Saria Saeed Portfolio June 2023

Page 1

SARIA SAEED Architect

ARB registered SELECTED WORKS
Academic work
of
for environmental
Practice work
House
Life style hotel
7.
5*
CONTENTS
1. Neo-Baroque Office 2. Cleaning Bee 3. International court
justice
criminals 4. Sufi Theatre
1. Boundary
Hotel
2. Bristol Temple Quay Hotel, Extended stay hotel, Apartments 3. Walnut tree Close Student accommodation 4. Shurayrah Island Coral reef resort 5. Santa Clara Neighbourhood Commercial mix use 6. National Magazine house Apartments
Park Lane hotel
Hotel

Neo-Baroque Office

This project is a critique on modern day office/work architecture design which treats office spaces as factories and warehouses. Where creativity is often missing and stress takes over.

The research begins by studying, what effect does environmental stimuli have on the problem-solving and creative faculty of the brain, from a neuroscience perspective. Do architectural genres such as Baroque and Art nouveau effect the inhabitant’s thought process to become more inventive/creative due to its provoking and stimulating effect?

The project looks to propose an alternative office/work architecture typology using generative algorythms. One that treats places of work in integration with places of play, leisure and rest.

The New-Baroque office employs the sensorial properties of highly detailed and stimulating art movements to generate an architecture that could perhaps automate creativity and inventiveness in the inhabitants of the building, through its generated physical design.

[Academic project]
Location : Gran Canaria Balcony
Problem solving station Evaluation station
Brainstorming station
Elements of the Office

The cleaning Bee

Location : Greenwich park

The cleaning Bee is a small automated robot, that flys around the city at regular time intervals. It cleans the air and collects air samples to be tested in the Lab at the Lawcourt. It then lands into its docking station for servicing.

The Bee is constructed using smart materials such as photovoltaic film wings, and photosynthetic skin called SYN Leaf. Both materials use light to produce energy.

The Bee is a fragment designed to be inside the proceeding project.

[Academic project]
3d
view of the Bee ready to fly Plan and section of the Bee Section and perspective of the docking station

International court of justice for environmental criminals

Location : Greenwich park

The court seeks to bring to justice criminals that damage the environment. The narrative seeks inspiration from the hidden crimes that have come to surface in form of environmental law suits as well as the 2015 Paris climate summit.

Corporate criminals such as Volkswagen and fossil fuel companies, reporting incorrect carbon footprint of thier products and funding anti-climate change theories are to be trialed.

Located in Greenwich park, the court strives to challenge what justice means for the common man, and create an intangible boundary between law and general public, through architectural expression and an inviting building experience. Incorporating park-like qualities to the court.

[Academic project]
Public hearing trial at the garden in the court Looking at the court from above Short-section of the court Concept drawing of the court room Sketch model

Sufi theatre

Borrowing the letters and mood from Rumi’s poetry, the theatre takes its form. The Murqana (an Islamic architecture dome feature) is modernised using modelling and 3d printing. Neuropathology psychology is studied to understand the impact of light on the senses. The colour, texture, luminosity index, form and movement of light is studied in this project and its impact on creating a senses.

[Academic project]

Boundary House Hotel

Location : City of London

Project summary:

The Site is located in the dense area of City of London near Aldgate Station. The proposal is to redevelop an outdated office building into a 14 storey bespoke hospitality led scheme with a 311-key life style hotel, co-working spaces on the ground floor, podcast studios on the first floor with a roof top bar-restaurant. The schemes borrows design elements from the industrial past of the site and pays homage to the heritage assets around the site in its materiality and use of arches on the ground floor elevation.

Size: 311key hotel, Status: Planning permission approved

My involvement:

• 3d modelling the building in Revit

• Worked with the BIM coordinator to ensure the model is set up for efficient working.

• Coordinating structure with structural engineer

• Creating detailed room packages for the co-working spaces, podcast studios, restaurant and bar.

• Working with accessibility consultant to ensure the plans are regularised by Building Regulation and British Standards.

• Working on elevation design.

• Attending client meetings.

• Working with the client to build bespoke brand standards.

Softwares used: Revit, Enscape, Indesign, photoshop, AutoCad, Enscape, Excel RIBA stages:

[Practice project]
Typical Plan Section Side elevation

Bristol Temple Quays

Location : Bristol, UK.

Project summary:

The site is located in the heart of Bristol Right opposite Grade 1 listed Bristol Temple Meads Train station. It is an up and coming area going under radical development. The fund is Abrdeen, the second largest fund in Europe. The proposal is to construct three new buildings on the currently empty site comprising of a 234-room hotel, a 168-room extended stay aparthotel and 108 Build to Rent apartments. The scheme incorporates an ecological zone in front of the plot and a ‘play on the go’ zone into the site. The Hotel operators are Dalata and Room2. The proposal has developed in close coordination with Home England - land owner.

Size: 234 key hotel, 168 key aparthotel, 108 apartments

Status: Planning submitted

My involvement: Planning Lead

• Created design options for the plan and massing for the hotels and the residential block.

• Prepared pre-app documents for consultation with the council and attended council meetings

• Prepared presentation for client and design team meetings, and attended the meetings.

• Took minutes for the meetings.

• Performed detailed coordination of plans for; fire strategy, MEP, transport, landscape, structure, accessibility with relevant consultants.

• Creating fully coordinated plans and schedules for planning submission, ensuring they align with National space standards, Building Regulation and brand standards.

• Managing team members- allocating tasks, training team members and managing resources to meet tight deadlines.

• Project filling all documentations in the correct locations.

• Using accurate bearings and coordinates obtained from the council I created protected views using VuCity (Townscape) software to ensure protected views are considered in the design.

• Directly liaising with the client taking instructions from them. Establishing good working relations with the client and the wider design team.

Softwares used: Revit, Vu City Enscape, Indesign, Photoshop, Sketchup

Massing options addressing overlooking on the tight site

[Practice project]
1:42 STANDCYCLE Up Up +11.65m AOD +12.00m AOD +10.30m AOD +7.15m AOD +11.65m AOD +7.07m AOD +7.71m AOD +11.21m AOD +11.28m AOD ISAMBARD WALK THEFRIARY THE SQUARE Retaining Wall Retaining Wall +11.65m AOD +12.00m AOD +11.98m AOD +12.10m AOD +11.65m AOD +12.00m AOD +9.79 m AOD 12470 16560 10481 13320 12590 14784 10927 12000 10831 10646 77 Parkway Camden Town London NW1 7PU T: +44 (0)20 7504 1700 enquiries@sheppardrobson.com PROJECT SCALE@A1 The copyright this drawing vested Sheppard Robson and assignment any kind has been, or granted any third party whether provision copies originals otherwise unless agreed writing. For construction, figured dimensions shall take precedence. Whe figured dimension given, seek clarification. Sheppard Robson assumes responsibility for any error arising from scaling from this drawing. Electronic Data drawings are issued "read only" and should interrogated measurement. All dimensions and levels should read, only from those values stated text the drawing. - - - - - - P04 31.05.2023 250 Bristol Temple Quay Plot 3 General Arrangement Second Floor Plan 5772 SRA ZZ 02 DR 02192 Planning Submission Planning Update 1 750 02250 Site Section A 1 1 750 02250 Site Section B 2 1 750 02260 Isambard Walk Elevation 1 THE 'EYE RESIDENTIAL GLASS WHARF BRISTOL TEMPLE QUAY, PLOT 3 BRISTOL TEMPLE MEAD TRAIN STATION TWO TEMPLE QUAY BRISTOL TEMPLE QUAY, PLOT 3 PRICE WATERHOUSE COOPER 1 750 02260 Isambard Walk Elevation 1 THE 'EYE RESIDENTIAL GLASS WHARF BRISTOL TEMPLE QUAY, PLOT 3 BRISTOL TEMPLE MEAD TRAIN STATION THE SQUARE DEPARTMENT FOR EDUCATION 1 750 02260 Isambard Walk Elevation 1 THE 'EYE RESIDENTIAL GLASS WHARF BRISTOL TEMPLE QUAY, PLOT 3 BRISTOL TEMPLE MEAD TRAIN STATION TWO TEMPLE QUAY BRISTOL TEMPLE QUAY, PLOT 3 PRICE WATERHOUSE COOPER IBIS
VuCity townscape modelling Protected view from the station

Looking from River Avon

Apartment Bay study

Apartment Layouts

Hotel room Layouts

Apartment Bay studies

7830 UC Store 2200 2000 SVP Living Kitchen Dining - 21.8m2 Double Bedroom - 14.0 m2 Bathroom - 4.4 m2 Utility Cupboard (U/C) - 0.6 m2 Store - 0.8 m2 Store - 0.9 m2 Balcony - 5.0 m2 Corridor 5.5 m 2 7830 1b2p 50 m² 930 Store UC Store 5505 2966 5315 3339 1500 1290 1655 2968 SVP SVP 390 319 2200 2010 Living Kitchen Dining - 33.4m2 Bathroom - 4.4 m2 Utility Cupboard (U/C) - 0.6 m2 Store - 1.5 m2 Balcony - 5.0 m2 7830 4995 39 m² 1b1p 930 UC Store 3535 1870 1200 1655 2968 300 SVP SVP 2085 Kitchen pass-through window 2200 2000 300 11800 Living Kitchen Dining - 29 m Principal Bedroom - 16 m Single Bedroom - 10.3 m Single Bedroom - 10.3 m Bathroom 5.6 m 2 Ensuite - 3.5 m2 Utility Cupboard (U/C) - 1.2 m2 Corridor 10.5m 2 Store 2.4 m 2 Balcony - 7 m Riser Riser Riser 1610 5395 1600 3444 2600 2200 4236 6800 2400 2400 725 765 377 1168 1510 4234 2296 4236 4236 2264 1105 1070 SVP SVP SVP 2180 Store UC Wheelchair storage 77 Parkway Camden Town London NW1 7PU T: +44 (0)20 7504 1700 E: enquiries@sheppardrobson.com CLIENT PROJECT SCALE@A1 ORIGINATOR CHECKED DRAWING NO. REV. DATE AUTHORISED KEYPLAN A1 SR NO. STATUS PURPOSE FOR ISSUE - - - - - - P04 31.05.2023 50 Bristol Temple Quay Plot 3 GD MPA IKB Developments Limited MPA 5772 S2 PLANNING Residential Flat Types 5772 SRA CC ZZ DR A 02180 1 50 02180 1B 2P - 50m2 (Levels 1-10) 2 1 50 02180 1B 1P - 39m2 (Level 0-10) 3 2.75 w National Space Standards Requirements Floor area – Minimum of 50m2 Balcony – Minimum of 5m2 Double bedroom – Minimum of 11.5m2 and at least 2.75 w Storage – Minimum of 1.5m2 of built in storage National Space Standards Requirements A B C N Part M4 (3) Requirements Living/dining/kitchen - Minimum of 29m2 Principal bedroom - Minimum of 13.5m2 Single bedroom - Minimum 8.5m2, 2.4m wide Storage - Minimum of 2.5m2 of built in storage Kitchen worktop lenght - Minimum of 6530mm Sanitary provision Bathroom with level access shower and seperate WC/Cloakroom Floor area – Minimum of 39m2 (37m2 if shower room) Balcony – Minimum of 5m2 Double bedroom – Minimum of 7.5m2 and at least 2.15 w Storage – Minimum of 1m2 of built in storage Part M4(3)(2)(b) Wheelchair accessible apartment 1 50 02180 3B 4P 92m2 (Levels 1-5) 4 MEP, FIRE REQUIRE COORDINATION IN CONJUNCTION WITH THE ADDENDUM DRAWINGS REV. DATE AMENDMENT P01 13.12.2022 Planning Submission P02 14.12.2022 Planning Submission Updated Disclaimer P03 15.05.2023 Draft Addendum for Comment P04 31.05.2023 Planning Update Double Room 22 m² 1915 785 690 2025 1500 750 4275 2700 1900 800 1288 1200 400 885 585 1243 7100 3113 300 930 Riser Openable sidelight 1825 1288 2000 1113 1900 4275 7100 1288 1825 785 995 900 1920 460 1213 1900 1113 2000 Executive Twin Room 22 m² Wardrobe 885 1242 585 Openable sidelight 1 50 02182 Hotel Double Room Type 01 1 1 50 02182 Hotel Exec Twin Room Type 01 2 1 50 02182 Hotel Twin Room Type 01 3 1 50 02182 Hotel UA Room Type 01 4 Room Requirements Bedroom Double Bed Chairs Table Built in Wardrobe TV Unit, Mirror & Shelf Room Requirements Bedroom Double Bed Chairs Table Wardrobe TV Unit, Mirror & Shelf Room Requirements Bedroom 1 x Double Bed 1 x Single Bed 2 x Chairs 1 x Table 1 x Built in Wardrobe Room Requirements Bedroom Double Bed Single Bed Chairs Table Built in Wardrobe Double Room 22 m² 690 2025 1500 750 4275 2700 1900 800 1288 1200 400 885 585 1243 7100 3113 300 930 Riser Openable sidelight 1825 1288 2000 1113 1288 3113 1200 400 1900 800 4275 2700 7100 1288 1825 785 1915 995 900 1920 460 690 1213 1900 1113 2000 300 930 Executive Twin Room 22 m² Riser Wardrobe 885 1242 585 Openable sidelight 1287 1200 400 3113 1900 800 690 785 1915 2825 1030 900 420 1500 425 4275 2700 7100 1212 1900 1112 2000 1242 585 300 930 Twin Room 22 m² Riser 885 Wardrobe Openable sidelight 1287 1825 UA Double Room 28 m² 4500 7100 750 1500 2250 1338 1600 930 1937 2000 930 Openable sidelight 1338 2600 A1 1 50 Hotel Double Room Type 01 1 50 02182 Hotel Exec Twin Room Type 01 2 1 50 02182 Hotel Twin Room Type 01 3 1 50 02182 Hotel UA Room Type 01 4 Room Requirements Bedroom Double Bed Chairs Table Built in Wardrobe TV Unit, Mirror & Shelf Room Requirements Bedroom Double Bed Chairs Table Wardrobe TV Unit, Mirror & Shelf Room Requirements Bedroom 1 x Double Bed 1 x Single Bed 2 x Chairs 1 x Table 1 x Built in Wardrobe Room Requirements Bedroom Double Bed Single Bed Chairs Table Built in Wardrobe 1640 2000 24 m² Mezz Large Room 3640 300 830 600 1800 1700 1240 700 800 1700 1600 4130 6730 600 Riser 840 1270 1200 400 700 Openable sidelight Mezz Standard Room 22 m² 1300 2000 700 900 1700 930 1600 600 830 3300 4130 1800 6730 600 500 1200 400 1700 800 700 Openable sidelight 4600 2000 825 1175 3430 2500 425 1500 930 Openable sidelight Room2 Room Standards (Basic Furniture) 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. shaped sofa with cushion Sofa table Console table/unit Dining chair Bedside table Bedhead 1500mm wide bed Bedside table Open fronted wardrobe to detail Kitchen to detail Shower tray Room2 Room Standards (Basic Furniture) 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. shaped sofa with cushion Sofa table Console table/unit Dining chair Bedside table Bedhead 1500mm wide bed Bedside table Open fronted wardrobe to detail Kitchen to detail Shower tray Room2 Room Standards (Basic Furniture) 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. Sofa with cushion Sofa table Console table/unit Dining chair Bedside table Bedhead 1500mm wide bed Bedside table Open fronted wardrobe to detail Kitchen to detail Shower tray 50 02183 B AH Large Room Type 02 1 1 50 02183 B AH Standard Room Type 01 2 50 02183 B AH UA Room Type 01 3 4600 2000 2600 4130 825 1175 2600 6730 3430 2500 600 930 300 930 1600 900 425 1500 2500 2230 270 2500 930 1330 Openable sidelight A1 Room2 Room Standards (Basic Furniture) 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. Sofa with cushion Sofa table Console table/unit Dining chair Bedside table Bedhead 1500mm wide bed Bedside table Open fronted wardrobe to detail Kitchen to detail Shower tray 1 50 02183 B - AH UA Room Type 01 3 GLASS WHARF BRISTOL TEMPLE QUAY, PLOT 3 BRISTOL TEMPLE MEAD TRAIN STATION GLASS WHARF BRISTOL TEMPLE QUAY, PLOT 3 PRICE WATERHOUSE
THE SQUARE
42.430 m 38.850 m 35.850 m 10 09 08 350 1255 1225 1100 375 300 1225 1100 375 300 3580 3000 BRASS ALUMINIUM COPING WIDE CORRUGATED BRASS ALUMINIUM PANELLING FULLY GLAZED WINDOW FULLY GLAZED DOOR BRASS ALUMINIUM WINDOW FRAME BRASS ALUMINIUM BALUSTRADE BRASS ALUMINIUM BALCONY FASCIA NARROW CORRUGATED BRASS ALUMINIUM PANELING FULLY GLAZED WINDOW BRASS ALUMINIUM WINDOW FRAME BRASS ALUMINIUM CORNER POST BRASS ALUMINIUM CORNER POST 300 1906 1020 2512 5495 1254 637 INTERNAL FINISHES INSULATED STRUCTURAL FRAMING SYSTEM FIRE STOPPING CAVITY BARRIERS FULLY GLAZED WINDOW WITH OPENING DOOR MINERAL WOOL CAVITY INSULATION CORRUGATED ALUMINIUM RAINSCREEN FACADE WINDOW CORNER POST 675 2325 300375 2325 1575 372228 2400 372228 2400 372200608 3000 3580 INTENSIVE GREEN ROOF CEILING FINISHES RECESSED BULKHEAD FOR CEILING BLIND TRACK FIRE STOPPING CAVITY BARRIERS 77 T: +44 CLIENT PROJECT SCALE@A1 The assignment provision FOR The any Electronic interrogated from DO COPYRIGHT KEYPLAN DRAWING STATUSPURPOSE Bristol IKB Stage S2 Bay Block 5772 THE BUILDING AIR THERMAL REV.DATE P0113.12.2022Planning P0214.12.2022Planning P0331.05.2023Planning
COOPER
IBIS

Foster + Partners

Walnut tree close

Location : Guildford, UK.

Project summary:

The site is a located in a high risk flood zone. The proposal is a student accommodation aiming at students of University of Surrey. The proposal considers appropriate flood mitigation strategy by incorporating a landscape buffer techniques stilts structure to allow the building to exist in a symbiotic manner with the nature. The pitched roofs forms pay respect to the surrounding domestic vernacular.

Size: 180+ studios/clusters rooms.

Status: Stage 1 consultation

My involvement:

• Preparing stage 1 report

• Attending design team meetings, pre-app meetings and client meetings

• Coordinating sections with flood consultant and landscape consultants.

• Drawing plans, sections, massing options, 3d views.

• Preparing presentation to be presented to the Environmental Agency regarding flood mitigation.

Softwares used: Sketchup, Enscape, AutoCAD, Indesign, Photoshop

RIBA stages:

[Practice project]
1
Massing studies maximising the site and mitigating flooding Typical Plan Flood prediction diagram Section showing flood mitigation strategy Site aerial with the proposal

Shurayrah Island (Coral reef resort)

Location : Red Sea.

Project summary:

The site is located on the Eastern Island of the Red Sea owned by The Saudi Arabian Government. The resorts comprises of 11 hotels with each hotel being a mini resort in itself. The design concept comes from the shells of native plants of Saudi Arabia and the corals found locally. Each building is treated as a shell and built from lightweight materials such as Bamboo, rattan, aluminium and timber.

Size: 8000 hotel rooms, 1300 residential properties

Status: 100% detailed design submitted

My involvement:

• Prepared the Materials report for detailed design submission, including researching and ordering samples, liaising with material suppliers.

• In charge of the ‘Recreation’ zone of the eastern resort of the island

• 3d modelled and designed under guidance the 4 small buildings, including Facade design, space planning in coordination with the local architects to comply by local building code.

• Produced 3d render/drawings of proposals and options for weekly client meetings.

• Coordination with structural engineers, Facade consultants, MEP consultants, interior architects, landscape architects and Local executive architects through meetings, presentations and Model exchanges.

• Prepared 100% DD package for the Recreation buildings.

Softwares used: Revit, Enscape, Indesign, photoshop, AutoCad, Rhino, Excel

RIBA stages:

[Practice project]
+
Foster
Partners
3 4
Over looking the Wellcome lodge and entertainment pavillions Light weight timber shell canopies covering the architecture underneath
The Island
Over looking the guestroom suits

Foster + Partners

Santa Clara neighbourhood

Location : Silicone Valley, USA.

Project summary:

The site is located in Silicon Valley. A former Golf course to be transformed into a mixed-use development, featuring numerous office buildings, residential towers, 2 hotels and a park. The project aspires to introduce a European style pedestrianised streets on site whist accommodating a large high way and roads leading into the development.

Size: 854,708-square-metre

Status: Heading towards 100% DD submission.

My involvement:

• Carried out extensive research into the needs of the tenants who would occupy the building (Hilton Hotel, Equinox, Apple and Tesla)

• 3d modelled the Facade/cladding details of the office building

• Worked with BIM consultants to prepare families for facade proposals within Revit.

• 3d modelled the detailed design of the Conrad hotel envelop.

• Prepared the architectural sinage strategy for the Office building.

• Produced 3d render/drawings of proposals and options for weekly client meetings.

• Coordination with structural engineers, Facade consultants and Local executive architects (Gensler) through meetings and Model exchange.

• Prepared DD document file for the submission.

Softwares used: Revit, Enscape, Indesign, Photoshop

RIBA stages:

[Practice project]
3 4
Interior view of the Farmer’s market in the Global Food hall. Overview of the Masterplan Over looking the Global food market and retail zone. Out door retail plaza

EPR Architects

Mile End residential scheme

Location : East London

Project Summary

This is a HQ building in Carnaby street, where magazines are issued and stored. The existing building contains 3 storey high UKPN Power station that powers the West end. The proposal was to demolish the existing top 3 floors and re-build 4 new floors.

The renovated building had to comply by BREAM standards for energy efficiency, this required my team and I to design a new insulating facade system for the entire building as well.

Status: Planning submitted

My involvement:

• Carried out site survey/research

• Massing studies

• 3D modelling

• Prepared plans

• Prepared existing and proposed elevation

• Material selection for facade

• Attended meetings with planning officer and team of consultants

• Prepared documentation for Pre-app and Planning application

• CPD on BREAM standards

Softwares used : Revit

Sketch-up

Indesign

RIBA stages:

[Practice project]
0 1 2 3 Elevation drawing Residential floor plan
Entrance view (Image credit to 3d rendering team)

Park Lane hotel

Location : Piccadilly Circus

Project summary:

The site is located north of Green Park and consists of The Sheraton Grand London Park Lane Hotel and 31-49 Brick Street, both of which are currently C1 hotel use. The proposal is to demolish the two buildings which occupy 31-49 Brick Street and build a new extension to the Sheraton Grand Hotel providing extra meeting facilities at ground floor and 135 hotel rooms on the upper floors. Improvements will be made to the public realm between the two buildings on Brick Street. Links between the buildings will be made by upgrading the existing footbridge and a new service tunnel at Basement 2 level.

Status: Planning permission granted.

My involvement:

• Prepared planning drawings; plans and sections.

• 3d modelled the existing building

• 3d modelled the proposed building

• Worked on the planning document

• Attended meetings with client and consultants

• Proposed and prepared drawings for the link bridge

• Carried out material research for the bronze facade

Softwares used: Revit Indesign

RIBA Stages:

[Practice project]
EPR Architects
0 1 2 3
Proposed street view
First
Street elevation
Reception hall wall elevation before and after amendments
floor plan
Section Existing street view The Link bridge takes inspiration from the lattice work of cornices found inside the Grand Sheraton hotel. Section through the back street 3d model showing the new service tunnel in the basement Window and facade studies
you
Thank

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.