Sports Pitch Construction for HMP Featherstone - Phase 2 case study

Page 1

Work by O’Brien Construction of a natural turf pitch and MUGA pitch. Phase 2 involved the construction of the two new pitches: MUGA Pitch The project involved the design and build of a 5 a-side sports pitch. The work included site clearance and reduced level dig with cut and fill. The underside of the playing surface was a “Finn” underground drainage system and free draining sub-base granular fill. The playing surface used was “Playrite Matchwinner” synthetic sports surface with shockpad, surrounded by a 3m high welded mesh fence. Natural Turf Pitch The project involved the build of a natural turf rugby/football field. The underside of the natural pitch was made up from a number of layers which were supported by the lime stabilized formation in order to create the most level playing surface. The pitch consisted of a 125mm drainage layer of Viridor recycled glass and 175mm Rootzone 80/20 supplied by Tarmac Topsport. The “Sports Greenscape” turf was then laid to complete the natural turf pitch.

Client Shaylor Strategic Alliance Project HMP Featherstone Phase 2 Natural Turf & MUGA Pitches Location Wolverhampton Value £415K Contract Duration 12 Weeks


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Sports Pitch Construction for HMP Featherstone - Phase 2 case study by Simply Marcomms - Issuu