SGN Natural Gas Postalised Exit Capacity Charges for the Gas to the West Area

Page 1

SGN Natural Gas Postalised Exit Capacity Charges for the Gas to the West Area September 2022

2 Contents 1 Postalised Exit Capacity Charges................................................................................................. 3 2 Credit Support Arrangements..................................................................................................... 3 3 Transmission Exit Ratchet .......................................................................................................... 4 Appendix A Examples ................................................................................................................. 5

For the purposes of recovering the Postalised Exit Capacity charge from Gas Suppliers, SGN Natural Gas makes a commodity charge on Gas Suppliers on a monthly basis. SGN Natural Gas forecasts that commodity charge at the start of the gas year using the total volume forecast for the SGN Natural Gas Licence Area used to determine the NI Transmission Networks tariffs. This Postalised Exit Capacity charge is charged to Gas Suppliers on the basis of their monthly distribution commodity and is subject to an annual reconciliation using actual Distribution volumes.

Postalised Exit Capacity Charge (Exit Capacity only) 0.2334 6.8396

SGN Natural Gas is required to provide Gas Market Operator for Northern Ireland (GMO NI) with credit support for the Postalised Exit Capacity it holds on behalf of gas suppliers operating in the SGN Natural Gas Licence area. Where SGN Natural Gas’s Required Level of Credit Support (RLCS) exceeds their current Maximum Allowed Unsecured Credit (MAUC) SGN Natural Gas will be required to provide additional credit support using an alternative permitted method. Where this additional credit support requirement involves the payment by SGN Natural Gas of a financial cost, including any transaction costs, these costs are recoverable from gas suppliers operating in the SGN Natural Gas Licence area, as permitted by paragraph B 7.4 of the SGN Natural Gas Distribution Network Code. The actual credit costs incurred by SGN Natural Gas will also be included as part of the annual reconciliation process to incorporate any additional costs incurred by SGN Natural Gas throughout the year, e.g., increased credit support costs as a result of a Transmission Exit Ratchet.

SGN Natural Gas Postalisation charge 2022/23 3 8th September 2022

Commoditised Charge for Credit Support 0.0069 0.2036

2 Credit Support Arrangements

Pence per kWh

Postalised Exit Capacity Charge (Exit Capacity + Credit Support) 0.2403 7.0432

Postalised Exit Capacity Charges

Pence per therm

The Postalised Exit Capacity charge payable by Gas Suppliers operating in the SGN Natural Gas licensed area for the period 1st October 2022 to 30th September 2023 is as follows:

1

Gas Suppliers delivering gas to the SGN Natural Gas Ltd. distribution network are treated as utilising capacity in the Scotland to Northern Ireland Pipeline (SNIP), West Transmission Ltd pipeline and the GNI (UK) transmission pipeline systems. In relation to the utilisation by Gas Suppliers of Exit capacity in these transmission pipeline systems, SGN Natural Gas is responsible for the payment of Postalised Exit Capacity charges in accordance with the terms of Northern Ireland Network Gas Transmission Code (NINGTC).

Under the terms of the NINGTC, SGN Natural Gas is also required to pay on behalf of Gas Suppliers any Transmission Exit Ratchet which would apply when the total amount of capacity utilised by Gas Suppliers at the relevant Transmission Exit points exceeds the Postalised Exit Capacity held by SGN Natural Gas on their behalf. As per Section B7.4 of the SGN Natural Gas Distribution Network Code, SGN Natural Gas is permitted to recover these costs from Gas Suppliers using the following methodology:

3 Transmission Exit Ratchet

SGN Natural Gas Postalisation charge 2022/23 4 8th September 2022

Charges associated with the Transmission Exit Ratchet levied on SGN Natural Gas by Gas Market Operator Northern Ireland (GMO NI) will be passed to Gas Suppliers in the month in which they are incurred by SGN Natural Gas. The amount owing by each Gas Supplier will be determined on their percentage of total distribution throughput for the number of months for which the penalty associated with the Ratchet Amount applies

• Number of months Ratchet applicable for = 4 (Oct to Jan)

• Month Capacity Ratchet occurs = January

➢ Gas Supplier 1: £1,447.87 X 55% = £796.33

• Gas Supplier distribution throughput Oct to Jan = 100,000,000 kWh

• Ratchet amount X Transmission Exit Capacity Tariff /12 X Number of months

SGN Natural Gas Postalisation charge 2022/23 5 8th September 2022

• Exit Capacity Tariff (as published) = £0.43436 per kWh per day

Appendix A - Examples

Therefore, the Transmission Exit Ratchet penalty payable by SGN Natural Gas to PTL is:

Detailed below is an example of how the ratchet process will apply:

• Ratchet amount = 10,000 kWh

➢ Gas Supplier 1: 55%

Transmission Exit Ratchet Penalty Calculation:

• Ratchet Charge payable by SGN Natural Gas = 10,000 X 0.43436/12 X 4 = 1,447.87

➢ Gas Supplier 2: £1,447.87 X 25% = £361.97

➢ Gas Supplier 3: 20%

➢ Gas Supplier 2: 25%

Example Assumptions:

The Transmission Exit Ratchet Charge recoverable by SGN Natural Gas from each Gas Supplier is:

➢ Gas Supplier 3: £1,447.87 X 20% = £289.57

Increased Postalised Exit Capacity for remainder of Gas Year:

SGN Natural Gas will pay GMO NI each month for the Transmission Exit Capacity booking increased by the Ratchet Amount for the remaining months of the gas year. Gas Suppliers will continue to pay SGN Natural Gas for the Transmission Exit Capacity using the Postalised Exit Capacity charge (Exit Capacity + Credit Support) as published prior to the start of the Gas Year. Any additional monies paid by SGN Natural Gas for the Transmission Exit Capacity, including additional credit support costs, will be recovered from Gas Suppliers as part of the normal annual reconciliation process.

• Proportion of total throughput attributable to each Gas Supplier Oct to Jan:

If as a result of the application of Transmission Exit Ratchets, SGN Natural Gas determines that the costs associated with the increase in the Postalised Exit Capacity booking would potentially result in a negative impact on its cash flow of greater than twenty five percent (25%) by Gas Year end, then SGN Natural Gas reserves the right at the Gas Year mid year point to adjust and re publish the Postalised Exit Capacity tariff it uses to recover costs from Gas Suppliers. SGN Natural Gas will only undertake such a review of the Postalised Exit Capacity tariff following consultation with the Northern Ireland Authority for Utility Regulation.

SGN Natural Gas Postalisation charge 2022/23 6 8th September 2022

Recalculation of the Postalised Exit Capacity Charge during the Gas Year