2.4 Identify an appropriate infrastructure to support project delivery

What is infrastructure, in the case of Project Management? Infrastructure provides support for projects, programmes and portfolios, and is the focal point for the development and maintenance of P3 management within an organisation. Infrastructure can be existing within a company or can be purchased in at the project’s inception in order to support deliverables (Mema and Al-Thani: 2018). The governance of P3 project management requires a permanent organisational infrastructure that supports the temporary organisational structures of projects, programmes and portfolios. Many different names are given to the structures that ‘own’ P3 management within an organisation. The terms EPMO (Enterprise Project Management Office), PSO (Project, Programme or Portfolio Support Office), Project Services or Centre of Excellence are all in common use (APM: 2019). The name often reflects the scope of responsibilities. For example, a Project Support Office will provide predominantly administrative support to a project, while a Centre of Excellence will often be responsible for improving P3 management maturity.

Routine administration is required on all projects, programmes and portfolios. On small projects this may be performed by the consultant project manager, but on medium to large projects and all programmes and portfolios, a P3 manager needs support in handling day-to-day administration (Association for Project Management: 2020). Some projects and most programmes and portfolios also require specialist skills in areas such as risk, quality or finance. Separating the finances out for a specific project, and also ensuring that the overall project has a budget (that is proactively managed) is key to delivering a successful project (Ochieng: 2017).

Advertisement

Project Administration

For larger projects, an administrative support function can operate at different levels depending upon how it is constituted. It may provide:

• administrative help in areas such as planning, risk management, change control etc.;

• the secretariat for meetings and logistical services for members of the management team;

• technical support including collecting, analysing and presenting progress information, managing interdependencies and handling communications with stakeholders;

• assurance of governance structures and standard project management practices through audits, health checks and phase end reviews.

A sophisticated infrastructure may also cover:

• provision of subject matter expertise to ensure that there is access to all necessary tools and techniques;

• training, coaching and mentoring for the project, programme or portfolio management team;

• maintaining the infrastructure, momentum and drive to support communities of practice;

• improving, embedding and measuring capabilities to achieve higher levels of maturity;

• owning and deploying standard tools and techniques.

The P3 management infrastructure may range from a single person to a large team containing many different roles and specialists including, among others:

• planners and schedulers;

• cost engineers;

• subject matter experts;

• assurance staff;

• configuration managers (Mema and Al-Thani: 2018)

The overall infrastructure may be divided into multiple offices, some temporary and some permanent. For example, a support office might provide administrative support to a specific project or programme. This is then disbanded once the work is complete. In contrast, a community of practice, or centre of excellence, has a permanent support role independent of the creation and completion of any individual piece of work (McKinsey & Co. 2017).

The shape of the infrastructure will reflect its environment, but its component groups must always have a clearly defined purpose and scope. The roles and levels of authority of these groups must be communicated to the delivery team(s) and reinforced periodically (APM: 2019 and Ochieng 2017).

Project

In the project dimension, the main focus is on administrative and technical support. Where a project is part of a programme or portfolio, the project support function will be provided by the programme or portfolio office. On smaller, stand-alone projects that cannot justify the overhead of a support function, the support work will fall on the project manager’s shoulders. This is often a consultant role. Some organisations will have central functions for planning, cost management, procurement etc., that may be able to provide assistance in these circumstances. Engagement with the project sponsor will be a key driver behind success all of the way through the project’s journey.

According to the APM, with the support of the sponsor, the project manager of a small, stand-alone project should seek as much help with day-to-day administration as possible. Taking shortcuts in the administration of even the smallest project is often a cause of failure (APM website: 2019). Beyond day-today management of the project, the project manager should be provided with other types of support. This may include continuing professional development (CPD) through communities of practice, career advice or managing the transition between one project and the next. It is this broad support for the profession and discipline of project management that is provided by the governance infrastructure.

Project Programme

Programmes are large enough to carry the overhead of a support function and may also have access to a central support function.

Programme support functions must have the expertise to cover the additional services required by programmes. These typically include supporting change management, benefits realisation and project interfaces.

The programme management team decide how to constitute the support organisation across the programme, e.g. whether one support function will serve the programme and all its component projects, or whether some, or all, projects will have separate project support functions.

Project Portfolio

Some organisations will have multiple departmental or regional portfolios, while others might have a single, organisation-wide portfolio. In the latter case, the portfolio and the governance infrastructure are effectively the same thing. This is often referred to as an EPMO and is a permanent organisational structure.

Infrastructure Plans

Depending on your type of project, you will need to consult with other team members and devise an Infrastructure Deployment Plan (or another equally suitable title). There are various structures and configurations to this type of plan and the ‘rule of thumb’ is that it should be designed to suit your project and your organisation; it should not be a copy from another organisation’s template that has been shoehorned into your business. Designing this plan involves much research and detail and is achieved best by gathering together different departments and colleagues and ascertaining what physical resources already exist within the business that can become support infrastructure for your

project’s goals. This planning area is vulnerable to errors and overestimates of existing resource. Because just because, for example, a company owns 10 highspec printers, that could be used for a major sustained marketing campaign, does not mean to say that they are a) all working and b) all available!

Infrastructure plans therefore require research and anticipation around work patterns and key spikes in existing business activity.

A suitable example of a very simple Infrastructure Development Plan can be found at the website within the exercise below. It is based around a major IT project.

Reflective Exercise 1:

Go to the website:

https://templatescart.com/tag/it+infrastructure+deployment+plan.html - or Google the search phrase ‘Infrastructure Development Plan example’

Then …. in your private notebook … Imagine that you are a new Online retail bank with just ten sites (around 20 staff each) across the south of your home country. Your transactions are around 20,000 per day to the value of £2m per day. The banks payment systems keep experiencing downtime and you have been tasked as an internal consultant by the CEO to overhaul/ replace the payments system with new software and enhanced staff numbers, because customer-wait-times are too long and customers are frustrated that they can’t carry out basic online transaction tasks. What (existing and new) infrastructure might you require for this project? Put your ideas with timescales into an Infrastructure Plan with SMART measurables and deliverables for your team.

Reflective Exercise 2:

Please read the following article by the world’s most well-known management consultancy, McKinsey & Co. (2017)

https://www.mckinsey.com/industries/capital-projects-andinfrastructure/our-insights/optimizing-performance-in-infrastructureproject-delivery

In your private notebook, to what extent do you agree with McKinsey’s four strategies to reduce variables?

Further reading:

Association of Project Management(APM) (2019) Body of Knowledge (7th Ed.), accessible via: https://www.apm.org.uk/book-shop/apm-body-of-knowledge7th-edition/

Ochieng, A., (2017) Major Infrastructure Projects: Planning for Delivery. London. Red Globe Press

Mema, T and Al-Thani, F (2018) Financing Infrastructure Projects. (2nd Ed.) ICE Publishing

References:

Mema, T and Al-Thani, F (2018) Financing Infrastructure Projects. (2nd Ed.) ICE Publishing

APM (2020) Infrastructure definition, accessed on 20/1/2020 at: https://www.apm.org.uk/body-of-knowledge/context/governance/infrastructure/

Ochieng, A., (2017) Major Infrastructure Projects: Planning for Delivery. London. Red Globe Press

McKinsey & Co. (2017) Optimizing performance in infrastructure project delivery. Accessed on 20/1/2020 at: https://www.mckinsey.com/industries/capitalprojects-and-infrastructure/our-insights/optimizing-performance-ininfrastructure-project-delivery