Infographics Lent ENG 2015

Page 1

Dyke relocation at Lent (Room for the River Waal Nijmegen)

Current situation

New situation dyke featuring homes and vegetation

The existing dyke at Nijmegen/Lent is to be relocated inland and will also create a channel. This intervention will widen the narrow section of the bend in the river Waal between Nijmegen and Lent, allowing the river to discharge more water during times of high water levels.

Waal

planning area ‘text’

island

seepage barrier and quay

development

Waal An urban river park with nature and recreational activities will be created. There will be space for homes to be built on part of the new island.

Citadelbrug (bridge)

N Key to map:

high water

farmland

secondary channel

W

E

N325

S

NIJMEGEN

( LENT)

modified / new situation existing objects

VEUR- LENT

new, removed or replaced objects new dyke / quay removed dyke

Promenadebrug (bridge)

railway bridge

new bridge new channel

quay

extended Waalbrug (bridge)

NIJMEGEN

current

NIJMEGEN- NORTH

dyke

bar

Waal

future buildings

Waalbrug (bridge)

LENT

(provincial) road

During high water, the secondary channel will flow alongside the Waal.

Citadelbrug (bridge)

railway track

bar extended Waalbrug (bridge)

bridge 'De Oversteek'

NIJMEGEN

Promenadebrug (bridge) railway bridge

Planning

Waalbrug (bridge) 1 2 3 4

Project decision Preparation phase Start of work Delivering water safety

Effect 34 cm drop in water level during high water. Scale:

1 2011

www.roomfortheriver.nl

2

3 2012

2013

4 2014

0

500 m

2015 Jan 2015 / 3


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.