P O R T F O L I O 1
Rohit Sohale
Date of birth 2/12/2000
I am Rohit Sohale , an Architecture Undergraduate from the MIT, Aurangabad, India. I have always been extremely intrigued by buildings, spaces and the general sense of aesthetics that these spaces embody which sparked my interest to pursue the subject. My college has contributed in nurturing me as a budding architect. My hard work and passion have propelled me forward in this direction. I think designs can make difference and creative solutions can be to achieved to modern architecture challenges to bring change. So I am looking forward to this opportunity to be part of such change. My portfolio shows my 4 years of work as a student and intern showcasing my interests and skills.
EDUCATION
INTERESTS
HINDI ENGLISH MARATHI
SKILL SET
2 contact
+91 9518950208
Aurangabad, Maharashtra rohitsohale9@gmail.com
SKILLS 2017 SSC 10th ( Trimurti pawan pratishthan , Newasa maharashtra (MH) 2019 HSC12th Trimbakdas junior college Aurangabad (MH) 2019 to present B.Arch. MIT, Aurangabad, Maharashtra (MH) S O F T W A R E S
L
A N G U A G E S
3 Pg no. 4 01MASS HOUSING 02 MUSEUM Pg no.10 03 CAMPUS DESIGN Pg no.13 04 WORKING DRAWING Pg no.18 Pg no.22 05 PHOTOGRAPHY
RESIDENTIAL 4 01
MASS HOUSING
LOCATION OTHER
: Near Shahnoor Miya Dargah, Osmanpura road. Shahnoorwadi, Aurangabad, Maharashtra.
Site is surrounded by overcrowded residential and commercial development towards east and has an open playground towards west of the site.
SITE AREA: 49721 Sqm.(approx.)
N 24MWIDEROAD 24 M WIDE ROAD 9 M WIDE ROAD ENTERENS ENTERENS ENTERENS SITE PLAN SITE PLAN SITE SECTION PARK ROW HOUSE COMMERCIAL BUILDING BANGALORE PRIMARY SCHOOL AMENITIES MIG 2BHK APARTMENT LIG 1BHK APARTMENT
DETAILS
5
GROUND LEVEL 0. 1ST FLOOR 3000 2ND FLOOR 6000 3RD FLOOR 9000 4TH FLOOR 12000 5TH FLOOR 15000 6TH FLOOR 18000 7TH FLOOR 20695 8TH FLOOR 24000 9TH FLOOR 27000 10 TH FLOOR 30000 11th FLOOR 33000 TARRACE 36000 PARAPET WALL 37000 1) LIVING ROOM 4.5X4 2) KITCHEN 3X3.5 3) BEDROOM 1 4X3.5 4) BEDROOM 2 4X4 5) UTILITY AREA 2X1.2 6) WC COM 1 2.1X1.2 7) ATTACH WC 2 1.5X2.1 8) BALCONY 1 4X1.2 9) BALCONY 2 4X1.2 10) BALCONY 3 3.4X1.2 11) STORE ROOM 1X1.2 1 2 3 4 5 6 7 8 9 10 A A TYPICAL FLOOR PLAN SECTION A’A’ M I G A P A R T M E N T 2 B H K 11 6
SECTION A’A’ L I G A P A R T M E N T A A 1 2 3 4 5 6 1 B H K 1) LIVING ROOM 3.6X3.8 2) KITCHEN 3.5X3.8 3) BEDROOM 3.5X3.5 4) UTILITY AREA 1.2X1.8 5) WC 1.5X2.5 6) BALCONY 3.8X1.5 7
FLOOR PLAN SECTION A’A’ LINIEL LEL 2550 1ST FLOOR 3600 SILL LEL 1 4500 LINIEL LEL 1 6000 STAIRCASE TOWER 9750 GROUND LEL PLINT LEL 450 SILL LEL 1350 TERRACE LEL 6750 PARAPET WALL 7750 1) LIVING ROOM 3.7X4.12 2) POOJA ROOM 1.2X2.4 3) KITCHEN 3.8X5.7 4) DINING 3X2 5) STORAGE ROOM 1.3X1.7 6) UTILITY AREA 1.3X2.5 7) COMMON TOIET 1.5X1.8 8) BEDROOM 1 3.8X3.8 9) BEDROOM 3.6X5.8 10) ATTACHED TOILET 1.5X2 11) BEDROOM 3 3.8X6 12) BEDROOM 4 3.8X3.8 13) GYM 3.6X5.8 14) BALCONY 4X1.2 15) TERRACE GARDEN 4X1.2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 10 7 A A B U N G L O W 4 B H K GROUND FLOOR FIRST FLOOR 8
PLAN SECTION A’A’ GROUND FLOOR FIRST FLOOR 1ST FLOOR 3600 STAIRCASE TOWER 9750 GROUND LEL 0 PLINT LEL 450 TERRACE LEL 6750 PARAPET WALL 7750 A A 1 2 3 4 5 6 7 8 4 6 9 1) LIVING ROOM 4.5X3 2) KITCHEN 3.3X3 3) BEDROOM 1 3.3X3.5 4) ATTACHED TOILET 1.2X1.8 5) UTILITY AREA 3X1.8 6) COMMON TOIET 1.5X2.5 7) BEDROOM 2 3 3X3 8) BEDROOM 3 3.3X3.5 9) TERRACE GARDEN 4.5X3 R O W H O U S E 3 B H K 9
MUSEUM PUBLIC BUILDING 10 02
PRIVATE ZONE AUDITORIUM
GALLERY’S LIBRARY PARKING
PLAN ENTRANCE LOCATION
DETAILS:
11
OAT
SITE
OTHER
Near Dr. Babasaheb Ambedkar Marathwada University, Aurangabad, opp. Main University Gate. the Kham River on east side of the plot, flows from north-east to south-west direction. SITE AREA: 50633 Sqm.(approx.)(12.511 Sqf.)
A A 1 ENTRANCE LOUNGE 2 WAITING LOUNGE 3 GENERAL TOILETS G1 MANUSCRIPTS 500 SQM G2 SOCIETY / CULTURE G3 MUSICE AND ART G4 PAINTING AND OHOTOGRAPHY G5 SCULPTURE G6 LITERATURE G7 TEXTILE / FABRIC G8 POLITICS G9 ECOLOGY G10 ARCHEOLOGY G11 SCIENCE G12 CALLIGRAPHY 5 FOOD COURT [595 sq m] 6 LIBRAR [600 sq m] 7 BOOK STALL [150 sq m] 8 AUDIOVISUAL 200 sq m 9 FISH AQUARIUM 200 sq m 10 AUDITORIUM 500 sq m 11 AUDIOVISUAL 150 sq m 12 OFFICE 13 CONFERENCE ROOM 14 VIP LAUNGE 15 PRO CABIN 16 SECURITY OFFICE 17 DEPARTMENTAL STORE 2 1 3 4 3 4 G1 G2 G3 G4 G5 G6 G7 G8 G9 G10 G11 G12 5 5 6 8 9 7 10 11 12 4 4 4 3 3 3 13 14 15 16 17 18 19 20 21 12
03
CAMPUS
13
GROUND
HOSTEL BLOCK BOYS
FACULTY HOUSING
ADMINISTRATION
HOSTEL
LIBRARY
ACADEMIC
DINING
MANAGEMENT CENTRE AUDITORIUM O.A.T SITE PLAN 14
BLOCK
BLOCK GIRLS
BLOCK
BLOCK
BLOCK
1)ENTRANCE 6M WIDE 2)RECEPTION AREA 3)DISCUSSION ROOM 605q.M 4)COMMON TOILET 50sq.M 5)SERVICE ROOM 20 sq.M 6)PANTRY AREA 20sq.M 7)COURTYARD 8)CONFERENCE AND MEETING 100sq.M 9)HOD CABIN 50sq.M 10)ASSOCIATE PROFESSOR 15sq.M 11)ASSISTANT PROFESSOR 15sq.M 12)STAFF TOILET 28sq.M 13)STAIRCASE 2M WIDE 14)INTERACTIVESPACE 20 sq.M 15)CLASSROOM 171sq.M 16) CLASSROOM LOBBY 30sq.M 11 11 11 11 11 11 11 11 11 11 10 10 9 9 8 12 12 7 7 7 5 6 4 4 13 13 3 3 1 2 15 15 15 15 14 14 10 10 16 16 16 16 -+0.0LVL 1 2 3 3 4 4 5 6 7 7 7 8 9 9 10 10 10 10 11 11 11 11 11 11 11 11 11 11 12 12 13 13 14 14 14 14 15 15 15 15 15 15 16 16 16 16 16 16 -+0.0LVL A A FLOOR PLAN A C A D E M I C B L O C K FRONT ELEVATION 15
GROUND LEVEL 0 PLINTH LEVEL +900 SIL LEVEL +1800 ROOF LEVEL 5000 LINTEL LEVEL 3000 1 1 1 1 1 1 1 2 2 3 3 3 3 3 3 4 5 5 5 5 5 5 5 6 7 7 7 7 7 7 7 8 8 9 10 11 10 11 12 12 13 14 15 16 17 18 18 19 20 21 A SECTION A’A’ A D M I N I S T R A T I O N B L O C K FLOOR PLAN FRONT ELEVATION 1)ENTRANCE 2)RECEPTION 3)WAITING AREA 4) ENQUIRY ROOM 44sq.M 5) PANTRY ROOM 20sq.M 6) ADMINISTRATION OFFICE 139sq.M 7 PRIVATE TOILET 8sq.M 8)DINING 9)ADMISSION OFFICE 132sq.M 10) MEETING ROOM 45sq.M 11) CONFERENCE ROOM 45sq.M 12) COMMON TOILET 63sq.M 13)ACCOUNTANTS OFFICE 35sq.M 14) STUDENT COUNSELLING 22sq.M 15) ACCOUNTS DIVISION 56sq.M 16) STUDENT SECTION 103sq.M 17) ACHIEVE ROOM 30sq.M 18) TRUSTEES CABIN 40sq.M 19) VIP ROOM 30sq.M 20)SUPERVISOR CABIN 30sq.M 21) PRINCIPAL CABIN 50sg.M 16
FLOOR PLAN GROUND
TYPICAL FLOOR PLAN ROOM AREA 30sq m A A
FRONT ELEVATION H O S T E L B L O C K 17
FLOOR
SECTION A’A’
WORKING DRAWING
FRONT SIDE ELEVATION
18 04
C27,C28,C29,C30,C31,C32
C23,C24,C25,C26
C17,C22
C21,C18
C3,C4,C5,C6
C16 C8,C14,C22,C23 C31 C7,C13 C21 C6,C12 C26 C25 C5,C20 C4,C19 C29 C24 C23 C3,C11 C18 C2,C10 C28 C1,C9,C17,C27 C15 19
F.T 06 F.T 06
F.T 04 F.T 04
F.T 06 F.T 05
F.T 02
F.T 03
F.T 01 F.T 07
F.T 02
F.T 04 F.T 05 F.T 06 F.T 06 F.T 06
F.T 04 F.T 03
SECTIONS
20
BB'
LANDING LEV. WAIST SLAB 165MM THK LANDING AT PLINTH LEVEL P.C.C SOLING 12@6Nos EXTRA TOP 8@150mmc/c DIST STEEL 12@6Nos EXTRA TOP 12@6Nos EXTRA TOP 12@6Nos EXTRA TOP 12@6Nos EXTRA TOP WAIST SLAB 165MM THK WAIST SLAB 165MM THK WAIST SLAB 165MM THK WAIST SLAB 165MM THK LANDING LEV. LANDING LEV. LANDING LEV. LANDING LEV. 21
22
23 THANKYOU!!!!