C A N H O P E ( C C A C )
PROJECT TYPE: COMMUNITY CENTER
PROJECT ROLE: PROJECT COORDINATOR
PHASES: PRE DESIGN & CONCEPT DESIGN
HOLABIRD AND ROOT HAS A STANDING RELATIONSHIP WITH THE WONDERFUL PEOPLE OF THE CHICAGO CHILDREN’S ADVOCACY CENTER (CCAC). H&R HAD THE HONOR OF DESIGNING AN ADDITION TO THEIR FIRST BUILDING YEARS BACK. WITH THAT SUCCESSFUL ADDITION, THE GROUP AT CCAC GRACEFULLY ASKED H&R TO START
PRIMARY ROLES: CONCEPT IDEATION, PRECEDENT STUDIES, SPACE ANAL.
SOFTWARES USED: REVIT, ENSCAPE, ADOBE SUITE, SKETCH UP
TIME ON PROJECT: FALL 2021 - SPRING 2022
STUDYING THE EXISTING SPACE FOR RENOVATION, ALONG WITH CONCEPTUAL DESIGN FOR A GROUND UP ADDITION TO THEIR EXISTING FACILITY KNOWN AS THE CAN HOPE CENTER. THIS FACILITY WOULD HOUSE A LOT OF THE PROGRAMS THAT ARE STARTING TO SHIFT MORE TOWARDS THE CARE OF ADULTS, AND ADOLESCENTS.
A BIG PORTION OF PRE DESIGN AND SCHEMATIC DESIGN FOR THE CHICAGO CHILDREN’S ADVOCACY
CENTER WAS SPACE PLANNING, CLIENT COMFORT AND MOVEMENT THROUGH THE MASSING, AND SPACES THAT HAD RELATIONSHIP WITH NATURE, AND SUNLIGHT. WHEN CLIENTS ARRIVE AT THE CENTER THEY NEED TO FEEL SAFE AND COMFORTABLE. HOLABIRD & ROOT THOUGHT A INTERIOR COURTYARD WHICH IS AWAY, AND HIDDEN FROM MAIN ROADS WOULD HELP CLIENTS FEEL SAFE AND PROTECTED WHEN ARRIVING. THE PITCHED ROOFS ALLOW FOR SUNLIGHT TO BE BROUGHT DOWN INTO SPACE THAT WOULD NORMALLY NOT RECEIVE MUCH LIGHT, AND ALLOW THE CLIENTS TO NOT FEEL TRAPPED IN SPACES.
C A N N I N G C E N T E R
PROJECT TYPE: HIGHER EDUCATION
PROJECT ROLE: PROJECT COORDINATOR PHASES: SD, DD
HOLABIRD AND ROOT HAS HAD A LONG LASTING RELATIONSHIP WITH HARPER COLLEGE, ITS ADMINISTRATION, AND THE LOCAL COMMUNITY OF PALETINE. HOLABIRD OVER THE YEARS HAS HAD NUMEROUS PROJECTS AT MANY DIFFERENT SCALES ON THE CAMPUS. WITH A RECENT GROWTH IN ADMISSIONS THE COLLEGE AND ITS
PRIMARY ROLES: EXT. MODELING, ITERATIVE RENDERING, AND ELEVATIONS
SOFTWARES USED: REVIT, ENSCAPE, ADOBE SUITE
TIME OF COMPLETION: WINTER 2021 - SUMMER 2022
COMMUNITY HAD DECIDED TO PROPOSE A NEW STUDENT CENTER/UNION. THIS FACILITY WOULD HOUSE OFFICES, CLASSROOMS, FOOD AMENITIES, LABORATORIES, COMMUNAL SPACES, AND A NEW SITE DESIGN EXPERIENCE. IT WAS IMPORTANT TO INTEGRATE SOME OF THE EXISTING CHARACTER BACK INTO THE PROPOSAL.
EARLY ON IN SCHEMATIC DESIGN PHASE ALOT OF EFFORT WAS PUT TOWARDS THE PROGRAMMING OF SPACES AND HOW THEY WOULD BE ORGANIZED IN PLAN AND IN SECTION. THIS PROGRAMMATIC PLANNING WOULD HELP THE TEAM UNDERSTAND AND START TO INTERATE PATTERN MAKING DECISIONS ALONG THE FACADE BASED ON THE SPACES RELATIONSHIP TO THE EXTERIOR. THE DESIGN TEAM HAD WEEKLY OR BI-WEEKLY MEETINGS WITH THE COLLEGE TO GO OVER PROGRESS OF ELEVATIONS WHICH WERE RENDERED IN ENSCAPE TO HELP UNDERSTAND PATTERNS, MATERIALS, PATH OF TRAVEL, LANDSCAPE , AND OVERALL CONCEPT .
W A D S W O R T H ( I S )
PROJECT TYPE: EDUCATION
PROJECT ROLE: PROJECT COORDINATOR
PHASES: DD, CD, & CA H O L A & R
HOLABIRD AND ROOT HAS HAD A LONG STANDING RELATIONSHIP WITH WADSWORTH PUBLIC SCHOOLS AND HAS BEEN ABLE TO HAVE THE OPPORTUNITY TO DESIGN MANY OF THEIR K-12 EDUCATIONAL FACILITIES. WITH A RECENT GROWTH IN NUMBERS IN THE MIDDLE SCHOOL GRADES WPS DECIDED TO ADD AN INTERMEDIATE
PRIMARY ROLES: ALL EXT. MODELING, WALL SECTION DEVELOP., AND ELEVATIONS
SOFTWARES USED: REVIT, NAVIS WORKS, ENSCAPE, ADOBE SUITE, MICROSOFT OFF.
TIME OF COMPLETION: SPRING 2022 - SPRING 2025
SCHOOL WHICH WOULD CONTAIN 5TH AND 6TH GRADES. THIS FACILITY WOULD HOUSE A FULL AUDITORIUM, GYMNASIUM, TWO CLASSROOM WINGS, A LARGE ADMIN AREA, AND A BAND AND VOCAL WING ADJACENT TO THE AUDITORIUM. PROJECT WILL BE IN CA DURING THE SUMMER OF 2024.
1. EAST ELEVATION - COURTYARD CURTAINWALL 2. ENLARGED 100 LVL PLAN - COURTYARD
WALL SECTION - COURTYARD CURTAINWALL
DURING THE CONSTRUCTION DOCUMENT PHASE A LARGE AMOUNT OF TIME WAS SPENT CONCENTRATING ON THE NOT SO TYPICAL WALL SECTIONS. ONE OF THOSE INSTANCES IS SHOWN HERE:OF A LARGE EXTERIOR CURTAINWALL WHICH IS THE CENTER PIECE OF A COURTYARD BETWEEN TWO OF THE CLASSROOM WINGS. THE COURTYARD CURTAIN WALL DETAILS WERE HEAVILY THOUGHT ABOUT IN THE PLAN ORIENTATION BECAUSE OF THE WALL INTERSECTIONS HAPPENING AT AN INSIDE CORNER. ANOTHER CHALLENGE WITH THIS INSIDE CORNER WAS THAT THERE WAS ALSO A FIREWALL NEARBY WHICH AFFECTED THE PLAN DETAIL, AND ITS ADJACENT OPENINGS NEARBY.
1. SOUTH ELEVATION - MAIN ENTRY CURTAINWALL
2. ENLARGED 100 LVL PLAN - ENTRY VESTIBULE
3. WALL SECTION - MAIN ENTRY CANOPY
1. EAST ELEVATION - END OF WING TERRACE
2. ENLARGED 100 LVL PLAN - CLASSROOM
3. WALL SECTION - END OF WING TERRACE
C R E S T V I E W K - 12
PROJECT TYPE: EDUCATION
PROJECT ROLE: PROJECT COORDINATOR
PHASES: DD, CD, & CA
HOLABIRD AND ROOT BEGAN THEIR RELATIONSHIP WITH CRESTVIEW LOCAL SCHOOLS BACK IN 2018 AND 2019 . THE PROJECT HAS EVOLVED MANY TIMES OVER THE COURSE OF 8 YEARS BEGINNING WITH ALMOST 3 YEARS OF PRE DESIGN AND SCHEMATIC DESIGN , AND A PARTIAL DESIGN DEVELOPMENT PHASE. IN LATE 2019 THE PROJECT
PRIMARY ROLES: DESIGN DEVELOPMENT, MODEL COORDINATION, CONSTRUCT. ADMIN
SOFTWARES USED: REVIT, NAVIS WORKS, ENSCAPE, ADOBE SUITE, MICROSOFT OFF.
TIME OF COMPLETION: SPRING 2022 - SPRING 2025
WENT ON HOLD BECAUSE OF COST ESTIMATION AND COVID CONCERNS. IN LATE 2020 DESIGN DEVELOPMENT WAS RE-IMAGINED AND THE FULL K-12 SCHOOL WAS COMING IN AROUND THE BUDGET THAT WAS EXPECTED. THE DESIGN DEVELOPMENT PHASE INCLUDED A STRICT PATH TO BUDGET PROCESS FOR HOLABIRD AND ALL CONSULTANTS.
MATERIAL MAPPING CONCEPTUAL SKETCH
HIGH SCHOOL ELA LEARNING STAIR
LATER STAGES OF DESIGN DEVELOPMENT BROUGHT DESIGNS OF DOUBLE HEIGHT SPACES TO BE CAPPED WITH LONG CURVED ROOFS TO HELP DEFINE THE SPACE WITHIN. IN THE IMAGE ABOVE BOTH CURVED ROOFS ARE SHOWN, ONE ABOVE THE PERFORMANCE GYM SPACE WHICH WILL SERVE AS MUCH MORE THAN JUST A GYM BUT AS A COMMUNITY EVENT SPACE FOR THE TOWN, AND SECOND IS THE MAIN ADMIN SPACE AND ENTRY CANOPIES. THE SUBTLE CURVE IN THE FRONT OF THE BUILDING IS A CALM INVITATION TO ENTER THE BUILDING.
BAND & VOCAL SUITE SKETCH
NORTH VESTIBULE SKETCH
PERFORMANCE GYMNASIUM SKETCH
PERFORMANCE SUITE SKETCH
THROUGH THE YEAR S OF DESIGN DEVELOPMENT AND VALUE ENGINEERING CAME A LOT OF SKETCHING ,IN BOTH 3D, PLAN, AND ELEVATION TO COME UP WITH THE APPROPRIATE DESIGN THAT FITS WITHING THE BUDGET MODEL AND ALIGNS WITH THE OWNERS WANTS, AND NEEDS. WHEN WORKING ON MASSING, AND EXTERIOR ITERATIONS THROUGH SKETCHING SOME TOPICS THAT CIRCULATE ARE: MATERIAL MAPPING, PROPORTIONS AND DATUMS, LEED DAYLIGHTING CREDITS, AND RELATIONSHIP BETWEEN INTERIOR FUNCTION AND EXTERIOR DESIGN CONCEPT.
W H I T E
DESIGN EXP.
3 yrs
8 mo
K-12 & HIGH ED.
BIM & REVIT PUBLIC WORK
PROJECT COORDINATOR _ HOLABIRD & ROOT
EDUCATIONAL WORK: K-12 & HIGHER ED.
WORK IN COLLABORATION WITH A DESIGN TEAM AND CONSULTANT TEAM TO EFFECTIVELY AND EFFICIENTLY DELIVER PROJECTS DURING MULTIPLE PHASES: SD, DD AND CD. SOME TASKS INCLUDED: ITERATIVE EXTERIOR STUDIES, EARLY SITE PACKAGES, STAIR AND AUDITORIUM MODELING, ENSCAPE RENDERING, A LOT OF REVIT MODELING, AND WALL SECTIONS + DETAILING.
BIM EXPERIENCE: REVIT, NAVIS, AND CLIMATE STUDIO
WORK IN COLLABORATION WITH ONE PROJECT ARCHITECT AND ANOTHER PROJECT COORDINATOR TO EFFECTIVELY PROVIDE AND COORDINATE CLASH DETECTION RESULTS FOR CONSULTANTS. ABLE TO LEAD CONSULTANT MEETINGS WITH AN AGENDA REGARDING THE CLASHES IN THE BIM MODEL. ALSO ABLE TO RUN BIM MODEL THROUGH CLIMATE STUDIO TO AID IN COMPLETION OF LEED CREDITS.
PUBLIC WORK: ADVOCACY + FAMILY CENTER
WORK IN COLLABORATION WITH A SMALL DESIGN TEAM TO EFFECTIVELY AND EFFICIENTLY DELIVER PROJECT DELIVERABLES DURING PRE-DESIGN AND SCHEMATIC DESIGN PHASES. SOME TASKS INCLUDED: ON-SITE PROJECT CONTROL MEETINGS, CONCEPTUAL DIAGRAMS, ITERATIVE PLAN PROGRAMMING, AND COORDINATION OF EXISTING + DEMO + NEW PHASED DRAWINGS.
6 mo.
ARCHITECTURAL INTERN _ NM & R ARCHITECTS
CIVIC, HEALTHCARE, & EDUCATIONAL
WORKED IN COLLABORATION WITH A WIDE RANGE OF DESIGN TEAMS TO EFFECTIVELY AND EFFICIENTLY DELIVER PROJECTS DURING ALL PHASES OF THE DESIGN PROCESS. SOME TASKS INCLUDED: REVIT CONSTRUCTION DOCUMENT CREATION; SKETCH-UP MODELING + RENDERING, WEEKLY PROJECT MEETINGS, SITE VISITS, STRUCTURAL COORDINATION, AND PLAN PROGRAMMING.
EDUCATION
‘14-’18 ‘19-’21
REFERENCES
M.ARCH _ ILLINOIS INSTITUTE OF TECHNOLOGY
B.ARCH _ UNIVERSITY OF NEBRASKA-LINCOLN
RUSTY WALKER - PARTNER, HOLABIRD & ROOT
JAMES BAIRD - ADJUNCT PROF/ASSOC, HOLABIRD & ROOT
*can provide contact information upon request