Final thesis report

Page 52

OPEN SPACES 1.The open area on the western side of the building is used as a site for organising parties 2.This site is kept along the banquet hall and the kitchen 3. There is a private courtyard adjacent to the residential zone CIRCULATION 1.Since separate entry for auditorium and conference hall is provided, overcrowding can be controlled SERVICES 1.Separate entry for services like fire exhausts,kitchen servicing etc 2.Coffee shop is ket in the first floor so that people coming out from the auditorium can access them

Landscaping in the backside of the building

Steps connecting the backyard to the reception

STRUCTURAL SYSTEM 1. For shorter spans RCC coloumns of size 500 mm x 500 mm is used, for spanning distance of about 4m 2. For larger spans 800 mm dia columns of RCC spanning 6m, andalso supports the central dome with a cylindrical base MATERIALS 1.Brick and concrete 2.Red sandstone clad exterior 3.Marble interior flooring with granite lining

Inside view of the dome from the entrance lobby

Library


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.