Flood plain excavation in millingerwaard

Page 1

Flood plain excavation in Millingerwaard

Current situation

New situation

dyke

Channels are being excavated in the Millingerwaard flood plain area. This will give the river Waal more space during high water levels and will ensure better distribution of water between the Waal and the Pannerdensch Kanaal (channel).

dyke

high water

dam

channel

dam

high water Waal

Waal

Clay and sand will be extracted until 2020, to create channels as a result.

N W

N839

E S

GENDT

Millingerwaard (flood plain)

Key to map:

Millinger Theetuin (tea garden)

Planning area ‘text’

Pannerdensche Kop

modified / new situation clay and sand

existing objects

Millingse dam

new, removed or replaced objects new channel

(provincial) road

Waal

MILLINGEN A/ D RIJN

conduit quay

current dyke

The channels will allow the Waal to discharge an increased volume of water during high water.

removing trans-shipment firm

national border

Pannerdensch Kanaal (channel) Millingse dam

KEKERDOM

MILLIN G EN AAN D E RIJ N

The channels flow into the Kaliwaal.

Waal channel

Kaliwaal dyke

Planning 1 2 3 4 5

Effect Preparation phase Project decision Start of work Delivering water safety Completion of project

9 cm drop in water level during high water. Scale:

1 2010

www.roomfortheriver.nl

2011

2 2012

3 2013

4 2014

2015

5

0

500 m

2020 Jan 2015 / 2


Dyke relocation at Lent (Room for the River Waal Nijmegen)

Current situation

New situation dyke featuring homes and vegetation

The existing dyke at Nijmegen/Lent is to be relocated inland and will also create a channel. This intervention will widen the narrow section of the bend in the river Waal between Nijmegen and Lent, allowing the river to discharge more water during times of high water levels.

Waal

planning area ‘text’

island

seepage barrier and quay

development

Waal An urban river park with nature and recreational activities will be created. There will be space for homes to be built on part of the new island.

Citadelbrug (bridge)

N Key to map:

high water

farmland

secondary channel

W

E

N325

S

NIJMEGEN

( LENT)

modified / new situation existing objects

VEUR- LENT

new, removed or replaced objects new dyke / quay removed dyke

Promenadebrug (bridge)

railway bridge

new bridge new channel

quay

extended Waalbrug (bridge)

NIJMEGEN

current

NIJMEGEN- NORTH

dyke

bar

Waal

future buildings

Waalbrug (bridge)

LENT

(provincial) road

During high water, the secondary channel will flow alongside the Waal.

Citadelbrug (bridge)

railway track

bar extended Waalbrug (bridge)

bridge 'De Oversteek'

NIJMEGEN

Promenadebrug (bridge) railway bridge

Planning

Waalbrug (bridge) 1 2 3 4

Project decision Preparation phase Start of work Delivering water safety

Effect 34 cm drop in water level during high water. Scale:

1 2011

www.roomfortheriver.nl

2

3 2012

2013

4 2014

0

500 m

2015 Jan 2015 / 3


Lowering of groynes and longitudinal dams on the Waal

Current situation

New situation with lowered groyne

New situation with lowered groyne

(low water level)

(low water level)

(average water level)

The groynes have shipping beacons. These will be relocated and extended.

Thereby ensuring the navigation channel remains visible during high water.

beacon

450 groynes are being lowered and partly replaced by longitudinal dams between Gorinchem and Nijmegen, allowing the river Waal to discharge more water during high water levels, as a result.

Groynes will be lowered (±1 m) over a section of the river Waal spanning roughly 60 km between Gorinchem and Nijmegen.

N W

E

Mid Waal

S TIEL

A2

A15

DRUTEN WAMEL

GELDERMALSEN

A50

NIJMEGEN

OPHEMERT

beacon

GORINCHEM

Waal longitudinal dam Z A LT B O M M E L

Key to map: ‘text’

modified / new situation

lowered groynes

lowering groynes longitudinal dams motorway The groynes in the inner bend of the river between Tiel and Ophemert are to be replaced by longitudinal dams. The longitudinal dams run parallel to the direction of the river, making it easier for the water to flow.

Planning 1 2 3 4

Effect

Lowering 70 groynes between Nijmegen - Winssen Lowering groynes between Nijmegen - Tiel Lowering groynes between Tiel - Gorinchem, longitudinal dams between Wamel - Ophemert Delivering water safety 1

2009

www.roomfortheriver.nl

2 2010

2011

2 2012

3 2013

3 2014

6-12 cm drop in water level during very high water. Scale: 4

0

5 km

2015 Jan 2015 / 5-6-7


New situation alongside the dammed Meuse

Flood plain excavation at Munnikenland

high water

The dyke in Buitenpolder Munnikenland and the Brakelse Benedenwaarden (flood plains) is to be relocated and there will be channels created to allow water to pass through during times of high peak discharges from the river Waal.

Dammed Meuse

New situation

heightened access road through Maaskade

Castle Loevestein

The flood plains at Loevestein

new dyke

cycle path

tiered dyke

Buitenpolder 1

vegetation

high water

2

A heightened access road is being constructed to keep Castle Loevestein accessible for as long as possible at high water. The dotted line shows how high the water can get once every five years.

The new dyke is being constructed as a tiered dyke with viewing points for cyclists and walkers. The dotted line shows how high the water can get once every 1,250 years.

N W

E

Castle Loevestein

S

Buitenpolder het Munnikenland

Waal Key to map: planning area ‘text’

tiered dyke VUREN (Wakkere Dijk)

2

verhoogde toegangsweg

1

N830

modified / new situation existing objects new dyke Waal

dyke to be dug off new channel / open water

Brakelse Benedenwaarden (flood plains)

Castle Loevestein

dyke (provincial) road heightened access road cycle path

Gandelwaard (flood plain)

WOUDRICHEM

1

Buitenpolder het Munnikenland

The flood plains at Loevestein

dam

Planning 1 2 3 4

me

dM

2

eus

Maas quay

Effect

e

Project decision Preparation phase Start of work Delivering water safety

11 cm drop in water level during high water. Scale:

1 2010

www.roomfortheriver.nl

2

3 2011

2012

4

RIJSWIJK

2013

0

2014

2015

industrial estate

400 m

N322 Jan 2015 / 8


Depoldering Noordwaard (flood plain)

Lowering the dyke will create an inflow opening.

The Noordwaard (flood plain) is being depoldered by partially digging up the dykes on the river side and reducing the size of the ring of dykes. This will allow the river Nieuwe Merwede to flow through the Noordwaard (flood plain) to the sea more swiftly at high water. Furthermore, the water safety will increase in Gorinchem.

Fort Steurgat

dyke

A27 A15

high water

high water flood area

1

2

osier thicket

high-quayed polder

N W

An innovative dyke is being built at Fort Steurgat. Creating an osier thicket will reduce the wave load on the dyke, allowing it to be constructed lower.

E S

DORDRECHT

Key to map: planning area ‘text’

modified / new situation new quay / dyke high water flood area current high-quayed polder

Following the depoldering, the high water flood area will be underwater at least several times a year (primarily during the winter months). The new situation will require the buildings to be located on existing or newly constructed dwelling mounds.

old ring of dykes 23

Nie

uw

e

rw Me

The land outside the high water flood area will remain suitable for agriculture. The current inhabitants and a proportion of the farmers will be able to continue living and working on dwelling Noordwaard (flood plain) mounds. The high water flood area itself will remain partly suitable for cattle farming.

ed e

future ring of dykes 23

1

WERKENDAM

2

Fort Steurgat

A27

Facts and figures

high water flood area

70 km of quays and dykes 50 km of new road 29 dwelling mounds and customized solutions 38 road bridges 12 pumping stations and 17 wind-powered watermills 4 million m3 surface transport (c. 300,000 x )

dyke motorway (provincial) road

National Park De Biesbosch

Planning 1 2 3 4

Effect

Project decision Preparation phase Start of work Delivering water safety

30 cm drop in water level at Gorinchem and 60 cm drop next to the inflow opening in Werkendam. Scale:

1 2009

www.roomfortheriver.nl

2 2010

3 2011

2012

4 2013

2014

0

2 km

2015 Jan 2015 / 10


River widening of Overdiepse Polder

Current situation

The dyke on the river Bergsche Maas is being lowered, allowing river water to flow through the Overdiepse Polder during high water as a result. On average, this will occur every 25 years. A new dyke will be constructed along the Oude Maasje. The eight farming companies remaining in the polder will be moved to dwelling mounds.

New situation

farming companies

dyke

dijk

Oude Maasje

high water

farming companies on dwelling mounds

lowered dyke high water

Oude Maasje

Bergsche Maas

Bergsche Maas

Bergsche Maas

N Key to map:

W

defence ground

A27

S

planning area ‘text’

E

outlet + drainage channel

modified / new situation farming companies on dwelling mounds

guard lock Schipdiep

HANK

existing objects

cycle path

Westplas

N283

new, modified or replaced objects

Oude Maasje

new nature

lowered dyke (interim quay) farming company on dwelling mounds

new dyke lowering of dyke

pedestrian ferry

dyke

dyke

motorway (provincial) road cycle path hiking path

car ferry defence ground war memorial Westplas

Overdiepse Polder Bergsch

e Maas

information point A27

fishing points

pedestrian ferry

Oud

eM

aasje marina

Planning 1 2 3 4

Effect

Project decision Preparation phase Start of work Delivering water safety

27 cm drop in water level during high water. Scale:

1 2008

www.roomfortheriver.nl

2 2009

3 2010

4 2011

2012

2013

2014

0

1000 m

2015 Jan 2015 / 11


New situation along Bergsche Maas

Dyke reinforcement Amer/Donge The dyke is to be made higher and wider over a length spanning c. 940 metres. Because expanding the river here is not an option. Reinforcing the dyke will protect the hinterland from flooding.

ditch

new dyke profile

New situation along Oude Maasje

industrial site

maintenance path

new dyke profile

cycle path/footpath

road

Hank

high water

high water

Bergsche Maas

1

Oude Maasje

2

N283 De Pontonnier industrial site

N W

HANK

Bergsche Maas

E

The reinforced dyke will protect the hinterland to the south of the Bergsche Maas and the Oude Maasje from flooding.

S maintenance path Key to map: ‘text’

1

modified / new situation Oude Maasje

existing objects dyke reinforcement motorway (provincial) road

new dyke profile

cycle path/footpath 2

Keizersveerse brug (bridge)

Bergsche Maas

A27

De Pontonnier industrial site

RAAMSDONKVEER

Overdiepse Polder 1 new dyke profile 2

Oude

Planning 1 2 3 4

floodgate Schipdiep

Project decision Preparation phase Start of work Delivering water safety

Maas

je

Effect Preventing flooding or breach of the dyke during exceptional high water. kaartschaal: Scale:

1

2012 www.roomfortheriver.nl

2

3

2013

2014

0

4

300 m

2015 Jan 2015 / 13


Dyke reinforcement Steurgat / Land van Altena and Bergsche Maas / Land van Altena Wherever river widening is impossible, additional dyke reinforcement work will be carried out. Along the Steurgat, between Hank and Werkendam, sections of the dyke will be improved.

Causes

Height

Primary river dykes along the Nederrijn and Lek do not meet the requirements set for these watercourses. Some sections of the dyke have to be improved to pass (regular) safety tests.

Solutions

Stability (piping)

Stability

Water seeps under the dyke (seepage), taking sand with it (piping). This weakens the dyke and will lead to breaches.

The dyke is too low. At high water, the river water flows over the dyke.

1. Dyke improvement in ground

2. Construction

3. Dyke improvement in ground

inwards

W

outwards

In principle, dyke reinforcement is carried out inwards. In case this is unfeasible due to i.e. a lack of space, alternative measures will be taken in the order set out right.

DORDRECHT

N

High water pressure is causing the top layer of the dyke to deteriorate. This weakens the dyke.

GORINCHEM

A16

a Wa

E S

dyke reinforcement with sheet piling

port of Werkendam

l

WERKENDAM

uw

e

M

er

port of Werkendam

w

ed

e

N3

N

ie

A27

Key to map: ‘text’

Steurgat

modified / new situation

seepage barrier

existing situation

Steurgat

dyke reinforcement motorway (provincial) road

National Park De Biesbosch

Planning

Effect

De Gijster

1 2 3 4

Project decision Preparation phase Start of work Delivering water safety

Berg

sche

Maa

s

Preventing flooding or breach of the dyke during exceptional high water. Scale:

www.roomfortheriver.nl

1

2

2011

2012

3 2013

2014

4

0

4 km

2015 Jan 2015 / 14-15


Hartelkering

Water storage Volkerak-Zoommeer

Current situation

The Volkerak-Zoommeer (lake) is being prepared as a temporary storage site for river water during extreme situations. The water storage facility will provide protection for the southwest of the Netherlands in the event of storm surge barriers being closed in combination with very high discharge from the rivers - an exceptional combination. The likelihood of the Volkerak-Zoommeer water storage facility being utilized is 1/1,400 a year.

New situation Haringvlietsluis

Volkerak - Zoommeer

Ha

A20

S

Keersluis Oude Tonge (flood gate)

and Hartel storm surge barriers close. Under these Hartelkering A15 (stormZsurge barrier) IERIKZEE

Haringvlietsluizen (sluices)

in the Hollands Diep and Haringvliet can rise to a dangerous

DORDRECHT

level because the river water can no longer be discharged Oosterscheldekering to sea. Temporarily storing the river water in the

Haringvliet

Krammersluizen (sluices)

Keersluis Ooltgenplaat (flood gate)

Volkerak spuisluizen (drainage sluices)

MOERD

Manderssluis (lock) Volkerak

Vierlingh sluis (lock)

A29

Volkerak-Zoommeer allows the water level in

Hollands Diep

the Haringvliet to fall by around 0.5 metres. Once these barriers open again, the river water is able to flow to the sea through the Haringvliet.

Uitwateringssluis Rammergors (drainage sluice)

MOERDIJK

Schut- en spuisluis Benedensas (lock and drainage sluice)

Volkerak Oosterscheldekering (storm surge barrier)

Key:

Schelde-Rijnkanaal A16 (channel) Schelde-Rijnkanaal (channel)

planning area THOLEN

flood defences and sluices

THOLEN

Keermiddel Tholen (barrier)

Zoommeer (lake)

motorway

BERGEN GOES

national border

Zoommeer (lake)

OP ZOOM

Burgemeester Peterssluis (sluice) BERGEN OP ZOOM

modernize or improve sluices

improve dyke

E19

Planning 1 2 3 4

Effect

Project decision Preparation phase Start of work Delivering water safety

Bathse Spuisluis (drainage sluice)

c. 0.5 m drop in water level in the Hollands Diep and Haringvliet. Scale:

1 2012

www.roomfortheriver.nl

2 2013

2014

3

4

ZW

very high river discharge

ROTTERDAM

If simultaneously the river discharges very high, the water level

storage level

gv

In the event of an impending storm surge, the Maeslant circumstances, the Haringvliet sluices are closed as well.

improvement stability

SPIJKENISSE

lie A59 t When using the Volkerak-Zoommeer for water storage, the water level will rise to c. NAP + 2.30 m in 24 hours. Once the storm surge barriers are opened, the water will be discharged to the sea again.

Maeslantkering (storm surge barrier)

storm surge

E

new dyke cladding

Volkerak - Zoommeer rin

The set water level on the Volkerak-Zoommeer is around NAP (Amsterdam Ordnance Datum). Grevelingen

N W

HELLEVOETSLUIS

0

10 km

2015 Jan 2015 / 18


Flood plain excavation at Avelingen

New situation Nieuwe situatie

Current situation

A channel is being excavated next to Avelingen industrial site to give the river BovenMerwede more space during high water and to improve the water safety at Gorinchem.

Merwedebrug (bridge)

flood plain

high water

high water

To prevent the channel from flooding continuously, a bar is being created under the bridge. This will also help reinforce the bridge's pillars and prevent the passage of sailing vessels.

A15

Merwedebrug (bridge)

Key to map: A27

planning area ‘text’

Avelingen industrial bedrijventerrein site

500 m

Boven-Merwede

E S

nevengeul floodable met drempel secondary channel

Boven-Merwede

N W

Avelingen industrial site

overflowable bar quay

modified / new situation existing objects Boven-Merwede

new, modified or replaced objects new channel motorway

The channel is being prepared for shipping and is being given a new quay. This will give the companies on the estate that are linked to the water a sustainable place of business and will encourage transport by water.

(provincial) road overflowable bar

Avelingen industrial site GORINCHEM

Merwedebrug (bridge)

Boven-Merwede

Planning 1 2 3 4

www.roomfortheriver.nl

Effect

Project decision Preparation phase Start of work Delivering water safety

1

2

2009

2010

10.7 cm drop in water level during high water.

2011 SLEEUWIJK

3

4

2012

2013

Scale: 0

500 m

Jan 2015 / 9


Flood plain excavation in Huissensche Waarden

Current situation

New situation

dyke

Looveer industrial site

dyke

pond

Looveer industrial site

high water

The flood plain next to Huissen is being expanded to improve the flow of the river Nederrijn during high water.

Nederrijn

Nederrijn

farming area

N W

E

ARNHEM

HUISSEN

N235

Key to map:

dyke marina

planning area ‘text’

A12

Looveer industrial site

S

riparian forest

modified / new situation

quay

new, modified or replaced objects

Nederrijn

WESTERVOORT

DUIVEN

lowering of quay/ dyke/embankment

ANGEREN

quay

HUISSEN

Scherpekamp industrial estate

Looveer industrial site

new bridge

inflow opening with bridge

new lake marina

current quay motorway (provincial) road A235

ZEVENAAR

The area will first be excavated to extract sand. The sand extraction site will then be turned into a recreational pond.

GROESSEN

riparian forest

The existing quay is being lowered. This will make it easier for the Nederrijn to continue flowing during high water.

quay ANGEREN

Planning 1 2 3 4 5

Scherpekamp industrial estate

Project decision Preparation phase Start of work Delivering water safety Completion of project 1 2

2013

www.roomfortheriver.nl

inflow opening with bridge

8 cm drop in water level during high water. Scale:

3 2014

Effect

4 2015

5

0

1 km

2030 Jan 2015 / 19


Flood plain excavation at Meinerswijk We are removing soil in the flood plain to allow the river Nederrijn to discharge more water during high water. This measure will also ensure an adequate distribution of water discharge over the rivers Rhine and IJssel.

The summer quay is being lowered, allowing the water to flow in and out of the flood plain more readily during high water as a result.

summer quay

The excavated channel in the flood plain will contain water permanently. During high peak discharges of the river Rhine, water will flow from the channel over the flood plain. The amount of water distributed, depends on the height of the peak discharge.

Nederrijn

Two of the pillars of the John Frostbrug (bridge), which are situated in the flood plain, are being reinforced.

The bank will be stripped of rubble and low-lying vegetation to allow the river to flow better. Nederrijn rubble

Plas van Bruil N W

1

channel

repair work Sleuteldam (dam)

E

channel

S

natural levee ARNHEM- NORTH

2

Key to map: planning area ‘text’

The natural levee will be 0.5 - 1.0 metres high.

modified / new situation new, modified or replaced objects new quay/dyke/ embankment lowered summer quay

summer quay

A channel is to be introduced to the west of Plas van Bruil. This channel will be connected to the Nederrijn.

Mandelabrug (bridge)

Plas van Bruil 1

repair work Sleuteldam (dam)

channel

City blocks

Meinerswijk

John Frostbrug (bridge)

channel filling in pumping station ditch

removing brushwood between line of trees

green river

channel

direction of flow in the flood plain at high water 2

motorway

natural levee

(provincial) road

2011

rri

jn

Effect

Project decision Preparation phase Start of work Delivering water safety Completion of project 1

www.roomfortheriver.nl

de

ARNHEM- SOUTH

Planning 1 2 3 4 5

Ne

2012

A325

7 cm drop in water level during high water. Scale:

2 2013

3

4 5 2014

0

600 m

2015 Jan 2015 / 20


Flood plain excavation at Doorwerthsche Waarden

Current situation summer quay

The banks are being lowered and the summer quay is being relocated in the Doorwerthsche Waarden (flood plains), to create more space for the river Nederrijn during high water, as a result.

storage

summer quay

stone factory

high water

trees stone factory

high water

Nederrijn

Nederrijn

RENKUM

N W

New situation

DOORWERTH

E S

N2 2 5

Relocation of storage ground to the west side of the stone factory site.

Key to map: Planting of trees on the west and east sides of the stone factory site.

planning area ‘text’

modified / new situation existing objects

summer quay

new, modified or replaced objects

Ne

de

rrij

new quay/dyke motorway

Castle Doorwerth

Doorwerthsche Waarden (flood plains) stone factory

jetty for passers-by

lateral moraine

Relocating summer quay. storage

n

trees stone factory

HETEREN

(provincial) road

summer quay ELDEN

A50

Nederrijn

bank

Planning Effect 1 2 3 4

Project decision Preparation phase Start of work Delivering water safety

Lowering the bank.

3 cm drop in water level during high water. Scale:

1 2010

www.roomfortheriver.nl

2 2011

2012

3

4

0

600 m

2013 Jan 2015 / 21


Current situation

Flood plain excavation at Middelwaard

flood plain

New situation summer quay

bank

To improve the discharge capacity of the river Nederrijn during high water, the Middelwaard (flood plain) is being widened.

excavated flood plain

lowered summer quay

lowered bank

high water Nederrijn

Nederrijn

Additional discharge capacity is being created by means of lowering the summer quay and the riverbank. Rhenense brug (bridge) Utrechtse Heuvelrug

N W

N233

E S

Nederrijn

industrial estate RHENEN

high water lowering bank

Key to map: planning area ‘text’

lowering summer quay

N225

modified / new situation

excavating flood plain

existing objects new, modified or replaced objects

Nederr

lowering dyke

Utrechtse Heuvelrug

ijn

Rhenense brug (bridge)

excavation building

Middelwaard (flood plain)

(provincial) road

industrial estates summer quay

Planning Effect 1 2 3 4

Project decision Preparation phase Start of work Delivering water safety

3 cm drop in water level during high water. Scale:

1 2010

www.roomfortheriver.nl

2 2011

2012

3

4

0

400 m

2013 Jan 2015 / 22


Excavation of the flood plain area at De Tollewaard

New situation

Current situation industrial estate flood plain

The banks and the summer quay in De Tollewaard (flood plain) are being lowered, to create more space for the river Nederrijn during high water, as a result.

summer quay

lowered summer quay and bank

bridge

high water Nederrijn

Nederrijn

more shallow ponds

N W

E S

N225

REMMERDEN

dwelling mound

N233

bank summer quay

summer quay bridge

Key to map: planning area ‘text’

industrial estate and houses

modified / new situation

flood plain

bank

De Tollewaard (flood plain) bridge

dwelling mound

industrial estate and houses

existing objects lowering quay new quay new bridge

The bridge will ensure that the western dwelling mound remains accessible at high water.

RHENEN

summer quay

excavation

Ne

(provincial) road

Planning 1 2 3 4

de

rri

jn

Effect Effect

Project decision Preparation phase Start of work Delivering water safety

Waterstanddaling van 3 cm drop in water level 7 cm bij hoogwater. during high water. Scale:

1 2010

www.roomfortheriver.nl

2 2011

2012

3

4

0

500 m

2013 Jan 2015 / 23


Room for the River Lek Flood plain excavation Bossenwaard, Pontwaard and Heerenwaard

Current situation Bossenwaard flood plain

Channels are being created in the flood plains of the river Lek at IJsselstein, Nieuwegein, Vianen and Houten. The access dam at Hagestein and the summer quays are being lowered as well. These interventions will increase the water safety along the Lek at high water. N W

New situation Pontwaard flood plain

high water

Bossenwaard (flood plain) secondary channels

Pontwaard flood plain

secondary channel

Lek

Lek

IJSSELSTEIN

E

A2

Bossenwaard

S

NIEUWEGEIN

NIEUWEGEIN

recreation area Key to map: Merwedekanaal (channel)

planning area ‘text’

modified / new situation new, modified or replaced objects new quay/dyke new channel

Lek

Bossenwaard (flood plain)

A new summer quay will ensure better downward flow of the River Waal.

Pontwaard (flood plain)

motorway

't Waalse Waard (flood plain)

summer quay

dyke

Pontwaard (flood plain) VIANEN

Vianense waard (flood plain)

(provincial) road access dam

Le

Hagestein weir

k

The access dam at Hagestein weir island is being lowered. The Lek will be able to flow over this lowered weir island more easily during high water.

Hagestein weir island

VIANEN

Merwedekanaal (channel)

A27

Planning

Effect

1 2 3 4

8 cm drop in water level during high water level with Hagestein weir.

Project decision Preparation phase Start of work Delivering water safety

Scale: 1 2011

www.roomfortheriver.nl

2012

2

3

2013

2014

4

HAGESTEIN

0

1 km

2015 Jan 2015 / 25


Dyke reinforcement Hagestein - Opheusden

Causes

Height

Primary river dykes along the Nederrijn and Lek do not meet requirements set for these watercourses. Some sections of the dyke have to be improved to pass (regular) safety tests.

Wherever river widening is impossible, A28 additional dyke reinforcement work will be carried out. Sections of the dyke along the rivers Lek and Nederrijn ZEIST between U T R E C H THagestein and Opheusden will be improved.

Stability (piping)

High water pressure is causing the top layer of the dyke to deteriorate. This weakens the dyke.

Water seeps under the dyke (seepage), taking sand with it (piping). This weakens the dyke and will lead to breaches.

The dyke is too low. At high water, the river water flows over the dyke.

Solutions

Stability

2. Construction

1. Dyke reinforcement in ground

3. Dyke reinforcement in ground

inwards

outwards

In principle, dyke reinforcement is done inwards. In case unfeasible due to i.e. A12 a lack of space, alternative measures will be taken in the order set out right.

A30 A50

W

E

1

A27

S

EDE

VEENENDAAL

HOUTEN

N

AmsterdamRijnkanaal Amsterdam-Rijnkanaal (channel)

Clay is being buried under surface level to create an impermeable layer. This will prevent groundwater from flowing under the dyke, preserving the stability of the dyke as a result.

A12 2 ELST

1

An L-wall is being constructed to reinforce the dyke because of the lack of space due to the historical buildings on either side of the dyke in Rijswijk (protected townscape).The L-wall is a concrete flood wall with cut-offs level at the driveways of the houses. WAGENINGEN

RHENEN

2 CULEMBORG

ELDEN

RIJSWIJK

Key to map:

ELST

A15

dyke reinforcement

A325

Waal

A2

(provincial) road

structure with L-wall

OPHEUSDEN

Lek

modified / new situation

motorway

ARNHEM

Nederrijn

Lek

‘text’

OOSTERBEEK

clay burying

2

TIEL

A50 1

Planning Project decision Preparation phase Start of project Delivering water safety

1 2 3 4

www.roomfortheriver.nl

Effect

1

2

2011

2012

Preventing or breach of N I J M Eflooding GEN the dyke during exceptional high water.

Maas WIJCHEN

A73

2013

3

4

2014

2015

Scale: 0

A50

5 km

Jan 2015 / 27-29-30


dam wall

Current situation

Improving dykes at Nederrijn/Arnhemsebroek and Velpsebroek

New situation

cap

high water dam wall

high water

Sections of the quay along the Westervoortsedijk in Arnhem no longer meet the statutory water safety requirements. As such, part of the dam wall is being heightened.

quay

Rijn

quay

Rijn

The dam wall at the Westervoortsedijk is being heightened to ensure its capacity of withstanding representative high water levels.

N W

50 cm

The cap is being replaced by a new, L-shaped cap.

The new heightened dam wall will be a maximum of 50 cm higher than the current one.

E S ARNHEM

Westervoortsedijk (dyke)

Badhuisstraat Key to map: ‘text’

modified / new situation new quay/dyke

1,3 km

road

Nieuwe Haven

Nede

N225

rrijn

N325

industrial estate

Planning Project decision Preparation phase Start of work Delivering water safety

el

Preventing flooding or breach of the dyke during exceptional high water.

IJss

1 2 3 4

Effect

Scale: 1 2011

www.roomfortheriver.nl

2 2012

3

4

0

200 m

2013 Jan 2015 / 28


Current situation

Dyke relocation at Cortenoever

New situation

Dyke relocation work is being carried out in Cortenoever to protect the hinterland during high water of the river IJssel.

dyke

dyke

N3

high water

14 IJssel

IJssel A new dyke is being constructed a kilometre inland. Lowering sections of the old dyke on the north and south sides, will create inflow and outlet openings.

N

E

W

S

IJssel Lowering the dyke will create inflow and outlet openings during high water.

N345

planning area ‘text’

Sections of the surface level are being lowered by between 1 and c. 3 metres and several houses and farming companies are being moved. Where possible, the ground will remain in use for farming purposes.

IJssel

Key to map:

(farming) ground

high water

Flood plain Cortenoever

outlet opening

modified / new situation new dyke lowering dyke excavation/lowering

existing dyke

current dyke (provincial) road

dyke

inflow opening

railway track

Lowering the surface level will encourage flow during high water.

inflow opening

Planning 1 2 3 4

Effect

Project decision Preparation phase Start of work Delivering water safety

35 cm drop in water level during high water at Cortenoever. BRUMMEN

Scale: 1 2012

www.roomfortheriver.nl

2

3 2013

2014

4 2015

0

1 km

2016 Jan 2015 / 32


Current situation

Dyke relocation at Voorsterklei

New situation

Dyke relocation work is being carried out in Voorsterklei to protect the hinterland during high water of the river IJssel.

dyke

dyke

high water

IJssel

IJssel

A new dyke is being constructed a kilometre inland. Lowering sections of the old dyke on the north and south sides will create inflow and outlet openings.

N

E

W

S

(farming) ground

high water

Sections of the surface level are being lowered by between 1 and c. 3 metres and several houses and farming companies are being moved. Where possible, the ground will remain in use for farming purposes.

IJssel Lowering the dyke will create inflow and outlet openings during high water.

Key to map: planning area ‘text’

modified / new situation

IJssel

new dyke lowering dyke outlet opening

excavation/lowering

existing dyke

current dyke

Lowering the surface level will encourage flow during high water.

(provincial) road railway track oxbows inflow opening Voorsterklei

dyke ZUTPHEN

Planning 1 2 3 4

Effect

Project decision Preparation phase Start of work Delivering water safety

29 cm drop in water level during high water at Voorsterklei.

VOORST

Scale: 1 2012

www.roomfortheriver.nl

2

4

3 2013

2014

0

1 km

2015 Jan 2015 / 33


Flood plain excavation Deventer: • Bolwerksplas, Worp and Ossenwaard • Keizers-, Stobben- and Olsterwaarden

De Natuurderij (a so-called 'water farm') is contributing to the development and management of new nature in the flood plain.

dyke Natuurderij

Channels are being excavated along the river IJssel at Deventer, which will improve the flow of the IJssel during high water as a result.

cows and horses

1

N W

The facilities around the Zandweerdplas will be maintained. The channel is being widened and is given a facelift.

channel

line of balls E

A line of balls will be created to prevent shipping.

S

IJssel Hengforderwaarden (flood plains)

floating boathouse 2 IJssel

1

IJs

Natuurderij

se l

‘text’

Zandweerdplas

marina

Keizerswaard (flood plain)

Key to map:

A green front is being created for the IJsselhotel. With its floating landing stage, the ferry will connect the urban waterfront with the flood plain.

modified / new situation

black poplar IJsselhotel

existing objects new, modified or replaced objects

ferry

Stobbenwaard (flood plain)

TERWOLDE

IJssel

3 Olsterwaard (flood plain)

new channel (provincial) road

Worpplantsoen (park)

DEVENTER

railway track

floating landing stage

N792

floating boathouse

2

marina

Zandweerdplas

Ossenwaard (flood plain) bridges

Planning 1 2 3 4

3

Effect

cable ferry

Project decision Preparation phase Start of work Delivering water safety

floating landing stage

IJsselhotel Bolwerksplas WORP

10 cm drop in water level during high water level with Keizers-, Stobbenand Olsterwaarden (flood plains) and a 19 cm drop level with the Bolwerksplas. Scale:

1 2010

www.roomfortheriver.nl

2 2011

3 2012

4 2013

2014

0

1 km

2015 Aug 2012 / 34 35


Flood channel Veessen-Wapenveld

Current situation

New situation Westdijk (dyke)

By constructing two new dykes, a high water channel will be created between the villages of Veessen and Wapenveld. There will be farmland between the dykes. In the event of extreme high water, this area will be capable of discharging a proportion of the water from the river IJssel.

high water

Oostdijk (dyke) high water

flood channel IJssel

IJssel

550 - 1500 m

WINDESHEIM

E

Oostdijk (dyke)

S

W

N

IJssel

H AT T E M

IJss

quay bridge Werverdijk brug Werverdijk

Key to map: ‘text’

el

N337 Westdijk (dyke)

WERVEN

modified / new situation

outlet

MARLE

new, modified or replaced objects new quay/dyke

IJssel bridge + inflow construction

pumping Oo station (dy stdij ke k )

pumping station

flood channel

flood channel

new bridge

W est

high water channel

dij

WIJHE

k(

WAPENVELD

current

dy

ke

Grote Wetering

)

dyke

VORCHTEN

Ap

motorway

ns

ete eW

oor

ot

Gr

eld

(provincial) road

g

aal

rin

kan

railway track

(ch ann

VEESSEN

el) HEERDE

A50

bridge Kerkdijk + inflow construction

Planning 1 2 3 4

Under the Kerkdijk bridge, there is a quay with an inflow construction built on it. The inflow construction can be opened as soon as the water from the IJssel reaches 5.65 metres NAP.

Effect Project decision Preparation phase Start of work Delivering water safety

OLST

71 cm drop in water level during high water. Scale:

1 2011

www.roomfortheriver.nl

2 2012

3 2013

4 2014

2015

0

2.000 m

2016 Jan 2015 / 36


Flood plain excavation Scheller and Oldeneler Buitenwaarden

Current situation

Channels are being excavated between Oldeneel and the lakes of Het Engelse Werk park, creating more space for the river IJssel and providing better protection for the city Zwolle and the hinterland during high water.

high water

New situation channels

houses

houses on a dwelling mound

high water IJssel

IJssel

N W

IJs

S

se

l

Het Engelse Werk (park)

ZWOLLE

N237

E

It is anticipated that the channels will flow simultaneously for a few weeks each year, allowing surplus water from the IJssel to be carried off more swiftly.

A28

Key to map: planning area ‘text’

modified / new situation

Hanzeboog (railway bridge)

Het Engelse Werk (park)

existing objects new, modified or replaced objects

channels 5 houses on a dwelling mound nature reserve

dyke

bird hide

new bridge new channel

IJssel

dyke motorway 5 houses

(provincial) road railway track

ruins

houses

OLDENEEL

ZWOLLE

-

SOUTH

KRAAIJENBERG

't Kleine Veer

Planning 1 2 3 4

Effect

Project decision Preparation phase Start of work Delivering water safety

8 cm drop in water level during high water. Scale:

1 2008

www.roomfortheriver.nl

2 2009

2010

3 2011

2012

4 2013

2014

2015

0

400 m

2016 Jan 2015 / 37


Dyke relocation in Westenholte

Current situation houses

The dyke next to the Westenholte district of Zwolle is being relocated 300 metres inland. Two channels are also being excavated. These interventions will ensure that the river IJssel can discharge more water and that the city Zwolle and the hinterland are protected.

dyke

houses

houses

high water

channel

dyke

houses

IJssel

V E E C AT E N ZWOLLE

E S

viewpoint

IJssel

Key to map:

country estate

bridge N331

planning area ‘text’

channel

high water IJssel

N W

New situation

modified / new situation

dyke channel

bridge

existing objects new, modified or replaced objects

nature reserve channel

new bridge excavated dyke

ZALK

farm

new bridge new channel

IJssel

bird hide

dyke

W E S T E N H O LT E

motorway

country estate

Vreugderijkerwaard (flood plain)

(provincial) road

A28 houses

railway track

Spoolde

houses on a dyke

ZWOLLE

water purification plant

Planning Effect

SPOOLDE

1 2 3 4

Project decision Preparation phase Start of project Delivering water safety

14 cm drop in water level during high water.

N50

Scale: 1 2008

www.roomfortheriver.nl

2 2009

2010

3 2011

2012

4 2013

2014

2015

0

400 m

2016 Jan 2015 / 38


Dyke relocation at Hondsbroeksche Pleij The Pleijdijk (dyke) in the Hondsbroeksche Pleij has been moved land inward and a high water channel, a control system and a pond have been created. These interventions increase the drainage capacity of the rivers IJssel and Nederrijn during high water. They also maintain the agreed distribution of water discharge.

The control system ensures that there is no disruption to the set distribution of water over the IJssel and Nederrijn even during high water.

Rijndijk (dyke)

new Pleijdijk (dyke)

pumping station

old Pleijdijk (dyke)

regelwerk

pond

control system

N W

A pond is being created to cope with the rising groundwater during high water. This prevents cellars and crawl spaces from being submerged.

In the case of the pond, a pumping station is being built that pumps captured water back into the IJssel.

E IJssel

S

flood channel groundwater

N325

Nederrijn

pumping station

seepage barrier

bifurcation point

Key to map: ‘text’

old Pleijdijk (dyke)

modified / new situation new, modified or replaced objects

250 m

high water channel

IJssel

new quay/dyke

current

Ne

de

rri

pond

Hondsbroeksche Pleij

removed dyke dyke

The seepage barrier protects this dyke from being weakened.

new Pleijdijk ( (dyke)

jn

WESTERVOORT

(provincial) road control system

Effect Planning 1 2 3 4

40 cm drop in water level in the event of extreme high water and maintenance of a constant distribution of water discharge between the Nederrijn (2/3) and IJssel (1/3).

Project decision Preparation phase Start of work Delivering water safety

Scale: 1 2003

www.roomfortheriver.nl

2 2004

2005

2006

3 2007

4 2008

2009

2010

0

300 m

2011 Jan 2015 / 42


Room for the River IJssel delta

New situation

Various measures are being implemented in the IJssel delta at Kampen to improve high water safety and the spatial planning quality of the river IJssel. As such, the summer bed is being lowered by around two metres and six flood plains are being restructured to bolster the natural features.

N W

winter bed

The Reevediep high water channel is being created to the south of Kampen. In the event of extreme water discharge, a proportion of the water from the IJssel will be discharged to the lake Dronter- and Vossemeer through this channel. Approx. 400 ha of nature, a ferry connection and 30 km of cycle paths and footpaths are to be created in and around the Reevediep.

km 1000,6

summer bed

15 m

15 m

The lowering of the summer bed will be effected over a total length of 7.5 km.

Eilandbrug (bridge)

E S

Het Onderdijks (houses)

Legend

dyke

Vossemeer (lake)

The terms in red reflect the new situation

Reevediep

lowering of summer bed

shipwreck IJssel cog

shipping channel

dyke

new water connection

Onderdijkse Waard (flood plain)

Stadsbrug (bridge)

inflow opening

motorway (provincial) road areas to be organized new dyke new bridge

0

IJssel

KAMPEN

Roggebotsluis (lock) (possible extra discharge tube)

new dyke

N50

km 992,9

N307

Molenbrug (bridge)

recreation area Roggebotsluis

Hanzelijn

construction of 42.7 ha reed marsh Natura 2000 area

Scale:

IJs

recreational lock

Village of Reeve

2 km

island of Reeve

1 2 3 4 5

bridge nature reserve Nieuwendijk De Enk

Drontermeer (lake)

Onderdijkse Waard (flood plain)

2 2014

IJsse

l

Zalkerbosch

WILSUM

ZALK

Vreugderijkerwaard (flood plain)

Effect

3 2015

ZWOLLE

Bentinckswelle

Project decision Preparation phase Start of work Water safety lowering of summer bed Water safety Reevediep

2013

Scherenwelle

Koppelerwaard (flood plain)

1

www.roomfortheriver.nl

sel

inflow opening

Reevediep

Reevekering and Reevedam

Planning

recreational lock

4 2016

5 2017

During exceptional high water, the various measures will ensure a 41 cm drop in water level at Zwolle. As such, these measures are an important element in the water safety of a sizeable part of the IJssel delta.

2018 Jan 2015 / 39


Removal of obstacles in Elst

Current situation

During high water, the elevated grounds of the stone factory at Elst are a bottleneck for the discharge of water from the river Nederrijn. Removing the stone factory and, to a large extent, excavating the site will give the river more space.

New situation stone factory

high water

flood plain

bank

lowered bank

lowered flood plain

chimney

Nederrijn The stone factory is being demolished, while sections of the site are being excavated.

Excavating the site of the stone factory will connect the Amerongse Bovenpolder with the Elster Buitenwaarden (flood plains).

N W

E

Amerongse Bovenpolder

S

The former site of the stone factory has been earmarked for nature and recreational purposes. N416 lateral moraine

Key to map: planning area ‘text’

modified / new situation new, modified or replaced objects

slow-moving traffic bridge

ELST

former stone factory site

Utrechtse Heuvelrug

knoll

excavation new bridge

former stone factory site

widening oxbow lowering bank Elster Buitenwaarden (flood plains)

jetty for passers-by

bridge

chimney Nederrijn

(provincial) road

N225

Ne

Planning 1 2 3 4

Project decision Preparation phase Start of work Delivering water safety

de

rri

jn

Effect At least a 13 cm drop in water level during high water. Scale:

1 2010

www.roomfortheriver.nl

2 2011

3 2012

4 2013

0

300 m

2014 Jan 2015 / 24