SAR A H KITCHING
1
AS
GNIHCTIK
R HA
Nestle Westminster, London Workplace
Food & Beverage 16,000sqft
Role: Senior Designer
Programmes: Revit + Enscape
Scope: CAT A + B Design + Build
Listed Status: Grade II
Responsibilities
Site Survey: Findings recorded to present to the client and to instruct the BIM co-ordinator to create accurate drawings.
Concept 3D designs: Developing this fully in Revit to create many axo and 3D views, giving the client a full understanding of the historical features in their space.
Construction Pack: I have been working closely with a BIM co-ordinater to create a stage 3 drawing pack giving direction and developing the drawings along side them.
Sarah Kitching I Portfolio 2024
Nestl e
01 St e m 2 ASE STA nk d o hen t K SCREEN SCREEN SCREEN SCREEN DN RE N SC SC EE T hS S N RE C R 03.12 ROOM 03.13 5P MEETING ROOM (Standing) 16P MEETING ROOM 03.17 ROOM (VC) 03.18 PHONE ROOM 03.19 ARRIVAL+CO-WORKING 03.10 COATS&LOCKERS 03.11 OPENPLAN 16HA PRINT AREA 03.21 75" 75" 43" 43" 49" VISION ROOM 03.29 WORKSTATIONS 1400x800 03.30 PHONE ROOM 03.07 WORKSTATIONS CO WORKING 6P MEETING ROOM (VC) 03.36 6P MEETING ROOM (VC) 03.35 8P MEETING ROOM 03.34 CORRIDOR 03.03 LIBRARY/MEETING ROOM WORKSTATIONS 1400x800 03.01 STUDIO 03.26 PHONE ROOM 03.33 k C oc Coa S ae ACCESSIBLE WC 9 0 COMMS ROOM 03.32 PHONE ROOM STORE 03.27 THE HUB 03.24 03.25 THE WELCOME 03.23 CATERING STORE 03.22 1 0 3P MEETING (VC) 03.39 WC 03.37 LIFT MECH ROOM e P in g W bad Wh LFT 2PPOD ELEC CPD 03.46 FEMALE WC'S 03.44 MEN'S WC'S 03.45 LIFT LOBBY 03.43 CPD 03.42 CORRIDOR 03.41 ENGAGEMENT CORRIDOR 03.28 CBD CBD 03.57 LOBBY P POD B 0 1 0 2 3 0 121 20 1 © MMOSER ASSOCIATES LIMITED 2020. 1 100 03 Third Floor GA -Day 2 1
eltseN
3 3D Axo Views 3D Views
Citadel Central London
Workplace Finance 20,000sqft
Role: Senior Designer
Programmes: Revit
Scope: CAT B Consultancy
Responsibilities
Space planning using Revit and co ordinating a very detailed stage 3 drawing pack with the technical designer, directing and developing with them the details required for a high end client. I am currently working on the stage 4 pack.
Sarah Kitching I Portfolio 2024
Citadel datiC le
02
FHR FHR 1 2 3 4 5 A B C D E Room 1:12 COLLAB ROOM 08.01 OFFICE 08.02 OFFICE 08.03 OFFICE 08.04 OFFICE 08.05 OFFICE 08.06 OFFICE 08.07 OFFICE 08.08 OFFICE 08.09 OFFICE 08.14 OFFICE 08.13 OFFICE 08.12 OFFICE 08.11 OFFICE 08.24 PHONE ROOM 08.51 SWITCH ROOM 08.25 UPS/IDF 08.26 BOH KITCHEN 08.27 OFFICE 08.50 WC 08.30 SERVERY 08.29 ACCESIBLE WC 08.33 WELLNESS AND MULTI FAITH ROOM 08.34 CLEANER CUPBOARD 08.31 WATER HEATER 08.32 6P MEETING ROOM 08.36 10P MEETING ROOM 08.19 COLLABORATION ROOM 08.22 OFFICE 08.44 STORAGE 08.46 STORAGE 08.45 OFFICE 08.39 OFFICE 08.43 OFFICE 08.42 OFFICE 08.41 PRINT/STORAGE 08.40 OFFICE 08.38 PHONE ROOM 08.37 TEAPOINT 08.47 10P MEETING ROOM 08.16 5P MEETING ROOM 08.17 STORE ROOM 08.28 AMENITY SPACE 08.10 COLLABORATION AREA 08.20 39 DESKS 28GQS 11VISITORS 08.21 32 WORKSTATIONS EQR 08.15 ARRIVAL LOUNGE 08.35 COLLABORATION AREA 08.18 LIFT LOBBY FEMALE WASHROOM MALE WASHROOM OFFICE 08.49 OFFICE 08.48 CORRIDOR 08.52 WORKSTATION 08.23 WHITEBOARD WHITEBOARD WHITEBOARD WHITEBOARD WHITEBOARD WHITEBOARD WHITEBOARD WHITEBOARD WHITEBOARD WHITEBOARD WHITEBOARD WHITEBOARD WHITEBOARD WHITEBOARD WHITEBOARD WH T BOARD WH TE OARD WHTEBOARD WHI EBOARD WHITEBOARD WHITEBOARD WHITEBOARD WHITEBOARD WHITEBOARD WHITEBOARD WHITEBOARD AV SCREEN AV SCREEN AV SCREEN 1 2 3 4 5 A COLLAB ROOM 08.01 OFFICE 08.03 OFFICE 08.04 OFFICE 08.05 OFFICE 08.06 OFFICE 08.07 OFFICE 08.08 OFFICE 08.09 OFFICE 08.14 OFFICE 08.13 OFFICE 08.12 OFFICE 08.11 AMENITY SPACE 08.10 WHITEBOARD WHITEBOARD WHITEBOARD WHITEBOARD WHITEBOARD WHITEBOARD WHITEBOARD WHITEBOARD WHITEBOARD WHITEBOARD OFFICE 08.02 1 : 100 LEVEL 8 GENERAL ARRANGEMENT 1 1 : 100 2 DAY 2 NORTH OFFICE PLAN
5 MULTIFAITH ROOM AXONOMETRIC 2 20110 3 4 6 5 S.O.P. S.O.P. FFL UCL 2560 2560 1260 1260 40 DF-02 FFL UCL 2560 1260 1260 40 FFL UCL 2560 1 : 20 MULTIFAITH ROOM PLAN 1 MULTIFAITH ROOM AXONOMETRIC 2 1 : 20 MULTIFAITH ROOM ELEVATION A 3 1 20 MULTIFAITH ROOM ELEVATION B 4 MULTIFAITH ROOM ELEVATION C 1 20 MULTIFAITH ROOM ELEVATION D 6 F R 20110 3 5 S.O.P. S.O.P. FFL UCL 2560 2560 1260 1260 40 DF-02 FFL UCL 2560 1260 1260 40 WT-02 LM-02 LM02 LM-02 LM-02 LM-02 LM-02 SF-01 FFL UCL 2560 1260 1260 40 120 EQ-WM.100 EQ-WM.300 EQ-WM.200 SAN-W.101 SAN-W.200 4 60402 WT-02 FFL UCL 2560 40 1260 1260 Description Drawing Title: Project: Drawn By: Dwg. No.: Scale: M. Moser Associates Limited St Magnus House 3 Lower Thames Street United Kingdom © M Moser Associates All designs are the sole property of M. not be used, transferred, or disclosed express permission. Electronic copies convenience only. No dimensions inferred from the electronic copy unless copy drawings or specifications. Do not dimensions only are to be used 'For Construction' drawing will be at the Contractor's dimensions, levels, and components be addressed in writing to this office addressed in writing to this office commencement of the work, otherwise responsibility for any associated cost. extras shall be submitted to this office of any such variation or extra. This drawing with all other contract As indicated@A0 SC 7-2311-MMA-08-ZZ-DR-A-20110 EP -WELLNESS & MULTIFAITH ROOM LEVEL 8 CITADEL-LEVEL 8 120 London Wall INFORMATION P127.03.24Stage 3 Issue 2 1 : 20 MULTIFAITH ROOM PLAN 1 MULTIFAITH ROOM AXONOMETRIC 2 1 20 MULTIFAITH ROOM ELEVATION A 3 1 : 20 MULTIFAITH ROOM ELEVATION B 4 1 : 20 MULTIFAITH ROOM ELEVATION C 5 1 20 MULTIFAITH ROOM ELEVATION D 6 5526 63 4800 600 63 600 600 600 600 600 600 600 600 600 700 290360 425 600 600 600 600 600 600 425 EQ-ST.100 EQ-ST.601 EQ-ST.700 SHADOW GAP SHADOW GAP BIN EQ-ST.800 EQ-ST.800 EQ-ST.800 EQ-ST.800 EQ-ST.800 WATER PUMP HEATER FFL UCL SHADOW GAP SHADOW GAP 2760 EQ-ST.501 EQ-ST.601 EQ-ST.500 EQ-ST.400 EQ-ST.401 30 30 30 SF-02 SF-02 400 850 EQ-ST.300 BIN 100 720 30 800 420 2853035025 SHELVING SHELVING ADJUSATBEL FOR ICE MAKER VR-02 VR-02 EQ-ST.800 EQ-ST.800 EQ-ST.800 EQ-ST.800 EQ-ST.800 EQ-ST.800 EQ-ST.800 EQ-ST.800 60407 5 60407 LED LIGHTING AROUND BACK OF UNIT 700 50 800 420 720 30 1535 35025 COUNTER TOP FRONT PANEL DOOR WITH DOOR WITH ANGULAR HANDLE JOINERY NOTES:AND DIRECTION AS INDICATED SIZES AND INSTALLATION REQUIREMENTS N Description Project: File Path: Dwg. No.: Rev: M. Moser Associates Limited St Magnus House Lower Thames Street London EC3R 6HD United Kingdom commencement of the work, otherwise the Contractor sha bear full responsibility for any associated cost. Any claims for variations or extras shall be submitted to this office for assessment prior to approval of any such variation or extra. This drawing is be read on conjunction with all other contract documentation. (+44) 020 7621 5400 (+44) 020 7621 5401 As indicated@A0 P1 Author 7-2311-MMA-08-ZZ-DR-A-60407 JOINERY DETAILS SERVERY TEAPOINT LEVEL 8 CITADEL-LEVEL 8 120 London Wall PRELIMINARY 7-2311 P127.03.24Stage Issue 2 1 : 10 SERVERY PLAN 1 1 : 10 SERVERY ELEVATION 2 1 10 Detail 3 3 1 10 Detail 4 4 1 1 HANDLE DETAIL 5 1 1 TOP UNIT HANDLE DETAIL 6 WT-02 GLASS SCRREN UCL 1260 1260 40 EQ-WC.500 EQ-WC.800 JOINERY DETAILS WT-02 UCL 40 1260 1260 SAN-WC.300 EQ-WC.600 EQ.WC-801 B 20111 2 4 60403 EQ-WC.600 EQ-WC.500 WELLNESS WASHROOM AXONOMETRIC 1 1 : 20 WC & SHOWER ROOM ELEVATION C 2 WC & SHOWER ROOM ELEVATION B 1 : 20 WC & SHOWER ROOM ELEVATION A 1 20 WC & SHOWER ROOM ELEVATION C 5 1 20 WELLNESS WASHROOM PLAN 6 WT-02 GLASS SCRREN FFL UCL 1260 1260 40 EQ-WC.500 EQ-WC.800 FFL UCL JOINERY DETAILS 60403 DF-02 WT-02 WT-02 FFL UCL 2560 40 1260 1260 1200 SAN-WC.201 2000 SAN-WC.200 EQ-WC.100 WT-02 WT-02 FFL UCL 40 1260 1260 SAN-WC.300 EQ-WC.600 EQ.WC-801 3 60403 3 EQ-WC.500 Date Rev Drawing Title: Project: File Path: Dwg. No.: General Notes: Scale: M. Moser Associates St Magnus 3 Lower Thames London EC3R United Kingdom All designs not be express convenience inferred from copy drawings dimensions drawing dimensions, be addressed addressed commencement responsibility extras shall of any such As indicated@A0 7-2311-MMA-08-ZZ-DR-A-20111 EP -WC LEVEL 8 CITADEL-LEVEL 120 London P127.03.24Stage AXONOMETRIC 1 : 20 WC & SHOWER ROOM ELEVATION C 2 WC & SHOWER ROOM ELEVATION B 1 : 20 WC & SHOWER ROOM ELEVATION A 4 1 : 20 WC & SHOWER ROOM ELEVATION C 5 WASHROOM PLAN FHR WT-02 GLASS SCRREN FFL UCL 1260 1260 40 EQ-WC.500 EQ-WC.800 LM-02 LM-02 LM-02 LM-02 LM-02 LM-02 LM-02 FFL UCL 1260 1260 40 EQ-WC.700 SAN-WC.101 EQ-WC.300 JOINERY DETAILS 60403 DF-02 WT-02 WT-02 FFL UCL 2560 40 1260 1260 1200 SAN-WC.201 2000 SAN-WC.200 EQ-WC.100 WT-02 WT-02 FFL UCL 40 1260 1260 SAN-WC.300 EQ-WC.600 EQ.WC-801 Date Rev Description Drawing Title: Project: File Path: Drawn Dwg. No.: General Notes: Scale: M. Moser Associates Limited St Magnus House 3 Lower Thames Street London EC3R 6HD United Kingdom © M Moser Associates All designs are the sole property not be used, transferred, or disclosed express permission. Electronic convenience only. No dimensions inferred from the electronic copy copy drawings or specifications. dimensions only are to be used 'For drawing will be at the Contractor's dimensions, levels, and components be addressed in writing to addressed in writing to this commencement of the work, otherwise responsibility for any associated extras shall be submitted to this of any such variation or extra. This with all other contract As indicated@A0 SC 7-2311-MMA-08-ZZ-DR-A-20111 EP -WC & SHOWER ROOM LEVEL 8 CITADEL-LEVEL 8 120 London Wall INFORMATION P127.03.24Stage 3 Issue 2 AXONOMETRIC 1 20 WC & SHOWER ROOM ELEVATION C 2 1 20 WC & SHOWER ROOM ELEVATION B 3 1 : 20 WC & SHOWER ROOM ELEVATION A 4 1 20 WC & SHOWER ROOM ELEVATION C 5 PLAN
Hillhouse Central London
Workplace
Hedgefund
6,000sqft
Model View| Entrance
Role: Senior Designer
Programmes: Revit + Enscape
Scope: Consultancy Stage 2
Resposibilities
I created a concept document which included 3D views of the space using Revit and Enscape. I wanted to get across in these views the fine details which made this concept for a high end client.
Model View| Reception
Sarah Kitching I Portfolio 2024
Hillh ouse hlliH esuo 03 M Moser Associates - Hillhouse Investment 5
Soft hidden lighting to follow curve Timber and stone paneling in lobby surround Stone floor finish to bleed onto wall panelling Feature light in bronze and HILLHOUSE signage to match singapore design M Moser Associates - Hillhouse Investment 7
Model View| Meeting Rooms
Model View| Teapoint
7 M Moser Associates - Hillhouse Investment 9
M Moser Associates - Hillhouse Investment 13
PAYSAFE EFASYAP
Paysafe
Central London Workplace
Fintech
25,000sqft
Role: Senior Designer Programmes: Revit + Enscape Scope: CAT B Design + Build Responsibilities
I was working with a team of three on this project. Myself as senior designer, one junior designer and a technical designer. I was the front face to the client delivering the design concept and development. I worked closely with the junior designer to help develop the design using revit to create white panoramic views to help the client understand the spacial design. I also directed the construction pack where I would create initial mark ups and return comments back to the technician to get it to the level I wanted.
Flexible multi use area maximising the usage of the space and creating an exciting place to collaborate/train/present
Central atrium that creates connectivity through the office
Mix of working typologies including focus, meeting rooms, hot desking, phone booths, to give employees flexibility in how they would like to work
Business
Offices and meeting rooms have direct access to natural light
Fitness room with easy access down to end of journey facilities
Sarah Kitching I Portfolio 2024
04
Admirable entrance lobby looking over reception
lounge adjacent to meeting suite includes phonebooths for quick private phone calls
Reception and meeting suite located in the impressive arced section of the floor, embracing it’s architecture
360 Panoramic Views
Paysafe was returning client, we developed a great relationship with them after COVID. They wanted to adapt their current space to work as a more collaborative office. They came straight to us again once they needed to move to a new building. For this project we delivered all the design development in 3D format to aid the client to visualise their new office space in London. We also created 360 Panoramic views to finalise the space plan, as this needed to be approved by a high number of people within the organisation this was a great way to get people to understand the space that find it hard to read 2D plans.
9 Boardroom 26 Person Flexible Collab (training, meeting, fitness) Teapoint Furniture Store Pantry Prep Room Reception 8 Person Meeting Room 4 Person Meeting Room 12 Person Meeting Room AVScreen CurvedVideoScreenWall ScreenAV ScreenAV ScreenAV Screen ScreenAV Library Table Collab Whiteboard Whiteboard Whiteboard AV Screen Frameless Door CateringTrolley Dishwasher Fridge waveMicro Coffee Tap Coffee Fridge Dishwasher Fridge waveMicro Dishwasher Fridge shelves Benches Open shelves Reception Atrium Lift Lobby Lift Lift Lift Lift Storage EBS Lounge Open shelves Hot Coffee Cleaners Storage Benches Lockers (24) Whiteboard Credenza 3 Person Meeting Room Video Wall Video Wall VideoWall Credenza Credenza Openshelves Frameless Door AV Store Storage Credenza Wellness Room Comms Room Workstations Prayer Room 4 Person Meeting Room AV Screen Whiteboard Pinboard Marketing Corner Whiteboard 6 Person Meeting Room ScreenAV IT Storage Open shelves Openshelves Person Meeting Room Workstations Office Focus booth Focus booth Focus booth Office AV Screen AV Screen ScreenAV 4 Person Meeting Room Office Office Office Pinboard/Whiteboard Whiteboard Office Office Printing Storage Water Point shelves Whiteboard Coats Coats Focus booth Lockers (12) (S1) AV Screen Whiteboard Furniture Store AV Screen AV Screen AV Screen Library Table AV Screen AV Screen Collab AV Screen AV Screen Library Table AV Screen AV Screen Furniture Store AV Screen AV Screen AV Screen Library Table AV Screen AV Screen Date Rev Description Drawing Title: Project: Cad File Name: Drawn Dwg. A1 © M Moser Associates All designs are the sole property of M. Moser be used, transferred, or disclosed to a permission. Electronic copies of this drawing only. No dimensions or other information electronic copy unless specifically shown specifications. Do not scale from this drawing. are to be used 'For Construction' and any the Contractor's risk. Contractor to verify components on-site. Any discrepancies this office for clarification prior to the otherwise the Contractor shall bear full cost. Any claims for variations or extras assessment prior to approval of any such is to be read on conjunction with all Job No.: General Notes: © MMOSER ASSOCIATES LIMITED 2013. Scale: M. Moser Associates Limited St Magnus House 3 Lower Thames Street London EC3R 8HD United Kingdom ISSUED FOR INFORMATION Paysafe 2 Gresham Street 7-2169 - 12.10.22Testfit FIRST FLOOR GENERAL ARRANGEMENT DSK 1:100 @ A1 JB APPROX SQM APPROX SQFT BUILDING INFOMATION RAF TO SUSPENDED CEILING FLOOR VOID DEPTH CEILING VOID HEIGHT MAX HEADCOUNT WC QUANTITY TRAINING ROOM 20,000 1,850 BOARD ROOM MEETING ROOM FITNESS/YOGA 3200 WORKSPACES DESKS 1600x800 PERSON OFFICE HOT DESKS 1 PERSON BOOTH COAT STORAGE STORAGE (5H) 8 PERSON MEETING 8 PERSON MEETING COMMS ROOM 2 PERSON BOOTH AMENITIES COPY POINT 12 PERSON MEETING 26 PERSON MEETING (BOARDROOM) FOCUS BOOTHS (4no. booths) RECEPTION MEETING SUITE 4 PERSON MEETING INTERNAL MEETING TEAPOINT WELLNESS ROOM FURNITURE STORE COFFEE POINT WATER POINT PRAYER ROOM PREP ROOM 4 PERSON MEETING HR OFFICE IT OFFICE TOTAL SEATS 3 PERSON MEETING IT STORAGE MARKETING STORE CLEANERS STORE PANTRY STUDIO LOCKERS 6 PERSON MEETING
Click Me PANORAMICV EW EIVCIMARONAP W PANORAMICV EW EIVCIMARONAP W PANORAMICVIEW VCIMARONAP E W PANORAMICVIEW VCIMARONAP E W
3D Views
acoustic ceiling raft to reduce noise levels and ground the space acoustic feature wall art with LED back ligh
bespoke timber door to form
Using 3D models to aid in the design process with the client
all focus rooms to have slightly different typologies to create sense of playfulness
faux planting on rear wall
Sarah Kitching I Portfolio 2024
timber worktop
focus room for phone calls and added privacy
04
PAYSAFE EFASYAP
use
Informative Technology throughout the office
cafe style seating area in teapoint to create comfortable and relaxing break out area surrounded by floor to ceiling glazing
11
collab acoustic ceiling rafts to reduce sound travel and to ground the space
large folding wall to crreate a
of stone to add depth and texture to the space
large LED screens for impressive town hall
Biophilia feature to create backdrop to reception desk
Playful grand light sculpture
Impressive AV wall backdrop to lounge Entrance
Catering facilities for guests
Large scale manifestation that compliments brand identity and provides privacy to meeting rooms
Elan Capital Knightsbridge Workplace Hedgefund 8,000sqft
Role: Designer
Programmes: CAD + Sketchup
Scope: CAT B Design + Build
Responsibilities:
I was a designer on this project reporting to the senior designer. I developed the concept and design. I developed with the technician all of the joinery and ceiling details. I also directed the visuals with the visualising team.
Elan Capital are a hedge fund company, they came to M Moser after seeing another one of our projects and being impressed with the quality. They wanted to create a space that really showed their respect and appreciation of their staff. Focus was on the space and facilities provided for the staff. Including elements like increased shower and laundry facilities to encourage staff to bike to work, focus areas with optimal sound privacy, a professional teapoint area where it would be possible to host events and create a relaxed atmosphere away from the desk. It was also very important to have an area to bring in clients and give them optimum privacy.
Sarah Kitching I Portfolio 2024
05
LATIPAC
ELANCAPITAL LE NA
Soft/warm
13
Premium Seating
Oversize planting
elements
Contrasting feature wall
Wall lighting
FCeiling Details
GENERAL LEGEND
B
NOTE XX
XXXX
A
AREA OUTSIDE OF PROJECT SCOPE
ANNOTATION REFERENCE
CEILING LEVEL
CHANGE IN CEILING LEVEL
RE USED EXISTING CEILING TILE
KVADRAT SOFT CELL
EXISTING CEILING TO REMAIN
NEW MF CEILING
OPEN CEILING
SLATTED CEILING
LIGHTING TYPE SUMMARY
Sarah Kitching I Portfolio 2024 05ELANCAPITAL LE NA LATIPAC 360 SLOT ALIGN WITH WINDOW BULKHEAD SEE PLAN SEE PLAN HEADCOUNT 18 12P MEETING ROOM WAITING AREA TEAPOINT 8P MEETING ROOM FOCUSED WORKING OFFICE 8P MEETING ROOM POINT CLENRS C/BRD 3P MEETING ROOM COATS A B C D E F 1 2 3 4 5 L6 L6 L6 L6 L5 L6 L7 L7 L7 L7 L7 A A BULKHEAD B B L7 L7 L7 04-01 04-02 04-03 04-04 04-07 04-08 SHWR 04-05 04-10 04-11 04-09 04-14 04-13 G G C C 200 225 200 200 200 200 200 250 200 226 200 250 EXISTING BULKHEAD EXISTING BULKHEAD EXISTING BULKHEAD 2500 2360 2360 2360 F F L7 L7 L7 L7 L7 L7 L7 L7 L7 L7 L7 04-16 PHONE 04-16 PHONE L9 L10 2360 2360 200 EQ3 EQ3 EQ3 225 EQ3 1861 5306 250 350 350 EQ2 EQ2 EQ2 EQ2 3979 EQ1 EQ1 803 866 EQ4 EQ4 EQ4 EQ4 200 COMMS 04-12 EQ1 EQ1 1550 C/L C/L EQ2 EQ2 EQ2 EQ2 EQ4 EQ4 EQ5 EQ5 EQ4 EQ4 PROFILE GENERAL LEGEND NOTE XX CHANGE CEILING ANNOTATION AREA XXXX RE USED KVADRAT EXISTING OPEN NEW SLATTED WINDOW BULKHEAD 1860 Project: CREATING WORKPLACES FOR GLOBAL © M Moser Associates Limited. All designs are the sole property of M. Moser Associates Ltd. and may not be used, transferred, or disclosed to a third party without their express permission. Electronic copies of this drawing are supplied for convenience only. No dimensions or other information should be inferred from the electronic copy unless specifically shown on the hard copy drawings or specifications. Do not scale from this drawing. Figured dimensions only are to be used 'For Construction' and any scaling of the drawing will be at the Contractor's risk. Contractor to verify all dimensions, levels, and components on-site. Any discrepancies shall be addressed in writing to this office for clarification prior to the commencement of the work, otherwise the Contractor shall bear full responsibility for any associated cost. Any claims for variations or extras shall be submitted to this office for assessment prior to approval of any such variation or extra. This drawing is to be read on conjunction with all other contract documentation. DateRev Description DateRev Description AS BUILT ELAN CAPITAL MANAGMENT 116 BROMPTON RD KNIGHTSBRIDGE LONDON AB15.09.20 SECTION G-G
360 40 150 varies 2500 SOFT CELLS HINGED CEILING PANELS SLOT GRILL LED LED SPOT LIGHT ALIGN WITH WINDOW BULKHEAD SEE PLAN 100 5 5 SEE PLAN
Detail
Detail
L1 SUSPENDED LIGHT FERROLIGHT SOL L2 TWIN SPOT L3 LAMBERT & FILS WALDORF TRIPLE L4 LED L5 PENDANT L6 WALL LIGHT L7 SPOT LIGHT RECESSED L8 RELOCATED EXISTING LINIER LIGHTING L6 L7
NE W LINIER SLOT GRILL
L9 L10 L9 U BRASS PENDANT L10 LINESCAPES PENDENT 50 100 50 500 ALIGN WITH WINDOW BULKHEAD SECTION A-A SECTION C-C
Joinery
Teapoint
Banquette Seating
Feature Panelling
15
IT IS THE CLIENTS RESPONSIBILITY TO ENSURE THAT ALL DESIGNS CONFORM TO THE RELEVANT REGULATIONS. PARAGON CANNOT BE HELD LIABLE FOR DIVERGENCE FROM REGULATIONS. NOTE: TIMBER IS A NATURAL PRODUCT AND CAN VARY WIDELY IN SHADE AND GRAIN. WHILE PARAGON DESIGN WILL TAKE EVERY MEASURE TO MAKE SURE THE PRODUCT SUPPLIED IS SATISFACTORY, SOME DIFFERENCES DUE TO AGE, LIGHT EXPOSURE AND NATURE OF PRODUCT MUST BE EXPECTED. PLEASE ALSO BE AWARE THAT PLY PRODUCTS MAY SHOW MANUFACTURING MARKS IN THE DETAIL T SCALE 1:2 20 LED TRACK DETAIL S SCALE 1:2 3 DETAIL U SCALE 1:2 50 20 30 80 CUT OUT TO ZIP TAP UNIT ONLY DETAIL V SCALE 1:2 30 160 DETAIL Z SCALE 1:2 10 19 S SECTION M-M 1780 1970 VOID FOR LED DRIVERS BEHIND REMOVABLE MICROWAVE UNIT INSTALLED DIRECTLY ABOVE UNDERCOUNTER FRIDGE SECTION N-N 382 382 1250MICROWAVE UNIT 414 880 23 382 18 382 12 INFILL SCRIBED AROUND BULKHEAD SHELVING UNIT TALL FRIDGE UNIT ZIP ZAP AND ZIP TAP VENTILAION INSTALLED BY ZIP TAP IN DOUBLE UNIT FRONT ELEVATION 737 497 737 597 597 690 150 150 330 597 1967 160 2130 2500 SITE DIM 370 900 432 597 J J K K M M N N P P MICROWAVE SECTION K-K 58.5 600 600 600 19 500 600 1200 600 500 58.5 560 IT IS THE CLIENTS RESPONSIBILITY TO ENSURE THAT ALL DESIGNS CONFORM TO THE RELEVANT REGULATIONS. PARAGON CANNOT BE HELD LIABLE FOR DIVERGENCE FROM REGULATIONS. NOTE: TIMBER IS A NATURAL PRODUCT AND CAN VARY WIDELY IN SHADE AND GRAIN. WHILE PARAGON DESIGN WILL TAKE EVERY MEASURE TO MAKE SURE THE PRODUCT SUPPLIED IS SATISFACTORY, SOME DIFFERENCES DUE TO AGE, LIGHT EXPOSURE AND NATURE OF PRODUCT MUST BE EXPECTED. PLEASE ALSO BE AWARE THAT PLY PRODUCTS MAY SHOW MANUFACTURING SCRIBE TO WALLS FRONT ELEVATION LIGHTING SUPPLIED AND FITTED BY OTHERS SPEC TBC SCRIBE TO WALLS 5330 2360 1070 1070 1070 1070 1066 1066 1066 1066 1066 2132 1066 2132 O O J J TOP FILLER SHADOW GAP 18 25 20 100 SECTION J-J PLANTER OPENING DIMS K L M N 1730 1280 281 351 1260 1100 470 630 512.9 9215 ° 800 303 LACQ. FLUTED MDF PANEL SPLIT LINE SECTION O-O SPLIT LINE PLANTER OPENING DIMS P 5252 OVERLAMINATED EXCEPT THE 25mm SIMILAR BUILD WALL HOOK BATTENS SCALE 1:2 DETAIL P SIDE FILLER SHADOW GAP STRIP LED LACQ. FLUTED PANEL 100 18 20.5 R24 25 LAM PLANTER PANEL SCALE 1:5 DETAIL L LOW PROFILE LED SUPPLIED AND FITTED BY WALL BATTENS AND FILLERS SPACE 19 40 18 9
IT IS THE CLIENTS RESPONSIBILITY TO ENSURE THAT ALL DESIGNS CONFORM TO THE RELEVANT REGULATIONS. PARAGON CANNOT BE HELD LIABLE FOR DIVERGENCE FROM REGULATIONS. NATURAL PRODUCT AND CAN VARY WIDELY IN SHADE AND GRAIN. WHILE PARAGON DESIGN WILL TAKE EVERY MEASURE TO MAKE SURE THE PRODUCT SUPPLIED IS SATISFACTORY, SOME DIFFERENCES DUE TO AGE, LIGHT EXPOSURE AND NATURE OF PRODUCT MUST BE EXPECTED. PLEASE ALSO BE AWARE THAT PLY PRODUCTS MAY SHOW MANUFACTURING MARKS IN THE PANELS, SUCH AS PLUGS AND STREAKS. DETAIL T SCALE 1:2 20 LED TRACK DETAIL Y SCALE 1:2 50 18 20 Y T U V SECTION P-P 720 510 720 DETAIL U SCALE 1:2 50 20 30 80 CUT OUT TO ZIP TAP UNIT ONLY DETAIL V SCALE 1:2 30 160 DETAIL Z SCALE 1:2 10 19 S SECTION M-M 1780 1970 VOID FOR LED DRIVERS BEHIND REMOVABLE PANEL MICROWAVE UNIT INSTALLED DIRECTLY ABOVE UNDERCOUNTER FRIDGE SECTION N-N 382 382 1250MICROWAVE UNIT 414 880 23 382 18 382 12 INFILL SCRIBED AROUND BULKHEAD SHELVING UNIT TALL FRIDGE UNIT DRAWER UNIT DISHWASHER ZIP ZAP AND ZIP TAP VENTILAION INSTALLED BY ZIP TAP IN DOUBLE UNIT FRONT ELEVATION 737 497 737 597 597 690 150 150 330 900 432 597 J K M M N N P P BLACK GRILLE MICROWAVE AND FRIDGE UNIT ZIP TAP COFFEE MACHINE BLACK GRILLE ISOMETRIC VIEW SECTION K-K 600 600 19 500 600 1200 600 500 58.5 560 18 50 350 678 50 7 18 SCALE 1:2 DETAIL K HOOK BATTENS VEN. BLACK CORE MDF PACKING SPACE 20 PLAN VIEW N 45 RETURNED PANEL TO COVER OFF FRAME SCALE 1:2 DETAIL N J3A GROOVED PANEL 45 20 CUT OUT DONE ON SITE SCALE 1:2 SECTION L-L CUT OUT DONE ON SITE 5 10 CL 45 J3A - GROOVED PANEL 2 CLOSED END J3A GROOVED PANEL 1 J3A - PLINTH 1 J3A GROOVED PANEL 1 +50MM SITE SCRIBE J3A - GROOVED PANEL 1 J3A - GROOVED PANEL 1 MIR J3A - PLINTH 2 J3A - GROOVED PANEL 1 MIR J3A - GROOVED PANEL 2 OPEN END J3A - PLINTH 1 2574 2430 858 858 858 858 812 2528 TYP 50 858 858 838 55° 2500 20 5960 J J L L GRAIN DIRECTION VIRTICAL SECTION J-J K J3A - HOOK BATTEN M BLACK CORE MDF HOOK BATTENS 19 18 20 130 50
Sarah Kitching I Portfolio 2024
Visuals
Bespoke acoustic ceiling
05ELANCAPITAL LE NA LATIPAC
Timber and carpet floor finishes
17
Textured Glazing
Hidden Door Access
Exposed Ceiling
Acaster Lloyd
Central London
Workplace
Finance
3,000sqft
Role: Senior Designer
Programmes: Sketchup + Enscape + Photoshop
Scope: CAT B Design + Build
Responsibilities
I was involved in the whole process of this project as the single designer on this project I also took on the role as technician.
Accommodation
Collaboration Area
12 x Soft Seating / Break out area
4 x Cafe Style Area 10 x Stools
Internal 1 x 8 person Meeting Room
2 x 2 person Meeting Pods
1 x Phonebooth
18 Desks 8 x Touch down Desks
Storage 24 Lockers 4 filing cabinets
Sarah Kitching I Portfolio 2024
AC ASTERLLYO D YOLLRETSACA D 06
Fabric wrapped acoustic panels enhance the space with texture and colour as well as act as a sound absorbent in the open plan area
Planters are placed on top of storage for privacy & well-being
The company logo will great staff and visitors at the entrance sitting on a dark background
In order to break up the open plan area, two different types of desking will be used. For the static users, the desk will be a fresh white with a plywood edge, whilst the touch down desk will feature timber tops
A mix of faux green walls and real planting will add to the wellness levels in an area with minimal natural light
The large tea point with the central island provides amble space for lunch breaks as well as impromptu meetings. The pull down projector transforms the area into a social seminar scenario
A small lounge area at the entrance makes use of an awkward space and extends the area of the teapoint to maximise the space
19
Visuals + Finished Photos
Sarah Kitching I Portfolio 2024
AC ASTERLLYO D YOLLRETSACA D 06
Enscape 3D renderings
21
PAYPAL LAPYAP 07
Central London
Workplace
Fintech 13,000sqft
Role: Senior Designer
Programmes: CAD + Sketchup
Scope: CAT B Consultancy
Responsibilities
PayPal is a long standing client with M Moser in the Asia branch. They approached us to pitch for their new space in London for a traditional consultant role. I was the lead designer with a team of 3 . Working closely with the technical designer I instructed and aided in the delivery of RIBA Stages 2-4
Sarah Kitching I Portfolio 2024
PayPal
Meeting Room 7-8p Coffee Bin Hot &Chilled Tap 34 Desks 1600x800 12 Desks 1600x800 48 Desks 1600x800 Break Area/Social Hub IT Storage Facilities BU Storage IDF Cleaner Cupboard Mothers Room Wellness Room Library Chat Chat Chat Phone Booth Phone Booth Huddle Meeting Room 12p AV Screen Collaboration Suite Open Collaboration Area Reception Fridge Shelving Shelving Meeting Room 7-8p Coffee Bin Store Meeting Room 7-8p Sliding Door Sliding Door LIMITED 2013.
Meeting Rooms
Copy Point Mother’s Room Wellness Room IDF Storage
Phone Booths Collaboration Spaces Reception Library Breakout / Social Hub
Design inspiration + colours
23
Concept Sketches + Visuals
Sarah Kitching I Portfolio 2024
PAYPAL LAPYAP 07
25
Stage 4 Construction Drawings
Sarah Kitching I Portfolio 2024
M3.2 M3.1 M3.1 M3.1E M3.1E M3.1E M3.1E EX2 EX2 EX2 EX2 EX2 EX2 EX2 EX2 EX2 EX2 EX2 L9 L1.1 EX2 L1.2 L1.1 L1.1 L1.1 L1.1 L1.1 L1.1 L1.1 L1.1 L1.1 CEILING LEGEND GRID WITH BANRASTER EXPOSED WHITE CEILING ACOUSTIC RAFT L9 INTEGRATED DESIGN LED STRIP TAPE FIRE BARRIER M3.1 M3.2 ROUND DOWNLIGHT LINEAR SLOT DIFFUSER FEATURE PENDANT LIGHTING P-8 L2 EX1 EXISTING/RELOCATED CIRCULAR LIGHTING LEGENDS LINEAR SUSPENSION LIGHT L1.2 L5 FEATURE PENDANT LIGHTING CIRCULAR RECESSED DOWNLIGHT (142mm) ACOUSTIC PANELS AC-2 (SUSPENDED FROM SOFFIT ON METAL ROD) Hanging Plant 600X600 SUSPENDED CEILING Date Rev Project: Checked By: Drawn By: © All designs are the sole property of M. Moser Associates Ltd. and may not be used, transferred, or disclosed to a third party without their express only. No dimensions or other information should be inferred from the electronic copy unless specifically shown on the hard copy drawings or are to be used 'For Construction' and any scaling of the drawing will be at the Contractor's risk. Contractor to verify all dimensions, levels, and this office for clarification prior to the commencement of the work, otherwise the Contractor shall bear full responsibility for any associated assessment prior to approval of any such variation or extra. This drawing to be read on conjunction with all other contract documentation. General Notes: N F (+44) 020 7621 5401 St Magnus House United Kingdom 02ND FLOOR RCP 15-02AB 1:100 @ A1 IB SD AS BUILT PAYPAL 5 FLEET PLACE 7-2092 AB 07.07.22 AS BUILT D02 2750 FFL 0 SLAB 3450 CONTRACTOR TO REFER TO PAYPAL AV SPECIFICATION FOR DIMENSIONS FAUX PLANTING WIRE GRID FRAME JOINERY J01 FIXINGS G-1 Coffee Hot &Chilled Tap Bin Shelving Double Sliding Door Single Sliding Door 02-02 RECEPTION 01-02 03-02 COPY ROOM 04-02 FACILITIES 16-02 BREAK AREA SOCIAL HUB 18-02 BU STORAGE Shelving Shelving Coffee Bin Bin PaypalLogoSignage Fridge 2xMwFridge 2xMwFridge Fridge Paypal Logo Signage 17-02 8P MEETING ROOM 01 30-12 02 30-12 03 30-12 2750 FFL 0 SLAB 3450 B-4 BRICK PANEL TO BE INSTALLED JOINERY J01 FIXINGS BEAM LOCATION DUCTWORK L 1.1 L 1.1 2750 FFL 0 D04 D03 Drawing Title: Project: Cad File Name: Checked By: Drawn By: Dwg. No.: Rev: Print Date/Time: Job No.: Scale: CREATING WORKPLACES FOR GLOBAL BUSINESS N © M Moser Associates Limited. All designs are the sole property of M. Moser Associates Ltd. and may not be used, transferred, or disclosed to a third party without their express permission. Electronic copies of this drawing are supplied for convenience only. No dimensions or other information should be inferred from the electronic copy unless specifically shown on the hard copy drawings or specifications. Do not scale from this drawing. Figured dimensions only are to be used 'For Construction' and any scaling of the drawing will be a the Contractor's risk. Contractor to verify all dimensions, levels, and components on-site. Any discrepancies shall be addressed in writing to this office for clarification prior to the commencement of the work, otherwise the Contractor shall bear full responsibility for any associated cost. Any claims for variations or extras shall be submitted to this office for assessment prior to approval of any such variation or extra. This drawing is to be read on conjunction with all other contract documentation. DateRev Description DateRev Description RECEPTION ELEVATIONS 30-12 C2 AS SHOWN @ A1 AK SD CONSTRUCTION PAYPAL 5 FLEET PLACE LONDON 7-2092 C114/01/22ISSUED FOR CONSTRUCTION SCALE: 01 RECEPTION 02-02 1:20 @ A1 SCALE: 00 FLOOR PLAN 1:100 @ A1 SCALE: 02 RECEPTION 02-02 1:20 @ A1 SCALE: 03 RECEPTION 02-02 1:20 @ A1 C214/03/22ISSUED FOR CONSTRUCTION PAYPAL LAPYAP 07
27 2750 FFL 0 P-0 WB02 WHITEBOARD Neon Style Sign Neon Style PanelsSecurity Shelving Shelving Safe Shelving 03 30-01 0430-01 01 30-01 02 30-01 2750 FFL 0 65" AV SCREEN 65" AV SCREEN INSTALL DETAILS WP-7 WP-7 ACOUSTIC PANELS TO BE CUT AROUND AV BRACKET 2750 FFL 0 CONTROLS ARE AS PER CONSULTANT'S SPECIFICATIONS. CONTROL PANELS SPECIFICATIONS TBC BY CONTRACTOR FOR FINAL SETTING OUT HEIGHTS. D11 9mm WP-7 ACOUSITC WALL PANEL P1 Indicative location for potential future room booking panel. Power/data provision Drawing Title: Project: Cad File Name: Checked By: Drawn By: Dwg. No.: Print Date/Time: Job No.: Scale: CREATING WORKPLACES FOR GLOBAL BUSINESS N © M Moser Associates Limited. All designs are the sole property of M. Moser Associates Ltd. and may not be used, transferred, or disclosed to a third party without their express permission. Electronic copies of this drawing are supplied for convenience only. No dimensions or other information should be inferred from the electronic copy unless specifically shown on the hard copy drawings or specifications. Do not scale from this drawing. Figured dimensions only are to be used 'For Construction' and any scaling of the drawing will be the Contractor's risk. Contractor to verify all dimensions, levels, and components on-site. Any discrepancies shall be addressed in writing to this office for clarification prior to the commencement of the work, otherwise the Contractor shall bear full responsibility for any associated cost. Any claims for variations or extras shall be submitted to this office for assessment prior to approval of any such variation or extra. This drawing is to be read on conjunction with all other contract documentation. DateRev Description DateRev Description 11-02 MEETING ROOM ELEVATIONS 30-01 C2 AS SHOWN @ A1 AK CONSTRUCTION PAYPAL 5 FLEET PLACE LONDON 7-2092 C114/01/22ISSUED FOR CONSTRUCTION SCALE: 03 12P MEETING ROOM 11-02 1:20 @ A1 SCALE: 00 FLOOR PLAN 1:100 @ A1 SCALE: 01 12P MEETING ROOM 11-02 1:20 @ A1 SCALE: 04 12P MEETING ROOM 11-02 1:20 @ A1 SCALE: 00 ACOUSTIC WALL 1:20 @ A1 SCALE: 02 12P MEETING ROOM 11-02 1:20 @ A1 GYPROC FIXING STRAP (GFS1) TO RECEIVE UPPERMOST BOARD FIXINGS. NO FIXINGS WALL BOARDS TO BOTH OUTER FACES SKIRTING DEFLECTION HEAD TO SUB CONTRACTOR RAISED FLOOR 25 25 REFER TO SPEC CONTINUOUS LINE OF REFER TO RCP PLAYOUT TIGHT PACK RIBS WITH WITH MASTIC BEAD TRACK FIXED TO TOP OF CORE FLOOR 180mm SMALL AMOUNT OF EXPANDING FOAM MAY BE REQUIRED TO GIVE A COMPORES AGAINST. THIS MUST BE 15 700mm TBC VIA SITE SURVEY 32mm GYPROC FIXING STRAP (GFS1) TO RECEIVE UPPERMOST FLANGE CHANNEL WALL BOARDS TO SKIRTING STEEL, IF CONNECTION IS REQUIRED THIS MUST BE VIA ACOUSTIC RESILIENT CONNECTION RAISED FLOOR 25 25 CONTINUOUS LINE OF SUSPENDED CEILING TILES PLASTERBOARD TOP HAT TRIM TRACK FIXED TO TOP 50mm MINERAL WOOL REFER TO SPEC CONTRACTOR DESIGN MINERAL WOOL WITH MASTIC BEAD MASTIC SEAL BEAD 15 700mm TBC VIA SITE SURVEY 180mm 32mm WALL BOARDS TO SKIRTING RAISED FLOOR 25 25 SUSPENDED CEILING TILES PLASTERBOARD TOP HAT TRIM 50mm 'C' STUDS FIXED TO TOP OF 50mm GYPROC DEEP 15 TBC VIA SITE SURVEY 180mm 32mm Description Drawing Title: Project: Cad File Name: Checked By: Drawn By: Dwg. No.: Print Date/Time: © M Moser Associates Limited. be used, transferred, or disclosed to a third party without their express permission. Electronic copies of this drawing are supplied for convenience electronic copy unless specifically shown on the hard copy drawings or specifications. Do not scale from this drawing. Figured dimensions only are to be used 'For Construction' and any scaling of the drawing will be at the Contractor's risk. Contractor to verify all dimensions, levels, and components on-site. Any discrepancies shall be addressed in writing to this office for clarification prior to the commencement of the work, otherwise the Contractor shall bear full responsibility for any associated cost. Any claims for variations or extras shall be submitted to this office for assessment prior to approval of any such variation or extra. This drawing is to be read on conjunction with all other contract documentation. Scale: N (+44) 020 7621 5401 St Magnus House United Kingdom CONSTRUCTION PAYPAL 5 FLEET PLACE 7-2092 PARTITION TYPES DETAIL 1 40-01 C2 1:5 @ A1 IB SD 1:5 @ A1 2.REFER TO REFLECTED CEILING PLANS A-15-XX SERIES AND DETAILS FOR PENETRATION DETAILS. 1:5 @ A1 1:5 @ A1 LINING TYPE-CLASSIC PARTITION THICKNESS MIN-100mm THICKNESS ACOUSTIC db-N/A FIRE MINS-N/A STUDS / FRAME-50mm 'C' STUDS @ 600mm CENTERS BOARDS -2x 12.5mm PLASTERBOARDS EITHER SIDES LINING TYPE-CLASSIC PARTITION THICKNESS MIN-122mm THICKNESS ACOUSTIC db-45 db FIRE MINS-60MINS STUDS FRAME-70mm 'C' STUDS @ 600mm CENTERS BOARDS -2x 12.5mm PLASTERBOARDS EITHER SIDES LINING TYPE-CLASSIC PARTITION THICKNESS MIN-122mm THICKNESS ACOUSTIC db-45 db FIRE MINS-60MINS STUDS FRAME-70mm 'C' STUDS @ 600mm CENTERS BOARDS -2x 12.5mm PLASTERBOARDS EITHER SIDES Gypframe 'C' studs (site specific) Gypframe service 18mm Plywood General contractor to install 18mm ply pattress within stud wall partitions to support cupboards, worktops, shelving, notice boards, extinguishers, coat hooks, mirrors and sanitaryware + grab rails. C214.01.22ISSUED FOR CONSTRUCTION
Stage 4 Construction Drawings PAYPAL
LAPYAP 07
Sarah Kitching I Portfolio 2024 6TILES 6TILES 7TILES 32TILES 31TILES 29TILES 29TILES TILES 5TILES 28TILES TILES 2TILES 3TILES 2TILES TILES TILES 1TILE 1TILE 1TILE TILE TILE TILE 1TILE TILES TILES 8TILES TILE TILE TILES 2TILES 3TILES 4TILES 5TILES TILES 3TILES TILES 3SPACES SPACES SPACE SPACES 2SPACES 2SPACES 2SPACES 6SPACES SPACE SPACES 5SPACES 3SPACES 5SPACES SPACE 2SPACES SPACES SPACE SPACE SPACE SPACE 2SPACES 2SPACES 6SPACES 3SPACES 2SPACES 4SPACES 4SPACES 3TILES 2TILES 5TILES TILES TILES TILES TILES 2TILES 2TILES SPACE SPACE SPACE 2SPACES SPACES SPACES SPACES 3 SPACES 2TILES 5TILES 6TILES TILE TILES TILE 1TILE 6TILES 7TILES TILES 3TILES ALIGNED ALIGNED ALIGNED WITHIN BOUNDARY AREAS WITHIN BOUNDARY AREAS PLEASE NOTE: SAMPLES OF FINISHES TO BE PROVIDED BY DESIGNER FOR CLIENTS APPROVAL PRIOR TO CONSTRUCTION / MANUFACTURE. PLEASE REFER TO THE FINISHES SCHEDULES FOR MATERIAL SPECIFICATIONS. Description Drawing Title: Project: Checked By: Drawn By: Dwg. No.: Print Date/Time: © M Moser Associates Limited. be used, transferred, or disclosed to a third party without their express permission. Electronic copies of this drawing are supplied for convenience electronic copy unless specifically shown on the hard copy drawings or specifications. Do not scale from this drawing. Figured dimensions only are to be used 'For Construction' and any scaling of the drawing will be at the Contractor's risk. Contractor to verify all dimensions, levels, and components on-site. Any discrepancies shall be addressed in writing to this office for clarification prior to the commencement of the work, otherwise the Contractor shall bear full responsibility for any associated assessment prior to approval of any such variation or extra. This drawing is to be read on conjunction with all other contract documentation. N (+44) 020 7621 5400 (+44) 020 7621 5401 M. Moser Associates Limited St Magnus House London EC3R 8HD United Kingdom CONSTRUCTION PAYPAL 5 FLEET PLACE LONDON EC4M 7RD 7-2092 LIBRARY FLOOR SETTING-OUT 75-05C1 1:100 @ A1 1:20 @ A1 C1 14.01.22 ISSUED FOR CONSTRUCTION FLOOR FINISHES LEGEND (INCLUDING 4mm GROUTING) SPACES BETWEEN TILES Feature Tiles 200 200mm General contractor to install tiles so that they lay aligned vertically and horizontally with each other. Allow for 4mm grout line 4mm Grout
2750 FFL 0 SSSO SSSO SSSO SSSO SSSO SSSO DSSO J-1 BAR HANDLE TO ALL CUPBOARDS GR-1 EQ-18 EQ-18 EQ-18 EQ-18 EQ-21 EQ-21 EQ-15 EQ-15 EQ-16 EQ-16 EQ-17 EQ-17 EQ-22 P-7 PC-1 T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-1 SS-1 EQ-14 EQ-20 WT-1.2 WT-1.1 WT-1.3 SSSO SSSO 32A SINGLE PHASE SWITCHPLATE SWITCHPLATE JOINERY J03 BREAK Project: CREATING WORKPLACES FOR © M Moser Associates Limited. All designs are the sole property of M. Moser Associates Ltd. and may not be used, transferred, or disclosed to a third party without their express permission. Electronic copies of this drawing are supplied for convenience only. No dimensions or other information should be inferred from the electronic copy unless specifically shown on the hard copy drawings or specifications. Do not scale from this drawing. Figured dimensions only are to be used 'For Construction' and any scaling of the drawing will be a the Contractor's risk. Contractor to verify all dimensions, levels, and components on-site. Any discrepancies shall be addressed in writing to this office for clarification prior to the commencement of the work, otherwise the Contractor shall bear full responsibility for any associated cost. Any claims for variations or extras shall be submitted to this office for assessment prior to approval of any such variation or extra. This drawing is to be read on conjunction with all other contract documentation. DateRev Description DateRev Description CONSTRUCTION PAYPAL 5 FLEET PLACE C114/01/22ISSUED FOR CONSTRUCTION SCALE: 01 TEAPOINT 16-02 1:20 @ A1 C214/03/22ISSUED FOR CONSTRUCTION
29 B6 base track with B5 clip in bead 1x layer of 14.8mm acoustic laminated glass Note - Screen acoustic rating 40dB Rw RS32 door with 12.8mm acoustic laminated glass, 36dB Rw Integrated drop down seal CC bottom pivot, finished in RAL 9005 Dorma BTS75 floor spring w/cover galv lid to allow carpet to oversail 826 Leaf 910 O/A Frame Flush rebated frame Indicative guardsman pull handle, finished in RAL 9005 CC offset pivot, finished in RAL 9005 1000 700 1200 725 Clear Opening 300 O/A Tech Panel Approx 2750 Plywood pattress required above all glazing/doors (by others) D8 deflection head upper section D11 deflection head lower section CC top pivot, finished in RAL 9005 Acoustic floor barriers below partitions & doors (by others) Note - Deflection head detail incorporates +/- 15mm. +/-25mm can be provided however head will be 90mm O/A 75 75 19 8 26 54 26mm bands applied to either side of glass using 3M bonded tape See DWG 50-07 for proposed tech panel details 52 32 100 32 52 54 54 Description Drawing Title: Project: Cad File Name: Checked By: Drawn By: Dwg. No.: © M Moser Associates Limited. All designs are the sole property of M. Moser Associates Ltd. and may not be used, transferred, or disclosed to third party without their express permission. Electronic copies of this drawing are supplied for convenience only. No dimensions or other information should be inferred from the electronic copy unless specifically shown on the hard copy drawings or specifications. Do not scale from this drawing. Figured dimensions only are to be used 'For Construction' and any scaling of the drawing will be at the Contractor's risk. Contractor to verify all dimensions, levels, and components on-site. Any discrepancies shall be addressed in writing to this office for clarification prior to the commencement of the work, otherwise the Contractor shall bear full responsibility for any associated cost. Any claims for variations or extras shall be submitted to this office for assessment prior to approval of any such variation or extra. This drawing is to be read on conjunction with all other contract documentation. General Notes: © MMOSER ASSOCIATES LIMITED 2011. Scale: N CONSTRUCTION PAYPAL 5 FLEET PLACE LONDON EC4M 7RD 7-2092 PROPOSED PARTITION SYSTEM SINGLE GLAZED DOOR DOOR TYPE E 50-05C1 VARIES @ A3 IB SD C1 14.01.22 ISSUED FOR CONSTRUCTION 1:20 @ A3 1:20 @ A3 1:5 @ A3 1:5 @ A3 1:5 @ A3 1:5 @ A3 PLEASE NOTE: PROPOSED FRAMEWORK FINISH RAL 9005 BLACK (20-30%) PLEASE REFER TO THE DOOR SCHEDULE 81-01 FOR CORRECT SIZE OF DOORS PLEASE REFER TO THE IRONMONGERY SCHEDULES 81-02 FOR SPECIFICATIONS. (GFS1) TO RECEIVE HEAD CHANNEL. METAL STUD @ 600 CENTRES. 15 BOTH SIDES ON 50mm GALVANISED TILES 600 600 ON MF CHANNEL (GFS1) TO RECEIVE HEAD CHANNEL. 15 PLASTERBOARD FIXED TOP HAT TRIM SUPPORT BRACKET FIXED PROPRIETARY 15mm SUPPORT BRACKET FIXED SUSPENDED CEILING ON 70mm GALVANISED PLASTERBOARD FIXED SUPPORT BRACKET FIXED ON 50mm GALVANISED PLASTERBOARD FIXED SUPPORT BRACKET FIXED 150 54 SYSTEM HEAD TRACK BAFFLE IN VOID SUPPORT BRACKET FIXED PLASTERBOARD FIXED 1 LAYER OF 12.5mm BLOC TO BOTH BOTH SIDES TOP HAT TRIM 150 PLASTERBOARD ON MF CHANNEL BLIND BOX DIMS TBC PLASTERBOARD BOTH SIDES ON 70mm GALVANISED LAYER OF 12.5mm SHADOW LINE TRIM PLASTERBOARD BOTH SIDES METAL STUD @ 600 CENTRES. 15 ON MF CHANNEL TO SLAB 150 (GFS1) TO RECEIVE HEAD CHANNEL. TOP HAT TRIM METAL STUD @ 600 CENTRES. 15 FLANGE CHANNEL FIXED TO SLAB TO SLAB FLANGE CHANNEL FLANGE CHANNEL 150 FLANGE CHANNEL Date Rev Description Drawing Title: Project: Cad File Name: Checked By: Drawn By: Dwg. No.: Print Date/Time: © M Moser Associates Limited. All designs are the sole property of M. Moser Associates Ltd. and may not be used, transferred, or disclosed to third party without their express permission. Electronic copies of this drawing are supplied for convenience only. No dimensions or other information should be inferred from the electronic copy unless specifically shown on the hard copy drawings or are to be used 'For Construction' and any scaling of the drawing will be at the Contractor's risk. Contractor to verify all dimensions, levels, and this office for clarification prior to the commencement of the work, otherwise the Contractor shall bear full responsibility for any associated assessment prior to approval of any such variation or extra. This drawing is to be read on conjunction with all other contract documentation. Scale: N T (+44) 020 7621 5400 F (+44) 020 7621 5401 St Magnus House London EC3R 8HD United Kingdom CONSTRUCTION PAYPAL 5 FLEET PLACE 7-2092 CEILING JUNCTIONS DETAIL 1 75-01C2 1:5 @ A1 IB SD ** PLEASE NOTE **: JUNCTION DETAILS SHOWN ARE TYPICAL JUNCTIONS BEING DEMONSTRATED. THEY DIFFER THROUGHOUT THE FLOOR. FOR CORRECT ORIENTATION, ANGLES AND DIMENSIONS PLEASE REFER TO THE SETTING-OUT DRAWING. C214.01.22ISSUED FOR CONSTRUCTION
Role: Designer
Curzon Cinema
Aldgate Hospitality
16,000 sqft
Programmes: CAD
Scope: CAT B Design + Build Responsibilities
The new Aldgate cinema was to add to Curzon’s impressive collection of individually designed cinemas with a new 4 screen cinema, along with a restaurant and bar in an up and coming area of east london. I was the lead designer on the project taking it from concept to final build. This project was a great challenging experience at the beginning of my career where I gained an immense amount of knowledge on acoustics and cinema design.
Sarah Kitching I Portfolio 2024
Area Auditoriums Restaurant Toilets C URZONCINEM A NICNOZRUC E M A 08 Screen 02 Screen 03 Screen 04
Bar
31 Riser Restaurant Bar Lounge Screen 01 Kitchen Men’s WC Women’s WC Office
Auditorium Detail
Working very closely with an acoustic consultant and Curzon’s AV team we designed four ‘box in a box’ rooms to get the best possible sound, viewing angles and achieve no sound leaking to the level above which were residential units
Sarah Kitching I Portfolio 2024 Bar L C R SW RS LS RS LS RS LS RB LB projector A A B C E D A S S W 193 2102 1500 1500 1500 1500 1837 1380 3100 677 332 641 560 420 420 420 280 140 158 2199 1984 4152 Indicative, refer to contractors design Insulation Carpet 2no. Plywood Carpet 18mm Plywood 18mm Cement board 18mm Plywood 18mm Cement board 18 Plywood Stage 50mm Rockwool Resiliant Hangers Metal Frame 3no. 15mm Soundbloc board 50mm Fabric Panel L C R SW RS RS RS RB LB projector B C E D S S W 193 44° 2102 1500 1500 1500 1500 1837 1380 3100 677 332 641 560 420 420 420 280 140 158 2199 1984 4152 Timber Structure. Indicative, refer to contractors design Insulation Carpet 2no. Plywood Carpet 18mm Plywood 18mm Cement board 18mm Plywood 18mm Cement board 18 Plywood 50mm Resiliant Rubber mounts Stage 50mm Rockwool Resiliant Hangers Metal Frame 3no. 15mm Soundbloc board 50mm Fabric Panel Column 140mm blockwork 50mm mineral wool 90mm Stud frame 3no. 15mm Soundbloc board 50mm Fabric Panel
C URZONCINEM A NICNOZRUC E M A 08
33 Camera Supply IR Supply 16A for projector Quad data outlet 32U Server/Sound Rack 32A for server rack 3xDSSO 2xDSSO speaker junction box Masking Control Dimmer for auditorium lighting Light switch for projector room spot light and auditorium spot lights B A R XLR (for Snoop Mic) round pin socket for spot lights 1295 Masking Motor Fused Spur DSSO Quad data outlet DSSO Quad data outlet DSSO for PA Speakers DSSO for PA Speakers Patch Panel Subwoofer: QSC SB-1180 Central Stage Speaker: QSC SC - 1150 Right hand side Stage Speaker: QSC SC 1150 Left hand side Stage Speaker: QSC SC - 1150 Masking Motor Control Panel Angled Wall Angled Wall 2186 2883 820 820 947 1159 2013 975 1500 2871 2328 2858 2861 2236 1600 586 2104 2860 2859 2100 2013 975 1500 2871 2858 2100 3442 Camera Supply IR Supply 16A for projector Quad data outlet 32U Server/Sound Rack 32A for server rack 3xDSSO 2xDSSO speaker junction box Masking Control Dimmer for auditorium lighting Light switch for projector room spot light and auditorium spot lights B A R XLR Snoop Mic) socket lights 1295 Masking Motor Fused Spur DSSO Quad data outlet DSSO Quad data outlet DSSO for PA Speakers DSSO for PA Speakers Patch Panel Subwoofer: QSC SB-1180 Central Stage Speaker: QSC SC - 1150 Right hand side Stage Speaker: QSC SC 1150 Left hand side Stage Speaker: QSC SC 1150 Masking Motor Control Panel Angled Wall Angled Wall 2186 2883 820 820 947 1159 2013 975 1500 2871 2328 2858 2861 2236 1600 586 2104 2860 2859 2100 2013 2871 2100 3442 Camera Supply IR Supply 16A for projector Quad data outlet 32U Server/Sound Rack 32A for server rack 3xDSSO 2xDSSO speaker junction box Masking Control Dimmer for auditorium lighting Light switch for projector room spot light and auditorium spot lights B A R Surround Speaker: QSC SR-8101 Surround Speaker: QSC SR-8101 H460mmxW495mm structural opening (porthole supplied and installed by Curzon) round pin socket for spot lights XLR (for Snoop Mic) IP Camara IR Unit XLR (for Snoop Mic) round pin socket for spot lights 645mmx445mm structural opening (porthole supplied and installed by Curzon) 1740 5088 1837 4346 3046 1050 1295 DSSO Quad data outlet DSSO Quad data outlet DSSO for PA Speakers Patch Panel Subwoofer: QSC SB-1180 Central Stage Speaker: QSC SC - 1150 Left hand side Stage Speaker: QSC SC 1150 Angled Wall 2186 2883 820 1159 2013 975 1500 2871 2328 2858 2861 2104 2859 2100 2013 975 1500 2871 2328 2858 2861 2236 3123 1600 1694 2104 2860 2100 2859 3442 Camera Supply IR Supply 16A for projector Quad data outlet 3xDSSO 2xDSSO Masking Control Dimmer for auditorium lighting Light switch for projector room spot light and auditorium spot lights B A R Surround Speaker: QSC SR-8101 Surround Speaker: QSC SR-8101 H460mmxW495mm structural opening (porthole supplied and installed by Curzon) round pin socket for spot lights XLR (for Snoop Mic) IP Camara IR Unit XLR (for Snoop Mic) round pin socket for spot lights 645mmx445mm structural opening (porthole supplied and installed by Curzon) 1740 5088 1837 4346 3046 1050 1295 2013 975 1500 2871 2328 2858 2861 2236 3123 1600 1694 2104 2860 2100 2859 3442
Time Out
‘The Prettiest Cinemas in London’ Article
Tucked away in the City, this latest addition to the Curzon boutique cinema chain is a sleek four-screener. Cinema goers can sip cocktails in the mid-century-chic bar before heading to one of the neat and understated screening rooms and kicking back in a mustard yellow reclining seat. It’s a little bit ‘Mad Men’ and we love it.
Sarah Kitching I Portfolio 2024
C URZONCINEM A NICNOZRUC E M A 08
Finished Photos + Reviews
Londazed (Blogger)
...Hang on. Old things, a swanky bar... am I in a hipster’s paradise? Nah. It’s more authentic than that. This is a homage to old hollywood that somehow feels instantly cosy...
‘Great addition to the Curzon family’
‘I just love it! New, stylish (amazing design), so comfy, good quality. It’s a whole new experience of ‘going to the cinema’!’