Silver Lake Mixed Use Housing DD Set

Page 1

DRAWING LIST TITLE PAGE

G-101

CODE ANALYSIS

G-102

FIRE ACCESS PLAN

A- 100

SITE PLAN

A- 110

PARKING AND GROUND FLOOR PLAN

A- 111

SECOND AND THIRD FLOOR PLAN

A- 112

FOURTH AND ROOF FLOOR PLAN

A- 200

ELEVATIONS

A- 300

SECTIONS

A- 301

WALL SECTIONS

A- 400

ENLARGED FLOOR PLAN

A- 401

KITCHEN AND BATHROOM INTERIOR ELEVATION

A- 500

3D DETAILS

A- 501

DETAILS

A- 600

SCHEDULES

A- 700

RENDERS

E- 100

ELETRICAL PLAN

M- 100

MECHANICAL AND PLUMBING

S- 100

STRUCTURAL FRAMING PLANS

S- 101

STRUCTURAL FRAMING AXON

LOCATION

1650 SILVERLAKE BLVD. LOS ANGELES, CA, 90026

PLOT PLAN EFFIE ST. + 5’ - 0”

-3

N. OCCIDENTIAL BLVD

6’

1/

2”

COMMERCIAL: BOUTIQUE STORE- 1000 SQFT

HEIGHT LIMIT

COMMERCIAL: BOOKSTORE WITH OUTDOOR SEATING- 1000 SQFT

MAXIMUM HEIGHT: 45'

RESIDENTIAL: STUDIO UNITS- 4 UNITS- 500 SQFT EACH

MAXIMUM STORIES: NO LIMIT

RESIDENTIAL: ONE BED- 5 UNITS- 700 SQFT EACH

FAR: 3:1

RESIDENTIAL: TWO BED- 1 UNIT- 1000 SQFT

REQUIRED SETBACKS

OUTDOOR SPACE: 2368.5 SQFT

N NORTH ARROW

RESIDENTIAL: 5'

XX-XX

XX-XX

EXTERIOR ELEVATION

INTERIOR ELEVATION

SIDES 5' (+1' EVERY STORY OVER 2ND FLOOR RESIDENTIAL)

PARKING COMMERCIAL: 8 REQUIRED, 3 ON SITE, 5 OFF SITE (PARKING COVENENT)

BUILDING SECTION

XX-XX XX-XX

CONSTRUCTION GRID

CORNER CUT (GROUND FLOOR ONLY)

113’ - 1”

TITLE

DATE

1

FIRST PASS

4/11/22

2

FRAMING

4/19/22

3

DRAWINGS

4/22/22

4

SECTIONS

4/26/22

5

LARGE SCALE

4/29/22

6

ROUGH DRAFT 5/03/22

7

MEP PLANS

5/06/22

8

3D DETAIL

5/10/22

9

FINAL

5/13/22

RESIDENTIAL: 11 REQUIRED, 13 PROVIDED XX

XX

BUILDING USE ZONINGS

REVISIONS NO.

FRONT AND BACK

COMERCIAL: NO REQUIREMENT SILVER LAKE BLVD

PROJECT AREAS

TYPE V LWF OVER TYPE I CONCRETE PODIUM

+ 0’ - 0”

21’ - 2”

SYMBOL LEGEND

PROJECT INFORMATION CONSTRUCTION TYPE

1650 SILVERLAKE BLVD. LOS ANGELES, CA, 90026

SITE

G-100

MIXED USE HOUSING

VICINITY MAP

XX

LEVEL

MIXED USE RESIDENTIAL AND COMMERCIAL

[Q]C2-1VL DOOR TAG

89’ - 3”

XX

COMMERCIAL: C2 RESIDENTIAL: R4

OPEN SPACE AREA

5’ - 0”

PUBLIC: 3,395.5 SQFT PRIVATE: 1,043 SQFT

PL

POPULATION

DRAWN BY:

FOR RECENT COLLEGE GRADUATES TO YOUNG COUPLES

XX

XX

PROJECT MANAGER BARRY MILOFSKY

05/13/22

MATERIAL TAG

0

PROJECT ARCHITECT

POINT ZERO

TITLE PAGE

SARAH ETWARU STRUCTURAL ENGINEER

DATE: SCALE:

PROJECT TEAM

0 90’ - 8”

WINDOW TAG

SARAH ETWARU

PL

PROPERTY LINE

MARIA SVIRIDOVA MECH./ PLUMB./ELEC. ENGINEER

N

XX-XX XX-XX

CALL OUT

ERIC CARBONNIER

G-100


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Silver Lake Mixed Use Housing DD Set by sarahetwaru - Issuu