OLI ............
Interior Design POR
2009-2024
Hi, I'm Samantha Harte.
I've been an interior designer for fourteen years and love it!
Before I became an interior designer
I worked in operating rooms ass isting oral surgeons at Toronto's top hosp itals. I enj oyed what I did, but also had a passion for the arts On weekends, I'd binge-watch HGTV That is when I realized where my passion was.
Fast-forward years after completing my interior design education, I received an award for my thesis project.
Si nce I've been an interior designer, my medical and dental hea lthcare experie nce have bee n assets . I apply my technical knowledge to what is required ; designing eff icient, effective, and aesthet ic healthcare/dental environments. My reception areas become customer b rands
I also like to express my creativity through finishes and applications f or co r porate and healthcare.
My focus is on the individuals' needs in those spaces for long hours. Researching and assessing each case is crucial to me. I treat each project as unique to the client's needs. My creative drive st rives f or the best for clients' needs.
I've also designed corporate office spaces from new to retrofitting existing spaces. And dabb led in the retail sector in food courts and ha i r salons.
Dedicated and open-minded , a lifelong learner, I love challenges that make life and work i nteresting and demand design excellence.
I'm currently looking for new career oppo rtunit ies stretch i ng my horizon for new possibilit ies and goal s!
You could say design i ng is my passion. I love expressing my creativity and seeing my wor k come to li f e !
From carte blanche, repeat customers and their referra ls, my custom ers decla r e my success
Lastly, I'm working towards my NCIDQ certifica t ion, my next goal.
SAMANTHA HARTE
TORONTO, ON 416.576-2122
Samanthaharte5@gmail.com
www.linkedln.com/in/samanthaharteplan
SENIOR DESIGNER
IDC, LEED Green Associate
Senior Designer with 14+ years of experience and a track record of delivering successful projects on time and on budget. Created 70+ com pelling interiors between 2,0008,000 sq. ft, of corporate, healthcare, dental, ho spita lity, and retail projects. Lifelon g learner: finish NCIDQ certification in 12 months.
My motto is " Design Functional, aesthetic brand stories"
WORK EXPERIENCE
Senior Designer 6/2022- 07/2023 HOK, Toronto ON
• Nova Scotia Emergency Department P3 Project: With principal project designer; designed schematic space planning for the new emergency department. Designed room test fits, trauma -r es uscitation, isolation rooms, triage, cha ir care, waiting room, and reception area. Utilized Revit, dRofus.
• Humber River Hospital Wilson Site: Coordinated a drawin g package for renovation of doctor's lounge Managed project from initial design stage to completion. Utilized AutoCAD, Photoshop, and PowerPoint, and designed cabinet details.
• Humber River Hospital Finch Site: Prepared, presented executive summary for Reactive Care Centre. Led site review; documented ex ist in g sit e conditions and evidence regarding the stability of existing unoccup ied emergency department.
• Peel Memorial Centre New Addition P3 Project: Designed room test fits; isolation rooms, patient bedrooms, treatment rooms, diagnostic imaging. Contributed early sc hematic; inn ovative design solutions for th e butterfly method research and treat ment for cognitive patients Utilized Revit, dRofus.
EDUCATION
Diploma: Interior Design, 3rd year- Inter ior Design Fider (CIDA)
Professional Level Program Honours
International Academy of Design & Tec hno logy IA DT, Toronto, ON
Completed: 2005
George Brown College: Photoshop: 2005
Ryerson: Continuing Education: Introduction to Business Communication: 2004
CERTIFICATION
CaGBC : LEED Green Associate- 2019/present
NCIDQ: in progress
ORGANIZATIONS
IDC: 2022/present
ARIDO: in progress
WORK EXPERIENCE
Interior Design Professional 06/2007-06/2020
Bender Planning & Interiors, Toronto, ON
• OrthoSmiles King St W: Coordinated Project Specific Output Specifications for 1,000. sq. ft., led design of luxurious, orthodontic office, earned carte blanche, total trust from concept to completion. Received countless referrals from clients and colleagues
• CDI College Scarborough Campus: Led and developed innovative design floor plan concepts of 8,000 sq. ft, safe, practical, aesthetic, and beneficial to function, but to reflect the company's brand cu ltu re. Col laborat ed with outside stakeho lders, HVAC, and architects. Performed site visits measurements, initial meet & greet , and reviewed shop drawings.
• Established design guides for cli ents' needs, led to nati ona l mentions, and increased annual sa les.
COMPUTER SKILLS
AutoCAD- 15 years
Revit- 1.5 years
Adobe Photoshop- 14 years
Sketch Up- 1.5 years
dRofus- 1 year
Microsoft 365- 15 years
Bluebeam Revu - 1.5 years
Fieldwire - 1 year
CORE STRENGTH
• Gratified cli ents, count ess referral s
• Compre hensive eye for deta i l
• Abil ity to mu lti-task and manage mu ltip le projects
• Collaborat ion an d teamwork
• Increased client satisf action, recog nition
• Revenue generator
SOFT SKILLS TRAINING COURSES
• Mood Boards,
• Hand sketches
• Ab i lity to design compelling spaces, while working w ith compelling stakeholders
Linkedln Learning:
• Rev it 3D modeling 2020
• Rev it 2019- 2020
• SketchUp Interior Design 2020
• SketchUp Esse nt ial Traini ng 2020
CONTINUED RELEVANT EXPERIENCE
Responsible for managing multiple projects, from initial des ign stages to fabrication , to closeout.
Led projects i n preparation of wor king permits , construction drawings, project manual & materia l specifications, m ill work & door schedu es , FF&E schedu l es, furniture plans, con t ract documents, site admin istration to pr oject closeout
Crawford Metal Corporation and Luminous Financial : Managed proj ects from 2, 500 sq. ft to 6,000 sq. ft. from i nitia l desig n stages to fabrication, implementation to project closeout. Mainta i ned client's br and cu ture.
Furniture systems expertise
OBC requirements app l ication dur ing the initial design phase.
Fostered client relationships boosted sales led to Des igning additional offices.
• • • • • •
TABLE CONTENTS CORPORATE 0 1 LUMINUS FINANCIAL CORPORATE 05 CRAWFORD METAL CORPORATION INSTITUTION I CORPORATE 08 CDI COLLEGE RESIDENTIAL I CONDO 12 CONDO KITCHEN HEALTHCARE CLINIC My Health CENTRE FAMILY DOCTOR DR. I MARTIN ORTHODONTICS ORTHOSMILES GENERAL DENTISTRY GEORGIAN MALL FAMILY DENTAL GENERAL DENTISTRY DOWNTOWN CLINIC MISCELLANEOUS SketchUp I REVIT I TABLE DRAFTING 13 19 24 28 32 35
LUMINUS FINANCIAL
PROJECT: CORPORATE
ROLE:
Developed client's program
Designed: schematic, design development, construction documents
Completed project to permit application
PROGRAM:
AutoCAD, Photoshop, PowerPoint
CLIENT PROFILE:
I had the privilege to work with the CEO of Luminus Finacial; Mr. De La Rosa. They needed to expand for their growing corporation. He and his colleagues wanted to start a new era to create luminus Financial as a new alternative in financial services.
CONCEPT:
One Yonge Street was formally Starnews. A group of Toronto Star employees formed a credit union 1951. They were granted status to open a bond credit union, which was allowed to serve to any individual or organization in Ontario. Luminus Financial was in need of an executive office. The perimeter of the space provided full height windows all around to give every executive staff member full light and view of the waterfront.
LOCATION: 1 Yonge Street ,Toronto, Ontario
TENANT AREA sq.ft. 4,500
FINAL COMPLETION: 2011
01 • • • • • • • • • Q UEEN S QGAY NOT TO SCALE • • .. • • • • . • • .·. • • • • • • • • • .• • . ) :z.. • • • • • IAJ
SCOPE OF WORK
LUMINUS FINANCIAL PROGRAMMING BUBBLE DIAGRAM NIC • • CEO ACCOUNTING
02
MOOD BOARD
LUMINUS FINANCIAL FURNITURE PLAN & FF&E SELECTIONS ' I I ' I '0 ® ' I ' I ' I ·® I ' I ' I ' I ' !® I ' I ' I ' I ' !0 I ' ! 8 0 0 0 ® L __________________________________________ _ 03 WALL COVERING: V IN YL TEXTURED CHANTILLY LACE DESK TOP· SPRUCE CARPET TILE: STEE L GREY rfi{; Selections ACCENT LIGH TING ) ( ' BOARD ROOM SI DEBOARD WAL L FEAT URE WAITING ROOM
BOARD ROOM
LUMINUS FINANCIAL
PROJECT: WORK WAS IN PROGRESS: 2011
PROJECT PHOTOS
WAITING AREA TYP. EXECUTIVE OFFICE CALL CENTRE
0 CD MEETING ROOM 04
CRAWFORD METAL CORPORATION
PROJECT: CORPORATE
ROLE:
Developed client's program
Designed: schematic, design development, construction documents
Completed project to permit application
PROGRAM :
AutoCAD, Photoshop
CLIENT PROFILE:
Crawford Metal Corporation has been in business since 1977. We were referred to them by anot her client of ours with similar design planning. They needed to establish an office that would accommodate their purchasing, sales and accou nts department.
CONCEPT:
The client required an office for each department to work effeciently and have space to meet and not be interrupted . Plus meeting rooms and a boardroom for meeting perpective clients. The finishes reflect monochromatic colours such as; natural wood, stone, walnut, mocha and accent creme white.
LOCATION:
132 Sheppard Ave W, North York
TENANT AREA sq.ft. 6,ooo
FINAL COMPLETION: 2009
os 12'-10"
29'-6" Wilsonart wa lnut p-lam
Mannington flooring sheet vinyl
• I . t .J+mmmnNNNmmmm'm' 16'-7"'
Olympia tiles: calacatta marble
SPACES
LOBBY RECEPTION
( PRIVATE W/R) D IRECTOR OF SALES
PLANT MANAGER
(PRIVATE W/R) CEO
DIRECTOR OF PURCHASI NG SALES
GENERAL MANAGER
DIRECTOR OF IT ADMIN
ACCOUNTING
BOARD ROOM
MEETING ROOMS
PRINT/COPY WORKROOM
WASHROOMS STAFF LUNCH ROOM
FU RNITURE PLAN
FOLDED ADJ MATRIX
MANDATORY •
DESIRABLE •
NEUTRAL
CRAWFORD METAL CORPORATION
system
work
furniture
table & drafting chair
·• · • ·
office desk staff lunch room lmla 121 B AOA
RECTOR OF V v PURCHASING Lj boardroom ta ble & chair MEET NG RO M WORK ROOM 06
D meeting table & chairs guest chairs: lobby
D
CRAWFORD METAL CORPORATION
II , ll
PUL ·OUT I f!ICROI'IAVE I I 1/ICROI'IAVE I GARBAGf L __ JL __ J '-----9 -010 ' 21-010 21-010 21 11" ,, •II AOJ SHELVES ADJ •;ELVES AOJ S•rLVES EO EO t- - :- t- t----- -----H AOJ SHE VES (.: 21-010 l'r f!ICROWAVE CLEAR TYP II w ex; I DOUBLE SINK r = l _J EO = = PULL OUT fOR GARBAGE = = EO EO (.: ADJ SHELVES = = AOJ SHELVES = = J 11-5/2" ij 11-5/2" u11-4%" 11-411 ll 31-0 10 21-1)-2" 0 7 " RCP LEGEND NOTES : CEILING HEIGHT TO U/S T-BAR AND DRYWALL CEILING 9'-0" NEW CGC GRID CENTRICITY DXT # C WHITE 2x4 T-B AR GRID NEW CEILING TILECGC CLIMA PLUS WHITE A LL F ANS TO FAN LEG E ND BE CONFIRMED ON SITE I EF-1 IEF-2 IEF-3 IEF-4 IEF-5 PRIVATE - OPERATED BY SEP AR ATE SWITCH WI TH TIMER WASHROOM SUPPLIED AND NSTA LLED BY THE ELEC TRICAL CONTRACTOR PRIVATE - OPERATED B Y SEPARATE SWITCH WI TH TIMER WASHROOM SUPPLIED AND NSTALLED BY TH E ELEC TRICAL CONTRACTOR STAF F /WOMEN WASHROOM - OPERATED BY SEP ARATE SWITCH WI TH TIMER SUPPLIED AND INSTALLED BY THE ELECTRICAL CONTRACTOR STAF F /MEN WASHROOM- OPERATED BY SEP ARATE S WITCH WI TH TIMER SUPPLIED AND NSTALLED B Y TH E ELECTRIC AL CONTRACTOR STAFF-ROOM MAN UA L STARTER WI TH TIMER SUPPLIED AN D NSTALLED BY THE ELECTRIC AL CONTRACTOR LIGHTING LEGEND 0 RENESOLA: PAR SERIES: LED PAR 20 # RP20D007E0108 WATT 7 LU MEN S 4 70 (CCTK) 3000 CRI 80 BEAM 40 SIZE 2.48 H 3.39 (LED TYPE) COB (SHARP) EXI STING 2 X4 RECESSED L AMP (TO REUSE) lS IRENESOLA: PANEL LICHT SERIES: LED flECESSEQ MOUt:II 2 X 4 RLPD06010402 60 WATTS LUMENS 5100 CCTK) 4000 (L 23.66" X W 47 72 X H .39" CZJ REN ESOLA PANEL LIGHT SERIES: LED RECESSED MOUN T 2 X 2 RLPD4010302 40 WATTS LUMENS 3400 (CCTK) 4000 VAL ANCE LICHT UNDERMOUNT SUIT TO N EED OF SIZE H ZL CONCABLE12 ZEE LED 0075931 WHI TE SYMBOL LEGE ND 0 Exhaust Fan ven t ed a s ;nd;c ot ed sSingle pole nght switch NEW SIN GLE POLE SWI TCH-DECORA WHITE mJllliJh ' II II 0 0 II II IV llil- \ 0 0 II II 1/ I/ I/ V II lL 0 0 II 0 0 ol 1- $ 00 BB p --.....__ --.....__ '-... I 0 0 II II Fr II 0 0 0 II II I t- 0 0 0 v t- 0V II 0 1 t-r; bLr- II t-"0 v v v t'-- rT 0 I' v v 1 / II l t---fl II I ' o 0 0 0 0 $ t---f{ 0 IL' 0 I lL IL' Fr 0 II II fT ,.... II :::;::;: :::;::: ' II II 11 I I I I I 0 0 0 $ 0 0 II II li 1/ v • • tr-t- v / 11 IZ 0 0 0 0 0 0 0 1\ v / o • lL 0 0 7 I" 0 0 v I II I II / I/ [1 0 0 0 II 0 0 0 tz /"'-. 0 0 0 lL IL' RCP PLAN
CABINET DETAIL STAFF LU NC H ROOM CABINET DETAIL
--l r--
PROJECT: INSTITUTION I CORPORATE
IIIII
CDI COLLEGE (Scarborough Campus)
CDI COLLEGE (scarborough Campus)
PROJECT: CORPORATE I INSTITUTION
ROLE:
Developed client's program
Designed: schematic, design development, construction documents
Completed project to permit application
PROGRAM:
AutoCAD, Photoshop
CLIENT PROFILE:
The clients convey the mission of CDI College as The Centre on Diversity & Inclusion dedicated to examining the barriers and challenges to achieving a diverse and inclusive workplace.
CONCEPT:
CDI have their own personal branding for the colleges. We worked with the client's brand colours and incorporated our own elements to enhance the space.
We used three elements of nature in design -earth, water, air and key elements like wood, glass, stone. The large height windows supplemented natural sunlight needed for the labs.
LOCATION: 2131 Lawrence Ave E, Scarborough, TENANT AREA sq.ft. 8,ooo
FINAL COMPLETION: 2011
08 MOOD
• • FUTUR E DEVELOPMENT L. Lr
BOARD
CDI COLLEGE DETAILS, RCP AND WALL SCHEDULE WA LL SCHEDULE Existing demising walls Concrete block to underside of deck 1/2" drywall each side ULC DESIGN# 408, 3 5/8" STEEL STUDS@ 16 O.C WITH SOUND ATIENUATION 1/2" TYPE X GWB TO UNDER S DE OF DECK New part tion 3 5f8:' steel @ 16 O C. w 1/2" drywall Part1t1on He1ght to U/S of suspended ceiling Existing partition 3 5/8:' studs @ 16 O.C. w 1/2" drywall Part1t1on He1ght to U/S of suspended ce ling SID E LIT E SHEDULE FRAME PC350 ANNODIZED TO MATCH EXISTING A-3 3' N ew sid e lite to match exist ng 3'-0" A- 2 ,....__ N ew side ite to match existing 1 '-6 " 2' -0 11 A-1 "' I N ew sidelite to match existing 1'-6" G NEW SERVERY I -----' .:>{AVEOP 1 -Z,i " !: 2 -11" 2 I ::.:t I I 10 0 1--=I N i\.JI£' ::.t STAFF LOUNGE f-- rr==:l l ROOM 325 3 2'-1- " 1'-7- " 2' 2 !: 611 1l 1 AD SHELVES __:IN - - - - I-...j MICROWAVI CLEAR - I I• ;<., -I I E.Q f..- - t---E.Q ADJ! E.Q i-- - r-E.Q E.Q E.Q E.Q E.Q I 1 ' - 4" 2' - 6" 2' - 6" STAFF LO UNGE • LAB Q11!l I 0 I 1 / INEWVISIONEER NG 2 x 4 FLUORESCENT 3 LAMP MCTB T-8 ! . 0 0 0 0 j[ 0 0 - + I T i I 1 • .• 09
CDI COLLEGE
Reception desk Benjamin Moore 2065- 20 Classroom desk and seating-typical 10 Benjamin Moore OC-19 Office desk & chair-typical Staff lounge table & chairs 0 A-2 Q A-2 6 oo· SER eltt ON Q CUBIC G ELEVATION : RECEPTIO N AREA
SELECTIONS
CDI COLLEGE PHARMACY LAB HALLWAY 97' 9' I I CLASSROOM RECEPTION
LAB
11
COMPU T ER LAB
PROJECT: CONDO/RESIDENTIAL
ROLE : Developed client's program Project: Space planned with my associate Mr. Bender, coordinated all FF&E selections
PROGRAM: AutoCAD, Photoshop
CLIENT PROFILE:
The client was referred to us by our healthcare client. He purchased three condo units for his home, office busness and needed to upgrade the existing units.
CONCEPT:
The client requested a minimalist and uncluttered look. We provided a contemporary kitchen as requested. The finishes reflect simplicity with white and gray shades.
LOCATION: One King West Hotel & Residence TENANT AREA sq.ft. 200.
FINAL COMPLETION: 2019
I KING WEST KITCHEN
12
co co 0 STORAGE /CAB IN ET I COUNTER D/W 1 £0 r I SHELI/I ;::: I ll "' UNOE:RCOutn!RuGHiwG ... =. ,._ N f8 "' ....... E#\TNGOOUNTER ... h ;;; Olympia tiles su bway:white £0 I 1-1-Marble counter top £0II J1.11CROWAVEf I I FRIDGE PANTRY 6299 [20'-8"] £0 £0 £0 •o r I II I I I I - - 1-- 1-- 1 ADJ f'ELVES I I II I I I I II I I q I 1 ! I I I I "' ... I I ,._ N I I : 1...--:? I ., I l I I I I I6299 [20 -8 Benjami n re oc-ss Paper W hite NEW SHOWER 0 r--t--rt--r--tt- - (' _j KING BED BEDROOM
Selection
PROJECT: HEALTHCARE CLINIC IIIII MyHealth CENTRE
MyHealth Centre
PROJECT: HEALTHCARE CLINIC
ROLE:
Developed client's program
Designed: schematic, design development, construction documents
Completed project to permit application
PROGRAM : AutoCAD, Photos hop
CLIENT PROFILE:
Our client was recommended to us by an associate doctor in the field. They were in need of a Cardiology and Disciplinary facility. We were awarded the project because of our experience in healthcare.
CONCEPT:
The Sudbury Larch Cardiology Centre is a disciplinary facility with the state-of-the-art Diagnostic Services. They're a team of experienced Healthcare professional s, that deliver quality care .
Their motto is simp licity, calmness, warmth, and the feeling of being comforted and nurtured.
MyHealth knows the importance of promoting well ness to its patients. The ongoing treatments are beneficial to their healing for a better quality of life.
The Sunflower Well ness organic farm was our inspiration to develop the palette fo r the finishes. Upon entering the clinic, patients will env ision treading softly down the stone-edged gravel, brushing against the tall bright burst of yellow sunflowers, peering over the m with a smile
The cabinetry will reflect the majestic maple trees and be offset by the Calacatta marble with its rich thick veining against the wood.
LOCATION: 65 Larch St. Suite 402 &407
Sudbury, Ontario
TENANT AREA sq.ft. 6,ooo
FINAL COMPLETION: 2018
13 S U ITE 402 A ND SUITE 4 07 KEY
Mood Board N C SUITE 401
PLAN
MyHealth Centre
staff lounge
waiting room furniture
waiting room 402
staff office furniture typical
stress tests
14
ultrasound room
MyHealth Centre FINISHING
SCHEDULE
NOTES
1. SEE MANUFACTURERS SPECS FOR ADHES \IE 2 COORDINATE HEAT ROO
3 SEE MANUFACTURERS INSTRUCTIONS FOR INSTALLAT ON
1. SEE MANUFACTURERS SPECS FOR ADHES \IE
2 SEE MANUFACTURERS NSTRUCTIONS FOR NSTALLAT ON
1. SEE MANUFACTURERS SPECS FOR AOHESr<E
2 COORDINATE 'MTH CONTRACTOR
PT-3 WILLIAMS
PT-4 PAINT BENJAMIN MOORE
PAINT SHERWIN
PT-5 FOR DOOR WILLIAMS FRAMES BULKHEAD SHERWIN
PT-6 OUTSIDE WILLIAMS SURFACES
PT-7 PAINT SHERWIN FOR CEILING WILLIAMS
PT-8 SHERWIN CEILING WILLIAMS
PLASTIC LAM INATE
PL-1 P·LAM WILSONART JANBIBIC 416-319-8107
P-LAM WILSONART JANBIBIC
PL-2 416-319-8107
PL-3 P-LAM FORMICA SOPHIA RICKSON 905-960-0212
PL-4 SOLICOR WILSONART JANBIBIC 416-319-8107
JANBIBIC
PL-5 SOLICOR WILSONART 416·319-8107
ST-1 SOLID NICOLE COLASIMON SURFACE EASERSTONE 416-579·1188
SS-1 STAINLESS FORMICA SOPHIA RICKSON STEEL 905-960.()212
WALL TILES (BARR ER FREE WASHROOM)
PORCELAIN OLYMPIA RITA O'HARA
W-T1 MOSAIC 416·219-9059
GR-2 GROUT FLEXTILE
SANDED DECOMETAL COLLECTION
HC-4 &N7()25 TO MATCH \W-1 TO&N7()25MATCH \W- 1
7982-38
7990-38
8847·58
OJS.I
<925-38
•s1•1
REGAL SERIES NOT SANDED 612 SW7036 HC-162 SW7009
ACCESSIBLE BEIGE
BREWSTER GRAY (ACCENT WALLS)
PEARLY WHITE
BARRIER FREE SHOVI1:R WIROOM
SUPPLY & INSTALL COORDINATE 'MTH CONTRACTOR
STRESS RM AS MAIN COLOUR +ACCENT WORKSPACE AND ALL HALLWAYS+BOTH WAITING ROOM ALL 3 WASHROOMS
OR'S OFFICES+EXAM RMS+ECHO RMS+ECG ROOM STAFF-RM
OR S OFFICES+EXAM RMS +ECHO RMS+ECG ROOM
STAFF-RM PLUS ACCENT WALL
HAWTHORNE YELLOW STRESS ROOM ACCENT (ACCENT WALLS)
BACKDROP ALL DOORS AND FRAMES
BACKDROP OUTSIDE BULKHEADS FOR 402 & 407
EXTRA WHITE ALL DRYWALL CEILINGS AND INSIDE BULKHEADS
EXTRA WHITE DRYWALL CEILING FOR BARRIER FREE SHOWER
BUKABARK
MISSION MAPLE JARRAH LEGNO (CHOCOLAT COLOUR
DESIGNER WHITE
CALCUTIA MARBLE
FROSTY CARRINA
BRUSH STEEL
.2178 2"X2" 512 BONE
TAUPE POLISH BARRIER FREE SHOVI1:R I WIROOM
BONE BARRIER FREE SHOVI1:R W/ROOM
EGGSHELL FOR WALLS
EGGSHELL FOR WALLS
EGGSHELL FOR WALLS
EGGSHELL FOR WALLS
USE OULUX ARCYO EMULSION
WATER BASED LOWVOC PRIMER CN-/2 COATS OF DIAMOND STAIN TOP COAT
FLAT LATEX FOR ALL DRYWALL CEILINGS
FLAT LATEX FOR ALL DRYWALL CEILINGS
SEMI-GLOSS
SUPPLY & INSTALL AS PER FINISHES PLAN & MILLWORK ELEVATIONS
SUPPLY & INSTALL AS PER FINISHES PLAN & MILLWORK
ELEVATIONS
SUPPLY & INSTALL AS PER FINISHES PLAN & MILLWORK
ELEVATIONS
SUPPLY & NSTALL AS PER FINISHES PLAN & MILLWORK
ELEVATIONS
SUPPLY & INSTALL AS PER FINISHES PLAN & MILLWORK
ELEVATIONS
SUPPLY & INSTALL AS PER FNISHES PLAN & MILLOORK ELEVAT ONS ALL EDGES TOHAllE STRAIGHT POLISH MITER OUTSIDE UPPER TRANSACTIONTOP CORNER
AS PER
'MTH
: CODE ITEM COMPANY CONTACT PRODUCT ITEM DESCR PTION NUMBER COLOUR F LOORING SCHEDULE
VINYL GELLATL {EXCEPT BARRIER FREE FLOORING ALTRO·FLOOR 416 346 -0HO PATIERN: WOOO WSM2053 URBANCHERRY TRHOUGHOUT
VINYL JOHNSONITE JILL LAUGHLIN WALL-BASE 416-729·5455
PORCELAIN RITA O'HARA OLYMPIA MOSAIC 416-219-9059 STANDARD TOE 4" WALL BASE # 179 REGAL 2"X2" SERIES STEELWG TAUPE (MATI) LOCA TION::EPTBARRIERFREE TRHOUGHOUT IW1R BARRIER FREE SHOVI1:R I WIROOM ADD TRANSITION STRIP TO SUIT
FLOOR
FINI SHIN G SC HED ULE
FL-1
WB-1
FL-2
GROUT
CBARRIER FREE WASHROOM) GR-1 GROUT FLEXTILE PAINT SCHEDULE
PT-1 PAINT SHERWIN WILLIAMS 1·800-474·3794 PT-2 PAINT BENJAMIN MOORE PAINT SHERWIN
15
FULL
WALLS
SPECS
& INSTALL COORDINATE
CONTRACTOR CHAIR RAI L: SUITE 402 & 407 CODE ITEM SS-1 STAINLESS STEEL COMPANY CONTACT FORMICA SOPHIA RICKSON 905-960.0212 HAN DLES FOR CA BIN ETRY HANDLES BY RICHELIEU: PRODUCT ITEM DESCRIPTION NUMBER COLOUR DECOMETAL COLLECTION • me BRUSH STA NLESS STEEL #719128 6-11116" LONG STAINLESS STEEL OR OTHER LENGTH TO SUIT DRAWER FACE SIGNAG E: 402 & 407 RECEPTION: SEE CONTRACTOR FOR S GNAGE BEHIND RECEPTION DESK SIGNAGE ALUMINIUM LETIERING MOUNTED PANEL OF M LWORK MATCHING on 1!:!!1 -c I!:J LOCATION OF F INISH NOTES CHAIR RAIL+ OTHER CABINET DETAILS SEE DETAIL: EL407 SEE DETAIL: El402
INSTALL
MILL\\()RK DRAWINGS AND DETAILS SUPPLY & INSTALL
HEIGHT
COORDINATE
CONTRACTOR SEE
FOR MORE DETAILS SUPPLY
'MTH
MyHealth Centre
BENJAMIN MOORE: BENJAMIN MOORE: SHERWIN- WI LLLIAMS : SHERWIN- WILLIAMS: BREWSTER GRAY HAWTHORN YELLOW ACCESSIBLE BEIGE PEARLY WHITE
PLAN
WILSONART WILSONART WILSONART WILSONART P-LAM P-LAM SOLICOR SOLICOR
MISSION MAPLE BUKA BARK DESIGNER WHITE CALCUTTA MARBLE
OLYMPIA TILES: REGAL SERIES ALTRO-FLOOR: URBAN CHERRY
16
REFLECTED CEILING .. - • · PLAN N I. C Philips Day- Brite CFL recessed Flex Panel Led 17 [DETAIL 4-A] SUITE 402 RECEPTION DESK BULKHEAD JOYOLIGHT (ROPE) BULKHEAD + L ED EXTRUSION
CROSS SECTION lQETAIL 4-li] SUITE 402 l WAITI N G ROOM 2 X BULKHEADS JOYOLIGHT IROPE) BULKHEAD + LED EXTRUSI O N PLAN VIEW COVE LIGHTING CROSS SECTION -RECEPTION 7'-111" SEE BULKHEAD DETAILS FOR 407 & 402 SU TES IN DRAWING A2·B SUITE 4 0 7 LINE OF DRYWALL CEILING WAITING ROOM ";" - k.BUILDING STORAGE N .I.C . -SUITE 40 2 . --... - -"' / N. I. C N .I.C / > N .I. CRECEPTION SUI TE 4 0 2 WAITING ROOM F HC ,-' typica WAITING ROOM I
MyHealth Centre
MtVEUGHTONG
MyHealth Centre
Reception Desk 402 PLAN VIEW ..... GLASS DETAIL FRONT ELEVATl ON - ,----BULKHEAD FLOOR T O CE ILING GLASS PRIVACY PANEL VIALL PLAN VIEW Finishes Exterior & Side Of Desk ST-1 CAESARSTONE 5141 SS-1 INSIDE AND RECESSED PL-1 WILSONART - LO _,_STURDY PULL-OUT SHELF SIDE VIEW BULKHEAD 1 -I SIDE ELEVATION I; SIDE ELEVATION I I S DESPLAS I PL-3 I I L __ _ Section Rece tion Desk Privac Panel 402 RECEPTION DESK W ITH PR VACY GLASS PART TION STAINLESS STEEL CHANNEL RECESSED IN BULKHEAD TO SECURE GLASS PANEL SECURE 6mm TEMPERED GLASS FROM FLOOR TO DECK WITH APPROPRIATE CHANNEL WHERE INDICATED OLISHED EDGE STA NLESS STEEL CHANNEL TO SUIT L sACKPLASH PLAN VIEW FRONT ELEVATION I TOEKICI< J'-3. F INISHES: ALL VERTICAL: PL-3 (FORM ICA 8847-58) COUNTER & BACKSPLASH : PL-5 (WILSONART SOLICOR 4925-38) HANDLES SEE F INISHI NG SCHEDULE CAB NET DETAIL TYP I !.. I r--I PL-3 I I • I I 18
DR. I MARTIN
PROJECT: FAMILY DOCTOR
ROLE:
Developed client's program
Designed: schematic, design development, construction documents
Completed project to permit application
PROGRAM :
AutoCAD, Revit, Photoshop
CLIENT PROFILE:
Our client a a long time friend to one our other medical doctors. This is Dr. Martin's first medical offce. We were honoured to work with her.
CONCEPT:
The project provided a physical wellness place. Enabling, aesthetically hospitable comfort in aestheticaly enhanced surroundings extracted from nature. Finishes, incorporated the look of shale rock, nordic wood and green moss.
LOCATION: 3280 BLOOR ST.W.
TENANT AREA sq.ft. 1,105.00
FINAL COMPLETION: MARCH 2020
19 3280 BLOO R STREET WEST SUITE 143 WAS HROOMS MAIN FLOOR BLOOR IS LINGTON PLACE
EXTERIOR 3D VIEW: STAFF ROOM
NORTH ELEVATION
ELEVATION: STAFF ROOM
PROGRAM: AutoCAD '
REV IT
WEST ELEVATION EAST ELEVATION
3D VIEW: WAITING ROOM
3D VIEW: PRIVATE OFFICE
3D
STAFF ROOM
ELEVATION: PRIVATE OFFICE
ELEVATION - WAIT ING ROOM
FAMILY DOCTOR
VIEW:
20
FAMILY DOCTOR FLOOR PLAN & ELEVATIONS TYP EXAM ROOM 1A RENDERING-MEDIUM NURSING STATION 2A RENDER NG-MEDIUM 21 i EXAM ROOM ELEVATION 1A RENDERING-REALISTIC i l..·- -·- -·- -·- - - -·-·-·-·-- - - - -·- -·- -·- -·- -·- - - - - -·J I PLAN VIEW NURSING STATION ELEVATION 2A RENDERING-REALIST C II -- [B Prog ram: AutoCAD-exam room cabinet detail-typical fO fO fC fO 0 0 0 0 '!'" I --- I . --r• ! - I 7
DOCTOR
FAMILY
FURNTURE { FINISHING PLAN
Wilsonart-light oak P-lam
HC - 173
Benjamin Moore
OC - 134
Benjamin Moore
Formica paloma- polar
WEST ELEVATION NORTH ELEVATION
EAST ELEVAT ON
" Art work
Benjamin Moore CC- sgo
Global- roma chair
Global-meeting room chair
22
Selections Global-princeton table Global-sidero chairs
DOCTOR SUIT TO SIZE 23 FULL LITE TEMPERED GLASS SEE DRAWING A4 DETAI L 1-C DOOR# 7 VIEW A \'!1 0TH OF DOOR v.1TH 2" FRAME
D f>PEC 2X2 LED F LAT RECESSED LAMP T-BAR APPLICATION 4000K I WH TE 120V SPEC 2X2 LED FLAT RECESSED LAMP DRYWALL APPLICATION 4000K WHITE I 120V L I _______JI SPEC 1X4 LED FLAT RECESSED LAM P DRYWALL APPLICATION 0 SUITE TO I SIZE NEEDED ® 4000K WHITE I 120V 4" ROUND DOWNLIGHT LED LUMENS 750 COLOUR TEMP : 3000K WHITE TRIM VALANCE L I G H T S UIT TO NEED OF SIZE UNDERMOUNT H ZL CONCABLE12 ZEE LED 0075931 WHITE XACARACL-R WEB PIN#613 30A LED 300K 80 CRI WH WHITE ABOVE MIRROR 1 X (3'-0") 1 PIECE WAL L SCONCE FOR 1 WASHROOM 3' lo o ol BETACALCO: RAIL-UTE II RECESSED BEH ND RECEPTION DESK 1X (AK5/ BA7/R2/F1/N 1/B 1 D 1 ) ABREVIATIONS DETAIL ;:.uL VVUUL HM HOLLOW METAL p 1PAINT(see paint
DOOR & HARDWARE SCHEDULE CONTACr BEN RUBINI 0 CITY 'M OE DOOR & HARDWARE TEL 905-26 4-4401 E EXIS TI NG- '""" "t.u:- ,..... "'"" """" DOOR SPEQFICATIONS "" DOOR """"""' """ w<JRCAN Cl\JIOR!CAL t.V.UISET 3'-0"X 7'-0"X 1 3/4" A sc p H.M p """""' N A 1 ,........,. OfACE Ra..EftlNSH SAllH NIO<O. 2 sc H.M """"""" ''" A p p """" 3'-2"X 7'-0"X 1 3/4" .. """" ,........,. 3 """"'"""' 2'-B"X 7'-0"X 1 3/4" A sc p H.M p """"" N/A ICfLOCK 4 A sc p H.M p "' WORCAH C'I1..NlRICAL t.£\£RStl 3'-2"X 7'-0"X 1 3/4" """'"""' flOOR WH4000$(111[$AifSII;RAI)(% ,........,. " """'' """"""" "' 5 3'-2"X 7'-0"X 1 3/4" A sc p H.M p FlOOR WH 4000 SUlliES .-NSI GftAll( 2 ,........,. n """'' HIO<D. A sc """ ::""'"""" "' 6 3'-2"X 7'-0"X 1 3 4" p H M p "'""'""" flOOR WH 4000 stJbE:S AH$1 ($W)( 2 ,........,. """"' WH 40 SR()IAEJ'WISH $A1W NtOCD. 7 3'-2"X 7'-0"X 1 3/4" c FULL p H.M p STAffROOM N A WH4000 $UatSA.H$1GRJ« 2 WITH TRANSOME UTE WH 40SROWEftlNISH SAllH NtOCEl (SEE OETAILS) RC&ItftlNISH SATtt NIQ(Q. ,........,. BELOW& + ORAWINGA4 OETAIL 1-C TRANSC ME FUL H.M "' 8 3'-2"X 7'-0"X 1 3 4" B SC LITE p p DOCTOR """" WH 4000 SERIES AH'SI CRADI: 2 WOUNT 3'-2"X 7'-0"X 1 3 4 " B FUL OR.IoWUIN "' 9 SC LITE p H M p FlOOR OCKSEJ WOUNT WH omc:t I.OCX DOOR """"' N/A N A N A N A N A N A N A N A N A I DRAWINGS ARE TO BE READ IN CONJUNCT O N W ITH TH E ENG NEER ALL LOC ATIONS TO BE VERIFIED ! L eo•• 1....-- ,(./ v ·I IL IlL:: I/ ' ? uu- ( ( l1i\ IC STAJ ROOM - hrS ( ... I ! _.>;. 1:>-.. 1---:--..._ / I) '0 )-o ( DO< L:::::: L:::::: L:::::: 1,® nv:. ( T i ( v r- v L / v \.. j@ ( IL:: IlL:: [2J \ , v .'.)c 1'--=' =U
t / IL ( @ loo: 3 IL I ( ._, r \ 36 inch 1 pi ece waLL sconce [2] [2J / [ / / L ·-• @ ( fREE m. L:::::: ..,,P[;;/ / . --i.&l.:-!.li. . 3 19- f-..,[I Beta- Ca Lco RAI L LI TE ST TUN80P '--::(1) ""' /. @ h-- 1·r .::;. ;-::; ( , X0 TONG <::T -...,_" 101 'f>' lo l _:t'=-+·- - "" XIST NG """""" ......... _ <HlER<UT WINIMUM 1/2 S£E O.OTfOR f'ROS'nNC OCSION 8Y OTHERS SEE aJEHl OR rR0$11NC OCSICN YOnt(RS sa: Q.OIJ OR FROSTINGOCSICN B Ol'HE1t$ CEOL>NG I Xacara CL- R LEGEND: EXISTING DEMISING WALLS NEW P ART TI O N 3 - 5 8" stee studs @ 16 O C w 1 2" drywall Partition Height o U/S to - bar & drywall c e ng SUSPENDED DROP DOWN CEILING-RECEPT ON LIGHTING SYMBOLS: A L L SIN G LE POLE LIGHT SW TCH BARRI ER FREE P ATH O B C (A-3.8 1 .5 (1)(a) (;;)CON TROLS ALL L GHT SWITCHES TO BE FROM 36" AFF 900mm - 1100mm ABOV 3 WAY SWITCH (BARRIE R FREE) OLUME CONTROL (BARRIER F REE) XHAU ST F A N VENTED AS ND CATED THE FI NISH FLOOR)
FAMILY DOCTOR RCP PLAN & DOOR SCHEDULE
LIGHT FIXTURES LEGEND :
schedule)
v
ORTHODONTICS 111111 OrthoSmiles
OrthoSmiles
PROJECT: ORTHODONTICS
ROLE:
Developed client's program
Designed: schematic, design development, construction documents
Completed project to permit application
PROGRAM:
AutoCAD, Photoshop
CLIENT PROFILE:
We had previously completed renevation work for his father's orthodontic practice. Dr. Laski had total confidence in us to design his new practice. I worked with him from concept to completion. I was given carte blanche!
CONCEPT:
LASKI ORTHODONTICS practice philosophy is to craft a beautiful smile for everyone with the highest quality of orthodontic care.
The clinic is situated in mid-town Toronto, on the concourse level. The majority of the patients are adults which makes it convenient for the employees of the underground path.
The boutique-style clinic concept will have an upscale feeling of a spa, with one-on-one personalized attention.
The chosen finishes mimic a hotel of a resort in Bora Bora. The countertops are like the white powder sands of the beach. The colours throughout the clinic reflect the clear crystal turquoise waters of the ocean
The treatment rooms give you the feeling you're in for a relaxing massage while having your treatm ent.
What better way to take time out during the day or after work and leave with the feeling you've just experienced a day at the spa.
LOCATION: Concourse level, 145 King St. W.
TENANT AREA sq.ft.698.
FINAL COMPLETION: August 2012
24 UNIT 15
BOARD
PLAN Wilsonart-pewter mesh clinic cabinetry Corian-artic ice counter O peratory Benjamin Moore 2125-50 Benjamin Moore 2138-60 interlocking rock panels #Cliff RECEPTION WA I TING ROOM OP-1 D !( 0 IJBox Global: ,----------STERI CENTRE 6OP-2 D" , 0 0 "" 0 0 IJ.BOX I CONSULT PRIVATE PAN/CEP H Consult room Wind lounge chairs FLOOR SCHEDULE I PORCELAIN TILES OLYMPIA BYZANTIUM 13.1'' X 13.1" L._ _, AZZURRO BLUE 362123 (CODE RO.BY.AZR.1313) 11- + + +i VINYLLSI L • • • ELEMENTS NICK EL EL 1612 ENGIN EERED WOOD FLOOR LAUZON E HARD MAPLE AZURITE SEMI GLOSS 5 3/16" WALL BASE: CENTURA ROPPE: PINNACLE PLUS 616 PLATINUM #35 4 9/16" COLOUR 616 PLATINUM WAI TING ROOM WEST WALL ONLY
BASE: CENTURA ROPPE: PINNACLE PLUS 197 ICEBERG #35 4 9/16" COLOUR 197 ICEBERG THROUGHOU T CLINIC Abet laminati 879 Global: roma chair waiting room wall panel 25
ORTHODONTICS
WALL
EUREKA OTY•4 (12!>10-2x1)BASS 12540 2X1
LIGHT SOURC£(l£0 BW) 120V TRIM: 'MilfE/R NG FINISH: 'MilfE/ ENCLOSURE 'Mi rE (see specs f0< full fo UNION LIGHTING f----..1 ZEE l£0: 0075931 WHITE SUIT TO NEED OF SIZE UNION LIGHTING
UNOERMOUNT HZL CONCABLE12
[]
WAI TING ROOM PENDAN 1 180
QTY • 5 PENDANTS FOR DROP DOWN CE1LING{EUROFASE)
#20445 24' X 2 3 16" SILVER/UGHT PENDANT COLOUR# 027 SATIN NICKEL)
LAMP(GU10/10W l£0/120V (TO BE l£0 NO OTHER)
UN ON LIGHTING
fOR GlASS CABINET X 4 & PRIVAfE OfFICE CABINET X 2 TOTAL OTYz 6
© GLASS CABINET RECESSED LEO LIGHTS
(PRODUCT BY REVLITE QTY•4 X EVOLVE REQUIRED PARTS 130104- 30 300QK HOUSING
ORTHODONTICS PLAN l2J '1:TJT, l£NS BY PH UPS/CANLYlE --D 4 X LIGHT SCONCE CLINIC HALLWAY LIGHTING: PLATEAU SCONCE UB-061 2FQ26-120 'Mi (SEE OESIGHER (SAMANTHA) FOR SPEC INfO) CHECK LOCAL D STRIBUTER (ANY QUESTIONS TO CONTACT REP ® QTY• 16 4-1/2" APERTURE RECESS CALCUUTE l£0 OOWNUGHT LEO BY PH UPS/CANLYlE CAT# C4L100L35KWHW C/W CAL10N1 120VOLTS FOR DRYWALL CEILING APPUCAnON WAITING ROOI.I OTY=11 NEW W/R 0TYz1 (TO CONTACT lool
3W l£0) Wall sconce: Manning Plateau Pendant Eurofase 130135 ( 25 dO<J l£NS)- 30126 36mm FACE TRIM BEVELED ECCE (sM cabinet detai s fOI' locat on)
CONTACT REVLITE TECHNOLOGIES INC Alter Concept 26 Philips I Canlyte LED Lamps o o o! WAITING ROOM o []] o j I @ ·o o o · L ___________ _j PLAN LEGEND
Duplex receptacle He ghts are indicated TYPIC AL N OP'S (£] CABLE TV BOX @:: Du plex receptacle sc sep ara te circui All Computer receptacle s @:: Grou nd fault receptacle AFF GFI OR AS SHOWN WITHIN 1M OF SINK IN OP CAB. Isolated Ground receptacle SEPARA TE C RCUI T <J Telephone out e t- SEE NOTES w<J Wall Mount Telephone out et @ 50" AFF Fax /Modem outlet Split Receptac e «}- Com pu ter outlet -with aluminum f ex condui t to cei ing space 1/4" for wiri ng from main frame or CPU 3/4" from all other equipment with pla steri ng r ing w/fish wire AL L LOCAn ONS & HEIGHTS TO BE VERIFIED SEE OTES M$ Moster switches for water, air, vacuu m with pilot lights Usc 18- 3 Th ermostat wire to lighted pilot sw tch for vacuum and compressor $ Sing e po e light sw tch 1" Condu i for data and /or electronic w ri ng (by others) CONFIRM SIZE VIITH IT CONTRACTOR 0 Conduit termina es at junction box • Conduit Riser to c e ing spa ce for data wir ng En try bell by alarm company BY OTHERS MUSIC WIRING. STEREO. VOLUME CO TROLS BY OTHERS!
(TO
@::
STORE FRONT SECTION STORE f"RONT CLASS OOOR 1w STAIN LESS \ SUILOINC TENANT CEILIN G COVE \ STEEL C'-- AR TE M PERED Oc 1/2. CLASS DOOR HANDLE TBO .TOE KICK STAINLESS STEEL STAI N LESS STEEL A:AIL Photos hop Jl u 1 F'RAMELESS DOOR. TOP PIVOT. CLOSURES. LOCK NG DEVICE AT BASE ADO DOOR STOP. DOOR HANDLE BOTH SlOES TBO CLEAR TE M PERED CLASS WI T H KLEATS AT '-'OINS FI NISH IN BRUSHED SATlN STAINLESS STEEL VERIFY DIMENSIONS ON SI T E H FIN ISHING SCHEDULE: VERTICAL ABET LAMINA Tl 879 GRAIN WOOD FRONT PANEL: ABET LAMINA Tl 286 LUC DA TRANSACTION TOP : CORIAN GLACIER ICE UNDER TRANSACTION TOP LED STR P LIGHT • COUNTERtop: P ON ITE PYRENEES MARBLE ME011-G GLOSS: HANDLE RICHELIEU: # 21691128 COLOUR: 174 MATT CHROME Reception Desk Detail ear- UPS CPU ANG LOCK FlLE . L£0 LIGHTING STR P FRONT ELEVATION SIDE VIEW ADJ SLOTS / [1 KBD ABE T lAMINAn 286 LUOD:Y PANEl.. v 27
ORTHODONTICS Front Entrance Detail
GENERAL DENTISTRY
PROJECT: GEORGIAN MALL FAMILY DENTAL
ROLE:
Developed client's program
Designed: schematic, design development, construction documents
Completed project to permit application
PROGRAM: AutoCAD, Photoshop
CLIENT PROFILE:
Back in 2010 the client was referred to us by a previous client. The client needed her dental office to be redesigned with an addition for he r growing practice at The Woodbine Centre Mall. She was thrilled with the new transformation of her office. Giving our client the opportunity to expand her practice. We loved her.
CONCEPT:
Right in Barrie, Georgian Mall is one of the largest in the community. This ever expanding mall has all the necessities, except for a dental office.
The mall attracts shoppers and ski enthusiasts. The city of Barrie is surrounded by hills which are great for skiing! There's an abundance of resorts and chalets for skiers near and far.
We took our inspiration from those ski resorts and chalets with a touch of luxury! We wanted Dr. Hulbert's office to welcome the community with w hat Barrie is known for, their ski resorts.
The finishes reflect a spa-like feeling like a stone hearth fireplace with fresh cut logs from the client's cottage. The flooring will incorporate the look and feel of reclaimed barnwood.
The lighting showcases mimicked deer antlers as wall sconces leading t he patients to their treatment rooms. The reception desk will be decked with the look of gas lamps The waiting room will have chalet-style wall paneling welcoming patients as they first come in and relax in a luxury chalet-style resort.
LOCATION:
509 Bayfield St. Barrie, Ontario
TENANT AREA sq.ft. 2,470.
FINAL COMPLETION : MARCH 2012
28
l •
BOARD
GEORGIAN FAMILY DENTAL BOARD RECEPTION DESK CORIAN : WITCH HAZEL ROYAL LIGHTING OPERA TORY WILSONART: CABINETS ' ' ' ' ' ' ' ' ' ' N "' HALLWAY WAITING ROOM F OR LOCKING GATE RECEPTION ROYAL LIGHTING 0 FULL SET UP 67'-5 ST RICE TRE 0 : ! WA IT ING ROOM OFFICE STAFF ROOM NAPO LEON FIRE PLACE ELECTRIC EFL 48 CHAIR SOURCE 29
INTERFACE:
CARPET TILE
RAW FACTORY OLYMPIA: PORCELAIN TILE AVENUE COLLECTION
FLOOR SCHEDULE:
SOLARBRITE:
VINYL PLANKS
HERITAGE BARNWOOD
PORCELAIN FLOOR: OLYMPI A
AVE N UE COLLECT ION
12 X 24
COLOUR : IVORY # DM.AV .I VO I 224
WALL BASE JOH N SONITE M ILLWORK
STYLE# INFLECTIO N H= 5 25"
COLOUR: SECT ION B # 08 ICICLE
CARPET : INTERFACE
RAW I 0 05G FACTORY
BASE: MATCH I NG CARPET
VINYL : SOLARBRITE (V I NYL)
HERITAGE B A RNWOOD G X 3G
WALL BASE JOHNSONITE MILLWORK V /////.Ai
STYLE# INFLECTION H= 5.25" V/////__,.11
COLOUR: SECT ION B # 08 ICICLE
WALL SCHEDULE:
• FEATURE WALL: @ RECEPTION
ERTHCOVER IN(;S SF-RP SILVER FO X STRIPS (LIMESTONE)
BENJAM N MOORE AURA
W A TERBORNE INTERIO R PAINT
DRYWALL CEILING & SUSPENDED CEILING AT RECEPTION DESK
DRYWALL CEILING: CC 40 BENJAMIN MOORE AURA
"P=t 2141 - 60 WALL PAINT
P-2 2141-50 WALL PA N T
P-3 0C-36 WALL PA NT
P-4 HC-99 WALL PA NT
e 2141-60 DOOR & FRAME
<f3 2142-70 DOOR & FRAME
30
GEORGIAN FAMILY DENTAL
--
PLAN A-1 A-1 ErthCOVERINGS SILVER- FOX : LIMESTONE
..
BENJAMIN MOORE
I;QFF!Cf< ""'"' 2 141-50 2141-60 OC-36
PANA
RECEPTION DESK FINISHES
FINISHES:
TRANSACTION TOP: CORIAN: WITCH HAZEL
COUNTER: WILSONART 4880-38 LAMINATE
VERTICAL: OCTOLAM # 905 SEDA AFRICANA LAMINATE
TOE KICK: WILSONART 4880-38 LAMINATE
HANDLES : RICHELIEU #311128 FINISH: 185
FINISHING SCHEDULE
COUNTER TOPt FU LL BACKSPLASH t SIDE SPLASH CORIAN: BISQUE
2 CORIAN PULL OUT SHELVES: GLACIER WHITE
VERTICAL: WILSONART 4944-38 LAMINATE
TOE KICK: WI LSONART D9G-GO LAMINATE
HANDLES: RICHELIEU 70G I FINISH #I 95
HARDWARE: SOFT CLOSE
SINK: SEE PLUMB ING DRAWING
METAL PERFORATED SHELVES
GEORGIAN FAMILY DENTAL I I ""LL REQUIRE GROMETS ""LL REQUIRE GROMETS WALL EQ IE.Q •• CLEAR I I TYPICAL E Q E.Q 0 - CPU-.. 1·- ·· ,._... .. I r -
DETAIL SLOTS TYPICAL AOJ AND REMOVABLE TRANSACTION TOP COR SLOTS TYPICAL 6" CLEAR ""LL REQUIRE GROMETS ADJ AND REMOVABLE \ Q 0 CPUOPEN CPU.. ,._.. . '-rPERFORATED STA NLESS STEEL GRILL TO LET STEAM OUT DETAIL ,,/ , E.O / E.O v ,--"' all OJ SHELVES jYP. CLEAN 1- ROOM TO VENT TRAY RACKS t-DIRTY TRAY RACKS H - =·1-' t--GLOVES G0 0i I II I I 1 VALANCE VALANCE I STABLE FOR HEAVY LOAD PULL OUT CORIAN SHELF FULL BACKSPLASH It FULL BACKSPLASH \-12" COUrTER S CE SIDE SPLASH I 5oa8"V STABLE PULL OUT CORIAN SHELF = I 1111 = II ULTRASONIC L __ COUNTER TOP w PULL OUT II = = GARBAGE SINK 1---- ADJ JSO FIT 2 BINS ACK TO BACK u ADJ SHELVES = 1---=
• = t-= c ,I l l 31
GENERAL DENTISTRY
PROJECT: DOWNTOWN CLINIC
ROLE:
Developed client's program
Designed: schematic, design development, construction documents
Completed project to permit application
PROGRAM: AutoCAD, Photoshop
CLIENT PROFILE:
Dr. Saadat was a client of ours two years prior. We designed her first practice in North York. She was delighted... and especially pleased with the finish design. She wanted us to design her next office located on Yonge St. And history was made!
CONCEPT:
The interior facilitates an easy flow for a large dental office, six operatories and exam rooms. The operatories were given priority on the full light windows, giving the patients a lot of light to de-stress. With Dr. Saadat's charismatic personality, we chose finishes that reflected her. Finishes from gold and pink copper accents to serene effects like marble, soft wood.
LOCATION:
FINAL COMPLETION: 2016
819 Yonge St. Toronto, On TENANT AREA sq.ft. 2,900.
32
ZA NE EN : ONE SUSPE NSION
GOLD LEA F
PENDANTS
COU NTER
CORIAN:
GLACIER
WHI T E
UNIO N
LIGHT IN G
GLOBAL CONTRACT
HA NOV ER MAPLE
VERTICAL
CABINETRY
OCTOLAM: 171
WILSONART:
CLIN IC
CABINET RY 4942-38
CORIAN:
VENERA WHITE
STERI-CENTRE
PORCELA IN FLOORING
OLYMPIA:
CALCUTT A MATT E
24 X 24 LU
GLOBAL CONTRACT:
STAFF ROOM TABLE
FINISH:
AVAN T HO NEY
MILLIKEN
EUCALYPTUS I
VIN YL FLOOR
G LOBAL CONTRACT
DUET CHAIR
DOWNTOWN CLINIC Finishes OC- 135
BENJAMIN MOORE r-
WA ITIN G ROOM NEXT UNIT
J
L__ ____,
NCH ROOM 33
DOWNTOWN CLINIC NEXT UNIT I TOWER \ -----------, '------- ----------, W] [M ! ruRiliGIJ'¥NF STERI-CENTRE ALL ADJ SHELVES """"""""' r o! WTN.TlAl1 """"""""' 1 / ''"""'""""" 1-- rCWWCI!I'riC.\l -----1 IUXI Uflll\'tU.W: IX SECUtiFORvo::»n c.usrmn II ; """ "' ..,.. '""'"'n 11 lllfTN.iJW()A.lllO """"wsmu I r""""'"""' I I lWIIIIIESIIl'tU.tJif 0 0 ,...... ,..... """' • SI\00\'1\AlM ! """"""""' """"""""' .' AIDSIIEPWIII01M SIDD AIDSUSfi.MIItoniSIDD ;' .' ... SOFTCLOSI: IX = = t--;:- I IX"""'"""" CORIAH: VENARO WHITE r-1-111(0 COIINTER TO BE CORIAH 1'-+ SIDESPLASH &BACKSPLASH f- 1-- ..,... VERTICAL: Wll.SONART 00-38 = TOE KICK FORMICA:1-HAHDLE MARATHON: 9lll-SSC I I I AU.Oifeft*ll.tKOfW.'IIIOC*IETS TOIJS('tm'Un:JII -.off@ ISI,.OC.a,TUI 34 DOOR 8. H A RDWAR E SC H E DU L E c E XI STI N G }" - ?" ICYPE A •I • h.rrwwsnm ..,.,I ,----6H -r---! I W] .W.WHI.'ID bl -OOIYWiml II I I fa .... ----- ---...L. """' SCUDT?.AYIMX I I 00 I I """7 "'· '"""' """""""" .. [""1 , """'""""" ,__ _J """" "-""''"' ""' """"" l ..,..,.. X 2 7 rnrn CLA SS L£A0 CLA SS 1.6 l.E A O COVI V ,. , A =..,.--. .,. - - --·--· N/A ::... """,-u LL UTE TE.M PERCD z ·-•o ;:::::::::=; ffi AM£L£SS METJ L. DOOR ... ··'TD'P'Dti!D Q.A$S 2 0 ANOO ZI:O Al.U M N U M lfYPE Bl SOLID CORE LE AD LINE DOOR STERI - CEN TRE ITYPE 0 1 I !TYPE El VI S SOLID CORE WOOD M 2 0 M N UTE FIRE RATED M T A L DOOR 1(,; G e.;p.:;r,cEA'LUf:4 ;;..,u M 18 - X ta·· H M HOLLOW M ETA L P A N T see oin sc:h & dul& - NEW FR AM ELESS DOOR WITH SIDE LITE CONSUL T R OO M FR A ME LESS 84.. AFF F ROM DR YWA LL CEIUNC A.F .F. 8-'0"" ANOO IZEO ALUMINU M CHAN EL TEMPERED GLASS BUTT JOIN (NO SILICONE) « T E MPERE D B .z:. '---.. f--1 '-i ALUMINUM 1-.I.::±==::J I D ETA I L H - 1 DOOR FOR DETA LS CONTAC B HARDING GLASS .....,.,...,. .._._.......
MISCELLANEOUS
SkechUp I REVIT I HAND DRAWINGS
IIIII
SOUTH
35 EQ3 sl:lrd floo- lamp sha::Je bl<d EQ3sola-oska-85" bou:ler g:>ld WEST Auea- 140 x&J.dxf Mesa de CEOtro 'te- matt steel legs g<rll SOUTH EAST Minimal TV wall U'lit 2 Nab.ral maple wocd
Sketch Up PROJECTS: MISCELLANEOUS
PROGRAM: Sketch Up FINAL COMPLETION: 2021
FINAL COMPLETION: 2021
MISCELLANEOUS PROJECT: REVIT PROGRAM: Revit, Photoshop
EXTERIOR ELEVATION VIEW.f«>RTH . •• • :i lEVEl 1 Pl.AH SCALE 3132 1" 0'" Exterior View
View Levell • ,._ I I __ -e I LEVEL 2 Pt..AH SCALE 3132'"111"·0'" Interior View Level 2 • I I J ' ; ; I I
Interior
MISCELLANEOUS PROGRAM: Hand sketches, Table drafting
& AutoCAD 3D, Photoshop
Site plan
The track light system will be suspended twenty inches from the ceiling and will be approximately 3'-6" between both walls. Adjustable Luminaires will be used to accommodate different viewings at different times.
The track light will be utilized to display art and a temporary bar.
Two pendant lamps will be suspended the at the far end of the room to display a guest book on opemng mght
During the day, the table will be for general information on upcoming events. In front of the window display t here will be a partition wall to display artwork and art1st names for the upcoming event.
Interior design class project: 2004
two story house on the Toronto Island
Table drafting
Re ndering: markers & pencils
Exterior elevation
Thesis project: 2005
2004
'lliE DODSON PROJECr Inte rior e levation 37 itaJJ F.rr l .:=:=--
The International Affair
The rising of the National Club on Bay Street AutoCAD 3 D rendering, Photoshop
303 BAY STREET 303 BAY STREET
Renderi ng: Photoshop Rendering: pencils/markers Rendering: pencils/markers
SAMANTHA HARTE
samantha ha rtes@gmail.com
www.linked ln.com/in/samanthaharteplan cell: 416.576.2122
I