SHABBIR HATHIARI
Nirma University, Institute of Planning and Architecture B.ARCH | 2020
+918155970960
+971569232353
Al Nahda, Dubai, United Arab Emirates.
EDUCATION
- Institute of Architecture, Nirma University | Ahmedabad, India
Bachelor of Architecture | 2020 candidate
- GEMS Modern Academy | Dubai, United Arab Emirates
International Baccalaureate Diploma | 2018 Candidate
- The Millennium School | Dubai, United Arab Emirates
CBSe-I 10th standard graduate
EXPERIENCE
- Mott MacDonald | Dubai, United Arab Emirates
Project Engineering Management Intern
Assisted in reviewing project from conceptual stages to detail design stages, through to construction and commissioning.
- ThinkScience | Dubai, United Arab Emirates
Product Design Co-ordinator
To launch a consumer product which sequesters CO2 gas by 73% and contributes to UAE’s Climate Change goals by November 2019.
ACHIEVEMENTS
SCARAB Film Festival
FIRST Lego League Challenge
ThinkScience Competition
SKILLS
AutoCAD, Rhinoceros, SketchUp, Revit, Adobe Suite, MS Office
Video/photography, Final Cut Pro, Adobe Photoshop, Adobe Premier Pro Grasshopper, 3D Printing, Hand drafting/modeling
2020 - 2025 2018 - 2020 2008 - 2018 2018 2017 Design Media Fabrication 2018 2018 2017 Honourable Mention Third Place Third Place CONTENTS | 3
Solstice
1st Semester | Anthropometry Studio
Old Age Home
2nd Semester | Contextual Studio
4th Semester | Housing Studio
5th Semester | Institution Studio
Working Drawing
6th Semester | Working Drawing Studio
Ahmedabad
Measure Drawing Related Study Program
Studio 8B3E44
archmello Competition | Studio Design
“Vaayu Machaan”
3rd Semester | Material Studio
Laurie Baker Workshop
Hands-on Related Study Program
France & Italy
Exploratory Related Study Program
വായു മcാൻ
ةاون
“Nawat”
YuJ
6 - 13 14 - 17 18 - 21 22 - 25 26 - 29 30 - 33 SELECTED PROJECTS | 5
ةاون
~ nawat
Housing Studio
The project revolved around the idea of housing for the indigent. As the site Afzal Khan no tekro was selected, one of the largest squatter settlements in the city of Ahmedabad. The aim was to uplift their lifestyle by providing better houses and facilities but at the same time reserving all the reformed features and characteristics of which made them a close-knit community.
6 | RENDER
8 | RENDER
CONCEPT
“Nawat” is a social housing nucleus which aims to provide effective and comfortable connections between people and spaces. This can ensure productivity and efficiency of an area, and comes with all the economic and social benefits it entails.
STRATEGY
Higher levels are stacked to create space for multiple levelled housing , each having an entry exit onto the upper ground floor podium. This level shall act as the public area for the residents.
Creating two levels of public space, one for residents and one for the general public is essentially creating a "Semi-Public" and "Public" Space. Residential Public Space
10 | CONCEPT & STRATEGY
General Public Space
4 person household with store-front 72 m2 6-8 person household with store-front 144 m2 1-2 person household with store-front 27 m2 2-3 person household 54 m2 3-4 person household 63 m2 Residential Public Space Residential Public Space First Floor Plan PLAN | 9
PUBLIC
An all-accessible public open space inviting all residents of “Nawat” to experience Afzal Khan no tekro.
PRIVATE
Multitude of residential units to accommodate dynamic family sizes throughout Afzal Khan no tekro.
12 | SECTION
SEMI-PRIVATE
Providing a semi-public / exclusive public space for residents alone on the upper ground floor creates a sense of home they were used to.
SEMI-PUBLIC
Commercial store-front houses run their livelihoods through their residential dwellings facing the general ground floor.
വായു മcാൻ
~ vaayu machaan
Material Studio
Examining the properties of timber as the starting point for design and studying timber to expand and understand building craft, structural limits and architecture to make a dream house.
Set amidst the green, this home in Munnar, Kerala, India, is an amalgamation of modern architecture elements into a tropical architecture , giving prime importance to the central courtyard and traditional planning concepts. Broad windows, and an open-to-sky courtyard makes the home well-lit and ventilated. The trees in the surroundings together with the tropical
CONCEPT | 15
16 | FORM DEVELOPMENT
North Elevation View
ELEVATIONS | 17
South Elevation View
Studio 8B3E44 ~ adaptive re-use
archmello Competition done by Stuti P. and Shabbir H.
The challenge was to design an architecture design studio that is open for design dialogues. A studio that is innovative in terms of its architecture and and a studio that is beyond glass cubicles which also breaks the monotony of a conventional office.
“ One can not just be an architect, the idea is to become a sthapati. ”
~ B.V. Doshi
When you are an architect, you just erect buildings. When you transform into a sthapati , you enter into its soul right from the beginning. We synthesised our background research for the competition similarly. Starting from the roots we compiled our current knowledge on design studio contexts and reviewed conventional design studios and practices that take place within Ahmedabad.
We visited and reviewed practices of Sangath, HCP Design and Kamal Mangaldas Architects. All these firms are credited with making significant contributions to contemporary architecture in India in the latter half of 20th century, and have a setup with facilities and a layout that fully support the working style that the respective firms believe in.
Amongst the bustle of the University Area in Ahmedabad, lies a lost structure. The site has an abandoned structure that is not only surrounded by green cover but also takes you to the city life as you cross the edge. With simple access to public transportation, the site is well connected to the outside, making it advantageous for the users.
Ahmedabad being an architectural hub has had an incremental growth in terms of new architecture. Hence the focal point was to bring back what already exists. The project revolves around the concept of adaptively reusing this abandoned structure opposite CEPT university.
BACKGROUND RESEARCH | 19
Studio 8B3E44 sustains existing broken walls and uses its debris for construction. It also introduces as alternative to a fixed glass facade. 8B3E44 highlights the use of a light weight material that allows one to make a temporary change to the lighting conditions of the built form. It is a preliminary concept around the use of Aerogel as wall panels.
The purpose of every space is bendable. The hierarchy in profession is removed by providing similar spaces to all. In a nutshell, this is a proposal for a raw space.
Recreational Space
Reception
Exhibition Space
Canteen
Workspace
Library
Existing structure on site taken up for adaptive re-use
20 | CONCEPT
Exploded View of Studio 8B3E44
Section AA’
SECTIONS | 21
Section BB’
YuJ
Architecture Incubation Centre
Institution Studio
Design of an architecture incubator including co-working space, meeting rooms, economic services of the community of communes, workshops, for about 400 architects. Being opposite CEPT university the design is part of an approach to promote innovation, particularly in the field of architecture. In this context, the new architecture incubator had to be a showcase building, attractive to architects and reflecting its vocation.
22 | HANDMADE MODEL
Floor Plan Preliminary Design 24 | PLANS
Ground Floor Plan Preliminary Design First
The programme gives pride of place to the people. Through a public access street , large common areas , the project extends this desire through its design: the spaces all look out over, and are accessible via a common passageway and staircase, encouraging emulation .
Articulated in brick and concrete, with exposed structural members abutting the structure along all sides. The centre’s design empowers architects with freedom of movement within an environment that prioritises thermal comfort and functionality to become an exemplar of sustainable energy design .
Section AA’ Preliminary Design
Section BB’ Preliminary Design
Section CC’ Preliminary Design
SECTIONS | 25
Section DD’ Preliminary Design
A B C D E F G H I J K L M N O P Q R S T U A B C D E F G H J K L M N 6 5 7 O P 5 4 8 6 4 2 1 7 5 3 4 2 1 3 1 5 3 2 4 8 3 5' 4' 5' 4' 18900 520 2700 520 9600 520 3200 1800 750 230 290 230 750 2750 750 2300 750 2750 750 3000 2000 170 2480 230 290 290 230 950 950 950 950 950 950 950 57200 5060 5060 2530 5060 2530 5060 6600 5060 5060 5060 5060 2530 2530 1151200 2430 1200 230 2300 1200 2430 1200 230 2300 1200 2430 1200 230 6380 1200 2430 1200 230 230 230 230 2300 2301200 2430 1200 230 2300 2301200 2430 1200 2301200 2430 1200 230 1850 1850 1850 1850 1850 1850 1850 6600 57200 5060 5060 2530 5060 2530 5060 6600 5060 5060 5060 5060 2530 2530 1200 2430 1200 230 2300 1200 2430 1200 230 2300 1200 2430 1200 230 6380 1200 2430 1200 230 2300 1200 2430 1200 230 2300 2301200 2430 1200 230 115 115 2300 230 230 230 230 230 115 700 3600 750 2430 238 750 2430 230 750 2430 230 750 2430 230 750 2430 230 750 2430 230 750 2430 3330 1380 350 5060 2530 5060 3451380 3330 6600 1380 1380 1320 2300 2070 5751150 575 1380 1380 1380 1380 6090 2430 750 230 2430 750 230 2430 750 230 2430 750 230 2430 750 230 2430 750 115 115 920 920 5290 3685 3685 5298 2530 5060 2530 1850 115 2300 2301200 2430 1200 230 2300 2301975 2430 18870 1800 3200 1430 1430 1970 1430 1970 1430 520 9600 520 2700 520 2000 22100 770 15560 770 1000 3900 7590 3910 1000 3000 900 2100 900 900 2100 900 22100 1800 3210 770 770 11560 5000 1000 3900 7590 3900 1000 900 900 900 2130 900 900 900 1000 2430 230 2430 1000 230 3910 5290 2300 7590 880 1200 5501200550 1830 1600 2302080 2430 1000 230 115 1200 2430 1200 5290 2300 7590 880 1200 5501200550 1830 1600 230 2080 2430 1000 230 115 1975 2430 1000 2430 230 2430 1000 230 24310 6600 2530 5064 2530 5060 2530 115 2300 230 230 2300 230 1975 230 2300 230 1204 2430 1200 230 +215+300RECEPTIONS.B.+4265 5060x6600 F1 W1C1 +150+300PROMENADES.B.+3750 57200x2700 F2C2 DIRECTOR'SCABIN+215+300 S.B.+4265 5060x6600 F1 W1C1 1380 920 230 1380 920230 COAPRESIDENT'SCABIN +215+300 S.B.+4265 5060x6600 W1 3850 CONFERENCEROOM +215+300 S.B.+4265 7590x9600 F1 W1C1 DOUBLEHEIGHTEDBUFFER +150+300 S.B.+8250to+12750 6380x8790 F2 W1C1 +215+300TRAININGHALLS.B.+426512650x9600 F1C1 CANTEEN +215+300 S.B.+4265 5060x9600 C1 HANDWASHAREA+150+288 S.B.+4265 5290x3685 C1 KITCHEN +150+288 S.B.+4265 5290x3685 F3 W2C1 +215+300ENTRANCEFOYER S.B.+426510120x7590 F1 W1C1 MALE'SWASHROOM+150+288 S.B.+4265 5290x3910 F3 W2C1 FEMALE'SWASHROOM +150+288 S.B.+4265 5290x3910 F3 W2C1 +215+300MULTIPURPOSEHALLS.B.+12750to+8250 14120x15560 F1 W1C1 01W01 02 03W01 04W01 05 06W01 W01 08W01 09 10W01 11W01 12 23W01 W01 25 W01 W02 02W02 03W02 W02 W0205 W0206 07W02 W02 01W03 W01 14W01 15W01 W01 17 18W01 19W01 W01 21W01 22W01 01 02W04 D1 D2 2 D3 D3 D4 D4 1D5 D5 D5 D5 02W03 D1 3D1 D1 D6 D6 D6 D6 D7 D7 D7 4D7 DN ASPERDETAIL STAIRCASE A201 A A201 A A201 B A201 B A202 C A202 C GENERAL NOTES: PROPERTY OF SHABBIR HATHIARI AND SHALL NOT BE TRACED, COPIED, LENT,REPRODUCED, KEY PLAN DOOR WINDOW SCHEDULE LINTEL G.F. :All dimensions are from finished floor DRAWING: GROUND FLOOR PLAN SCALE: 1:100 SEMESTER: 6 INCUBATION CENTER STUDENT: SHABBIR HATHIARI ROLL NO.: 20BAR034 A101 NOT SCALED. SHALL TAKE PRECEDENCE OVER THOSE TO SMALLER SCALE. OTHERWISE MENTIONED. 2130mm 2500mm 1380mm x 2500mm 920mm 2500mm 1380mm x 2500mm 2300mm 2500mm 1200mm x 2500mm 1975mm x 2500mm LINTEL G.F. F.F. TOTAL 1200mm 3750mm 1200mm 3750mm 1380mm 2500mm BEAM BOTTOM AT +3750 BEAM BOTTOM AT +4125 TYPE SIZE SILL LINTEL G.F. F.F. TOTAL DN SLAB BOTTOM AT +4265 DOUBLE HEIGHT AT +8250 DOUBLE HEIGHT AT +12750 S.B.+10000 S.B.+8250 S.B.+8250 S.B.+10000 S.B.+8250to+12750 S.B.+12750 S.B.+14500 S.B.+14500 S.B.+12750 S.B.+12750to+8250 A202D A202 D A202E A202 E A202 F A203 A A203 B A203C A203 D Ground Floor Plan Ongoing Working Drawing First Floor Plan Ongoing Working Drawing 26 | PLANS A B C D E F G H J K L M N O P Q R S T U A B C D E F G H I J K L M N 6 5 7 O P Q R S T U 5 4 8 6 4 2 1 7 5 3 4 2 1 3 1 5 3 2 4 8 3 2 1 5' 4' 5' 4' 18900 520 2700 520 9600 520 3200 1800 750 230 290 230 750 2750 750 2300 750 2750 750 3000 2000 170 2480 230 290 290 230 950 950 950 950 950 950 950 57200 5060 5060 2530 5060 2530 5060 6600 5060 5060 5060 5060 2530 2530 1151200 2430 1200 230 2300 1200 2430 1200 230 2300 1200 2430 1200 230 6380 1200 2430 1200 230 230 230 230 2300 2301200 2430 1200 230 2300 2301200 2430 1200 2301200 2430 1200 230 1850 1850 1850 1850 1850 1850 1850 6600 57200 5060 5060 2530 5060 2530 5060 6600 5060 5060 5060 5060 2530 2530 1200 2430 1200 230 2300 1200 2430 1200 230 2300 1200 2430 1200 230 6380 1200 2430 1200 230 2300 1200 2430 1200 230 2301200 2430 1200 230 115 115 2300 230 230 230 230 115 700 3600 750 2430 238 750 2430 230 750 2430 230 750 2430 230 750 2430 230 750 2430 230 750 2430 3330 1380 350 5060 2530 5060 3451380 3330 6600 1380 1380 1320 2300 2070 5751150 575 1380 1380 1380 1380 6090 2430 750 230 2430 750 230 2430 750 230 2430 750 230 2430 750 230 2430 750 115 24310 6600 2530 5064 2530 5060 2530 1850 1850 1850 1850 1850 115 2300 2301200 2430 1200 230 2300 2301975 2430 1975 230 2300 230 1204 2430 1200 230 18870 1800 3200 520 9600 520 2700 520 22100 1800 3200 770 15560 770 1000 1000 5000 2000 170 3000 22100 1800 3210 770 770 11560 5000 1000 1000 1000 2430 230 2430 1000 230 2430 1000 2430 1200 2430 1000 1975 2430 1000 2430 230 2430 1000 230 24310 6600 2530 5064 2530 5060 2530 115 230 2300 230 1975 230 2300 230 1204 2430 1200 230 BIGHALL +4415+4500 S.B.+1000026450x12200 F1 W1C1 1380 920 230 1380 920230 3850 DOUBLEHEIGHTEDBUFFER +150+300 S.B.+8250to+12750 6380x8790 C1 +215+300MULTIPURPOSEHALLS.B.+12750to+8250 14120x15560 W1 27W01 28 29W01 30 31 W01 W01 W01 35W01 W01 W01 38W01 55W01 56 58 57 10 05 W0206 W02 W02 02 W01 51W01 50W01 49W01 48W01 47 45 44 43W01 03 D2 D2 D3 D3 3 DN ASPERDETAIL STAIRCASE GENERAL NOTES: MODIFIED OR MADE UNAUTHORISED USE IN ANY MANNER WITHOUT THE WRITTEN CONSENT. KEY PLAN DOOR WINDOW SCHEDULE TYPE SIZE SILL LINTEL G.F. :All dimensions are from finished floor F.F. TOTAL FLOOR FINISHES HATCH LEGENDS BRICK HATCH RCC HATCH DRAWING: FIRST FLOOR PLAN SCALE: 1:100 SEMESTER: 6 INCUBATION CENTER STUDENT: SHABBIR HATHIARI ROLL NO.: 20BAR034 A102 ALL THE DIMENSIONS SHALL BE READ AND NOT SCALED. D1 D2 D3 D4 D5 FINISHES SCHEDULE F1 SADALAHARI STONE 600 X 400 WALL FINISHES CEILING FINISHES C1 EXPOSED CONCRETE D6 D7 2130mm 2500mm 1380mm x 2500mm 920mm 2500mm 1380mm x 2500mm 2300mm 2500mm 1200mm x 2500mm 1975mm x 2500mm TYPE SIZE SILL LINTEL G.F. F.F. TOTAL W1 W2 W3 W4 1200mm x 3750mm 1200mm x 3750mm 920mm 3750mm 1380mm x 2500mm F3 CERAMIC TILE 600 X 1200, 600 X 600 BEAM BOTTOM AT +8250 BEAM BOTTOM AT +8500 TYPE SIZE SILL LINTEL G.F. F.F. TOTAL F2 LEATHERED SADALAHARI STONE 600 X 400 DN SLAB BOTTOM AT +8765 DOUBLE HEIGHT AT +8250 DOUBLE HEIGHT AT +12750 01W05 W05 W5 1500mm x 3750mm W02 230 39W01 40W01 230 42W01 W01 D5 D5 04 4D4 W01 W01 W01 1850 1850 1850 1850 1850 1850 1850 1850 S.B.+10000 S.B.+8250 S.B.+8250 S.B.+10000 S.B.+8250to+12750 S.B.+12750 S.B.+14500 S.B.+14500 S.B.+12750 S.B.+12750to+8250 430 430430430430430430430430 1290 1290 1290 1125 6040 6165 1000 430430430430430430430430430 1290 1290 1290 430430430430430430430430430 1290 1290 1290 2300 3730 W06 W06 W6 1975mm x 3750mm 03 04W06 LIBRARY +4415+4500 S.B.+12750 10350x8090 F1 W1C1 A201 A A201 A A201 B A201 B A202 C A202 C A202D A202 D A202E A202 E A202 F A202 F A203 A A203 B A203C A203 D
O O P P Q Q R R S S T T U U 7 6 4 3 2 2 1 1 5 8 7 6 4 3 5 8 7 6 4 2 1 5 7 6 4 3 5 8 GENERAL NOTES: KEY PLAN DOOR WINDOW SCHEDULE TYPE SIZE SILL LINTEL G.F. :All dimensions are from finished floor F.F. TOTAL FLOOR FINISHES SHALL TAKE D1 D2 D3 D4 D5 FINISHES SCHEDULE F1 SADALAHARI STONE 600 X 400 WALL FINISHES W1 EXPOSED BRICK AND CONCRETE CEILING FINISHES C1 EXPOSED CONCRETE D6 D7 2130mm x 2500mm 1380mm 2500mm 920mm x 2500mm 1380mm 2500mm 2300mm x 2500mm 1200mm 2500mm 1975mm 2500mm TYPE SIZE SILL LINTEL G.F. F.F. TOTAL W1 W2 W3 W4 1200mm x 3750mm 1200mm x 3750mm 920mm x 3750mm 1380mm x 2500mm TYPE SIZE SILL LINTEL G.F. F.F. TOTAL F2 LEATHERED SADALAHARI STONE 600 400 W5 1500mm 3750mm W6 1975mm 3750mm W7 1200mm 3750mm LVL. +300 LVL. +3750 LVL. +4500 LVL. +8250 LVL. +9000 LVL. +12750 LVL. +13500 +14500 LVL. +15250 MULTIPURPOSE HALL LVL. +300 LVL. +4500 LVL. +9000 LVL. +10750 3750 750 3750 750 1000 750 LVL. +300 LVL. +4500 LVL. +9000 LVL. +13500 3750 750 3750 750 LVL. +13500 3750 750 CONFERENCE ROOM CONFERENCE ROOM PROMENADE PROMENADE STAIRCASE 3 SECTION - CC SCALE 1:100 4 SECTION DD SCALE 1:100 5 SECTION - EE SCALE 1:100 A A B B C C D D E E F F G G H H K K L L M M N N A A B B C C D D E E F F G G H H J K K L L M M N N O O P P Q Q R R S S T T U U GENERAL NOTES: KEY PLAN DOOR WINDOW SCHEDULE TYPE SIZE SILL LINTEL G.F. :All dimensions are from finished floor F.F. TOTAL FLOOR FINISHES HATCH LEGENDS DRAWING: SECTION AA, BB SCALE: 1:100 SEMESTER: 6 INCUBATION CENTER STUDENT: SHABBIR HATHIARI ROLL NO.: 20BAR034 A201 DIMENSIONS DRAWINGS TO LARGE SCALE SHALL TAKE D1 D2 D3 D4 D5 FINISHES SCHEDULE WALL FINISHES W1 EXPOSED BRICK AND CONCRETE CEILING FINISHES D6 D7 2130mm x 2500mm 1380mm 2500mm 920mm x 2500mm 1380mm 2500mm 2300mm x 2500mm 1200mm 2500mm 1975mm 2500mm TYPE SIZE SILL LINTEL G.F. F.F. TOTAL W1 W2 W3 W4 1200mm 3750mm 1200mm 3750mm 920mm x 3750mm 1380mm 2500mm F3 CERAMIC TILE 600 X 1200, 600 X 600 W2 CERAMIC TILE 600 X 1200 AND PLASTER TYPE SIZE SILL LINTEL G.F. F.F. TOTAL C2 PRE-CAST CONCRETE CEILING PANEL W5 1500mm 3750mm W6 1975mm 3750mm W7 1200mm 3750mm LVL. +300 LVL. +3750 LVL. +4500 8500 13 14 15 17 18 19 20 21 22 23 24 52 51 50 48 47 46 45 44 43 42 41 54 53 07 08 09 10 54 300 3750 750 3750 750 1000 750 LVL. +300 LVL. +3750 LVL. +4500 300 3750 750 3750 750 1000 750 LVL. +8250 LVL. +9000 LVL. +12750 LVL. +13500 LVL. +15250 1 SECTION AA SCALE 1:100 2 SECTION BB SCALE 1:100 LVL. +300 LVL. +3750 LVL. +4500 3750 750 LVL. +8250 LVL. +9000 3750 750 RECEPTION STAIRCASE RECEPTION DIRECTOR'S CABIN COA PRESIDENT CABIN CONFERENCE ROOM TRAINING HALL TRAINING HALL KITCHEN CANTEEN MULTIPURPOSE HALL BRICK HATCH RCC HATCH BEAM BOTTOM DOUBLE HEIGHT SECTIONS | 27
Staircase Detail Ongoing Working Drawing
1 2 3 4 5 7 8 9 11 10 12 13 14 15 16 17 18 19 UP 0 -200 +1350 +1310 +2850 +2810 B C D E 3 3 4 4 1 1 5060 2530 5060 615 485 485 485 485 485 485 485 485 3245 485 485 485 485 485 485 485 485 485 150 5070 90 1820 90 50 50 2000 150 B B C C D D E E 1 2 3 4 5 6 7 8 10 11 12 13 14 15 16 17 18 9 19 LVL. +0 LVL. +1350 LANDING LANDING 150 300 2600 150 300 1100 150 650 2530 5060 190 5060 3000 240 1760 2390 200 260 100 150 40 EQ EQ EQ 20 22 24 26 19 21 23 25 DETAIL DETAIL A DETAIL D 10 MM THK TREAD SUPPORT PLATE MM ALL AROUND FILLET WELD 40 MM THK BLACK GRANITE STRINGER TO STRINGER CONNECTION MM ALL AROUND FILLET WELD SECTION PARALLEL FLANGE CANTILEVERED SUPPORT BEAM COMPACTED EARTH 150 MM THK R.C.C SLAB 15 MM THK BASE COAT 150 MM THK BEDDING 20 MM THK BEDDING MORTAR 20 MM THK BLACK GRANITE ALL AROUND FULL WELD, 20 MM BOLTS 20 MM CONNECTION BOLTS 10 MM THK TREAD SUPPORT PLATE SECTION PARALLEL FLANGE 90 STEEL STRINGER 40 MM THK BLACK GRANITE 240 ALL AROUND FULL WELD, 20 MM BOLTS SECTION PARALLEL FLANGE 300 60 90 90 60 BASEPLATE STIFFENERS 10 MM THK, 6 MM FILLET WELD 20 MM CONNECTION BOLTS 440 300 20 MM THK BASE PLATE 40 150 CONNECTION PLATE 300 x 240 x 12 MM ALL AROUND FULL WELD, 20 MM BOLTS 75 75 75 75 6 MM ALL AROUND FILLET WELD 3 2 GROUND FLOOR PLAN 1:20 SECTION AA' PLAN 1:20 SECTION BB' PLAN 1:20 DETAIL A 1:5 DETAIL A 1:5 DETAIL D 1:5 DETAIL C 1:5 GENERAL NOTES: MODIFIED OR MADE UNAUTHORISED USE :All dimensions are from finished floor HATCH LEGENDS DRAWING: STAIRCASE DETAIL SCALE: 1:20, 1:5 INCUBATION CENTER STUDENT: SHABBIR HATHIARI SHEET NO. A401 STONE HATCH GROUT HATCH BBCC HATCH EARTH HATCH BRICK HATCH A' A B' B 2 2 KEY PLAN: TYPICAL WINDOW PLAN 1:20 ELEVATION A 1:20 DETAIL A 1:1 ALUM. SECTION TO WALL SECTION AA' 1:20 TYPICAL DOOR PLAN 1:20 ELEVATION B 1:20 DETAIL E 1:1 TYPICAL WINDOW PLAN 1:20 TYPICAL WINDOW PLAN 1:20 SECTION BB' 1:10 OUTSIDE INSIDE DETAIL 50 1125 50 150 50 1125 50 150 600 3750 50 3750 100 50 35 97 15 35 100 50 DETAIL B 1:1 ALUM SECTION to FLOOR ROUGH GROUND 100 50 MM ALUM. BOX ROUGH GROUND 5.5 MM THK GLASS 50 15 ALUM. BOX 100 100 900 100 700 100 OUTSIDE INSIDE 100 1150 100 500 200 205 775 150 715 210 2050 DETAIL C DETAIL D 40 120 BEEDING 5.5 MM THK GLASS 28 27 80 A' A B' B :All dimensions are from finished floor HATCH LEGENDS DRAWING: DOOR WINDOW DETAIL SCALE: 1:20, 1:1 SEMESTER: ROLL NO.: 20BAR034 A701 RCC HATCH BBCC HATCH EARTH HATCH BRICK HATCH
Door and Window Detail Ongoing Working Drawing 28 | DETAILS
3 6 8 3 6 3 A B C D FOLDED ELEVATION ABCD 1:20 75 X 75 VATA CINDER FILLING 8 THK CERAMIC TILE 20 THK WATERPROOFING 230 THK BRICK WALL FOLDED ELEVATION EFGH 1:20 H 1255 390 225 SLOPE E F G H 720 390 H.F. 1200 1200 PART PLAN 1:20 GENERAL NOTES: :All dimensions are from finished floor HATCH LEGENDS RCC HATCH DRAWING: TOILET DETAIL SCALE: 1:20 SEMESTER: STUDENT: SHABBIR HATHIARI ROLL NO.: 20BAR032 A702 FIXTURE SCHEDULE ITEM NO. FIXTURE MAKE MODEL SIZE 1 WATER CLOSET TABLE TOP BASIN URINAL FLOOR TILES JAQUAR 360x575x410 mm ONS-WHT-10955P180UFSM QUANTITY JAQUAR JAQUAR JAQUAR SAPPHIRE KUS-WHT-35901 URS-WHT-13259 60x120 cm 60x60 cm 595x435x185 mm 475x315x715 mm 36 10 16 200 HEALTH FAUCET JAQUAR TILING SCHEDULE ITEM NO. FIXTURE MAKE MODEL SIZE QUANTITY 1080 12 SECTION AA' 1:20 SECTION BB' 1:20 THRESHOLD SECTION DETAIL 1:2 THRESHOLD PLAN DETAIL A 1:2 DETAIL C 1:2 LINTEL CONDITION DETAIL B 1:2 SILL CONDITION DROP SLAB DETAIL D 1:5 PART PLAN 1:20 2465 170 150 300 3710 75 X 75 VATA CINDER FILLING THK CERAMIC TILE 20 THK WATERPROOFING 8 THK CERAMIC TILE LAID TO SLOPE CINDER FILLING 40 THK SHUTTER FRAME 25 10 50 70 110 X 75 MM SHUTTER FRAME 95 40 MM THK SHUTTER FRAME LINE OF TILE DROP RC BEAM LOUVER ALUMINUM FOLDED CASTE STONE LAID TO SLOPE 10 THK MORTAR 100 45 ALUMINUM SECTION ALUMINUM SECTION HOARDING THK FROSTED GLASS LOUVER 200 1660 DETAIL D 1050 265 FOLDED ELEVATION EFGH 1:20 E F G H 12 MM TILE DROP INSIDE OUTSIDE INSIDE OUTSIDE 720 390 770 1665 200 1050 625 710 155 H.F. S.C. H.F. 1200 1200 SLOPE 300 360x575x410 mm 450x900 mm URS-WHT-13259 60x120 cm 475x315x715 mm DOM-JQR-LYR-CHR-38005B 10 12 SECTION AA' 1:20 SECTION BB' 1:20 THRESHOLD SECTION DETAIL 1:2 THRESHOLD PLAN DETAIL A 1:2 DETAIL C 1:2 LINTEL CONDITION DETAIL B 1:2 SILL CONDITION DROP SLAB DETAIL D 1:5 PART PLAN 1:20 170 3710 2645 75 75 VATA CINDER FILLING THK CERAMIC TILE 20 THK WATERPROOFING THK CERAMIC TILE LAID TO SLOPE CINDER FILLING 40 THK SHUTTER FRAME 25 10 50 20 10 70 45 10 110 75 MM SHUTTER FRAME 95 X 40 MM THK SHUTTER FRAME 75 LINE OF TILE DROP RC BEAM LOUVER ALUMINUM FOLDED CASTE STONE LAID TO SLOPE 10 THK MORTAR 100 X 45 ALUMINUM SECTION ALUMINUM SECTION HOARDING 3 THK FROSTED GLASS LOUVER 200 1660 775 DETAIL D 1050 265 150 F G E FOLDED ELEVATION EFGH 1:20 E F G H 12 MM TILE DROP INSIDE OUTSIDE INSIDE OUTSIDE 770 1665 200 1050 625 710 20 205 50 10 825 H.F. S.C. H.F. 1200 1200 SLOPE 360x575x410 mm 450x900 mm URS-WHT-13259 60x120 cm 475x315x715 mm DOM-JQR-LYR-CHR-38005B 10 A B B C C D D E E F F G G H H K K L L M M N N A A B B C C D D E E F F G G H H K K L L M M N N O O P P Q Q R R S S T T U U :All dimensions are from finished floor HATCH LEGENDS SCALE: 1:100 SEMESTER: INCUBATION CENTER A201 D2 D4 F1 SADALAHARI STONE 600 400 WALL FINISHES 1380mm 2500mm 1380mm 2500mm 1975mm 2500mm TYPE LINTEL G.F. F.F. W2 W4 1200mm 3750mm 1380mm 2500mm F3 CERAMIC TILE 600 X 1200, 600 X 600 TYPE LINTEL G.F. F.F. F2 LEATHERED SADALAHARI STONE 600 400 W6 1975mm 3750mm 1200mm 3750mm LVL. +300 LVL. +9050 250 290 300 LVL. +300 300 LVL. +8250 LVL. +13500 LVL. +14500 1 SECTION AA SCALE 1:100 2 SECTION BB LVL. +300 3750 750 LVL. +8250 3750 750 RECEPTION STAIRCASE RECEPTION DIRECTOR'S CABIN COA PRESIDENT CABIN CONFERENCE ROOM TRAINING HALL TRAINING HALL KITCHEN CANTEEN MULTIPURPOSE HALL BRICK HATCH BEAM BOTTOM A502 Toilet Detail Ongoing Working Drawing 7820 230 2300 5290 600 600 600 600 1200 4910 3910 1000 230 1600 2080 680 4910 1000 3910 1200 1200 1200 7820 2760 5060 230 2300 230 1200 2430 1200 230 12 MM DROP A B C D O O P P Q Q 3 3 8 8 B A A' FLOORING - TILING PLAN 1:20 TYPICAL MALE TOILETS FLOORING - TILING PLAN 1:20 TYPICAL FEMALE TOILETS 1 2 3 4 5 6 2 3 4 5 6 12 MM DROP 12 MM DROP 12 MM DROP 12 MM DROP 2 1 3 2 3 4 NT B C D S.C. H.F. S.C. H.F. S.C. S.C. H.F. H 45 45 120 280 280 850 540 540 240 240 240 TYPICAL MALE TOILETS 4860 x 4860 DISABLED TOILET 2300 x 2600 DUCT 1200 735 DUCT 1200 x 735 JANITOR CLOSET 1200 600 1200 B' 7820 230 2300 5290 1200 4910 3910 1000 230 1600 2080 680 4910 1000 3910 1200 1200 1200 2760 5060 230 2300 230 1200 2430 1200 230 12 MM DROP A B C D O O P P Q Q 5 5 4 4 1 3 4 5 6 2 3 4 5 6 12 MM DROP 12 MM DROP 12 MM DROP 12 MM DROP 2 1 3 2 2 4 NT H.F. S.C. H.F. S.C. H.F. S.C. S.C. H.F. 45 45 120 280 280 850 540 540 TYPICAL FEMALE TOILETS 4860 4860 DISABLED TOILET 2300 2600 DUCT 1200 x 735 DUCT 1200 x 735 JANITOR CLOSET 1200 x 600 1200 SECTION BB' 1:20 SECTION AA' 1:20 5000 500 3500 1000 85 460 680 520 300 300 120 120 581 1200 410 570 70 1211 150 1100 8 MM THK CERAMIC TILE 25 MM BEDDING MORTAR 15 MM BASE COAT 100 MM BEDDING 75 x 75 MM VATA 120 MM P.C.C 230 MM THK R.C.C. BEAM 430 410 350 70 430 200 2400 1 2 3 4 5 6 7 8 4500 500 500 3500 200 150 150 2 1 2 3 4 5 6 2 100 MM SOIL WATER PIPE 75 MM WASTE WATER PIPE 25 MM WATER SUPPLY PIPE 150 MM STORM WATER DRAIN O P Q 8 3 GENERAL NOTES: MODIFIED OR MADE UNAUTHORISED USE IN ANY MANNER WITHOUT THE WRITTEN CONSENT. :All dimensions are from finished floor HATCH LEGENDS BRICK HATCH RCC HATCH DRAWING: TOILET DETAIL SCALE: 1:20 SEMESTER: 6 INCUBATION CENTER STUDENT: SHABBIR HATHIARI ROLL NO.: 20BAR034 A501 ALL THE DIMENSIONS SHALL BE READ AND NOT SCALED. NOTICE OF ARCHITECT IMMEDIATELY. FIXTURE SCHEDULE ITEM NO. FIXTURE MAKE MODEL SIZE 1 2 3 4 5 WATER CLOSET URINAL PARTITION TABLE TOP BASIN URINAL FLOOR TILES JAQUAR 360x575x410 mm ONS-WHT-10955P180UFSM QUANTITY JAQUAR JAQUAR JAQUAR SAPPHIRE 1110-US 450x900 mm KUS-WHT-35901 URS-WHT-13259 60x120 cm 60x60 cm 595x435x185 mm 475x315x715 mm 36 10 16 10 200 DOM-JQR-LYR-CHR-38005B BASIN TAP JAQUAR ALD-591R 6 HEALTH FAUCET JAQUAR TILING SCHEDULE ITEM NO. FIXTURE MAKE MODEL SIZE QUANTITY 1 KEY PLAN; DETAILS | 29
Ahmedabad
Measure Drawing Related Study Program
Done by Shabbir H, Pawas P, and Nandini C.
Studied the Pol houses of Ahmedabad where indigenous building traditions are still alive and people make their own spaces. Firsthand experience during this program enhanced and sensitised our understanding of our abilities to appreciate and decode the built forms in terms of its making and socio-cultural aspects.
First Floor Plan Hand Drafted on Site PLANS | 31
Ground Floor Plan Hand Drafted on Site
2936 850 1258 565 540 1802 500 307 445 868 287 964 928 1252 164 727 395 640 110 1300 290 917 290 209 174 129 1064 243 789 1078 177 4077 290 701 600 6393 515 6915 4384 964 2328 7989 3480 D01 D04 D03 D02 DW01 DW02 W01 W02 N01 N02 N04 TEMPLE ROOM GFL + 1.08 MT ENTRANCE ROOM GFL + 0.93 MT SHOP 2 GFL+ 0.93 MT BATHROOM GFL+ 1.08 MT SHOP 1 GFL+ 0.21 A A' 4678 UP UP Rev. No. Ahmedabad World Heritage City Trust (A Trust of Ahmedabad Municipal Corporation) LEGEND CLIENT: PROJECT: Documentation of WHC UNIVERSITY/FIRM: KEY PLAN SCALE DRAWING NAME: DATE: DRAWN BY: CHECKED BY: DRAWING NO.: specified POL WARD NO SURVEY NO GRADEMetal cut Conjectural line Wood cut Metal wood Wall Distress Plumbing DATE: - -C31 50 XX/XX/XXXX N GROUND FLOOR PLAN PAKHALI NI POL KHADIA NANDINI CHOUDHURY 20BAR023 PAWAS PRASAD 20BAR027 SHABBIR HATH 20BAR034 3977 INSTITUTE OF ARCHITECTURE AND PLANNING NIRMA UNIVERSITY 1170 135 1430 153 120 713 278 712 120 153 1420 127 133 1778 820 916 1496 1380 473 1920 642 1222 406 1220 404 1226 618 394 412 2152 954 465 1106 1384 973 1251 5086 5713 3034 6677 3817 1212 2740 1180 313 892 772 892 1375 1622 70 1046 1046 110 640 645 742 648 1544 1559 849 2529 1228 6968 6934 654 912 287 832 1521 N01 N02 W05 W04 W01 W02 W03 W06 D01 D02 OTS TERRACE 1 SFL + KITCHEN SFL + 5955 510 285 294 568 2790 Ahmedabad World Heritage City Trust (A Trust of Ahmedabad Municipal Corporation) LEGEND CLIENT: PROJECT: Documentation of WHC UNIVERSITY/FIRM: KEY PLAN SCALE DRAWING NAME: DATE: DRAWING NO.: All dimensions are in Millimeters unless specified otherwise NOTES POL WARD NO SURVEY NO GRADEMetal cut Conjectural line Wood cut Metal wood Wall Distress Plumbing - -C3 1 50 XX/XX/XXXX N GROUND FLOOR PLAN PAKHALI NI POL II B KHADIA 3977 INSTITUTE OF ARCHITECTURE AND PLANNING NIRMA UNIVERSITY Ground Floor Plan Measure Drawn on AutoCAD Second Floor Plan Measure Drawn on AutoCAD 32 | PLANS
1782 2062 47 70 49 114 98 114 49 494 32 200 70 60 600 75 460 75 375 67 70 70 SECTION AT AA' ELEVATION AT B PLAN - N01 NICHE DETAIL10 (A Trust Ahmedabad Municipal City Trust LEGEND CLIENT: PROJECT: Documentation of WHC KEY PLAN DRAWING NAME: DATE: DRAWN BY: CHECKED BY: DRAWING NO.: All dimensions are in Millimeters unless NOTES Metal cut Conjectural line Wood cut Metal wood Wall Distress Plumbing DATE: POL-UNIVERSITY/FIRM: SCALE C17 C DETAIL C A' A B SCALE 1:10 100 260 120 285 40 276 40 275 40 276 40 116 293 104 169 2498 120110 104 462 130 462 104 117 25 100 260 120 285 40 276 40 276 40 276 40 116 293 104 169 2498 SECTION AT AA' ELEVATION AT B PLAN - D01 DOOR D01 DETAIL1 20 Rev. No. (A Trust of Ahmedabad Municipal Corporation) Ahmedabad World Heritage City Trust LEGEND CLIENT: PROJECT: Documentation of WHC KEY PLAN DRAWING NAME: DATE: DRAWN BY: CHECKED BY: DRAWING NO.: All dimensions are in Millimeters unless specified otherwise NOTES Metal cut Conjectural line Wood cut Metal wood Wall Distress Plumbing DATE: POL WARD NO SURVEY NO GRADE-UNIVERSITY/FIRM: SCALE C16 DETAIL C C A A' B PAKHALI NI POL B KHADIA INSTITUTE OF ARCHITECTURE AND PLANNING NIRMA UNIVERSITY ( SCALE 1:5 ) 3977 930 2595 2790 3626 2082 12600 SECTION AA' Ahmedabad World Heritage City Trust (A Trust of Ahmedabad Municipal Corporation) LEGEND CLIENT: PROJECT: Documentation of WHC UNIVERSITY/FIRM: KEY PLAN SCALE DRAWING NAME: DATE: DRAWING NO.: All dimensions are in Millimeters unless specified otherwise NOTES POL WARD NO SURVEY NO GRADEMetal cut Conjectural line Wood cut Metal wood Wall Distress Plumbing-SECTION AA' C12A 1 : 50INSTITUTE OF ARCHITECTURE AND PLANNING 3977 ELEVATION Rev. No. Ahmedabad World Heritage City Trust (A Trust of Ahmedabad Municipal Corporation) CLIENT: PROJECT: Documentation of WHC UNIVERSITY/FIRM: KEY PLAN SCALE DRAWING NAME: DATE: DRAWN BY: CHECKED BY: DRAWING NO.: POL WARD NO SURVEY NO GRADEMetal cut Conjectural line Wood cut Metal wood Wall Distress Plumbing DATE:-ELEVATION C2 1 : 50PAWAS PRASAD 20BAR027 INSTITUTE OF ARCHITECTURE Door Detail Measure Drawn on AutoCAD Niche Detail Measure Drawn on AutoCAD North Elevation Measure Drawn on AutoCAD Section AA’ Measure Drawn on AutoCAD DETAILS | 33