRECASTRCFIRESTAIRCASEWITH900MM HEIGHTSTEELTUBERAILINGSTOMANUF'SDETAIL R=175MM,T=250MM
THINKCITYSDNBHD
Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
UP UP 5 4 3 2 F E D C B 1 A 1250 4000 4500 4500 6 5100 4900 4900 4000 1750 20650 D1
FLOORFINISHES FF-1 FF-2 FF-3 POWERTROWELEDCONCRETEFINISH
10MMNON-SLIPHOMOGENEOUSTILES(BATHROOM) WALLFINISHES WF-1 WF-2 PLAINCEMENTPLASTEREDPAINTED 10MMCERAMICTILES FF-4 CEILING SKIMCOATED&PAINTEDWITHEMULSIONPAINT CEMENTPLASTEREDANDPAINTEDONFLOORSLAB CF-2 CF-1 FINISHEDLEGENDS FLOOR FINISHES FF-1 WALLFINISHES CF-1CT CEILING FINISHFLOOR LEVEL NATURALVENTILATIONMECHANICALVENTILATION NVMVFFL+CARPETTILES TOILETPARTITION25MMTHK LAMINATEDPHENOLICPARTITIONBOARD WF-3
ENGINEEREDTIMBERFLOORING
STEELCOLUMNTOENGR'SDETAIL UP UP D1 D1 D1 D1 D1 D1 D2 D4 D5 D7 W5 4700 18950 250MMTHICKCONCRETEPARTYWALL 1000WIDTHRCRAMPC/WCEMENTRENDER SPACE PURPOSEGROUP (UBBL5thSCHEDULE) GF SHOP(V) AREAsqm OCCUPANCY LOADFACTOR (sqm/person) OCCUPANCY LOAD(UBBL7th SCHEDULE) 652.51/3= 217.50 PERSONS CAPACITYEXIT (UBBL7th SCHEDULE) TABLEOFUSAGEAREA,CALCULATIONOFOCCUPANTLOAD&CAPACITYOFEXITS HORIZONTALEXIT= 100PERSONS/UNIT STAIRCASEEXIT= 60PERSONS/UNIT EXITWIDTHREQUIRED UNITOFHORIZONTALEXIT=217.50/100 =2.18UNITS UNITOFSTAIRCASEEXITWIDTH=217.50/60 =3.63UNITS REQUIREDHORIZONTALEXITWIDTH=2(550) =1100MM TOTALEXIT WIDTH PROVIDED ASSUMEONEEXIT INACCESSIBLE ASSUMEONEEXITIS INACCESSIBLE,THEOTHER EXITSSTILLCOMPLIES REQUIREDSTAIRCASEEXITWIDTH=4(550) =2200MM 1800+600+ 1500+1440+ 4350+2125+ 11815= 37463MM 652.51 3GROSS FIRERATEDDOOR FD1 SCHEDULEOFBOMBA COMPONENTS 600MM(W)X2100MM(H) SD SMOKEDETECTOR KELUARSIGN EMERGENCYLIGHT K EL FIREALARM HOSEREEL EMERGENCYBREAK GLASS FIREHYDRANT DRYPOWDERFIRE EXTINGUISHER FA BG DP H EL EL EL EL EL EL K K SD SD EL SD EL SD EL EL EL EL EL EL EL EL EL EL BGDP EL EL FD1 FA GROUNDFLOORPLAN SCALE1:100 N DISEMAK DILUKIS SKALA TARIKH NO.LUKISAN TAJUKLUKISAN REVISION BPSUBMISSION 1 LEMBAGA ARKITEK MALAYSIA STATUSLUKISAN TANDATANGANARKITEK ARKITEK NAMA,TANDATANGANDANNO.K/PPENYEWA NO.SIRI COPPENDAFTARANJABATAN TAJUKCADANGAN NAMA,TANDATANGANDANNO.K/PPEMAJUPEMILIKTANAH AR.WONG DIRECTOR
AR.NURULALIAAHAMAD10/05/2023 AR.WONG DIRECTOR
BOMBA GROUNDFLOORPLAN 08-01 CHOWQINGYING DBKL/BP/08-01 ARKITEKPROFESIONAL Ar.Bob No.PendaftaranLAM:A/L100 08 01 GF 01 02 03 04 05 06 07 08 09 ROOM ARTISANALMARKET CAFETERIA KITCHEN ARTSTORE SIDECORRIDOR LIFTLOBBY FIRESTAIRCASE1 FIRESTAIRCASE2 MALE&FEMALETOILET REQUIRED FLOORAREA (sq.m) 10 11 OKUTOILET PROVIDED sq.m % NATURALLIGHTING ACTION PROVIDED sq.m % NATURALVENTILATION ACTION AREA (sq.m) 10% REQUIRED FLOORAREA (sq.m) 5% 114.34 27.22 11.87 19.76 251.95 7.55 9.46 10.11 2.79 BATIKDRYINGAREA 167.79 PANTRY 2.80 24.04 12 STORAGEROOM 1.29 12 M&EROOM1 0.88 12 0.66 12 M&EROOM2 11.434 2.722 1.187 1.976 25.195 0.755 0.946 1.011 0.279 16.779 0.280 2.404 0.129 0.088 0.066 5.717 1.361 0.594 0.988 12.598 0.378 0.473 0.506 0.140 8.390 0.140 1.202 0.065 0.044 0.033 N/A N/A N/A 2.000 OPEN N/A N/A 100% 21.14% 0% ML 0% ML 0% ML 0% ML 0% ML N/A N/A N/A OPEN N/A N/A 100% 0% 0% 0% 0% 0% MV MV MV MV MV OPEN 100% OPEN 100% OPEN 100% OPEN 100% OPEN 100% OPEN 100% OPEN 100% OPEN 100% N/A 0% ML N/A 0% MV N/A 0% ML N/A 0% MV OPEN 100% OPEN 100% 2.000 21.14% 36.30 183.70% N/A 0% MV
COPKELULUSANTANDATANGANPENGARAHJABATANKAWALAN&PENGAWASANBANGUNAN DEWANBANDARAYAKUALALUMPUR
CADANGANPEMBANGUNANBLOKPUSATKOMUNITI5TINGKATYANG MENGANDUNGI 1) TINGKATBAWAHRUANGPASARSENI,KEDAISENI,RUANGRESTORAN 2) TINGKATSATUAUDITORIUM,PERPUSTAKAAN,BILIKBASUHBATIK 3) TINGKATDUAPERPUSTAKAAN,STESENWAXINGBATIK 4) TINGKATTIGABENGKELBATIK,RUANGMENGECATDANMENGERINGKAN BATIK 5) TINGKATEMPATRUANGJAHITAN,GALERISENI DI41,LEBOHAMPANG,CITYCENTER,50100KUALALUMPUR, WILAYAHPERSEKUTUANKUALALUMPUR UNTUKTETUANTAYLOR'SUNIVERSITYSDN.BHD UNTUKTETUANTHINKCITY
THINKCITYSDNBHD Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
THINKCITYSDNBHD Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
AR.WONG
AR.NURULALIAAHAMAD
UP 5 4 3 2 F E D C B 1 A 1250 4000 4500 4500 6 5100 4900 4900 4000 1750 20650
FLOORFINISHES FF-1 FF-2 FF-3 POWERTROWELEDCONCRETEFINISH ENGINEEREDTIMBERFLOORING 10MMNON-SLIPHOMOGENEOUSTILES(BATHROOM) WALLFINISHES WF-1 WF-2 PLAINCEMENTPLASTEREDPAINTED 10MMCERAMICTILES FF-4 CEILING SKIMCOATED&PAINTEDWITHEMULSIONPAINT CEMENTPLASTEREDANDPAINTEDONFLOORSLAB CF-2 CF-1 FINISHEDLEGENDS FLOOR FINISHES FF-1 WALLFINISHES CF-1 CT CEILING FINISHFLOOR LEVEL NATURALVENTILATIONMECHANICALVENTILATION NVMV FFL+CARPETTILES TOILETPARTITION25MMTHK LAMINATEDPHENOLICPARTITIONBOARD WF-3 900WIDTHCHECKEREDSTEELEXTERNALFIRESTAIRCASE WITH900MMHEIGHTSTEELTUBERAILINGSTOMANUF'S DETAIL R=175MM,T=250MM PRECASTCONCRETEPLANTERBOXWITH300MMSOIL DEPTHTOENGR'SDETAIL 150MMTHICKBRICKWALLTOENGR'SDETAIL 200MMTHICKRCSHEARWALL(2HOURRATED)W/15MM THK.CEMENTPLASTERANDPAINTEDONBOTHSIDES 900WIDTHPRECASTRCFIRESTAIRCASEWITH900MM HEIGHTSTEELTUBERAILINGSTOMANUF'SDETAIL R=175MM,T=250MM 110MMCONCRETEMASONRYWALL(2HOURRATED) W/20MMTHK.CEMENTPLASTERANDPAINTEDONBOTH SIDES SERVICELIFTTOENGR'SDETAIL 150X150MMRCCOLUMNTOENGR'SDETAIL 1300MMWIDTHRCSTAIRCASEWITH1100MMHEIGHT TIMBERRAILINGTOMANUF'SDETAIL R=175MM,T=250MM 150MMTHICKCONCRETEBOXWITH1000MMDEPTHTO ENGR'SDETAIL 150MMTHICKCONCRETEWALLWITHOFF-FORMFINISHON BOTHSIDESTOARCH'SDETS. 900MMSHSRAILINGWITHSTEELHANDRAILTOMANUF'S DETAIL 1000MMWIDTHRCSTAIRCASEWITH1100MMHEIGHT TIMBERRAILINGTOMANUF'SDETAIL R=175MM,T=250MM 7000MMWIDTHRCSEATINGWITH1100MMHEIGHTTIMBER RAILINGTOENGR'SDETAIL R=400MM,T=750MM 150X50MMGALVANIZEDAALUMINUMFINTOSPEC'SDETAIL 150X50MMGALVANIZEDAALUMINUMFINTOSPEC'SDETAIL 300X400MMSTEELCOLUMNTOENGR'SDETAIL STEELCOLUMNTOENGR'SDETAIL DN DN DN UP UP UP D1 D1 D1 D1 D1 D1 D5 D6 D7 W1 W5 4700 18950 250MMTHICKCONCRETEPARTYWALL SPACE PURPOSEGROUP (UBBL5thSCHEDULE) 1F PLACESOFASSEMBLY (VII) AREA(sqm OCCUPANCY LOADFACTOR (sqm/person) OCCUPANCY LOAD(UBBL7th SCHEDULE) 211.14/1.5= 140.76 PERSONS CAPACITYEXIT (UBBL7th SCHEDULE) TABLEOFUSAGEAREA,CALCULATIONOFOCCUPANTLOAD&CAPACITYOFEXITS HORIZONTALEXIT= 100PERSONS/UNIT STAIRCASEEXIT= 75PERSONS/UNIT EXITWIDTHREQUIRED UNITOFHORIZONTALEXIT=140.76/100 =1.41UNITS UNITOFSTAIRCASEEXITWIDTH=140.76/75 =1.88UNITS REQUIREDHORIZONTALEXITWIDTH=1(550) =550MM TOTALEXIT WIDTH PROVIDED ASSUMEONEEXIT INACCESSIBLE ASSUMEONEEXITIS INACCESSIBLE,THEOTHER EXITSTILLCOMPLIES REQUIREDSTAIRCASEEXITWIDTH=2(550) =1100MM 2(900)= 1800MM 211.14 1.5NET 14.94 11.78 6.94M 1.90 M 1.99M 1.55M 1.85 1.09 4.69M 10.02M 5.17 9.09 2.49 4.17 3.03M 2.87M M FIRERATEDDOOR FD1 SCHEDULEOFBOMBA COMPONENTS 600MM(W)X2100MM(H) SD SMOKEDETECTOR KELUARSIGN EMERGENCYLIGHT EL FIREALARM HOSEREEL EMERGENCYBREAK GLASS FIREHYDRANT DRYPOWDERFIRE EXTINGUISHER FA BG DP H EL EL EL EL EL EL EL EL EL SD SD EL SD EL K K K EL EL EL EL FD1 FD1 EL SD EL EL EL EL BG DP FA FIRSTFLOORPLAN SCALE1:100 N DISEMAK DILUKIS SKALA TARIKH NO.LUKISAN TAJUKLUKISAN REVISION BPSUBMISSION 1 LEMBAGA ARKITEK MALAYSIA STATUSLUKISAN TANDATANGANARKITEK ARKITEK NAMA,TANDATANGANDANNO.K/PPENYEWA NO.SIRI COPPENDAFTARANJABATAN TAJUKCADANGAN NAMA,TANDATANGANDANNO.K/PPEMAJUPEMILIKTANAH AR.WONG DIRECTOR
SCHEDULEOFFINISHES
10/05/2023
DIRECTOR
BOMBA FIRSTFLOORPLAN 08-02 CHOWQINGYING DBKL/BP/08-02
Ar.Bob No.PendaftaranLAMA/L100 08 02 BATIKWASHINGSTATION LIBRARY AUDITORIUMSEATING LIFTLOBBY FIRESTAIRCASE1 FIRESTAIRCASE2 MALE&FEMALETOILET OKUTOILET OPENDECK GF 01 02 03 04 05 06 07 08 09 ROOM PROVIDED sq.m % NATURALLIGHTING ACTION PROVIDED sq.m % NATURALVENTILATION ACTION AREA (sq.m) REQUIRED FLOORAREA (sq.m) 10% REQUIRED FLOORAREA (sq.m) 5% 37.83 33.73 30.82 57.02 7.55 9.46 10.11 2.79 19.00 STORAGEROOM 1.29 10 M&EROOM 0.88 11 0.66 12 M&EROOM2 3.783 3.373 3.082 5.702 0.755 0.946 1.011 0.279 1.900 0.129 0.088 0.066 1.892 1.687 1.541 2.851 0.378 0.473 0.506 0.140 0.950 0.0645 0.044 0.033 N/A N/A N/A OPEN N/A N/A 100% 0% ML 0% ML 0% ML 0% ML 0% ML N/A N/A N/A OPEN N/A N/A 100% 0% 0% 0% 0% 0% MV MV MV MV MV OPEN 100% OPEN 100% 4.4 7.717% ML 4.4 7.717% 2.000 21.14% 2.000 21.14% 26.700 79.16% N/A 0% MV 14.000 73.68% N/A 0% MV OPEN 100% OPEN 100%
ARKITEKPROFESIONAL
1)TINGKATBAWAHRUANGPASARSENI,KEDAISENI,RUANGRESTORAN
2)TINGKATSATUAUDITORIUM,PERPUSTAKAAN,BILIKBASUHBATIK 3)TINGKATDUAPERPUSTAKAAN,STESENWAXINGBATIK 4)TINGKATTIGABENGKELBATIK,RUANGMENGECATDANMENGERINGKAN BATIK 5)TINGKATEMPATRUANGJAHITAN,GALERISENI DI41,LEBOHAMPANG,CITYCENTER,50100KUALALUMPUR, WILAYAHPERSEKUTUANKUALALUMPUR UNTUKTETUANTAYLOR'SUNIVERSITYSDN.BHD
UNTUKTETUANTHINKCITY
THINKCITYSDNBHD Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
THINKCITYSDNBHD Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
5 4 3 2 F E D C B 1 A 1250 4000 4500 4500 6 5100 4900 4900 4000 1750 20650
FLOORFINISHES FF-1 FF-2 FF-3 POWERTROWELEDCONCRETEFINISH ENGINEEREDTIMBERFLOORING 10MMNON-SLIPHOMOGENEOUSTILES(BATHROOM) WALLFINISHES WF-1 WF-2 PLAINCEMENTPLASTEREDPAINTED 10MMCERAMICTILES FF-4 CEILING SKIMCOATED&PAINTEDWITHEMULSIONPAINT CEMENTPLASTEREDANDPAINTEDONFLOORSLAB CF-2 CF-1 FINISHEDLEGENDS FLOOR FINISHES FF-1 WALLFINISHES CF-1CT CEILING FINISHFLOOR LEVEL NATURALVENTILATIONMECHANICALVENTILATION NVMVFFL+CARPETTILES TOILETPARTITION25MMTHK LAMINATEDPHENOLICPARTITIONBOARD WF-3 900WIDTHCHECKEREDSTEELEXTERNALFIRESTAIRCASE WITH900MMHEIGHTSTEELTUBERAILINGSTOMANUF'S DETAIL R=175MM,T=250MM PRECASTCONCRETEPLANTERBOXWITH300MMSOIL DEPTHTOENGR'SDETAIL 150MMTHICKBRICKWALLTOENGR'SDETAIL 200MMTHICKRCSHEARWALL(2HOURRATED)W/15MM THK.CEMENTPLASTERANDPAINTEDONBOTHSIDES 900WIDTHPRECASTRCFIRESTAIRCASEWITH900MM HEIGHTSTEELTUBERAILINGSTOMANUF'SDETAIL R=175MM,T=250MM 110MMCONCRETEMASONRYWALL(2HOURRATED) W/20MMTHK.CEMENTPLASTERANDPAINTEDONBOTH SIDES SERVICELIFTTOENGR'SDETAIL 150X150MMRCCOLUMNTOENGR'SDETAIL 150MMTHICKCONCRETEWALLWITHOFF-FORMFINISHON BOTHSIDESTOARCH'SDETS. 900MMSHSRAILINGWITHSTEELHANDRAILTOMANUF'S DETAIL 1000MMWIDTHRCSTAIRCASEWITH1100MMHEIGHT TIMBERRAILINGTOENGR'SDETAIL R=175MM,T=250MM 7000MMWIDTHRCSEATINGWITH1100MMHEIGHTTIMBER RAILINGTOENGR'SDETAIL R=400MM,T=750MM 1000MMWIDTHRCSTAIRCASEWITH1100MMHEIGHT TIMBERRAILINGTOENGR'SDETAIL R=175MM,T=250MM 150X50MMGALVANIZEDAALUMINUMFINTOSPEC'SDETAIL 150X50MMGALVANIZEDAALUMINUMFINTOSPEC'SDETAIL 300X400MMSTEELCOLUMNTOENGR'SDETAIL STEELCOLUMNTOENGR'SDETAIL UP DN DN DN UP UP UP DN D1 D1 D1 D1 D1 D1 D5 D5 D7 W1 W1 W1 W5 W5 4700 18950 900WIDTHPRECASTRCFIRESTAIRCASEWITH900MM HEIGHTSTEELTUBERAILINGSTOMANUF'SDETAIL R=175MM,T=250MM 250MMTHICKCONCRETEPARTYWALL SPACE PURPOSEGROUP (UBBL5thSCHEDULE) 1F PLACESOFASSEMBLY (VII) AREAsqm OCCUPANCY LOADFACTOR (sqm/person) OCCUPANCY LOAD(UBBL7th SCHEDULE) 211.14/1.5= 140.53 PERSONS CAPACITYEXIT (UBBL7th SCHEDULE) TABLEOFUSAGEAREA,CALCULATIONOFOCCUPANTLOAD&CAPACITYOFEXITS HORIZONTALEXIT= 100PERSONS/UNIT STAIRCASEEXIT= 75PERSONS/UNIT EXITWIDTHREQUIRED UNITOFHORIZONTALEXIT=140.53/100 =1.41UNITS UNITOFSTAIRCASEEXITWIDTH=140.53/75 =1.87UNITS REQUIREDHORIZONTALEXITWIDTH=1(550) =550MM TOTALEXIT WIDTH PROVIDED ASSUMEONEEXIT INACCESSIBLE ASSUMEONEEXITIS INACCESSIBLE,THEOTHER EXITSTILLCOMPLIES REQUIREDSTAIRCASEEXITWIDTH=2(550) =1100MM 2(900)= 1800MM 210.79 1.5NET 13.70 1.00 M 2.54M 1.55 2.87M 1.24 2.90 1.09 1.56M 4.36M 1.72 5.16M 4.48M 1.27 M 1.73 M 5.43M 3.67 M 7.57 1.85M 4.69M FIRERATEDDOOR FD1 SCHEDULEOFBOMBA COMPONENTS 600MM(W)2100MM(H) SD SMOKEDETECTOR KELUARSIGN EMERGENCYLIGHT K EL FIREALARM HOSEREEL EMERGENCYBREAK GLASS FIREHYDRANT DRYPOWDERFIRE EXTINGUISHER FA BG DP H EL EL SD SD FD1 FD1 EL EL EL EL EL EL EL K EL K EL SD EL SD EL EL K EL EL EL EL EL EL EL EL EL FABGDP SECONDFLOORPLAN SCALE1:100 N DISEMAK DILUKIS SKALA TARIKH NO.LUKISAN TAJUKLUKISAN REVISION BPSUBMISSION 1 LEMBAGA ARKITEK MALAYSIA STATUSLUKISAN TANDATANGANARKITEK ARKITEK NAMA,TANDATANGANDANNO.K/PPENYEWA NO.SIRI COPPENDAFTARANJABATAN TAJUKCADANGAN NAMA,TANDATANGANDANNO.K/PPEMAJU&PEMILIKTANAH AR.WONG DIRECTOR COPKELULUSANTANDATANGANPENGARAHJABATANKAWALAN&PENGAWASANBANGUNAN DEWANBANDARAYAKUALALUMPUR
SCHEDULEOFFINISHES
CADANGANPEMBANGUNAN1BLOKPUSATKOMUNITITINGKATYANG MENGANDUNGI
AR.NURULALIAAHAMAD10/05/2023 AR.WONG DIRECTOR
BOMBA SECONDFLOORPLAN 08-03 CHOWQINGYING DBKL/BP/08-03 ARKITEKPROFESIONAL Ar.Bob No.PendaftaranLAM:A/L100 08 03 BATIKWAXINGSTATION LIBRARY OPENDECK LIFTLOBBY FIRESTAIRCASE1 FIRESTAIRCASE2 GF 01 02 03 04 05 06 07 08 09 ROOM PROVIDED sq.m % NATURALLIGHTING ACTION PROVIDED sq.m % NATURALVENTILATION ACTION AREA (sq.m) REQUIRED FLOORAREA (sq.m) 10% REQUIRED FLOORAREA (sq.m) 5% 83.65 19.34 44.42 7.55 9.46 10.11 2.79 MALE&FEMALETOILET OKUTOILET 9.04 FIRESTAIRCASE3 21.60 STORAGEROOM 1.29 M&EROOM1 0.88 0.66 M&EROOM2 10 11 12 8.365 1.934 4.442 0.755 0.946 0.904 2.160 0.129 0.088 0.066 4.183 0.967 2.221 0.378 0.473 0.452 1.080 0.065 0.044 0.033 1.011 0.279 0.506 0.140 N/A N/A N/A OPEN N/A N/A 100% 0% ML 0% ML 0% ML 0% ML 0% ML N/A N/A N/A OPEN N/A N/A 100% 0% 0% 0% 0% 0% MV MV MV MV MV 2.000 22.12% 2.000 22.12% OPEN 100% OPEN 100% 2.000 21.14% 2.000 21.14% 8.800 10.5% 8.800 10.5% 4.400 20.37% 4.400 20.37% 35.800 185.109% N/A 0% MV
SCHEDULEOFFINISHES
CADANGANPEMBANGUNAN1BLOKPUSATKOMUNITI5TINGKATYANG MENGANDUNGI 1) TINGKATBAWAHRUANGPASARSENI,KEDAISENI,RUANGRESTORAN 2) TINGKATSATUAUDITORIUM,PERPUSTAKAAN,BILIKBASUHBATIK 3) TINGKATDUAPERPUSTAKAAN,STESENWAXINGBATIK 4) TINGKATTIGABENGKELBATIK,RUANGMENGECATDANMENGERINGKAN BATIK 5) TINGKATEMPATRUANGJAHITAN,GALERISENI DI41,LEBOHAMPANG,CITYCENTER,50100KUALALUMPUR, WILAYAHPERSEKUTUANKUALALUMPUR UNTUKTETUANTAYLOR'SUNIVERSITYSDN.BHD UNTUKTETUANTHINKCITY
THINKCITYSDNBHD Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
THINKCITYSDNBHD Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
AR.WONG DIRECTOR
ARKITEKPROFESIONAL Ar.Bob No.PendaftaranLAM:A/L100
AR.NURULALIAAHAMAD
5 4 3 2 F E D C B 1 A 1250 4000 4500 4500 6 5100 4900 4900 4000 1750 20650 W4
FLOORFINISHES FF-1 FF-2 FF-3 POWERTROWELEDCONCRETEFINISH ENGINEEREDTIMBERFLOORING 10MMNON-SLIPHOMOGENEOUSTILES(BATHROOM) WALLFINISHES WF-1 WF-2 PLAINCEMENTPLASTEREDPAINTED 10MMCERAMICTILES FF-4 CEILING SKIMCOATED&PAINTEDWITHEMULSIONPAINT CEMENTPLASTEREDANDPAINTEDONFLOORSLAB CF-2 CF-1 FINISHEDLEGENDS FLOOR FINISHES FF-1 WALLFINISHES CF-1 CT CEILING FINISHFLOOR LEVEL NATURALVENTILATIONMECHANICALVENTILATION NVMV FFL+CARPETTILES TOILETPARTITION25MMTHK LAMINATEDPHENOLICPARTITIONBOARD WF-3
DEPTHTOENGR'SDETAIL 150MMTHICKBRICKWALLTOENGR'SDETAIL 200MMTHICKRCSHEARWALL(2HOURRATED)W/15MM THK.CEMENTPLASTERANDPAINTEDONBOTHSIDES 900WIDTHPRECASTRCFIRESTAIRCASEWITH900MM HEIGHTSTEELTUBERAILINGSTOMANUF'SDETAIL R=175MM,T=250MM
SERVICELIFTTOENGR'SDETAIL 150X150MMRCCOLUMNTOENGR'SDETAIL 150MMTHICKCONCRETEWALLWITHOFF-FORMFINISHON
900MMSHSRAILINGWITHSTEELHANDRAILTOMANUF'S DETAIL 1000MMWIDTHRDSTAIRCASEWITH1100MMHEIGHT TIMBERRAILINGTOENGR'SDETAIL R=175MM,T=250MM 150X50MMGALVANIZEDALUMINUMFINTOSPEC'SDETAIL 110MMCONCRETEMASONRYWALL(2HOURRATED) W/20MMTHK.CEMENTPLASTERANDPAINTEDONBOTH SIDES 300X400MMSTEELCOLUMNTOENGR'SDETAIL STEELCOLUMNTOENGR'SDETAIL DN DN DN UP UP UP D1 D1 D1 D1 D1 D1 D4 D4 D5 D3 D6 D7 W4 W4 W4 W2 W3 W2 W3 W5 4700 18950 250MMTHICKCONCRETEPARTYWALL SPACE PURPOSEGROUP (UBBL5thSCHEDULE) 1F PLACESOFASSEMBLY (VII) AREAsqm OCCUPANCY LOADFACTOR (sqm/person) OCCUPANCY LOAD(UBBL7th SCHEDULE) 293.82/1.5= 195.88 PERSONS CAPACITYEXIT (UBBL7th SCHEDULE) TABLEOFUSAGEAREA,CALCULATIONOFOCCUPANTLOAD&CAPACITYOFEXITS HORIZONTALEXIT= 100PERSONS/UNIT STAIRCASEEXIT= 75PERSONS/UNIT EXITWIDTHREQUIRED UNITOFHORIZONTALEXIT=195.88/100 =1.96UNITS UNITOFSTAIRCASEEXITWIDTH=195.88/75 =2.61UNITS REQUIREDHORIZONTALEXITWIDTH=2(550) =1100MM TOTALEXIT WIDTH PROVIDED ASSUMEONEEXIT INACCESSIBLE ASSUMEONEEXITIS INACCESSIBLE,THEOTHER EXITSTILLCOMPLIES REQUIREDSTAIRCASEEXITWIDTH=3(550) =1650MM 2(900)= 1800MM 293.82 1.5NET 1.55M 2.87 1.24 2.90 1.09 M 1.85M 4.69 4.46 2.54M 0.96 8.16M 0.97 5.17 M 2.26M 2.68 1.26 4.80M 6.34 4.89 11.62M 4.38 M FIRERATEDDOOR FD1 SCHEDULEOFBOMBA COMPONENTS 600MM(W)X2100MM(H) SD SMOKEDETECTOR KELUARSIGN EMERGENCYLIGHT K EL FIREALARM HOSEREEL EMERGENCYBREAK GLASS FIREHYDRANT DRYPOWDERFIRE EXTINGUISHER FA BG DP H 0.67 M EL EL SD SD FD1 FD1 EL EL EL EL EL K K EL K EL EL EL EL EL EL EL EL EL EL EL SD K EL BGDP THIRDFLOORPLAN SCALE1:100 N DISEMAK DILUKIS SKALA TARIKH NO.LUKISAN TAJUKLUKISAN REVISION BPSUBMISSION 1 LEMBAGA ARKITEK MALAYSIA STATUSLUKISAN TANDATANGANARKITEK ARKITEK NAMA,TANDATANGANDANNO.K/PPENYEWA NO.SIRI COPPENDAFTARANJABATAN
NAMA,TANDATANGANDANNO.K/PPEMAJU&PEMILIKTANAH AR.WONG DIRECTOR
900WIDTHCHECKEREDSTEELEXTERNALFIRESTAIRCASE WITH900MMHEIGHTSTEELTUBERAILINGSTOMANUF'S DETAIL R=175MM,T=250MM PRECASTCONCRETEPLANTERBOXWITH300MMSOIL
110MMCONCRETEMASONRYWALL(2HOURRATED) W/20MMTHK.CEMENTPLASTERANDPAINTEDONBOTH SIDES
BOTHSIDESTOARCH'SDETS.
TAJUKCADANGAN
COPKELULUSANTANDATANGANPENGARAHJABATANKAWALAN&PENGAWASANBANGUNAN DEWANBANDARAYAKUALALUMPUR
-
10/05/2023
BOMBA THIRDFLOORPLAN 08-04 CHOWQINGYING
DBKL/BP/08-04
08 04 BATIKPAINTINGSTATION BATIKWASHINGAREA COMMONSPACE BATIKWORKSHOP OPENAREAWORKSHOP LIFTLOBBY FIRESTAIRCASE1 FIRESTAIRCASE GF 01 02 03 04 05 06 07 08 09 ROOM PROVIDED sq.m % NATURALLIGHTING ACTION PROVIDED sq.m % NATURALVENTILATION ACTION AREA (sq.m) 10 REQUIRED FLOORAREA (sq.m) 10% REQUIRED FLOORAREA (sq.m) 5% 10.11 2.79 MALE&FEMALETOILET OKUTOILET 7.55 9.04 STORAGEROOM 1.29 M&EROOM1 0.88 0.66 M&EROOM2 11 12 13 24.75 61.69 46.97 14.93 69.48 43.68 0.755 0.904 0.129 0.088 0.066 2.475 6.169 4.697 1.493 6.948 4.368 0.378 0.452 0.065 0.044 0.033 1.238 3.085 2.349 0.747 3.474 2.184 1.011 0.279 0.506 0.140 N/A N/A N/A OPEN N/A N/A 100% 0% ML 0% ML 0% ML 0% ML 0% ML N/A N/A N/A OPEN N/A N/A 100% 0% 0% 0% 0% 0% MV MV MV MV MV 2.000 22.12% 2.000 22.12% 14.12 30% 14.12 30% N/A 0% ML N/A 0% MV 30.80 49.93% N/A 0% MV 15.12 34.62% N/A 0% MV N/A 0% ML N/A 0% MV 7.56 10.88% N/A 0% MV
PENGAWASANBANGUNAN DEWANBANDARAYAKUALALUMPUR
SCHEDULEOFFINISHES
900WIDTHCHECKEREDSTEELEXTERNALFIRESTAIRCASE WITH900MMHEIGHTSTEELTUBERAILINGSTOMANUF'S DETAIL R=175MM,T=250MM PRECASTCONCRETEPLANTERBOXWITH300MMSOIL
CADANGANPEMBANGUNANBLOKPUSATKOMUNITI5TINGKATYANG MENGANDUNGI 1) TINGKATBAWAHRUANGPASARSENI,KEDAISENI,RUANGRESTORAN 2) TINGKATSATUAUDITORIUM,PERPUSTAKAAN,BILIKBASUHBATIK 3) TINGKATDUAPERPUSTAKAAN,STESENWAXINGBATIK 4) TINGKATTIGABENGKELBATIK,RUANGMENGECATDANMENGERINGKAN BATIK 5) TINGKATEMPATRUANGJAHITAN,GALERISENI DI41,LEBOHAMPANG,CITYCENTER,50100KUALALUMPUR, WILAYAHPERSEKUTUANKUALALUMPUR UNTUKTETUANTAYLOR'SUNIVERSITYSDN.BHD UNTUKTETUANTHINKCITY
THINKCITYSDNBHD
Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
110MMCONCRETEMASONRYWALL(2HOURRATED)
THINKCITYSDNBHD
Level1No36,HighStreetStudios,40,JalanTunHSLee, CityCentre,50100KualaLumpur,WilayahPersekutuan KualaLumpur
5 4 3 2 F E D C B 1 A 1250 4000 4500 4500 4700 18950 6 5100 4900 4900 4000 1750 20650
FLOORFINISHES FF-1 FF-2 FF-3 POWERTROWELEDCONCRETEFINISH ENGINEEREDTIMBERFLOORING 10MMNON-SLIPHOMOGENEOUSTILES(BATHROOM) WALLFINISHES WF-1 WF-2 PLAINCEMENTPLASTEREDPAINTED 10MMCERAMICTILES FF-4 CEILING SKIMCOATEDPAINTEDWITHEMULSIONPAINT CEMENTPLASTEREDANDPAINTEDONFLOORSLAB CF-2 CF-1 FINISHEDLEGENDS FLOOR FINISHES FF-1 WALLFINISHES CF-1 CT CEILING FINISHFLOOR LEVEL NATURALVENTILATIONMECHANICALVENTILATION NVMV FFL+CARPETTILES TOILETPARTITION25MMTHK LAMINATEDPHENOLICPARTITIONBOARD WF-3
DEPTHTOENGR'SDETAIL 150MMTHICKBRICKWALLTOENGR'SDETAIL 200MMTHICKRCSHEARWALL(2HOURRATED)W/15MM THK.CEMENTPLASTERANDPAINTEDONBOTHSIDES 900WIDTHPRECASTRCFIRESTAIRCASEWITH900MM HEIGHTSTEELTUBERAILINGSTOMANUF'SDETAIL R=175MM,T=250MM
W/20MMTHK.CEMENTPLASTERANDPAINTEDONBOTH SIDES SERVICELIFTTOENGR'SDETAIL 150X150MMRCCOLUMNTOENGR'SDETAIL 150MMTHICKCONCRETEWALLWITHOFF-FORMFINISHON BOTHSIDESTOARCH'SDETS. 900MMSHSRAILINGWITHSTEELHANDRAILTOMANUF'S DETAIL 1000MMWIDTHRCSTAIRCASEWITH1100MMHEIGHT TIMBERRAILINGTOENGR'SDETAIL R=175MM,T=250MM 150X50MMGALVANIZEDALUMINUMFINTOSPEC'SDETAIL 2400MMWIDTHRCSTAIRCASE R=175MM,T=250MM 300X400MMSTEELCOLUMNTOENGR'SDETAIL STEELCOLUMNTOENGR'SDETAIL DN DN DN UP D1 D1 D1 D1 D1 D1 D4 D4 D5 D6 D7 W4 W4 W4 W4 W4 W4 W4 W5 250MMTHICKCONCRETEPARTYWALL SPACE PURPOSEGROUP (UBBL5thSCHEDULE) 1F PLACESOFASSEMBLY (VII) AREAsqm) OCCUPANCY LOADFACTOR (sqm/person) OCCUPANCY LOAD(UBBL7th SCHEDULE) 240.45/1.5= 160.3PERSONS CAPACITYEXIT (UBBL7th SCHEDULE) TABLEOFUSAGEAREA,CALCULATIONOFOCCUPANTLOAD&CAPACITYOFEXITS HORIZONTALEXIT 100PERSONS/UNIT STAIRCASEEXIT= 75PERSONS/UNIT EXITWIDTHREQUIRED UNITOFHORIZONTALEXIT=160.3/100= 1.6UNITS UNITOFSTAIRCASEEXITWIDTH160.3/75 =2.14UNITS REQUIREDHORIZONTALEXITWIDTH=2(550) =1100MM TOTALEXIT WIDTH PROVIDED ASSUMEONEEXIT INACCESSIBLE ASSUMEONEEXITIS INACCESSIBLE,THEOTHER EXITSTILLCOMPLIES REQUIREDSTAIRCASEEXITWIDTH2(550) =1100MM 2(900)= 1800MM 240.45 1.5NET 1.55M 2.87M 1.24 M 1.71M M 4.54 FIRERATEDDOOR FD1 SCHEDULEOFBOMBA COMPONENTS 600MM(W)X2100MM(H) SD SMOKEDETECTOR KELUARSIGN EMERGENCYLIGHT EL FIREALARM HOSEREEL EMERGENCYBREAK GLASS FIREHYDRANT DRYPOWDERFIRE EXTINGUISHER FA BG DP 7.13 7.22M 9.80M 5.20 3.71 2.25M 7.85M 2.35 1.83M 4.08 EL EL SD SD FD1 FD1 EL EL EL EL EL EL EL EL EL EL K EL SD EL EL EL EL EL SD EL K BG DP FA FOURTHFLOORPLAN SCALE1:100 N DISEMAK DILUKIS SKALA TARIKH NO.LUKISAN TAJUKLUKISAN REVISION BPSUBMISSION 1 LEMBAGA ARKITEK MALAYSIA STATUSLUKISAN TANDATANGANARKITEK ARKITEK NAMA,TANDATANGANDANNO.K/PPENYEWA NO.SIRI COPPENDAFTARANJABATAN TAJUKCADANGAN NAMA,TANDATANGANDANNO.K/PPEMAJUPEMILIKTANAH AR.WONG DIRECTOR COPKELULUSANTANDATANGANPENGARAHJABATANKAWALAN
AR.NURULALIAAHAMAD10/05/2023 AR.WONG DIRECTOR
BOMBA FOURTHFLOORPLAN 08-05 CHOWQINGYING DBKL/BP/08-05 ARKITEKPROFESIONAL Ar.Bob No.PendaftaranLAMA/L100 08 05 BATIKSEWINGSTATION SEWINGSPILLOVERAREA ARTGALLERY BALCONY LIFTLOBBY FIRESTAIRCASE1 FIRESTAIRCASE GF 01 02 03 04 05 06 07 08 09 ROOM PROVIDED sq.m % NATURALLIGHTING ACTION PROVIDED sq.m % NATURALVENTILATION ACTION AREA (sq.m) REQUIRED FLOORAREA (sq.m) 10% REQUIRED FLOORAREA (sq.m) 5% 10.11 2.79 MALE&FEMALETOILET OKUTOILET 7.55 9.04 STORAGEROOM1 1.29 11 M&EROOM1 0.88 12 0.66 13 M&EROOM 24.75 8.39 89.11 25.38 53.05 STORAGEROOM2 STORAGEROOM3 14 15 0.40 7.05 0.755 0.904 0.129 0.088 0.066 2.475 0.839 8.911 2.538 5.305 0.040 0.705 0.378 0.452 0.043 0.044 0.033 1.238 0.420 4.456 1.269 2.653 0.020 0.353 1.011 0.279 0.506 0.140 N/A N/A N/A N/A N/A 0% ML 0% ML 0% ML 0% ML 0% ML N/A N/A N/A N/A N/A 0% 0% 0% 0% 0% MV MV MV MV MV N/A 0% ML N/A 0% MV N/A 0% ML N/A 0% MV N/A 0% ML N/A 0% MV 2.000 22.12% 2.000 22.12% OPEN 100% OPEN 100% 14.00 26.39% 14.00 26.39% 5.60 22.06% N/A 0% MV 49.68 55.75% N/A 0% MV 14.00 56.57% N/A 0% MV