SMS ARQUITECTOS CV

Page 1

alberto sanchez architect ALBERTO SANCHEZ CV 09_2011


Profile_ Adress: Members: Web: Contact:

Sant Feliu 17, local 15 - 07012 Palma de Mallorca, ILLES BALEARS T 971 240 284 F 971 257 872 Alberto Sánchez, Aina Salvà www.smsarquitectos.com asanchez@smsarquitectos.com

ALBERTO SANCHEZ CV_ Alberto Sánchez studied architecture at the University of North London in the UK, where he graduated in 1999. He earned a degree in architecture recognition by the spanish ministry of Education in 2001. Currently a member of the Architect’s Association of the Balearic Islands and the Royal Institute of British Architects (RIBA) Before starting his own office he worked and collaborated with several offices as Caruso St John, London, Bosshardvaquer Architekten, Zurich and CollLeclerc (BCN). Main activities of the office involve public realm projects and a big interest for diffusion of architectural culture.

EDUCATION_ 2001: Reconocimiento del título de Arquitecto en España por parte del Ministerio de Educación. June 1999: Professional Diploma in Architecture, University of North London. Reino Unido. June 1996: Bachelor in Arts (Honours). Architecture. London Metropolitan University (former University of North London).

AWARDS_ 2011 FAD architecture award Shorlisted. Barcelona, Spain. Shorlisted at the Enor Ascensores architecture award. Vigo, Spain. 2010 1st prize Dance school and theater renovation. Casa del Poble de Esporles, Mallorca. Shortlisted for the Arquia Próxima, young architects awards Madrid. 2009 Shortlisted at the AR Awards for Emerging Architecture 09. London. UK. 2008 Shorlisted in the competition for a ferry terminal in Ciutadella, Menorca. Spain. 2007 First prize in Competition for Repol headquarterss, Castellón, Spain. 2006 First price for the competition for the extension and refurbishment of Badies Health center, Mallorca. Spain. 2005 Shortlisted at the competition J5, Coria del Rio Sevilla. Spain. 2004 Thrid price. Competition for a new primary school in Puigpunyent, Mallorca, Spain. Shortlisted. Competition for 86 housing units in Calvià. Spain.


PUBLICACIONS_ EXÉ Nº4. Textures Metalliques.pg 79-93. Tectónica nº22, Envolventes metálicas. 2G Dossier, Young Spanish architects, Editorial Gustavo Gili. Architectural Review diciembre 2009, publicacion proyecto centro de salud de Badies. Bauwelt nº 34, Septiembre 2009, publicación proyecto centro de salud de Badies. Detail, españa, publicación proyecto centro de salud de Badies. Revista Infodomus nº16. Repol competition. Pag 49-55 TC Cuadernos nº79. Repol competition. pag 182-185 Press notes on following magazines: On (nº286), Infodomus (nº14) DP Magazine nº38. Interview. Pulbication of lecture series “Arquitectura Caliente 07. Prospecciones de Arquitectura Contemporánea” ’Islaciudad, VII taller del COAIB’ pags, 088-097 / 032-042

EXhibitionS_ Exhibition of “AR Awards for Emerging Architecture 09” with Badies health Centre. London December 2009. Exhibition at the World architecture Festival, Barcelona. Exhibition of the maritime passenger port terminal in Ciutadella. Menorca. Spain. J5 housing exhibition, “Antiguo Convento Nuestra Señora de los Reyes”, Seville. Spain. ‘Aula Forestal en madera de eucalipto” COAG headquarters, Santiago de Compostela. Spain. ‘Aula Forestal en madera de eucalipto” COAG headquarters in Mondoñedo, Lugo. Spain. 90 units social housing fo the local housing authority, Palma, Spain. Exhibition of the primary school in Puigpunyent in COAIB, Palma, Spain. Exhibition of the primary school in Inca in Ajuntament d’Inca, Inca, Spain. Exhibition of the university facilities at the UIB, Palma. Spain.


SELECTED WORKS_


2009_ Competition for the New Maribor Art Gallery, Slovenia. Budget: - euros Competition for a civic infraestructure.Day centre. Budget: 600.000euros Client: Centre de recursos Socisanitaris de Mallorca 1

2008_ Competition for 18 dwelling public housing block in Sa Pobla, Mallorca. 1 Budget: 1.800.000 euros Client: IBAVI 2

3

Competition for the refurbishment and extension of the Artistic History Archive, Mallorca. 2 Budget: 11.774.000 euros Client: Ministerio de Cultura Competition for a public kindergarten in Son Dameto, Palma. Mallorca. 3 Budget: - euros Client: Ajuntament de Palma Competition for 19 dwelling public housing block in Eivissa. 4 Budget: - euros Client: IMVISA

4

Competition for 38 dwelling public housing block in Eivissa. Budget: - euros Client: IMVISA

2007_ 5

Competition for maritime passenger port terminal in Ciutadella. Menorca. 5 Budget: 4.293.105 euros Client: Ports de les Illes Balears Hounorable mention Competition for Grupo Repol’s production plant and headquarters in Almassora, Castellón. 6 Budget: 1.800.000 euros Client: Grupo Repol S.L First Prize

6

Competition for 50 dwelling public housing block in, Ourense. 7 Budget: Client: IGVS. Instituto de Vivienda e Solo de Galicia. Primary school extension and new kindergarten Na Caragol, Artá, Mallorca. Budget: 2.500.000 euros Client: IBISEC

7

Interior refurbishment and new classrooms for the Colegio Frances de Palma. Mallorca. Budget: 430.000 Euros Client: Asociación Cultural Francesa. Scheme design for a new 25 rooms urban hotel in Palma. Mallorca. Client: -

2006_ Competition for a new university building in Palma, Mallorca. 8


Budget: Client: COFIU

9

Competition for an extension of the Centre of Technologies and Information in Palma. Mallorca. Second clasified Budget: Client: COFIU Competition for 40 dwelling public housing block in Torre Baró. Bercelona. 8 PEM: Promotor: BAGURSA Extension and refurbishment of Badies health centre in LLucmajor, Mallorca. 9 First Prize Budget: 840.000 Euros Promotor: IB-SALUT. Servei de Salut de les Illes Balears

10

Extension of Secondary school IES Josep Sureda i Blanes in Palma. Mallorca. 10 Budget: 579.500 Euros Promotor: IBISEC

2005_ 11

12 units housing block in Sa Pobla, Mallorca. 11 Budget: 1.160.000 Euros Client: Promocions Ullaro SL Competition for 20 dwelling public housing block in, Palma. Mallorca. Budget: 1.576.600 Euros Client: Patronat municipal del Habitatge

12

Competition for 10 dwelling public housing block in, Palma. Mallorca. Budget: 1.326.600 Euros Client: Patronat municipal del Habitatge New primary school in El Toro, Calvià, Mallorca. 11 Budget: 1.528.204,62 Euros Client: IBISEC

13

New 20 and 16 units housing blocks in Palma. Budget: 2.307.508 Euros Client: Victormar SL

2004_ 14

Scheme design for a single housing in Binissalem, Mallorca. Budget:Client:8 units housing block in Felanitx, Mallorca Budget: 817.793 Euros Client: Bicome 206 SL

15

Competition for a new primary school in Puigpunyent, Mallorca. 12 3rd Prize Budget: 1.528.204,62 Euros. Client: IBISEC

J5 housing competition for young architects in Coria del Río. Sevilla. 13 Selected project Budget: 16


Client: Consejeria de Obras Publicas y Transportes Competion for a new primary school in Inca. Mallorca. 14 Budget: 2.002.897 Euros. Client: IBISEC 18

86 public housing competition in Santa Ponรงa, Mallorca. 15 Selected project Budget: 5.265.000 Euros Client: IBAVI Industrial production plant in Vila de Cruces, Pontevedra. 16 Budget:Client: Industrias Guerra

19

20


EXTENSION AND REFURBISHMENT OF BADIES HEALTH CENTRE, MALLORCA, SPAIN.

SHORTLISTED

1ST PRIZE BUDGET: 840.000 EUR SURFACE: 692 m2 CLIENT: Ib-salut TIPOLOGY: Health Centre ESTATE: Built ----------------------------------------------------------------------------------------------

STREET VIEW

ORIGINAL BUILDING

Badies, is an example of an extensive urban planning of the seventies with little urban qualities. In the last decade, it has undergone a population surge, necessitating an extension and refurbishment of existing health centre. The brief included works on existing building as well as an extension with new rooms for pediatrics, extraction and administrative staff to increase and improve the service provided. The urban structure of the site is formed by an endless maze of streets and buildings without hierarchy. In this context, the new health centre wants to strengthen the image an institutional building, in an area very much in need for hierarchy and urban structure. The commissioning of the project is set on an austere one storey building and the adjoining plot where building regulations leave room only for interventions that are a natural extension of the existing construction. The key factor to tackle was the fact that during building execution the health centre should remain open. The extension is proposed as an autonomous attachment directly “stuck” on to the existing building and a a series of phases have to be followed for minimizing the disorder to the health centre in operation. 1. Preparation of the existing building. Without interfering in the daily use of the health centre. Exterior “surgery” is done to existing construction in order to regulate the perimeter. 2. Construction of independent extension and when finished, reallocating the program from the existing centre. 3. Refurbishment of existing building and demolition of separation wall for internal comunication.


DIAGRAM

N

GROUND FLOOR

FIRST FLOOR

LONG SECTION


MAIN FAÇADE INTERIOR HALL


REAR FAÇADE INTERIOR VIEW


SHORTLISTED

SHORTLISTED

HIGH SCHOOL EXTENSION. PALMA, SPAIN. BUDGET: SURFACE: CLIENT: TIPOLOGY: ESTATE:

419.700€ 719 m2 Ibisec Education Built

----------------------------------------------------------------------------------------------

VIEW FROM PLAYGROUND

Resources map: The use of locally produced materials is the start of this project for achieving two objectives, first to reduce the ecological footprint by shrinking the “resource map” and second, to locate the building in a context much larger than the physical; the economic and the cultural. One of the few construction materials are available on the island that do not dependent on imports are those produced by the precast concrete industry. The implementation of concrete block as the ”new traditional” construction system in Mallorca, has developed a thriving industry of small manufacturers that use local aggregates in the manufacturing of a wide range of small pieces. It is an exercise that explores the visual capabilities of common elements used in local popular. The façade is made with blockwork of the company Palerm, and in their process only local aggregate has been used. Tests have been conducted to determine the load strength of the blocks that are not used in the usual position. Direct action: The new extension of the Josep Sureda i Blanes High school is situated directly after the volume of the existing school, without separating or moving away from it. In order to minimize costs, shared access with the existing school, such as stairs and lifts have been proposed. The 9m span structure is solved with prefabricated slabs creating a free column space for future extensions.



GROUND FLOOR PLAN

CROSS SECTION


INTERIOR


TEMPORARY SCHOOL INTERIOR. PALMA. MALLORCA, SPAIN. BUDGET: SURFACE: CLIENT: TIPOLOGY: ESTATE:

355.209€ 930.40 m2 Mission laïque française School Built

----------------------------------------------------------------------------------------------

The need for a temporary solution, before moving to a larger and new school, came to be solved in the refurbishment of the ground floor of a seventies housing block. The project is conditioned by two extreme factors, first, the intervention was to be built in a record period of two months and secondly the project had to adjust to a really strict budget. This impelled by the insularity factor, which further expands the delivery time of materials, only allowing materials in stock on the island. Since the work was to be executed during summer months, the palette of materials available was drastically reduced from the choice of the door handles to the light fittings. About 90% of the material used in the projectec was in stock on the island. Without considering the adequacy of resources and the need for rapid implementation, basic elements are worked as ornamnets as the only decoration in the interior. Lighting is one of those elements and its installation follow pragmatic considerations where the winding tube routes avoid obstacles found in the existing space. Thus, downpipes and rainwater pipes pass through the corridors and classrooms and shape the “luminous constellation”. The openings in the corridor area are linned by a wooden and metal lattice structure, protecting areas ciruculación of students and filtering the light to the interior.



LUMINOUS CONSTELLATION

LATTICE

BASE



PRIMARY SCHOOL AND KINDERGARDEN NA CARAGOL, ARTA, SPAIN. BUDGET: SURFACE: CLIENT: TIPOLOGY: ESTATE:

1.844.421€ 2098 m2 Ibisec Kindergarden and primary School On site

----------------------------------------------------------------------------------------------

VIEW FROM ENTRANCE

From the very beginning the school teachers and the client wanted to promote a particular educational scheme based on the idea of “one-room school”. This experimental idea, that is to be tested in this scheme, is based on open spaces with little partitions where students develop a higher sense of respect for the others. The layouts enhance the permeability from the classrooms to the bigger shred space, where activities occur and some of the classes are held simultaneously. The proposal for the new extension of the existing school is set in three separate volumes located at ground floor level in order to optimize the movement of land and their settlement on the plot. These three small-scale volumes are within the language of children, and the school breaks its total volume creating and new scale closer to a house and the surrounding buildings. Each of these pieces arises independently and are situated on the site depending on parameters such as topography, vehicle accesses, circulation spaces and playgrounds. The arrangement of the three volumes generate “in-between” spaces that thanks to their geometric, spatial and material qualities, outdoor activities can be easily performed. The resulting typology consists of a ring of classrooms around the multipurpose room generating a deep building perforated by generous skylights bringing light and ventilation to these spaces.


KINDERGARDEN

GROUND FLOOR

SECTION


PREELIMINARY MODELS

DETAILS


VIEW PLAYGROUND


PRIMARY SCHOOL IN EL TORO, MALLORCA, SPAIN BUDGET: SURFACE: CLIENT: TIPOLOGY: ESTATE:

1.528.204,62 â‚Ź 2200 m2 IBISEC. Primary school Standby

----------------------------------------------------------------------------------------------

VIEW FROM STREET

The new school is set in a extensive low density residential area with no urban hierarchy.Our proposal structures the area with a strong institutional that wants to act as a magnet for urban pulse. The school is a compact block that potentiates sinergy and interactions with the users and the context as well as enhances the interaction between courses and facilitate movement, while it will create a strong institutional image. The idea of compacting allows us to release the maximum plot surface for the sports and recreation areas outdoors. This action of compressing the program needs of perforations for the ventilation and ilumination of classrooms, offices and circulation spaces. These perforations, as a result of the emptying of a solid will give the building a great volumetric complexity, where solid and void are of equal importance. The courtyards resulting from the drilling of the volume, they acquire a particular spatial condition becoming exterior rooms which may be used as outdoor classrooms. The exterior lattice around the building as a veil, will filter sunlight into the building and giving a glimpse of the outside. It protects windows of solar direct solar radiation while letting through indirect light. The lattice generating an active space between the inner enclosure and the veil through which evacuation routes are made on the first floor. The school is proposed as an structural system that, allows the possibility of changing throughout time without altering the structure. At the time of the project, there is already planned an extension to the building that will fit perfectlly inside the volume of the current plan.

A/18


VIEW FROM PLAYGROUND

SF

A A1

SD

B B1

C

6.03

D

4.50

E

F

4.50

G

4.50

SE

SG

G1

4.50

H

I

4.50

0.65

I1

4.50

J K 0.30

4.47

0.36

L

K1 1.85

M

K2

4.66

N

3.80

7.47

57.41 1.71

C20 V3

V3

V3

P11

V3

P11

V3

V3

V3

V1

V3

V1

C11

V1

C11

V1

C11

7.91

1.30

1.30

8.48

1.20

38.01

V3

C20

C11

1

1

P2

D_07

S_03

2

P1

10

S.U.:118.56 m2 S.V.:5.70 S.I.:16.38

A_06

P1

A_07

P12

V2 P2

P1 C12

14

7

S.U.:14.45 m2 S.V.: 1.30 S.I.: 2.60

Ø1.5 0

P6

3a S.U.:5.68M2 S.V.:0.72 S.I.:0.72

P1

V5C

V2 V2

V5C

1.60

V5B

- 0.06 6.66

V3

5a

8.48

S.U.:5.68M2 S.V.:0.72 S.I.:0.72

P1

P4

4.31

P7

3

S.U.:3.60M2

2.98

V5B V5C

25

S.U.:2.40 m2

P1

P2

5b 6

P4

S.U.:22.34 m2 S.V.: 1.30 S.I.: 3.58

6a

P1

12

S.U.:58.57 m2 S.V.:2.10 S.I.:8.76

4.43

P1

P1

S.U.: 52.84 M2

S.U.:4.34 m2 S.V.:0.72 S.I.:0.72

V2

7.33

V5B

S.U.:11.87 m2 S.V.:1.44 S.I.:1.44

P2

23

4.32

5b 6 0.05

S.U.:59.20M2 S.V.:2.80 S.I.:11.68

S.U.:84.19 m2

25 S_04

SC

15

26

V2

S.U.:4.13 m2 S.V.:-S.I.:--

9

V3

V4

6a

4.63

A_05

V2

A_04

S.U.:200.00 m2 S.V.: 7.50 S.I.: 28.00

P7

16.62

P2

5a

22

V4

7

C7 V2

V2

V3

1.20 V3

V4

V4

V3

1.30

P1

V2

7a V3

SUP. CONS. CERRADA PB 1.151,40 SUP. CONS. PORCHES (50 %) 152.43 SUP. CONS. PORCHES EXTERIORES (50 %) 30.89

5

V5C

8

S.U.:52.24 m2 S.V.: 2.60 S.I.: 6.18

V5B

S.U.:19.26 S.V.:1.30 S.I.:2.60

V5B

4.00

D_08 D_09

5

P1

V5B

P4

D_06

V4

5

CUADRO SUPERFÍCIES - PLANTA 0 4b

P2

S_04

V5B

4.50

P1 V5B

3b 4

V2

S.U.:5.35 S.V.:-S.I.:--

S.U.:11.48 m2 S.V.:1.30 S.I.:1.30

S.U.:3.50 m2

4b

5

4

P6

25

2.10

S.U.: 5.40 m2

P1

15

S.U.:59.20M2 S.V.:2.80 S.I.:11.68

V3

1 P1

- 1.76 - 1.70

SB

1.09

S.U.:4.14M2 S.V.:-S.I.:--

V3

V2

S.U.:10.22 m2 S.V.: 1.30 S.I.: 1.30

19

P1

30.14

P9

V3

S.U.:139.53 m2 S.V.: 1.30 S.I.: 33.38

4.50

2 6

27.54

S.U.:3.25M2 S.V.: -S.I.: --

P1

S.U.:4.05M2 S.V.:0.30 S.I.:0.20

P1

18

V5B V5C

3a

30.14

D_03

P1

V7

P1

3.15

- 0.06 - 0.00

1.65

V6

3.45

3

S.U.:21.28 m2

- 1.76

1.58

V2

D_04

25

22.15

A_09

6.24

V5B

3b 4

2a

P13

1.50 P10

7.00

A_08

S.U.:6.76 m2

4.33

4.73

25

P2

P1 V5A

V5A

1.50 - 0.56

- 1.16

C9

7

SA

15

S.U.:59.20M2 S.V.:2.80 S.I.:11.68

V3

S.U.: 6.94 m2 S.V.: 0.80 S.I.: 0.80

S.U.:6.16 m2 S.V.:0.80 S.I.:0.80 P5

C8

8.00 3

SC

S.U.:5.68M2 S.V.:0.72 S.I.:0.72

18

13

2a

SB

4.55

V5C

S.U.: 31.89 m2 S.V.: 2.88 S.I.: 3.73

V2

S.U.:11.27 S.V.: -S.I.: --

P1

V2

S.U.:2.75 m2 S.V.:0.38 S.I.:0.38

16 2

S.U.: 5.25 m2 S.V.: 0.38 S.I.: 0.38

2.92

20

18

4.50

- 0.62 - 0.56

D_02

P1

D_10

P1

P1 V6

S.U.:2.68 m2 S.V.:0.30 S.I.:0.20

P1

18

P1

P1

S.U.:21.47 m2 S.V.: 2.16 S.I.: 2.16

S.U.:7.34 m2 P1

9.19

V3

21

V6

25

S.U.: 4.12 m2 S.V.: 2.40 S.I.: 0.85

P1

7.47

V3

S.U.:19.41 m2 S.V.: 2.16 S.I.: 2.16

P1

2

17

P1

P1

V3

S.U.:4.04M2 S.V.:0.30 S.I.:0.20

21 SA

S.U.: 5.30 m2 S.V.: 0.72 S.I.: 0.72

V2

S.U.: 7.10 m2 S.V.: 0.72 S.I.: 0.72

20 18

S_03

18

SUP. CONST. TOTAL

1.334,72

SUP. ÚTIL TOTAL

1.102,70

LEYENDA: 1- ACCESO ALUMNOS PRIMARIA 2- HALL PRINCIPAL Y ZONA COMÚN 3- ACCESO ALUMNOS INFANTIL 4- CONSEJERIA-REPROGRAFIA 5- SECRETARIA 6- OFICINA JEFE ESTUDIOS 7- OFICINA DIRECCIÓN 8- BIBLIOTECA 9- APAS 10- COMEDOR 11- EXTENSIÓN DE AULAS INFANTIL 12- AULA PSICOMOTRICIDAD 13- ENFERMERIA 14- CUARTO LIMPIEZA 15- AULAS INFANTIL 16- COCINA 17- ALMACÉN BASURAS 18- LAVABOS ALUMNOS 19- ALMACÉN MATERIAL DEPORTIVO 20- VESTUARIO PND 21- VESTUARIO ALUMNOS 22- GIMNASIO 23- OFICINA MONITOR E. FÍSICA 24- CUARTO INSTALACIONES 25- PORCHES ZONA PRIMARIA 26- PORCHES ZONA INFANTIL

7a cota acabado pavimento cota superior forjado

V3

20.04

8.60

28.77 57.41

GROUND FLOOR

- 0.56

0.30 6.22 AA A1

6.37 B B1

6.79 C

SF

D

E

9.00 F

G

4.14 G1

SD

H

SE

4.83 I

I1

5.73 J K

4.58

K1

L

SG

K2

7.47 M

N

PROYECTO DE EJECUCIÓ Plano título: Planta baja- Distribución Promueve: IBISEC Escala: A1 1/100 A3 1/200 24/03/06 Fecha: Nº plano:

Modificado:

A_P_02 01

A. Salvá + A. Marqués + A. Sánchez www.smsarquitectos.com

FIRST FLOOR


LONG FAÇADES

PERFIL S1 3.05

54.26

57.30

7.65

PERFIL S3

PERFIL S2

S2

S3

10.19

3.00

pk24

pk1

pk2

pk3

pk4

pk5

pk6

pk7

pk8

pk9

pk10

pk11

pk12

pk13

pk14

pk15

pk16

pk17

pk18

pk19

pk20

pk21

pk22

pk23

PARKING PROFESORES 269,55 M2

PORCHE 61 M2 7

3.00

36.05

N

1

CUADRO PARÁMETROS - GENERAL

25.86

3.00

SUP. PARCELA SUP. ZONA PAVIMENTADA TOTAL SUP. ZONA TERRENO NATURAL

4.386.00 M2 2.244.88 M2 2141.12M2

2

3.05

1- ACCESO ALUMNOS PRIMARIA 2- ACCESO ALUMNOS INFANTIL 3- EXTENSIÓN AULAS INFANTIL 174,50 M2 4- CONTADORES 1,62 M2 5- ACCESO RODADO 386,99 M2 6- ACCESO PEATONAL 136,18 + 61.08 M2 7- ZONA PAVIMENTADA INTERIOR 1.382,80M2 8- PISTA POLIDEPORTIVA 962,11 M2 9- ZONA JUEGOS PRIMARIA 226,87M2 10- ZONA DE JUEGOS INFANTIL 300,05 M2 11- PARKING PROFESORES 266,00 M2 12- PARKING ADAPTADO 18,78 M2 13- ZONA AJARDINADA 195.55 M2 14- HUERTA 95,81 M2

1.96

1.95

8.00

8.00

3.00

ZONA RESERVA DE SOLAR. AMPLIACIÓN CP.

S2

S3

S1

S1

PAVIMENTOS EXTERIORES S3 PAVIMENTO ASFÁLTICO CON BORDILLOS PLANOS DE HORMIGÓN DE 20 CM EN ENCUENTROS Y BORDES.

Ampliación

7.08

S7 TIERRA VEGETAL PARA HUERTA Y ZONA AJARDINADA

S8 PISTA DEPORTIVA EN BASE DE SOLERA DE HORMIGÓN CON TRAZADO DE

S9

2.01

2.01

PINTURA SEGÚN COLORES REGLAMENTARIOS.

ZONAS DE JUEGO EXTERIORES CON PAVIMENTO A BASE DE TIERRA Y ARENA FINA COMPACTADA.

GENERAL PLAN

3.54

PROYECTO EJECUTIVO

Planta jardinería - Pavimentos exteriore

0.00

1/200 24/03/06

-1.16

SECCIÓN A-A' -3.42

Ampliación

Ampliación

U_PJ_01 01

7.08

7.08 3.54

3.54 0.00

-1.16

SECCIÓN A-A' -3.42 0.00

-1.16

SECCIÓN B-B' -3.42

A

Ampliación

B

7.08

C

3.54

Ampliación

7.08

PROYECTO DE EJECUCI 0.00

Plano título: Secciones longitudinales Promueve: IBISEC Escala: A1 1/100 A3 1/200 24/03/06 Fecha:

3.54 -1.16

SECCIÓN B-B'

Nº plano:

-3.42

0.00

Modificado:

-1.70

LONG SETIONS

SECCIÓN C-C'

A_S_01 01

A

A'

B

B'

A. Salvá + A. Marqués + A. Sánchez www.smsarquitectos.com C

Ampliación

C'

7.08

PROYECTO DE EJECUCION 3.54

Plano título: Secciones longitudinales Promueve: IBISEC Escala: A1 1/100 A3 1/200 24/03/06 Fecha: Nº plano:

0.00

A_S_01


3.54

3.54

0.00

0.00

SECCIÓN 1

7.08

7.08

7.08

7.08

7.08

S11 S1

MUROS Y CERRAMIENTOS

S1

M1 M2 M3 M4 M5 M6 M7 M8 M9

LADRILLO H-16+AISLAMIENTO POLIESTIRENO EXTRUIDO e=30mm +CAMARA DE AIRE 20 mm+ LADRILLO H-8 BLOQUE DIAMANTE PREFABRICADO DE HORMIGÓN +AISLAMIENTO POLIESTIRENO EXTRUIDO e=30mm +CAMARA DE AIRE 20 mm+ LADRILLO H BLOQUE DIAMANTE PREFABRICADO DE HORMIGÓN TABIQUE DE LADRILLO H-8 TABIQUE DE LADRILLO H-8+AISLANTE TABIQUE DE LADRILLO H-16 TABIQUE DE LADRILLO H16+AISLANTE E=3cm+ CAMARA 2cm+TABIQUE DE LADRILLO H8 MURO DE HORMIGON VISTO e=30cm CON DRENAJE E IMPERMEABILIZANTE EN CARA EXTERIOR A PIE DE MURO CELOSIA DE HORMIGÓN MARCA PREMAR MODELO CÉSPED O SIMILAR DE PIEZAS CON MEDIDAS 45X30X10 cm COLOR A DETERMINAR COLOCADAS A JUNTA PARTIDA A UN TERCIO DE PIEZA JUNTA DE UNION DE CEMENTO COLA DE ALTA RESISTENCIA M10 FORJADO RETICULAR+ BARRERA DE VAPOR+ AISLANTE POLIESTIRENO EXTRUIDO e=3mm+FORMACION DE PENDIENTES +IMPERMEABIIZANTE+PROTECCION PESADA

3.54

S3 3.54

0.31

S1

3.54

3.54

1.99

0.60

1.99

0.61

3.54

3.30

1.86

1.19

0.09

0.00 -0.56

0.00

0.00

0.19

0.00

0.00 -1.70

ESTRUCTURA

S1

1.99

SECCIÓN 1 SECCIÓN 1

E1 E2 E3 E4 E4 E5 E6 E7

FORJADO RETICULAR DE HORMIGON h=25cm +CAPA DE COMPRESIÓN e=5cm 2 SECCIÓN LOSA ARMADA DE HORMIGON e=22cm SECCIÓN 2 SOLERA DE HORMIGON e=15 cm SOBRE ENCACHADO DE GRAVA + LAMINA DE PVC e=1mm SECCIÓN ELASTOMERICA 3 SOLERA DE HORMIGON e=30 cm CON ARMADURA DE REFUERZO SOBRE ENCACHADO DE GRAVA + LAMINA ELASTOMERICA DE PVC E=1mm PILAR DE HORMIGÓN CON MEDIDAS SEGÚN CUADRO DE PILARES, RECUBRIMIENTOS MINIMOS CUMPLIMENTADOS LOSA ARMADA DE HORMIGON e=30cm JACENA DE HORMIGON ARMADO CON MEDIDAS SEGÚN PLANOS DE ESTRUCTURA LOSA ARMADA PARA FORMACION DE ESCALERA

REVESTIMIENTO DE PAREDES

0.46

0.49

1.99

S3

-3.42

R1 R2 R3

2.20

1.99

R4 R5 R6

S11

S3

R7 R8 R9 R10

7.08 7.08

0.95

7.08

ZOCALO DE PROTECCIÓN h=110cm DE TERRAZO 2 CANTOS BISELADOS 40X40cm COLOCADAS SOBRE PARAMENTOS VERTICALES. RECERCADO DE PUERTAS DE TERRAZO 40X20cm COLOCADAS SOBRE PARAMENTOS VERTICALES. ENFOSCADO DE MORTERO DE CEMENTO FINO MAESTREADO SOBRE PARAMENTOS VERTICALES INTERIORES, ACABADO DE DOS CAPAS DE P COLOR A DETERMINAR ENFOSCADO LISO DE MORTERO SOBRE PARAMENTOS VERTICALES EXTERIORES, ACABADO DE DOS CAPAS DE PINTURA HIDROFUGA COLOR ALICATADO 20X20 TOMADO CON CEMENTO COLA. COLOR A DETERMINAR ACABADO DE PLACAS DE LANAS MINERALES ACABADO BLANCO 60X60cm ESPESOR 19mm SOBRE PERFILES OMEGAS GALVANIZADAS VISTOS DE 46mm CADA 60cm COLOCADOS EN UNA SOLA DIRECCION DIRECTAMENTE SOBRE PARAMENTOS VERTICALES PANEL AISLANTE RECUBIERTO DE VIRUTAS DE MADERA CON CEMENTO GRIS TIPO CELENIT 120X60cm ESPESOR 50mm SOBRE PERFILES OM VISTOS DE 46mm CADA 60cm COLOCADOS EN UNA SOLA DIRECCION DIRECTAMENTE SOBRE PARAMENTOS VERTICALES AISLAMIENTO POLIESTIRENO EXTRUIDO e=30mm RECERCADO DE HORMIGON GRIS PREFABRICADO e=4cm ZOCALO DE PINTURA ESMALTADA SOBRE PARAMENTO VERTICAL. COLOR A DEFINIR

14.12

TECHOS T1

1.19

3.54 3.54

T2 T3 T4

3.54

T5

4.91

0.61

T6 T7

0.00 -0.56 0.00

SOLADOS

0.00

-0.56

S1

S1 1.99

-1.70 -1.70

S4 S5 S6 S7 S8

SECCIÓN 3 SECCIÓN 3

-3.42

S9 S10 S11

1.75

CROSS SETIONS

S2 S3

S10 S3

-3.42

PAVIMENTO DE TERRAZO COLOR A ELEGIR E=30mm ACABADO PULIDO EN ZONAS INTERIORES Y APOMAZADO EN EXTERIORES CON TRATAM HIDROFUGANTE PAVIMENTO DE CAPA DE HORMIGON REALIZADO IN SITU, e=10cm, PULIDO MECANICO, CORTE DE JUNTAS CON RADIAL Y SELLADO PAVIMENTO SOBRE BASE GRANULAR DE 15cm, CON CAPA DE RODADURA SECCIÓNS12 4 DE AGLOMERADO COLOCADA EN CALIENTE e= 4cm,BORDILLOS DE 20 cm A COLOCAR EN ENCUENTROS Y BORDES PELDAÑO PIEZA PREFABRICADA DE HORMIGON e=30mm PARA COLOCAR SOBRE LOSA DE ESCALERA LECHO DE GRAVA DIAMETRO MAXIMO A DETERMINAR EN OBRA PAVIMENTO DE GRES ANTIDESLIZANTE PAVIMENTO DE TIERRA VEGETAL PARA ZONA AJARDINADA Y HUERTA PISTA DEPORTIVA EN BASE DE SOLERA DE HORMIGÓN SOBRE ENCACHADO Y TERRENO COMPACTADO, CON EL CORRESPONDIENTE TRAZAD SEGÚN COLORES REGLAMENTARIOS. ZONAS DE JUEGO EXTERIORES CON PAVIMENTO A BASE DE TIERRA Y ARENA FINA COMPACTADA D A B D PAVIMENTO VINILICO EN BASE DE SOLERA DE HORMIGÓN SOBRE ENCACHADO Y TERRENO COMPACTADO D A B D ALFOMBRA VINILICA

2.65

0.10

FALSO TECHO COMPUESTO POR PLACAS DE LANAS MINERALES ACABADO BLANCO 60X60cm ESPESOR 19mm SOBRE PERFILES OMEGAS GA VISTOS DE 46mm CADA 60cm COLOCADOS EN UNA SOLA DIRECCION ENFOSCADO DE MORTERO DE CEMENTO FINO SOBRE PARAMENTOS DE TECHO INTERIORES, ACABADO DE DOS CAPAS DE PINTURA PLASTI ENFOSCADO LISO DE MORTERO SOBRE PARAMENTOS DE TECHO EXTERIORES, ACABADO DE DOS CAPAS DE PINTURA HIDROFUGA. COLOR A ACABADO DE PLACAS DE LANAS MINERALES ACABADO BLANCO 60X60cm ESPESOR 19mm SOBRE PERFILES OMEGAS GALVANIZADAS VISTOS DE 46mm CADA 60cm COLOCADOS EN UNA SOLA DIRECCION DIRECTAMENTE SOBRE PARAMENTOS DE TECHOS PANEL AISLANTE RECUBIERTO DE VIRUTAS DE MADERA CON CEMENTO GRIS TIPO CELENIT 120X60cm ESPESOR 50mm SOBRE PERFILES OM VISTOS DE 46mm CADA 60cm COLOCADOS EN UNA SOLA DIRECCION DIRECTAMENTE SOBRE PARAMENTOS HORIZONTALES ACABADO DE PINTURA ANTIHUMEDAD. COLOR A DEFINIR AISLAMIENTO POLIESTIRENO EXTRUIDO e=30mm

D'

8.70

A' D'

B' A'

D' B'

D'

PLANTA

7.08 7.08

M10

M3

M2

E1

M10

M10

E1

M3

M3

M2

3.54 3.54

E5 T6

R9 0.00

R9

T1

R3

M3

0.00

PROYECTO DE EJECUCION M10 PROYECTO DE EJECUCION Plano título: Secciones transversales Plano título: Promueve: SeccionesIBISEC transversales Escala: 1/100 A3 1/200 Promueve:A1IBISEC Fecha: Escala: 24/03/06 A1 1/100 A3 1/200 24/03/06 Fecha: Nº plano: T6 Nº plano:

A_S_02 A_S_02 01 01

M2

M2 V5B

R9

R9

SECCIÓN 4 SECCIÓN 4

V5B

Modificado: Modificado:

R9

V5B

V5C

V5C

A B

A. Salvá + A. Marqués + A. Sánchez www.smsarquitectos.com A. Salvá + A. Marqués + A. Sánchez www.smsarquitectos.com

E2

S1

R3

R9

V5C

S1

T6

M4 T1

E1

E1

R9

T7

V5B

R9

E2

R3

M4

R3

R3

M4

M4

T7

T1

R9

M2

R9

R9

T1

T1

PR

T1

R9

Pl Al

R9

V5B V5B

Pr

Es E3

PATIO ELEVATIONS

S1

S11

E3

S1

A-A'

E3

S1

E3

Fe

S1

B-B'

Mo

A. S

VIEW FROM ABOVE


GRUPO REPOL HEADQUARTERS, CASTELLÓN, SPAIN. 1ST PRIZE BUDGET: 1.800.000 euros SURFACE : 9.700 m2 CLIENT: Grupo REPOL TIPOLOGY: Office and manufacturaing ESTATE: Draft design ----------------------------------------------------------------------------------------------

VIEW FROM STREET

The proposal for Repol Group headquarters, rather than proposing an end result or finished product, our aim is to define a that acomodates a wide range of possibilities. We propose therefore an intervention to define a framework and a variable content that accommodates the needs and constraints of the future user. A structural system based Vierendeel trusses allow us to get long spans that not interfiere with the production area. This system also allows us to think in a new location for the administrative areas that traditionally are atached to the front façades. The office area can be now distributed over a huge area on top of the roof, inside the Vierendeel truses. This location open the possibility for organize offices as in a ground floor, where terraces, seating areas, outdoor meeting areas and landscaped courtyards can occur. Access to the offices is proposed as a promenade, culminating in the offices of the company, passing through a sequence of spaces and events that happen along the way. The ascension begins on the ramp outside and leads to the “piano nobile” where entrance of the offices and laboratory occur. This ascending tour has two routes: one immediate access by an elevator or stairs to the offices and an other that brings visitors thruoghou the succession of various laboratories allowing us to peep in to production area carried out in the adjacent hall. The façade of Repol Group, manufacturer of polymers, we propose the development and design of a plastic material in which the company can actively intervene, thus closing the cycle of production and use. We understand the facade as an abstraction of the sequence of a polymer, an unlimited series consisting of the repetition of the same unit. The basic element of this facade is a hexagonal panel manufactured in an injection mold where the products of Repol will be used.


TOP VIEW

PARTIAL SECTION

GROUND AND FIRST FLOOR



Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.