Rory Morris - Architectural Portfolio

Page 1

RORY MORRIS ARCHITECTURAL PORTFOLIO

RORY MORRISARCHITECTURAL PORTFOLIO
2023

HUNTER STREET STATION

Project Type - Infrastructure - Rail

Project Cost - 26.6 Billion (full line)

Duration on Project - 1.5 Years

Project stage - DS1-2

My Role:

My responsibilities changed over time as the Sydney Metro West project developed. Initially working as part of the concept design team on Hunter Street, to then coordinating the development of the station, with a focus on materiality, and documentation delivery. Before simultaneously working as a project coordinator; coordinating deliverables, resourcing, and managing our AEO and contractual requirements, as well as station designer on another station on the Metro West line.

The Project:

The Sydney Metro West project is designed to link the two city centres of Parramatta and Sydney together to enhance connectivity between the two business districts. Hunter Street Station is the final station on the Sydney Metro West line and has been designed as the gateway to Sydney. Due to the tidal nature of the Metro West Line, and the predicted number of patrons using Hunter Street exceeding 35,000 people per hour, intuitive wayfinding and customer experience were at the forefront of the design approach. In addition to this, the design required the incorporation of over-station developments, lead by FJMT Architects, and integration into the existing subterranean links to Martin Place Station and Wynyard Station. Despite all these challenges, the station blended into the existing city networks, and the towers above.

SYDNEY METRO WEST
WEST 1. Hunter Street East Station Entry 2. Exploded Isometric of Hunter Street Station
SYDNEY METRO
3. Station Platform looking East

As one of the first to work on the station's design, I worked through the design principles and general configuration of the station, including the configuration of the escalators, which totalled thirty-four at DS1 delivery, tunnel ventilation systems, FOH layouts, and coordinate the BOH layouts.

The VT configuration was critical to the station's success due to the high patronage of the station. Pedestrian Modeling, Human Factors, and Operations coordination were crucial to creating an effective transfer of people from the platform, thirtytwo meters below ground, to the East and West Ground Floor entrances. Due to the expected demand of the station, the VT requirement was high with the East needing twelve and the West requiring ten escalators from entry to the platform Mezzanine. This would be more than any station in the Southern Hemisphere.

As the project developed, coordination with the Development Architects and MEP consultants was crucial to ensure station functionality didn't hinder customer experience. As the design progressed, with all major plant and station items coordinated, my primary focus was on materiality and station finishes.

                SCALE STATUS payment Grimshaw charges. This document may only used express purpose and project for which has been created and delivered, notified writing Grimshaw. This document may not be otherwise used, loss so arising. Grimshaw drawings read conjunction with grimshaw and specialist specifications. Drawings read conjunction with m&e, structural, fire and acoustic www.grimshaw.global Level 333 George Street, Sydney, NSW 2000, AUS 250 @A0 SMWSTEDS-SMD-SCB-SN100-AR-0052 AuthorCheckerApprover Movement Plans SYDNEY METRO WEST -HUNTER STREET STATION SMWSTEDS DESIGN STAGE SYDNEY METRO HUNTER STREET STATION 250 @A0 SMWSTEDS-SMD-SCB-SN100-AR-0052 AuthorCheckerApprover Movement Plans SYDNEY METRO WEST -HUNTER STREET STATION SMWSTEDS DESIGN STAGE SYDNEY METRO SYDNEY METRO WEST B04 Mezzanine Level B02 East Concourse Level O'Connell Street Service reticulation zone Through-site-link onto Bligh Street OSD Lobby B04 Mezzanine Level 00 George Street Level B01 West Concourse Level OSD Loading Dock Service reticulation zone Service reticulation zone
4.
5. Sectional Isometric of West site
Sectional Isometric of East site
6. Pedestrian Movement diagrams

SYDNEY METRO WEST

The final finishes proposal was a series of aluminium fins with a coloured backing. The fin system is augmented in different ways to emphasize depth and scale, depending on the location within the station. The fin depth is reduced from the ground floor down to the platform mezzanine, enhancing intuitive wayfinding. The spacing between the fins is modified depending on the scale of the space. In the large East Atrium, the fins are spaced further apart compared to the more confined western concourse space, where the spacing is reduced. The introduction of a coloured backing exploits the texture and depth of the

façade and results in the colour becoming apparent when viewed head-on but obscured when viewed obliquely. Giving the façades a varying and dynamic character that changes with movement. The simplistic design was chosen as it works with the array of different curves within the station, allowing less material to be used compared to GRC cladding, and giving the station a more identifiable design

DEPTH

Varying surface texture

The fins reduce in depth progressively as the depth of the shaft increases.

INCREASING SPACING

SCALE

A facade that is calibrated to the space

The fins increase in intensity in the smaller volumes providing a uniform but scalable system.

COLOUR

A shifting experience

The fins offer a shifting experience depending on how they are viewed.

Extrusion profile can be engineered to provide a fine leading edge while maximising stiffness and impact resistance, for example with wider base

Extruded aluminium vertical blade (250mm deep)

Acoustically absorptive material (flat sections)

C O L O U R T
DECREASING DEPTH
R A NSIT I O N
7. 3D Detail Diagram of Cladding 8. Isometric of Concourse Cladding Study
9. Hunter Street East Station Concourse

SYDNEY METRO WEST PROJECT COORDINATION

My Role:

My primary role on Sydney Metro West was as a Station Designer, but I also assisted with project coordination tasks. This consisted of deliverable and resource tracking, ensuring risk registers were updated, managing internal meetings and design reviews, onboarding new resources, and meeting our AEO requirements.

Agreed Covenants

1 Disclosure and Use of Confidential Information

1.1. Recipient obligations

Subject to clause 1.3, the Recipient warrants and represents that the Recipient will: a. keep confidential and not disclose the Confidential Information; b. not do any act or thing involving the use or disclosure of the Confidential Information which may cause loss or damage to Sydney Metro or TfNSW; c. not use or permit the use of the Confidential Information for any purpose other than the Permitted Purpose without the prior written consent of Sydney Metro; and d. not copy or reproduce the Confidential Information or make any notes which include the Confidential Information or any summary, extract or part of it except to the extent necessary for the Permitted Purpose.

1.2. Security measures

The Recipient must establish and maintain comprehensive security measures to ensure that any Confidential Information in the Recipient’s possession, custody or control is secure at all times. The Recipient must also comply with any reasonable direction of Sydney Metro regarding the safekeeping and storage of the Confidential Information.

1.3.

Disclosure of Confidential Information

a. The Recipient may disclose the Confidential Information:

Returnable Schedule 4

Confidentiality Deed Poll

i) with the prior written consent of Sydney Metro which can be given or withheld by Sydney Metro in its absolute discretion; ii) to the Recipient’s Associates to the extent that each has a need to know the Confidential Information for the Permitted Purpose; and iii) to the extent required by Law (subject to complying with clause 1.3(b)).

b. If the Recipient is required by Law to disclose Confidential Information, the Recipient (if legally permissible and practicable in the circumstances) must before doing so:

The Confidentiality Deed Poll or Individual Confidentiality Acknowledgement (refer to Attachment A of the Confidentiality Deed Poll (Organisations)) (as applicable) must be completed and signed by: a. each Interested Party; and b. the Representatives (as defined in the Confidentiality Deed Poll (Organisations)) of each Interested Party who are required to complete and sign a Confidentiality Deed Poll or Individual Confidentiality Acknowledgement (as applicable) in accordance with clause 1.3(a) of the Confidentiality Deed Poll (Organisations), in the format provided in this Returnable Schedule 4.

SYDNEY METRO WEST AEO Competency Assessment Self-Assessment Project Number and Name Name Grimshaw Level Qualification and year completed (highest / latest) Safety in Design Training Status Rail Safety Worker Status (Feqttifea / not required) Rail Projects experience (list projects): Projects experience (list projects): Reference Information:
Page l 1 Competency Assessment Revision 4, August 2021
Poll
Date Given by (full name of individual) (Recipient) Recipient’s Organisation (Recipient’s Organisation) In favour of Sydney Metro (ABN 12 354 063 515) of Level 43, 680 George Street Sydney NSW 2000 (Sydney Metro) Transport for NSW (ABN 18 804 239 602), a New South Wales Government agency constituted by section 3C of the Transport Administration Act 1988 (NSW) and located at 231 Elizabeth Street, Sydney NSW 2000 ( TfNSW) In relation to Review and submission of Sydney Metro – Western Sydney Airport – Stations, Systems, Trains, Operations and Maintenance PPP – Expression of Interest and Request for Proposal documents (Permitted Purpose)
GRIMSHAW
Confidentiality Deed
(Individuals)
49
43
10. Documentation for AEO compliance
11. Hunter Street Platform Mezzanine

AEROTROPOLIS STATION

Project Type - Infrastructure - Rail

Project Cost - 11 Billion (full line)

Duration on Project - 6 Months

Project stage - DS1 (BID)

My Role:

On SSTOM, my primary role was Station Design Lead for Aerotropolis, I also function as Linewide project coordinator. As the design lead, I reviewed the reference design and the design strategy for Aerotropolis CBD before developing a revised proposal. As part of the redesign, I developed the station form, layout, and FOH areas, coordinated with other teams, and present the design to the client, metro, and other stakeholders.

The Project:

This project was a six month bid for the Western Sydney Airport Line, running from St.Marys Station, which was to be redeveloped, to Aerotropolis, the soon-to-be third city in Sydney's three cities development strategy. The line cosisted of six stations, each with their own dedicated teams. The aim of the bid was to deliver the line at a reduced cost compared with the reference design. Working as Aerotropolis Design Lead, the Station Services Lead and I reduced the station's overall volume by 17% and created a station that blended with the proposed masterplan and urban framework of Aerortropolis precinct.

WESTERN SYDNEY AIRPORT LINESSTOM
12. Station perspective from the public domain

The proposed design approach behind the station buildings was to lightly touch the site via the use of lightweight canopies and by reducing the overall mass of each station. Enhancing the use of natural light through glazed or open facades and natural ventilation reduced the overall mass of the stations and focused on an environmental design approach.

The overall design outcome for Aerotropolis Station enhanced the intuitive wayfinding, reducing bottlenecking within the station and improving the customer experience.

WESTERN SYDNEY AIRPORT LINESSTOM Harness Solar Power Optimised height for required shading and rain cover 7 9 6 5 Shading 8 Collect Rain Water
13. Green Strategy Diagram 14. Initial VT Concept over Reference Design
15. Sectional Perspective of Station VT

SSTOM PROJECT COORDINATION

My Role:

My primary role was Station Design Lead for Aerotropolis, but around 40-50% of my time was as a Linewide project coordinator. As the Project Coordinator, I worked to build strong relationships with the external project managers and other station leads to ensure that resources were allocated correctly and that deadlines were reachable. On a day-to-day basis, I reviewed amended briefs and contracts to ensure we were meeting our contractual requirements, coordinated deliverables and document control, tracked design-related risks, and coordinate resourcing and onboarding. I also ran a project-wide retrospective, the first to be formally conducted on a bid, to understand areas of concern and positive outcomes for future projects to learn from.

SSTOM Resource Programme

WESTERN SYDNEY AIRPORT LINESSTOM DRAWING REGISTER (ARCHITECTURE) Day Month Year ST.MARYS DOCUMENT DESCRIPTION DOCUMENT TYPE DRAWING NUMBER SUBMISSION ADDITIONAL INFORMATION SCALE SIZE OWNER COVER SHEET ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-000001SILVER/GOLD SUB. NTS A1 GRIMSHAW A LEGENDS & NOTES ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-000002SILVER/GOLD SUB. NTS A1 GRIMSHAW A STATION PLAZA ARCHITECTURAL DRAWING TBC SILVER/GOLD SUB. 1:500 A1 JACOBS STATION AND SERVICE BUILDINGS (INC. ROOF AREAS) ARCHITECTURAL DRAWING TBC SILVER/GOLD SUB. 1:500 A1 JACOBS NEW & ADJOINING STREETS, ROAD AND INTERCHANGESARCHITECTURAL DRAWING TBC SILVER/GOLD SUB. 1:500 A1 JACOBS STREET FURNTURE ARCHITECTURAL DRAWING TBC SILVER/GOLD SUB. 1:500 A1 JACOBS BIKE PATHS AND PARKING ARCHITECTURAL DRAWING TBC SILVER/GOLD SUB. 1:500 A1 BUS BAYS, LAYOUVERS AND SHELTERS ARCHITECTURAL DRAWING TBC SILVER/GOLD SUB. 1:500 A1 JACOBS TAXI RANKS & KISS N RIDE LOCATIONS ARCHITECTURAL DRAWING TBC SILVER/GOLD SUB. 1:500 A1 JACOBS CAR PARKING ARCHITECTURAL DRAWING TBC SILVER/GOLD SUB. 1:500 A1 WALKWAYS, PAVEMENTS AND SEATING ARCHITECTURAL DRAWING TBC SILVER/GOLD SUB. 1:500 A1 JACOBS LANDSCAPE DESIGN, TREE AND GROUNDCOVER PLANTINGARCHITECTURAL DRAWING TBC SILVER/GOLD SUB. 1:500 A1 JACOBS EXTERNAL LIGHTING ARCHITECTURAL DRAWING TBC SILVER/GOLD SUB. 1:500 A1 JACOBS CCTV LOCATIONS ARCHITECTURAL DRAWING TBC SILVER/GOLD SUB. 1:500 A1 JACOBS DRAINAGE ARCHITECTURAL DRAWING TBC SILVER/GOLD SUB. 1:500 A1 REDUCED LEVELS ARCHITECTURAL DRAWING TBC SILVER/GOLD SUB. 1:500 A1 JACOBS STATION PLAZA AND SITE PLAN ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-110001ALL SUBMISSIONS 1:500 A1 GRIMSHAW A STAION AND SERCIVE BUILDINGS ARCHITECTURAL DRAWING TBC ALL SUBMISSIONS 1:500 A1 JACOBS EXISTING AND PROPOSED TOPOGRAPHY ARCHITECTURAL DRAWING TBC SILVER/GOLD SUB. 1:500 A1 MULTI DECK AND AT GRADE CAR PARKS ARCHITECTURAL DRAWING TBC SILVER/GOLD SUB. 1:500 A1 TBC LEVEL 00 GENERAL ARRANGEMENT SHEET 01 ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-200001ALL SUBMISSIONS 1:500 A1 A LEVEL 00 GENERAL ARRANGEMENT SHEET 02 ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-200002ALL SUBMISSIONS 1:500 A1 GRIMSHAW A LEVEL 00 GROUND LEVEL PLAN ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-200003ALL SUBMISSIONS 1:250 A1 GRIMSHAW A LEVEL 01 ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-200101ALL SUBMISSIONS 1:250 A1 GRIMSHAW A LEVEL 02 ROOF PLAN ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-200201ALL SUBMISSIONS 1:250 A1 GRIMSHAW A LEVEL 02 ROOF PLAN ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-200211ALL SUBMISSIONS 1:250 A1 A LEVEL B1 ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-208101ALL SUBMISSIONS 1:250 A1 GRIMSHAW A LEVEL B2 ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-208201ALL SUBMISSIONS 1:250 A1 GRIMSHAW A LEVEL B3 ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-208301ALL SUBMISSIONS 1:250 A1 GRIMSHAW A LEVEL B4 ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-208401ALL SUBMISSIONS 1:250 A1 GRIMSHAW A CONCOURSE RCP ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-210001ALL SUBMISSIONS 1:250 A1 GRIMSHAW A PLATFORM RCP ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-218401ALL SUBMISSIONS 1:250 A1 GRIMSHAW A DETAILED STREET PLAN ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-300500SILVER/GOLD SUB. 1:250 A1 GRIMSHAW A DETAILED FOOTBRIDGE PLAN ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-300501SILVER/GOLD SUB. 1:250 A1 GRIMSHAW A ELEVATION AA ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-400001ALL SUBMISSIONS 1:250 A1 GRIMSHAW A ELEVATION BB ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-400002ALL SUBMISSIONS 1:250 A1 A ELEVATION CC ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-400003ALL SUBMISSIONS 1:250 A1 GRIMSHAW A ELEVATION DD ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-400004ALL SUBMISSIONS SECTION AA ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-410001ALL SUBMISSIONS SECTION BB ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-410002ALL SUBMISSIONS SECTION CC ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-410003ALL SUBMISSIONS HISTORIC GOODS SCHED ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-450001ALL SUBMISSIONS Showing key featyres Staion entry (including ticketing and Gateline, amenites (inclyuding toilets), vertical Transportation (lifts and escalators) and egress areas: CIRCULATION AREA PLAN CONCOURSE PART ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-500001ALL SUBMISSIONS CIRCULATION AREA PLAN CONCOURSE PART 2 ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-500002ALL SUBMISSIONS PLATFORM PSD, FURNITURE AND CLADDING SET-OUT, COMPONENT AND SIGNAGE SET-OUT, VT ELEVATIONS AND SET-OUT, TYPICAL CONCOURSE CLADDING ELEVATION, PUBLIC ART PLATFORM (1 OF 2) ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-518301ALL SUBMISSIONS PLATFORM (2 OF 2) ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-518302ALL SUBMISSIONS FLOOR, WALL AND CEILING JUNCTION DETAILS (INTERNAL AND EXTERNAL) CANOPY DETAILS ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-550001ALL SUBMISSIONS INTERNAL CLADDING DETAILS ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-550002ALL SUBMISSIONS INTERNAL CLADDING DETAILS ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-550003ALL SUBMISSIONS EXTERNAL CLADDING DETAILS ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-550004ALL SUBMISSIONS EXTERNAL CLADDING DETAILS ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-550005ALL SUBMISSIONS GLAZING DETAILS ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-550006ALL SUBMISSIONS CEILING AND SOFFIT DETAILS ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-550007ALL SUBMISSIONS BALUSTRADES AND STAIRS ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-550008ALL SUBMISSIONS DOOR DETAILS ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-550009ALL SUBMISSIONS SIGNAGE INTEGRATION AND BRACKET DETAILS ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-550010ALL SUBMISSIONS UNALLOCATED ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-550011ALL SUBMISSIONS PSD, FURNITURE & CLADDING SETOUT ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-550012ALL SUBMISSIONS UNALLOCATED ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-550013ALL SUBMISSIONS VT LIFT & ESCALATOR DETAILS ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-550014ALL SUBMISSIONS SKYLIGHT DETAILS ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-550015ALL SUBMISSIONS PAVING & FLOORING DETAILS ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-550016ALL SUBMISSIONS MISCELLANEOUS DETAIL DRAWING ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-550017ALL SUBMISSIONS ST. MARYS ROOM SCHEDULE 1/2 ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-800101SILVER/GOLD SUB. ST. MARYS ROOM SCHEDULE 2/2 ARCHITECTURAL DRAWING SMWSASSM-BMC-STM-AT-DRG-800102SILVER/GOLD SUB. AERIAL PHOTOREALISTIC PERSPECTIVE LOCATION OTHER TBC SILVER/GOLD SUB. AERIAL PHOTOREALISTIC PERSPECTIVE LOCATION OTHER TBC SILVER/GOLD SUB. AERIAL PHOTOREALISTIC PERSPECTIVE LOCATION OTHER TBC SILVER/GOLD SUB. PHOTOREALISTIC PERSPECTIVE OF STATION LOC. 2 OTHER TBC SILVER/GOLD SUB. PHOTOREALISTIC PERSPECTIVE OF STATION LOC. 4 OTHER TBC SILVER/GOLD SUB. PHOTOREALISTIC PERSPECTIVE OF STATION LOC. 5 OTHER TBC SILVER/GOLD SUB. PHOTOREALISTIC PERSPECTIVE OF STATION OTHER TBC SILVER/GOLD SUB. PHOTOREALISTIC PERSPECTIVE OF STATION OTHER TBC SILVER/GOLD SUB. PHOTOREALISTIC PERSPECTIVE OF STATION OTHER TBC SILVER/GOLD SUB. CONCEPT DESIGN REPORT PRIMARY SUBMISSION REPORT TBC SILVER/GOLD SUB. URBAN DESIGN RESPONSE REPORT TBC ALL SUBMISSIONS URBAN DESIGN RESPONSE REPORT TBC ALL SUBMISSIONS STATION PLAZA & PUBLIC DOMAIN REPORT TBC ALL SUBMISSIONS WAYFINDING AND SIGNAGE REPORT REPORT TBC ALL SUBMISSIONS DESIGN SKETCHBOOK OVERVIEW & BENCHMARKING REPORT TBC SILVER/GOLD SUB. CONNECTION AND INTERGRATION WITH FOOTBRIDGEREPORT TBC SILVER/GOLD SUB. MATERIALS SCHEDULE SCHEDULE SMWSASSM-BMC-LWD-AT-SCH-00001SILVER/GOLD SUB. REVIT MODEL OTHER TBC ALL SUBMISSIONS COVER SHEET ARCHITECTURAL DRAWING SMWSASSM-BMC-OHE-AT-DRG-000001 ALL SUBMISSIONS PRECINCT PLAN ARCHITECTURAL DRAWING SMWSASSM-BMC-OHE-AT-DRG-100001ALL SUBMISSIONSSCALE TBC SITE PLAN ARCHITECTURAL DRAWING SMWSASSM-BMC-OHE-AT-DRG-100002ALL SUBMISSIONSSCALE TBC REPORTS, SCHEDULES, SKETCHBOOKS, ETC. ORCHARD HILLS OHE DELIVERABLES DRAWINGS AND IMAGES BREIF SUGGESTED DRAWINGS AND DISCRETIONARY DRAWINGS BIM / MODELS GA PLANS SERIES 20 ELEVATIONS SERIES 40 RCP SERIES 21 KEY CIRCULATION AREAS PLANS (DETAILED PLANS)- SERIES 50 COMPONENT SET-OUT SERIES 51 SECTIONS SERIES 41 VISUALISATIONS please refer to Deliverables Summary for locations GRIMSHAW REVISION DRAWING COUNT SCHEDULES SERIES 80 ST.MARYS STM- DELIVERABLES BASED ON BREIFING DOCUMENT DRAWING INFORMATION AND COVER SITEWIDE PLAN & SECTION SERIES 11 TYPICAL DETAILS SERIES 55 PUBLIC DOMAIN & LANDSCAPE DETAIL EXTERNAL PLANS SERIES 30 GOODS SHED - SERIES 45 Project: Western Sydney Airport Line [SSTOM] Project No. 21163 Location code: LWD Stage: BID CONCEPT DRAFT - TO BE REVIEWED Date: 29/04/2022 Revision: 09 Author: GRIMSHAW - RM
DELIVERABLES DRAFT HUNTER STREET STATION [SYDNEY CBD]
SSTOM
Feb Mar Apr 14/02 21/02 28/02 07/03 14/03 21/03 28/03 04/04 11/04 W/C 18/04 25/04 02/05 09/05 16/05 23/05 30/05 May 06/06 Jun 23th Feb 2022
Sydney Office Melbourne Office Asmita Deshpande Carl Costantine Grace Rubinic Jaime Tran Luella Yu Mark Gilder Michael Crozier Phi Bui Mai Ross Goldsworthy Rory Morris Alexandra Griffeth Duana Fisher Eduard Ross Frank Thompson Matthew Hutton Malgorzata Haley Neil Stonell Robert Ventresca Roshani De Silva Will Nguyen Vincent Heru SILVER SUBMISSION GOLD SUBMISSION Friday 18 DAP Presentation DRAFT SSTOM RETROSPECTIVE GRIMSHAW 12TH MAY 2022 RETROSPECTIVE 16. Documentation I created for project coordination
17. Main Station Entry

MARTIN PLACE STATION

Project Type - Infrastructure - Rail

Project Cost - 1.5 Billion

Duration on Project - 2 Years

Project stage - DS2 - AFC

My Role:

My contribution to the project was to coordinate and design the Southern Hall and lead the Wet Areas package for the project. From the outset, I lead coordination meetings with multiple services and structures teams, produce coordination drawings, conduct design studies, and produce documentation for the Southern Hall. As the project developed, I was also appointed as package lead for wet areas. Each area required multiple design iterations and coordination with stakeholders, material and fixing selection, DDA compliance verification, documentation production, and client update presentations.

The Project:

Martin Place sits as a magnetic center, at the heart of the City of Sydney, an axis between the rich cultural heritage and the story of early Australia on Macquarie Street. Since the 1890’s Martin Place has played a vital role as a significant public space in the heart of the central business district of Sydney. Stacked over two levels under Martin Place, the Southern hall, the site I worked on, is a vibrant place of convergence. Linking multiple subterranean passageways together, offering access to the street above, east to the Eastern Suburbs Railway, down to the Metro platforms, and across to the eastern entry to the MLC.

SYDNEY METRO
18.
gateline
Southern Hall looking down to

19. Structural Coordination Drawings

The Southern Station Entry and Concourse coordination, with the many stakeholders, was a challenge due to the tight deadlines and quality expected from the client. This was made even more challenging due to covid forcing everyone into a new way of working, however, this did not change the expected quality or deadlines. This project was one of the most challenging I have worked on, not only due to short deadlines and comprehension of technical information but because of the design excellence that Grimshaw strives for. It is a project I am sure will be globally renowned once completed.

SYDNEY METRO s02 s02 s03 s03 sA sA sC sC sD sD s05 s05 s06 s06 s07 s07 s01 s01 sB sB s04 s04 s08 s08 sE sE sF sF s04 sA sB sC sD s05 s03 s01 s06 s07 s08 s02 sE sF wall required, then be aligned with current riser design. Stairs and landing slab edges be amended per Grimshaw's latest Revit submission. This wall no longer required for stair. Please Please amend slab edge, as there opening for stairs, the stairs have been Opening slab updated as per Grimshaw's latest design. Opening slab be updated per Grimshaw's latest design. 100 A0- - - - -000058_1 100 S_B2_ ARUP COO Wall moved by 375MM. Stairs and landing slab edges be amended per Grimshaw's latest Thickening of the wall is not acceptable, please review and let us know we can reduce encroachment within the public understanding the structural need, can be eccentric? Can rectangular? Please discuss options. Lift L09/L10 shatfs to be amended as per Grimshaw sketch 18167-0614_2 possible make this wall slightly eccentric the west allow for cladding zone? Opening slab to be further coordianated following BIM clash-detection sessions S_LG_ARUP COO sA sC sD S_B1_ARUP COO S_B2 sB sE sF Martin Place finishes thickness under review Beam vertical edge clashes with ceiling profile. Please adjust beam edges to be vertically straight reduce Clash with retail Beam considerably wider and deeper. The 700mm deep. Please check against services reticulation Beam width increased considerably. Space under the beam for cable traysMEP team confirm feasibility Tree Pit Tree Pit Tree sA SMSSMP - LG CASTLEREAGH SMSSMP - B1 SMSSMP - B2 Please join beam and floor extent (Revit join tool) Please join beam and floor extent (Revit join tool) Please join beam and floor extent (Revit join tool) Please join beam and floor extent (Revit join tool) 3900 +21.45 Please clarify what this element Tree Pit slab to be dropped 110MM. Beam depth under review. Beam depth can extended up S_LG_ARUP COO sA sC sD S_B1_ARUP COO FFL 17.550 m S_B2 sB sE sF Martin Place finishes Wall doesn't appear to be aligned with centersE considerably. Space under the beam for cable traysMEP team confirm feasibility Tree Tree Pit by13mm to achieve 150mm for services reticulation 'Pit wings' slabs be raised by 4mm achieve 380mm for services reticulation sA SMSSMP - CASTLEREAGHSMSSMPPlease adjust level/wall height junction Please join beam and floor extent (Revit join tool) Please join beam and floor extent (Revit join tool) Please join beam and floor extent (Revit join tool) Please join beam and floor extent (Revit join tool) and MEP impact www.grimshaw.global COO_Concourse Sections _Tree PitsMACQUARIE GROUP LTD - - - -Concourse Section_Tree Pits south 50 Concourse Section_North Pits -Red lines indicates Arup Structural Model [5.13] Overlay S_LG_ARUP COO FFL 22.650 sC sD S_B1_ARUP COO S_B2 FFL 13.000 sB sE Beam vertical edge clashes with ceiling profile. Please adjust beam edges vertically straight reduce width by 50mm on each Structural wall added due deletion of ground beam This slab used be 300mm, thickness, the ceiling services space reduced to 150mm only. Transfer beam added due deletion of ground beam sA sB sC sD-sE sF 50 A0 COO_Concourse Sections_sheetCSWSMP-MAC-SMP- -SKE-000069_1 Concourse Section_ between s02 and s03 is possible make this wall slightly eccentric the west allow cladding zone? Slab connection the beam be reviewed against LV3 Sub Station design and retail shutters allocation. -Red lines indicates Arup Structural Model [5.13] Overlay UP s02 s02 s03 s03 sA sA sC sC sD sD s05 s05 s06 s06 s07 s07 s01 s01 sB s04 s04 s08 s08 sE sF s04 sA sB sC sD s05 s03 s01 s06 s07 s08 s02 sE sF as per Grimshaw's request. Modifications as per request. Wall to be moved line with OSD fire stair wall. ARUP wall required. 350 ARUP confirm structural wall required, so then aligned with current riser design. aligned with NDY specifications. per Grimshaw's latest design. Stairs and landing slab edges amended as per Grimshaw's latest www.grimshaw.global 100 South ARUP Structural COO.02/04/19 - - - -100 S_LG_ARUP COO Wall moved 375MM. Wall moved by 851MM. Stairs and landing slab edges amended as per Grimshaw's latest Revit submission. Opening in slab be further coordianated following BIM clash-detection sessions s02 s02 s03 s03 sA sA sC sC sD sD s05 s05 s06 s06 s07 s07 s01 s01 sB sB s04 s04 s08 s08 sE sE sF sF s04 sA sB sC sD s05 s03 s01 s06 s07 s08 s02 sE sF Wall moved by 375MM. Modifications request. current structural drawings, please confirm still required. Column not on pile, therefore location confirmed once retail frontage finalised. Stairs and landing slab edges amended as per Grimshaw's latest 350 wall required, so then be aligned with current riser design. TZANNES confirm inteernal shaft clearance aligned with NDY specifications. Please amend slab edge, as there no opening for stairs, as the stairs have been Stairs and landing slab edges be amended as per Grimshaw's latest Revit submission. This wall longer required for stair. Please required structurally. Column not pile, therefore location confirmed once retail frontage finalised. Column is not on pile, therefore location flexible? not required, but an architectural cladding or fake column would be allocated architectural symmetry purpose. we reintroduced the slimmer? Opening slab be updated as per Grimshaw's latest design. Opening slab to be updated per Grimshaw's latest design. 100 @ A0CSWSMP-MAC-SMP- -SKE-000057_1 100 S_B1_ARUP COO This opening longer required B1. Thickening of the wall not acceptable, please review and know we can reduce encroachment within the public concourse space. Structural bridge viewed. Workshop be arranged by Grimshaw. Opening in slab to be further coordianated following BIM clash-detection sessions
20. Southern Hall Cut-Away Diagram

CSWSMP-MAC-SMN-AT-MOD-999920 22 17.06.2020

CSWSMP-MAC-SMN-AT-MOD-999921 87 17.06.2020

CSWSMP-MAC-SMN-AT-MOD-999922 86 17.06.2020

CSWSMP-MAC-SMS-AT-MOD-999911 68 16.06.2020

CSWSMP-MAC-SMA-TU-MOD-999901 28 17.06.2020

CSWSMP-MAC-SMN-ST-MOD-999900 72 16.06.2020

CSWSMP-MAC-SMS-ST-MOD-999900 65 17.06.2020

TDS3

SDESIGN

RSTAGE 4 SOUTH OSD 03.03.2020N/AN/A

QSTAGE

PDESIGN STAGE 2 PB/14.10.19KJ/16.10.19AC/21.10.19

s02 s03 sA sC sD s05 s06 s07 s01 sB s04 1 509801 1 509803 1 509802 Void Void Unpaid access to ESL FFL RL +21.16 (TBC) Flood gate subject to further review Shaft offsetting to adopt reticulation of 20sqm TVS Bridge Link Above 900mm Resting Zone at level below 5362 5438 12600 5438 5362 Escalators down to B2 Escalators up to street level Indicative location for future stair and lift to MLC s08 sE sF Potential Fire Shutter FRL 180mins to MLC link Smoke downstand concealed in ceiling ESL LINK ABOVE Tree pit C above Tree pit D above Tree pit A above Tree pit B above Tree pit C above Tree pit F above Tree pit G above Tree pit H above 12060 15400 3140 9440 6310 13500 7496 419808 1 419810 1 419809 3 419811 1 Hydrants not shown for clarity FFL +17.55 FFL RL +17.55 FFL +17.55 1 309901 2 309901 FFL +17.55 FFL +17.55 FFL +17.55 FFL +17.55FFL +17.55 FFL RL +17.55 FFL RL +17.55 FFL +17.55 FFL +17.55 FFL +17.55 FFL +17.55 419808 1 Main Distribution Frame (MDF) #1 S81.03 Waste Management Room S81.06 Waste Management S81.08 Building Management Facilities S81.10 Station Comms Cupboard S81.R38 BOH Corridor S81.16 Retail S81.RT14 Retail S81.RT13 Retail S81.RT12 Retail S81.RT11 Retail S81.RT10 Retail S81.RT08 Retail S81.RT07 Retail S81.RT01 Retail S81.RT02 Retail S81.RT03 Retail S81.RT04 Retail S81.RT05 Retail S81.RT06 S81.22 Retail toilets Male WC S81.23 Retail toilets Female WC Combined tunnel fan Tunnel Draft relief South end S81.R03 R-TV/DR-4 S81.13 BOH Corridor S81.12 Smoke Lobby E Outside air riser#1 S81.R09 Exhaust Air Riser#2 S81.R07 Retail Storage S81.14 S81.L11 Tower Goods Lift S81.L12 Retail Goods Lift Hydraulic and Fire Services Riser S81.R20 S81.04 BOH Corridor S81.21 Accessible WC Egress Stair Lobby S81.51 OSD Exhaust risers S81.R26 S81.R24 Station Comms Cupboard Egress Stair S81.S04 S81.R40 Diesel Fill Point riser S81.R35 Retail Hydraulic Riser Combined tunnel fan Tunnel Draft relief South end S81.R02 R-TV/DR-3 S81.S05 Egress Stair S81.LS7 MLC connection Lift S81.LS1 Station Lift S81.LS2 Station Lift S81.LS6 ESL Concourse Lift Void Void Station riser S81.R21 Cleaners Store S81.34 Retail Storage S81.02 Retail Storage S81.39 S81.01 Retail Storage OSD Mechanical Riser S81.46 Waste Management S81.07 S81.RT09 Retail S81.44 Retail Storage 3HR fire rated concrete ceiling to create Smoke Exhaust plenum in the dashed area Retail Services Area Retail Services Area Bathroom Vestibule S81.20 Egress Stair Lobby S81.29 OSD Mechanical Riser S81.R45 All Retail space floors to be fit-out by tenant Indicative location of glass frontage for retail unit where a retail shutter can't be allocated due to substation constraints above. Shopfront glass door to be provided. Retail Services Area Retail Services Area S81.33 BOH Corridor Escalators down to B2 FFL RL +17.55 FFL RL +17.55 ES6 ES7 ES8 ES9 ES1 ES2 ES3 ES4 Retail Headroom 2500mm due to substation above Retail Headroom 2500mm due to substation above Opening closed off with sealed BLK wall Retail Headroom 2600mm due to substation above 419809 1 Stair Pressurisation #1 S81.R47 Retail Services Area Retail Headroom 2600mm due to substation above Location of floor signage to indicate egress path Fire Shutter FRL 180mins to ESL link Retail Services Area Retail Services Area Retail Services Area Fall restraint balustrade to escalators to be min 1.5m. height Balustrade to void to be min 1.25m. height FHR-03 Roller Shutter door to Waste management FFL RL +15.75 e01 eA 419811 3 FHR-03 BEN-01 FH-01 FH-01 FH-01 FFL +17.55 FFL +17.55 FFL +17.550 FFL +17.550 FFL +17.552 FFL +17.550 FFL +17.552 Mail Room S81.05 HLP-02 HLP-02 Retail BOH partition is not part of base build. Indicative division between retail and adjacent services. Retail BOH partition is not part of base build. Indicative division between retail and adjacent services. Retail BOH partition is not part of base build. Indicative division between retail and adjacent services. Retail BOH partition is not part of base build. Indicative division between retail and adjacent services. Retail BOH partition is not part of base build. Indicative division between retail and adjacent services. FFL +17.475 FFL +17.550 4130 FFL +15.366 BIN-01 BIN-01 1:20 SLOPE Station Comms Cupboard S81.R39 BIN-01 3210 4100 RUN-OFF 9610 1 509807 2 509807 3 509807 FW FW FW 5 0 M A R T N P L A C E 50 MARTIN PLACE VOID Handover condition as built from TSEJV in this area, unknown -awaiting survey. Existing Telstra and HV conduits encasement SSL +17.705 Handover condition from TSEJV in this area unknown -awaiting survey. Ladder configuration and access requirements to be further developed with relevant authorites. Smoke downstand concealed in ceiling Retail Smoke Shutters at high level. Retail Smoke Shutters at high level. Min 75mm drainage cavity. Waterproofing detail by Arup. Please refer to Arup drawings and specification. FHR-02 FHR-03 Station - FOH Station - BOH Retail - FOH Retail - BOH OSD - FOH OSD - BOH Site Boundary Minimum Clear Opening [MCO] and Minimum Clear Excavation [MCE] as per revised A16 set model, SMCSWSMP-SMD-SMPID-MOD-000215.C.INF.C.01 LEGEND: Station - Rail Contractor Rooms DRAWINGS ARE BASED ON INFORMATION RECEIVED FILE NAME REVISION DATE 1000 1:100(A0) 2500 5000mm Key Plan N DESIGNER SIGN./DATE VERIFIED SIGN./DATE APPROVED SIGN./DATE STATUS: FILE No. DRAWN DESIGNED CHECKED VERIFIED APPROVED OF SHEET: DF 801*554 Plot Date & Time: C DRG No. EDMS No. This drawing and the related information have been prepared by, at the request of, Transport for NSW for specific purpose and may not be used for any purpose other than the purpose intended by Transpor for NSW. Transport for NSW does not provide any warrantiesan accepts no liability arising out of the use of this drawing or any of the related information for any purpose other than the intended purpose. This drawing is protected by copyright and no part this drawing may be reproduced any form without the express written permission Transport for NSW. CO-ORDINATE SYSTEM: HEIGHT DATUM: SCALE: AMD DESCRIPTION 8 H DRAWING COLOUR CODED -PRINT ALL COPIES IN COLOUR A0 GRIMSHAW GRIMSHAW 7 6 5 4 3 2 1 J K L G E D C B A F 9 10 11 12 13 14 15 16 H J K L G E D C B A F 8 7 6 5 4 3 2 1 9 10 11 12 13 14 15 16 Disclaimer: Do not scale from drawing. Use marked dimensions. To be read in conjunction with all other Consultant's drawings. The Architect to be immediately notified of any other discrepancies. Copyright on this drawing to be retained by the Architect. To be read in conjunction with General Notes located on CSWSMP-MAC-SMA-AT-DRG-009807 Package to be read in conjunction with Design Stage 3 (SMP-600) refer to "Technical Architectura Design Report" (CSWSMP-MAC-SMA-AT-REP-949902). NOT FOR CONSTRUCTION
T 29/06/2020 4:02:44 PM
GENERAL ARRANGEMENT PLANS
PLAN -UPPER CONCOURSE (SHEET 1)
-MARTIN PLACE
1 : 100 B1 South Upper Concourse 1
24.06.2020 22.05.2020 26.05.2020 19.06.2020 R. MORRIS R.SEYMOUR M.GILDER A.CORTESE DESIGN STAGE CSWSMP-MAC-SMP-AT-DRG-308111
LEVEL B1
SYDNEY METRO
1:100 (A0) 12 19.06.2020 P.BYRNE
4 OSD LL REDSTICK SUBMISSION PB/05.12.19KJ/10.12.19AC/13.12.19
STAGE 3 WAVE 2 RED STICK N/AN/AAC/26.05.20
WAVE 2 GREENSTICK PB/03.07.20N/AN/A

Working as the wet area package lead came with many challenges, as these areas were neglected for the majority of the project. Once I began to develop the designs in detail, I uncovered an array of issues, including clashes with the structure to access non-compliances to name a few. A redesign was needed for all five unique areas. Due to the limited space within the Martin Place shafts, I needed to design to extremely tight tolerances and ensure I met all Australian and metro Standards. Despite this, it gave me great experience in coordinating, developing, detailing, and delivering of specific spaces within the station and resulted in a design that has been used as a benchmark for other stations.

SYDNEY METRO
21. Metro Super Standard Bathroom Visual 22. Metro Super Standard Bathroom Construction Photo 23. Metro Super Standard Bathroom Axos

CSWSMP-MAC-SMP-SS-MOD-999905

sA sA sE sE 2 618112 12 S81.23 Retail toilets Female WC S81.21 Accessible WC 618112 8 451 915 920 Ambulant Cubicle Ambulant Cubicle Diesel Fill Point riser Refer to drawing CSWSMP-MAC-SMP-ST-DRG-878101 for FRL around Diesel Fill Point riser C C C C C L SOP L C C C 468 900 632 174 778 FLR-402 C C C 6 TOD: FFL -15mm FALL FALL TOD: FFL -10mm FFL 0.00 FFL -15mm FFL -15mm FFL 0.00 SOP FLR-402 S81.20 Bathroom Vestibule C 460 C S81.22 Retail toilets Male WC FLR-402 SOP 618112 9 1800 1178 900 FIX-RAL-01 FIX-RAL-05 FIX-DIS-02 FIX-DIS-02 FIX-TOI-01 FIX-TOI-17 FIX-DIS-02 FIX-TOI-01 FIX-TOI-17 FIX-RAL-03 FIX-TOI-02 FIX-TOI-17 FIX-TAP-07 FIX-URN-01 FIX-URN-01 FIX-URN-01 FIX-URN-01 FIX-DIS-02 FIX-TOI-01 FIX-TOI-17 FIX-DIS-02 FIX-TOI-01 FIX-TOI-17 FIX-DIS-02 FIX-TOI-02 FIX-TOI-17 FIX-TAP-07 FIX-TOI-01 FIX-TOI-17 FIX-DIS-02 FIX-TOI-01 FIX-TOI-17 FIX-DIS-02 FIX-TOI-01 FIX-TOI-17 FIX-DIS-02 FIX-DRY-02B FIX-DRY-02B FIX-TOI-03 FIX-DIS-01 FIX-DRY-02B FIX-HOK-01 FIX-BCT-01 FIX-TAP-03 FIX-BAS-02 FIX-MIR-03A FIX-TOI-20-J FIX-DRA-02 FIX-DRY-02B FIX-DRY-02B FIX-DIS-05 FIX-TAP-08 FIX-BAS-03 FIX-MIR-02G FIX-DIS-05 FIX-TAP-08 FIX-BAS-03 FIX-DIS-05 FIX-TAP-08 FIX-BAS-03 FIX-BIN-05 FIX-BIN-05 FIX-BIN-05 FIX-BIN-05 FIX-BIN-05 FIX-TAP-08 FIX-DIS-05 FIX-TAP-08 FIX-DIS-05 FIX-DIS-05 FIX-BAS-03 FIX-DRY-02B FIX-BAS-03 FIX-TAP-08 FIX-DRA-02 FIX-DRA-02 FIX-DRA-02 524 720 FIX-DRA-02 FIX-MIR-02M FIX-MIR-02N JOF-303 JOF-303 FIX-MIR-02E JOF-303 450 915 923 314 138 908 915 918 909 915 918 451 915 920 455 670 700 700 320 700 700 700 TOD: FFL -15mm FIX-RAL-04 C FIX-DIS-02 FIX-BIN-05 FIX-BIN-05 910 FIX-DRY-02B 4 8 0 5 5 5 1 2 RAL 1070 248 FIX-CUB-01 FIX-URN-03 FIX-URN-03 FIX-URN-03 SOP C B O R O N F C E 5 5 FIX-CUB-01 1 C U B T O R O N A C E 6 SOP ALIGN ALIGN ALIGN C D IS 7 1 908 915 918 571 600 420 600 2000 135 619916 619916 619916 619916 619916 FFL +17.55 FFL +17.55 FFL +17.55 FFL +17.55 COF COF COF L 618111 7 618112 11 10 FIX-RAL-03 FIX-RAL-04 FIX-DIS-06A FIX-DIS-06A 482 150 750 150 468 22 619916 619916 619916 1. FLOOR WASTES TO BE CONFIRMED BY HYDRAULICS CONTRACTOR 2. ALL WALL TILES TO FOLLOW AND ALIGN WITH FLOOR LE SETOUT 3. WATER CLOSET AND GRAB RAIL INSTALLATION TO COMPLY WITH AS 1428.1 4. MARINE GRADE PLYWOOD NOGGINGS MAY BE REQUIRED FO FIXTURES AND FITTINGS. TO BE PROVIDED BY NOMINATED CONTRACTOR. 5. FIXTURES SET-OUT FROM GRID LINE OR WALL FINISH ACE. REFER TO 89 6. REFER TO SERIE 89 FOR DOOR SET-OUTS 7. REFER TO SERIES 31 FOR CEILING SET-OUT 8. ACCESS PANELS IN WALLS TO BE COORDINATED WITH AP SUPPLIER AND ARCHITECT PRIOR TO INSTALLATION 9. REFER TO SERIES 66 FOR JOINERY DETAILS 10. FOR ALL WET AREAS, PROVIDE STRUCTURAL NOGGINGS FOR WALL MOUNTED SANITARY FITTINGS FIXTURES. 11. EOTF WET AREAS TO BE READ CONJUNCTION WITH ERIES 65 DETAILED ROOMS GENERAL NOTES DRAWINGS ARE BASED ON INFORMATION RECEIVED FILE NAME REVISION DATE CSWSMP-MAC-SMN-AT-MOD-999920 CSWSMP-MAC-SMN-AT-MOD-999921 CSWSMP-MAC-SMN-AT-MOD-999922 CSWSMP-MAC-SMS-AT-MOD-999911 CSWSMP-MAC-SMA-TU-MOD-999901 CSWSMP-MAC-SMN-ST-MOD-999900 CSWSMP-MAC-SMS-ST-MOD-999900
2500 5000mm Key Plan DESIGNER DATE/SIGN. VERIFIED DATE/SIGN. APPROVED DATE/SIGN. STATUS: FILE No. DRAWN DESIGNED CHECKED VERIFIED APPROVED OF SHEET: DF 801*554 Plot Date Time: DRG No. EDMS No. This drawing and the related information have been prepared by, at the request Transport for SW for specific purpose and may used for any purpose other than the purpose intende Transport for NSW. Transport NSW does not provide any warrantiesand accepts liability arising the use this drawing any the related information any purpose other than the intended purpose. This drawing protected by copyright and no part this drawing may be reproduced any form without the express ritten permission Transport for NSW. CO-ORDINATE SYSTEM: HEIGHT DATUM: SCALE: AMD DESCRIPTION DRAWING COLOUR CODED -PRINT ALL COPIES IN COLOUR A0 GRIMSHAW GRIMSHAW 7 5 3 1 10 11 12 13 14 15 16 G Disclaimer: Do not scale from drawing. Use marked dimensions. To read in conjunction with all other Consultant's drawings. The Architect to be immediately notified of any other discrepancies. Copyright on this drawing to be retained by the Architect. To be read conjunction with General Notes located on CSWSMP-MAC-SMA-AT-DRG-009807 142 183 165 201 104 251 248 83 29/04/2022 29/04/2022 29/04/2022 26/04/2022 25/02/2022 22/04/2022 22/04/2022 25/01/2022 DCR ITEMS DATE [YY.MM.DD] -DESCRIPTION DATES FORMAT: YY.MM.DD 29/07/2022 4:22:11 PM R.MORRIS CSWSMP-MAC-SMP-AT-DRG-618110 WET AREAS RETAIL TOILETS -B1 SOUTH (SHEET 1) SYDNEY METRO -MARTIN PLACE 1:20 (A0) C.CASTILLO 15.01.2021 12.06.2020 29.07.2020 29.07.2022 11.10.2021 M.GILDER M.JANEKE A.CORTESE RETAIL TOILETS -B1 SOUTH (SHEET 1) 1 20 B1 South Retail Toilets_Plan 1 6DCRQST-000417 AFC SMP-601 APPROVED 22.07.28/CC N/A N/A 5DCRQST-000373 AFC SMP-601 APPROVED 22.06.01/CC N/A N/A 4DCRQST-000359 AFC SMP-601 APPROVED 22.05.09/CC N/A N/A 3DCRQST-000205 AFC SMP-601 APPROVED 21.10.11/CC N/A N/A 2DCRQST-000195 AFC SMP-601 APPROVED 21.09.27/CC DCAQST-000417 [Item 2]22.07.27 Soap refill point added DCAQST-000417 [Item 2] DCAQST-000417 [Item 2] DCAQST-000417 [Item 2] 200 PLASTERBOARD BULKHEAD FIXED TO SUSPENDED CEILING SYSTEM CONCEALED LINEAR LIGHT -LENGTH TO MATCH IWP LENGTH. REFER TO ELECTRICAL DOCUMENTATION CLG-102 ILG-414 FIX-MIR-02G ALIGN 150 131 145 SHADOWLINE P50 STOPPING BEAD PAINTED TO MATCH CEILING FCL FCL ILG-401 BLACK PAINT FINISH TO EXPOSED PLASTERBOARD FACES BLACK FLANGELESS GRILL FOR SUPPLY AIR DUCTWORK -REFER TO MECHANICAL DOCUMENTATION TILES INSTALLED UP TO PELMET FCL CLG-102 REFER TO 61-SERIES DRAWINGS FOR WALL FINISHES CEILING SUSPENSION SYSTEM SHADOWLINE P50 STOPPING BEAD PAINTED TO MATCH CEILING REFER TO 89-SERIES DRAWINGS FOR WALL DETAILS FCL FULL TILE SHOWN IN PROJECTION PLASTERBOARD BULKHEAD FIXED TO SUSPENDED CEILING SYSTEM CONCEALED LINEAR LIGHT -LENGTH TO MATCH IWP LENGTH. REFER TO ELECTRICAL DOCUMENTATION FORMED SLOT IN PLASTERBOARD FOR TOILET EXHAUST -REFER TO MECHANICAL DOCUMENTATION REFER TO 61-SERIES DRAWINGS FOR WALL FINISHES REFER TO 89-SERIES DRAWINGS FOR WALL DETAILS TILED INSTALLED UP TO PELMET FCL AS MINIMUM OR NEXT FULL TILE FULL TILE SHOWN IN PROJECTION SHADOWLINE P50 STOPPING BEAD PAINTED COMPACT LAMINATE CEILING SUSPENSION SYSTEM CONTINUOUS 200MM WIDE RESTRAINED PLYWOOD BATTENT FOR PANELS FIXING PACKING REQUIRED FOR RECESSED INSTALLATION OF PARTITION FIXING CONCEALED CEILING GRID SYSTEM FCL 30 3 3 3 3 300 210 approx.clear C L CL CL Sensor tap controller box and associated GPO 300 REFER TO ELEVATION SERIES 61 FOR SET-OUT ACP-01G ACP-04B ILG-401 92MM STEEL STUD FRAME BOTH ACP ALIGNED AT SAME CENTERLINE HEIGHT. ACP-01G 595X295MM TILED ACCESS PANEL. ACP-04B BEHIND 540X240MM 2HRS FIRE RATED ACCESS PANEL FOR FIXTURES IN WALL CAVITY 92MM STEEL STUD FRAME 28MM FURRING CHANNEL, 13 +13 PLASTERBOARD (PACKED AS REQUIRED) 6MM MIRROR ADHESIVE FIXED TO BACKING PLASTERBOARD TIMBER PACKER TO SUPPORT STONE SHELF ANODISED ALUMINIUM C SECTION -20MM WALL BUILDUP AND DETAILS VARIESREFER TO SERIES 89 FIXING AS PER MANUFACTURES'S SPECIFICATIONS 16+16MM FIRE RATED PLASTERBOARD 16 22 20 ILS-54A FIX-BAS-03 SOAP BOTTLE SHOWN INDICATIVELY DASHED. 23 ACP-01G CLEAR 250 23 20 ACP-04B CLEAR 200 20 PORCELAIN LARGE FORMAT TILE (NO JOINTS) ADHESIVE TO BACKING PLASTERBOARD ILG-413 TOP OF SHELF 1100MM AFFL JOF-303 ILG-414 SOAP BOTTLE INSTALLATION INSTALLED WITHIN WALL CAVITY LOWER THAN AP TO ALLOW ACCESS AND MAINTENANCE AS PER SUPPLIERS RECCOMENDATIONS CL 27 140 124 64 10 400MM MIN HIGH BLACKOUT PLYWOOD PANEL AT THE BACK OF STUD, FOR FIXTURES (CONTROLLER BOX + SOAP DISPENSER + GPO) INSTALLATION. SENSOR TAP CONTROLLER BOX 400 INDICATIVE REPRESENTATION OF FLEXI DUCT CONNECTING SOAP BOTTLE AND REFILL POINT F I X T U R E S C L 1 0 0 TOP OF SHELF 1100MM AFFL JOF-303 H G E D C B A F 8 7 6 5 4 3 2 1 9 10 1 : 5 DET SECTION -RETAIL AMENITIES IWS PELMET_GRILLE 1 1 5 DET SECTION_ RETAIL AMENITIES CEILING_TYPICAL 2 DET SECTION -OSD PELMET DET SECTION_ TOILET 1 : 5 DET_ELEVATION OSD TILED ACCESS PANEL (PERFORMANCE W 6 1 : 5 DET SECTION -B3 FEMALE IWP ACP INTERFACE 4 SYDNEY METRO 24. Public Amenities in Southern Hall - Set Out Drawing and 3D 25. Public Amenities - Fixings Detail 26. Station Amenities - Visuals

RCCQ TOWERS

Project Type - Commercial - Towers

Project Cost - 4.9 Billion (USD)

Duration on Project - 6 Months

Project stage - DS1

My Role:

My role on the project, with CL3 as the interior architectural designer, was to develop the interior lobbies and entryways of the office and residential towers, lift lobbies, and the grand ballroom. With the support of William Lim, Founder and Director of CL3, I led the design packages of these spaces, coordinated with various stakeholders, and led in-person presentations to clients and stakeholders, including Moshe Safdie himself. This project gave me great insight into the design process of high-end hotel and residential towers, as well as my first experience leading design packages on a project.

The Project:

Located at the confluence of the Yangtze and Jialing rivers, Raffles City Chongqing was designed in collaboration with world-renown architect Moshe Safdie, who drew inspiration from the region's thousand years of waterway transportation culture to create an image of powerful sails upon the river for Raffles City Chongqing to symbolize the host city’s surging growth. The project entails a shopping mall, office spaces, residential apartments, a luxury hotel, and the iconic sky garden.

COMMERCIAL TOWERHONG KONG
27. Sky Bridge Lounge
COMMERCIAL TOWERHONG KONG 28. Commercial Lobby Portico Photo 29.
30. Commercial Lobby
Grand Dining Hall Render
Design Study

H QUEENS GALLERY

Project Type - Commercial - Towers

Project Cost - 4.9 Billion (USD)

Duration on Project - 8 Months

Project stage - DS1

My Role:

When I joined the project it was in the early design phase, so I worked to develop the overall form of the building, its interface with the different levels and laneways in the public realm, and the cladding design. I coordinate the structural design, environmental design, signage, entry lobby, and facades. Additionally, I lead the rapid prototyping of models and visualizations. H Queens was one of a few commercial projects I got the chance to work on at CL3.

The Project:

Situated on Queens Road Central, the heart of Hong Kong's high-end shopping district, the design concept aimed to stand out from the standard Hong Kong skyscraper. This was achieved by its creative cladding design and its distinct cutaway form. The building functions as a series of large open gallery spaces for local artists, high-end retail units on the lower levels, bars, and restaurants including a rooftop bar.

COMMERCIAL TOWERHONG KONG
31.
Street
Photo of H Queens from Pottinger

Since its completion in 2017, it has won an array of different awards, including Hong Kong Green Building Council 2020 BEAM Plus, Asia Property Awards 2018 - Best Retail Development, Best Universal Design Development, and certified as a Gold Level LEED building, to name a few.

COMMERCIAL TOWERHONG KONG
32.
33.
34. H Queens Rear Facade - Render 35. H Queens Rear Facade - Photo 36.
Drawing
H Queens Commercial Entry - Render
H Queens Commercial Entry - Photo
H Queens Entry Awning -

THANK YOU

RORY
ARCHITECTURAL PORTFOLIO
MORRIS