Dyke reinforcement Steurgat / Land van Altena and Bergsche Maas / Land van Altena Wherever river widening is impossible, additional dyke reinforcement work will be carried out. Along the Steurgat, between Hank and Werkendam, sections of the dyke will be improved.

Causes

Height

Primary river dykes along the Nederrijn and Lek do not meet the requirements set for these watercourses. Some sections of the dyke have to be improved to pass (regular) safety tests.

Solutions

Stability (piping)

Stability

Water seeps under the dyke (seepage), taking sand with it (piping). This weakens the dyke and will lead to breaches.

The dyke is too low. At high water, the river water flows over the dyke.

1. Dyke improvement in ground

2. Construction

3. Dyke improvement in ground

inwards

W

outwards

In principle, dyke reinforcement is carried out inwards. In case this is unfeasible due to i.e. a lack of space, alternative measures will be taken in the order set out right.

DORDRECHT

N

High water pressure is causing the top layer of the dyke to deteriorate. This weakens the dyke.

GORINCHEM

A16

a Wa

E S

dyke reinforcement with sheet piling

port of Werkendam

l

WERKENDAM

uw

e

M

er

port of Werkendam

w

ed

e

N3

N

ie

A27

Key to map: ‘text’

Steurgat

modified / new situation

seepage barrier

existing situation

Steurgat

dyke reinforcement motorway (provincial) road

National Park De Biesbosch

Planning

Effect

De Gijster

1 2 3 4

Project decision Preparation phase Start of work Delivering water safety

Berg

sche

Maa

s

Preventing flooding or breach of the dyke during exceptional high water. Scale: