407 LINE CONVERSION TO SUPPLY THREE PHASE POWER AT THEMEMBER’S REQUEST

Item Cost

Setting a pole

Advertisement

$ 300.00 Retiring a pole $ 100.00 Setting a guy/anchor assembly $ 120.00 Retiring a guy/anchor assembly $ 50.00 Setting a transformer $ 100.00 retiring a transformer $ 75.00 setting a meter loop $ 75.00 retiring a meter loop $ 75.00 Setting a recloser $ 100.00 retiring a recloser $ 100.00 setting a line lightning arrestor $ 25.00 retiring a line lightning arrestor $ 25.00 moving one conductor -- per foot $ 0.25 setting a capacitor $ 50.00 retiring a capacitor $ 50.00

When relocating a line results in adding to the length of existing facilities, the cost of the added facilities shall be paid by the member based on the cost per foot as stated in Section 402.1, “Cost per Foot of Line”.

When underground line is relocated, the cost shall be paid by the member based on the cost per foot of new cable as stated in Section 402.1, “Cost per Foot of Line”.

When a third party (a person or entity that does not receive electric service from the facilities in question) requests the relocation of the Cooperative’s facilities, the third party shall be responsible for acquiring all necessary easements and permits. The cost of relocating primary poles, transformer poles, primary guys/anchors, primary conductor, and associated equipment, as well as any meter poles or service equipment, shall be paid by the third party, according to the table above, prior to commencement of the project. For special projects such as line relocations for state/federally funded highway, road or bridge projects, or when the actual cost differs more than 15% from the calculated cost based on the above referenced table, the actual cost shall be used.

407 LINE CONVERSION TO SUPPLY THREE PHASE POWER AT THE MEMBER’S REQUEST

When a member requests a conversion of an existing power line to supply three phase power, the member shall pay the cost of the length of conversion at $10.00 per foot.