Anyara Hills: Masterplan & Sales Gallery 01
Semenyih, Selangor
The 584 acres resort style homestead development offers the countryside living surrounded by natural green and rolling hills within the vicinity of the city center.
Key responsibility:
- Studied area/lots with steep slopes and proposed additional roads/revised road levels for better sellability.
- Checked as-builts against design levels and ensure correct information is relayed for scale model making.
- Reviewed coordination dawings for road reserve.
- Reviewed M&E drawings i.e street lighting, feeder pillar locations against landscape drawings and highlight clashes for further coordination.
- Assisted to review design for masterplan VE purposes.
- Reviewed guardhouse design and tender drawings.
JALAN SUNGAI LALANG approved bypass road link to silk highway 1 2 3 4 3 THE ANYARA RESERVE 183 182 181 180 116 113 112 118 117 179 178 177 176 175 173a 173 172 171 170 169 168 167 166 165 163a 163 162 161 160 159 158 157 156 155 153a 153 152 151 150 149 148 147 145 146 143a 143 142 141 140 139 138 137 136 135 133a 133 132 131 130 129 128 127 126 125 123a 123 121 120 119 105 106 107 108 109 110 111 340 1 2 3 3a 7 8 9 10 11 12 13 13a 15 16 17 18 19 20 21 22 23 23a 25 26 27 28 29 30 31 32 33 33a 6 5 48 47 46 45 49 50 51 43a 43 42 41 40 39 38 37 36 35 61 62 63 63a 65 66 67 68 69 72 73 73a 75 76 77 78 79 80 81 82 83 83a 85 86 87 88 89 90 91 92 93 93a 95 96 97 98 99 100 101 102 103 103a 52 53 53a 55 56 57 60 59 58 122 183a 185 186 187 188 189 190 258 253a 193 192 191 210 211 212 213 213a 215 216 115 113a 339 338 337 336 335 333 333a 203 203a 205 206 207 208 209 193a 195 196 197 198 199 200 201 202 250 251 252 253 329 328 330 331 332 255 256 257 Entrance Main Guardhouse Secondary Guardhouse Central Park 1 2 3 4
Perspective
Masterplan Note: Graphical illustration by external consultants team.
Year: 2022 - 2023 | Project Stage: Construction
Studies of slope profile and additional road access for overall masterplan.
Layout after Earthwork completed by YG Tan C&S Engineer. - Final levels to be verified and confirmed with as built Lot with ≥ 50% slope with gradient greater than 1:3 - 24 nos - 24/345 lots = 6.96% P/S: - Based on Terrain Mapping Layout after Earthwork completed by YG Tan C&S Engineer. - Final levels to be verified and confirmed with as-built levels on site. Area with rock discovered on site –proposed min. 2/3 of the site to be 1:3 slope and the rest to be left as it is - 4 nos Lot with < 50% slope gradient greater than 1:3 - 34 nos - 34/345 lots = 9.86% Lot with ≥ 50% slope with gradient greater than 1:3 - 24 nos - 24/345 lots = 6.96% P/S: - Based on Terrain Mapping Layout after Earthwork completed by YG Tan C&S Engineer. - Final levels to be verified and confirmed with as-built levels on site. Area with rock discovered on site –proposed min. 2/3 of the site to be 1:3 slope and the rest to be left as it is - 4 nos Lot with < 50% slope gradient greater than 1:3 - 34 nos - 34/345 lots = 9.86% Preliminary Masterplan
Sketch of water fall directions for entrance ramp
Sketch of pin kerb concept to hold aggregates
Additional drain for water down the slopes.
Aggregates with subsoil drain below.
Additional slotted drain at the beginning of staircase.
Anyara Hills: Masterplan & Sales Gallery
Proposed finishes to suit site condition.
Review on finishes proposed by consultants.
Completed work at site
Site work in progress with coordination to resolve area where finishes for various elements meet.
Colour scheme studies
Anyara Hills: Contemporary Pavilion 02
Semenyih, Selangor
As the second Show Unit in Anyara Hills, the Contemporary Pavilion carries a louder architectural design withina more simplified orchard setting.
Key responsibility:
- Identified & proposed suitable site for management’s approval.
- Researched & proposed hardscape ideas for management’s approval.
- Assisted to engage and liaised with consultants team to develop esign brief.
- Reviewed coordination and tender drawings to ensure design intention is carried through.
- Jointly reviewed, evaluated, and proposed architecture, C&S, M&E and landscape items for VE purposes.
Note: Graphical illustration, floor plans, and section by external consultants team.
Year: 2022 - 2023 | Project Stage: Schematic to Tender
Ground Floor Plan First Floor Plan
3000 1850 4350 Section A-A 1:25 @ A1 Scale 3375 2700 2400 2900 480 320 460 2400 820 825 356 3705 4000 7705 2750 149 424 775 3220 A 505 1850 4350 3375 2400 480 1600 825 3705 2400 3705 4000 7705 2525 2550 2200 C note project title project no. rev. scale drawing title C:\Askaree\Work\C'arch Works\2108 Semenyih Houses\230803 Plans\2108A SECTIONS.dwg 14/8/2023 8:50 PM key plan THIS DRAWING IS A COPYRIGHT. All designs are the property of C' arch and cannot be used without their written permission. All prints, specifications and copyrights are the property of C' arch and shall be returned on completion of work. All measurements must be checked at site by the contractor and the notification to be made to the Architect before commencement of work In event of any discrepancy arising from the drawings. All drawings must be read in conjunction with other consultants' drawings. date checked drawn drawing no. amendments no dated chk FOR TENDER 15 AUGUST 2023 PROPOSED CONSTRUCTION AND COMPLETION OF 1 UNIT OF SHOWHOUSE ON LOT 20, MUKIM ULU SEMENYIH, DAERAH ULU LANGAT, SELANGOR DARUL UNTUK : GOLDHILL FORTUNE SDN BHD 2108A/KHK/SHOUSES EHSAN. SECTION AA & SECTION BB 1:100 @ A1 AA 14 / 08 / 2023 CTW WD-301 C 0.42mm BST (0.47mm TCT) SANKO GRIP DECK 3 PAN in Colorbond XRW steel with 50mm x 40kg/m3 RL920 Rockwool 150 x 150mm box upvc rwdp fixed to column to manuf detail painted finish to match column colour RC Retaining Wall to engr's detail with admixture waterproofing to refer schedule and 20mm thk plaster and painted on the inner side Glass laminated low-e Timber staircase to engr's detail with ms railing at 1000mm ht t: min 280mm 168.41mm @ 22 steps Alumn box louvre to refer schedule and finish and approval compact detail concrete curb 200mm dia. UPVC pipe to connect to perimeter drain A 07.01.23 AA omitted covered drain, to be replaced with 6" upvc pipe connected to cascade drain A 07.01.23 AA located RWDP in Section AA and BB B 14.04.23 AA W10 W21 omitted glass panel B 14.04.23 AA W10 W21 omitted louvred screen B 14.04.23 AA omitted sunken deck B 14.04.23 AA railing changed from 75 c/c to 100mm c/c C 20.06.23 AA roof, ceiling and window height reduced by 280mm C 20.06.23 AA C-channel edge omitted. beam to be painted finish. slab edge to be plastered & painted finish C 20.06.23 AA omitted Breezeway louvres, replaced with 1100mm railing & roller blind C 20.06.23 AA alumn frame height reduced by 550mm 13 x 173mm WPC Ceiling Panel Ekowood or equivalent to arch's selection and approval zincalum roof gutter with waterproofing to detail 0.42mm BST (0.47mm TCT) SANKO GRIP DECK 3 PAN in Colorbond XRW steel to manuf detail 75 x 150mm MS RHS column to engr detail painted finish detail 75 x 400mm 3mm thk alumn C-channel edge at the perimeter of the roof 300 x 100mm alumn box with powder coated finish to manuf detail and arch selection and approval 300 x 300mm half round drain with brickwall to engr's detail 20mm sides metal arch's approval plate finish c/c C-Channel painted and approval laminated with frame detail finish laminated with frame painted approval edge roof 0.42mm BST (0.47mm TCT) SANKO GRIP DECK 3 PAN in Colorbond XRW steel with 50mm x 40kg/m3 RL920 Rockwool 150 x 150mm box upvc rwdp fixed to column to manuf detail painted finish to match column colour Glass laminated low-e Alumn face panel fixed to RC beam with painted finish to match I-beam colour zincalum roof gutter with waterproofing to detail RC Column with plaster and painted finish to engr's detail detail 75 x 400mm 3mm thk alumn C-channel edge at the perimeter of the roof 300 x 100mm alumn box with powder coated finish to manuf detail and arch selection and approval 300 x 300mm half round drain with brickwall to engr's detail 20mm sides laminated with frame laminated with frame painted approval edge roof 150mm drywall panel with plaster and painted finish 150mm drywall panel with plaster and painted finish RC to colour 50mm thk finishes + screeding to refer finishes schedule 50mm thk finishes + screeding to refer finishes schedule cement to and joining approval. with finish cement to and joining approval. Section A-A Coordination studies of building height and ceiling headroom required.
UMW Headquarters & Warehouses 03
Selangor UMW Headquarters UMW Warehouses UMW Main Guard House
Serendah,
Year: 2019 - 2022 |
Project Stage: Schematic to Construction
Extended metal cladding fascia to keep rain away while allowing air in.
Wire mesh to keep pest away while maximizing natural ventilation.
Metal cladding facade is protruded out to comply ventilation requirement by firefighting department.
Warehouse - facade detail
Warehouse - Rear Elevation
Warehouse - Front Elevation
Facade detail
Warehouse interior