The
house ages with the people that reside.
BLOCK 2

The overlooking spaces complimenting each other under the frame of vertical courtyard.



Door Window Joinery

















The
gradual deterioration





The grays and The browns.


house ages with the people that reside.
The overlooking spaces complimenting each other under the frame of vertical courtyard.
Door Window Joinery
gradual deterioration
The grays and The browns.
• The site is located at kotturpuram, the site marked and ploughed to 10m of deep foundation.
• The site was dug to commence grade beam for block1. Reinforcement done for water tank.
• Reinforcement done for block-1.
• Grade beam is done.
• Masonry retaining wall is done and started with grade beam for block-2.
• Reinforcement done for grade beam (Block-2).
• Grade beam completed
• Block 2 Brick Masonry retaining wall completed.
• Column work commenced.
Lime + cement + M sand
(2.5:5)
Lime: M sand
Lime + cement
(1:3)
Lime: M sand
Slow Setting Comparatively quick
Needed workman for application Easy application
Lime + cement + R sand
(1:5)
Lime: R sand
Three different lime ratios were utilized in the test, and the provided image displays the results after one week of application. However, when it came to R sand, the lime ratio was applied directly on the spot, resulting in distinct outcomes. The most noticeable disparities were observed in terms of color, as the gradation varied due to the presence of cement in the lime mixture. Conversely, in R sand, a slight brown shade was evident. Note: no admixtures were added during the lime test.